Shell
THE BIG MOVE:
MISSION COMPLETED.
Houston is well-known for historic missions. Since 1961,
it has been the hometown of the Lyndon B. Johnson Space
Center, responsible for the flight control of US manned
space programs such as the Space Shuttle, Apollo
and Gemini. State-of-the-art technology, years of training
and rigorous preparations were the critical success
factors of more than 160 space flights.
BEST PRACTICES
38
Shell data center relocation
Houston
headquarters
—
Copyright © Free Vector Maps.com
Photos:F1online,JRobbinsPhotography
<Copy> Thorsten Rack
TODAY, THERE ARE STILL MISSIONS,
involving state-of-the-art technology and
rigorous preparations, that begin in Texas’s
largest city and end with a smooth landing.
One of them is a recent project undertaken
by T-Systems for Shell.
Accordingtothe2015listoftheFortune
500, Shell is the fifth largest company in the
world. German ICT specialist T-Systems has
been providing Shell sites worldwide with
computing power and storage since 2008
– operating from four global data centers in
the Netherlands, Malaysia, the US and
Germany.
However, Shell’s US data center, the
Houston Information Center, was built over
forty years ago. A good reason for Shell,
being a frontrunner in the use of advanced
technologies and innovative approaches, to
move to a new, more advanced datacenter.
InMarch2014,acontractwassignedforthe
Houston Information Center Accelerated
Exit Migration Program, the largest under-
taking of its kind in the company’s history.
OVER 100 BUSINESS-CRITICAL
SERVICES, BUT ONLY ONE
DESTINATION
For the relocation to the Houston West data
center, clearly defined goals were set out by
Shell IT leadership: no disruptions, no down-
time, and Phase 1 was to be completed by
the end of June 2015. T-Systems’ task was
not just to migrate IT resources to the new fa-
cility, but also to decommission and dispose
of old property. This comprised no less than
69 business-critical IT application land-
scapes and more than 7,000 IT infrastruc-
ture assets (e.g. servers, storage filers,
switches and racks) on 3,500 square meters
of raised floor space. It was a huge project,
so John Kiest, Program Director at T-Systems
USA, put together an international team
comprising as many as 220 T-Systems pro-
fessionals to master it. As Kiest reported,
“The goal for Phase 1 was to move all Shell
business-critical landscapes and 102 essen-
tialITservices.Thisincludedapplicationsfor
oil production and energy trading, and two
large SAP landscapes for Shell’s Down-
stream Business Unit in the US”.
15 months and over 7,166 man days
later, Kiest and his team proudly declared
Self-check
You want to move to another
data center? Here are some things
you should do:
1. Identify all the hardware
and software that needs
to be moved from one data
center to the other.
2. Determine site architecture
and design specifications based
on the “footprint” required in
the new data center.
3. Complete capex approvals
for required new equipment.
4. Submit procurement
requests.
5. Complete high-level design
for the migration architecture
and processes based
on the estate to be moved.
6. Commence migration planning
based on the high-level
design and the agreed-upon
migration paths.
7. Begin staffing up the
teams (as required) to do
the migration work.
8. Complete migration wave
planning and set it out in
writing.
9. Begin to execute
migration waves in
accordance with plan.
10. As waves complete, do the
necessary logical and
physical decommissioning
and disposal.
Contact us for more
information
Konrad.Bauer@t-systems.com
this mission accomplished. “Apart from two
agreed step-outs, we completed the migra-
tion of all Shell’s business-critical services
to the new data center on time, and under
budget – without a single situation,” said
Kiest. “Our success was down to careful
planning, and close collaboration and com-
munication among all participating teams
– including Shell and our technology part-
ners, HP and AT&T.” Each and every step
was carefully defined, agreed, prepared
and executed – with a consistent focus on
always making sure someone was in
charge, and someone was on duty. This in-
cluded weekends, when all stakeholders
had to maintain sufficient resources avail-
able 24 hours a day to be able to intervene
if there were complications.
NEW VIRTUALIZATION
TECHNOLOGY MINIMIZES
TESTING EFFORT
Phase 2, which began immediately after
Phase 1, was no less strenuous: the busi-
ness-critical IT landscapes had been suc-
cessfully migrated. But now the team had to
tackle the remaining systems and decom-
mission and dispose of the legacy assets in
order to allow Shell to put the building on the
market for sale. “This meant handling an IT
volume that was five to six times greater. But
we had far less time than in the previous
phase,” emphasized Kiest, “So we thought
about how we could migrate the maximum
number of services with the leanest possible
process.” They were assisted by an innova-
tive network technology recommended by
T-Systems colleagues in Germany: Cisco’s
Overlay Transport Virtualization. This solu-
tion enabled T-Systems to migrate 550 vir-
tual servers for a huge number of dynamic
cloud hosted applications and services with-
outhavingtochangetheirIPaddresses.This
greatly reduced the effort on Shell’s part for
testing and approval. “It was a great piece of
advice and a prime example of our transat-
lantic teamwork, as well as our strong part-
nership with Cisco,” attested Kiest.
The move went smoothly. But there
was still work to be done. The T-Systems
team turned to the hardware that was now
surplus to requirements – 7,200 servers,
storage devices, tape libraries, server
7200Servers
storage devices and
other hardware
assets had to be
decommissioned
69IT landscapes
had to be migrated
from the old
data center to the
new one
220professionals
of T-Systems
managed
the big move
“THE HOUSTON IC ACCELERATED EXIT
MIGRATION PROGRAM WAS A VERY
SUCCESSFUL ONE, ESPECIALLY FROM A
BUSINESS CONTINUITY POINT OF VIEW.”
Doutie Nadema,
Manager Shell Supplier Services Platforms and
ITSO representative on ERP LT (Run Better)
enclosures and other assorted IT assets.
They had to be either sold off or disposed
of. By late June 2016, this task too was com-
pleted, and the legacy data center was
handed over on time to Shell’s Real Estate
department.
A MIX OF TRANSITION AND
TRANSFORMATION
T-Systems has now been hosting Shell’s IT
infrastructure from the new data center for
around six months. And as John Kiest ex-
plained, this has done more not just im-
prove the availability and reliability of IT
services: “This was not just a simple transi-
tion. It meant transforming infrastructure,
improving efficiency and being ever ready
for future changes and technology disrup-
tions. For example, we implemented new
storage networks and tape libraries, and we
shifted a large number of applications from
the legacy DCS 2.5 to the new DSC 3.0 plat-
form.” Shell Supplier Services Platform
Manager Doutie Nadema also expressed
her appreciation for the results of the migra-
tion program: “The Houston IC Accelerated
Exit Migration Program was a very success-
ful one, especially from a business continu-
ity point of view.”
The complicated multi-million migra-
tion was completed without any major mis-
haps. That’s an excellent outcome for Shell
and T-Systems. As Kiest pointed out, “From
the outset, we had said that failure is not an
option. And through constructive coopera-
tion, transparent governance and commu-
nication at all levels, plus clearly defined
escalation paths, we succeeded.” It is an
experience that should stand T-Systems and
Shell in very good stead with other pro-
grams of this type. High on the agenda is
the ongoing activity to consolidate data
center resources in three large data halls in
the European Global Data Center in
Amsterdam, the Netherlands.
<Contact> stefan.heiss@t-systems.com
<Links> cases.t-systems.com/shell
www.shell.com
BEST PRACTICES
39
Shell data center relocation
The Houston
West data center:
new home of
Shell’s IT.
Houston
Texas

Contenu connexe

Similaire à dl-best-practice-thema-shell-data

S T U D E N T L E A R N I N G O B J E C T I V E S After .docx
S T U D E N T  L E A R N I N G  O B J E C T I V E S After .docxS T U D E N T  L E A R N I N G  O B J E C T I V E S After .docx
S T U D E N T L E A R N I N G O B J E C T I V E S After .docx
agnesdcarey33086
 
An Update on CSCS
An Update on CSCSAn Update on CSCS
An Update on CSCS
inside-BigData.com
 
Supply Chain Network Design Essay
Supply Chain Network Design EssaySupply Chain Network Design Essay
Supply Chain Network Design Essay
Tracy Berry
 
Terrance Knecht Resume
Terrance Knecht ResumeTerrance Knecht Resume
Terrance Knecht Resume
jeanneknecht
 
Robin White Resume 10-19-16
Robin White  Resume 10-19-16Robin White  Resume 10-19-16
Robin White Resume 10-19-16
Robin White, PMP
 
DATA CENTER CONSOLIDATION AT GUARDIAN LIFE As one of the lar
DATA CENTER CONSOLIDATION AT GUARDIAN LIFE As one of the larDATA CENTER CONSOLIDATION AT GUARDIAN LIFE As one of the lar
DATA CENTER CONSOLIDATION AT GUARDIAN LIFE As one of the lar
sharondabriggs
 
Moe Aboelela - Resume - May 17 2015 - Director
Moe Aboelela - Resume - May 17 2015 - DirectorMoe Aboelela - Resume - May 17 2015 - Director
Moe Aboelela - Resume - May 17 2015 - Director
Mohamad Aboelela
 
CV Nicki Baxter - General
CV Nicki Baxter - GeneralCV Nicki Baxter - General
CV Nicki Baxter - General
Nicki Baxter
 

Similaire à dl-best-practice-thema-shell-data (20)

S T U D E N T L E A R N I N G O B J E C T I V E S After .docx
S T U D E N T  L E A R N I N G  O B J E C T I V E S After .docxS T U D E N T  L E A R N I N G  O B J E C T I V E S After .docx
S T U D E N T L E A R N I N G O B J E C T I V E S After .docx
 
An Update on CSCS
An Update on CSCSAn Update on CSCS
An Update on CSCS
 
Supply Chain Network Design Essay
Supply Chain Network Design EssaySupply Chain Network Design Essay
Supply Chain Network Design Essay
 
Terrance Knecht Resume
Terrance Knecht ResumeTerrance Knecht Resume
Terrance Knecht Resume
 
Red Hat: Self driving IT is here, and it's real
Red Hat: Self driving IT is here, and it's realRed Hat: Self driving IT is here, and it's real
Red Hat: Self driving IT is here, and it's real
 
Suttons case study
Suttons case studySuttons case study
Suttons case study
 
Dalet Case Study
Dalet Case StudyDalet Case Study
Dalet Case Study
 
Strategic IT Transformation Programme Delivers Next-Generation Agile IT Infra...
Strategic IT Transformation Programme Delivers Next-Generation Agile IT Infra...Strategic IT Transformation Programme Delivers Next-Generation Agile IT Infra...
Strategic IT Transformation Programme Delivers Next-Generation Agile IT Infra...
 
Carol Banville CV
Carol Banville CVCarol Banville CV
Carol Banville CV
 
Terrance Knecht Resume
Terrance Knecht ResumeTerrance Knecht Resume
Terrance Knecht Resume
 
Chap14
Chap14Chap14
Chap14
 
Chap14
Chap14Chap14
Chap14
 
Case Study - Hyper-Converged Infrastructure
Case Study - Hyper-Converged InfrastructureCase Study - Hyper-Converged Infrastructure
Case Study - Hyper-Converged Infrastructure
 
Robin White Resume 10-19-16
Robin White  Resume 10-19-16Robin White  Resume 10-19-16
Robin White Resume 10-19-16
 
DATA CENTER CONSOLIDATION AT GUARDIAN LIFE As one of the lar
DATA CENTER CONSOLIDATION AT GUARDIAN LIFE As one of the larDATA CENTER CONSOLIDATION AT GUARDIAN LIFE As one of the lar
DATA CENTER CONSOLIDATION AT GUARDIAN LIFE As one of the lar
 
Greene, David
Greene, DavidGreene, David
Greene, David
 
Moe Aboelela - Resume - May 17 2015 - Director
Moe Aboelela - Resume - May 17 2015 - DirectorMoe Aboelela - Resume - May 17 2015 - Director
Moe Aboelela - Resume - May 17 2015 - Director
 
CV Nicki Baxter - General
CV Nicki Baxter - GeneralCV Nicki Baxter - General
CV Nicki Baxter - General
 
Toyota tsusho africa case study
Toyota tsusho africa case studyToyota tsusho africa case study
Toyota tsusho africa case study
 
Resume
ResumeResume
Resume
 

dl-best-practice-thema-shell-data

  • 1. — eris cone es dolessint labo aut unt a Bolutem facculpa quid ma que nestis volecta. e ma dolu pid uscimpore volumquatus m o consporro ve libust es rerspse autatus. Shell THE BIG MOVE: MISSION COMPLETED. Houston is well-known for historic missions. Since 1961, it has been the hometown of the Lyndon B. Johnson Space Center, responsible for the flight control of US manned space programs such as the Space Shuttle, Apollo and Gemini. State-of-the-art technology, years of training and rigorous preparations were the critical success factors of more than 160 space flights. BEST PRACTICES 38 Shell data center relocation Houston headquarters
  • 2. — Copyright © Free Vector Maps.com Photos:F1online,JRobbinsPhotography <Copy> Thorsten Rack TODAY, THERE ARE STILL MISSIONS, involving state-of-the-art technology and rigorous preparations, that begin in Texas’s largest city and end with a smooth landing. One of them is a recent project undertaken by T-Systems for Shell. Accordingtothe2015listoftheFortune 500, Shell is the fifth largest company in the world. German ICT specialist T-Systems has been providing Shell sites worldwide with computing power and storage since 2008 – operating from four global data centers in the Netherlands, Malaysia, the US and Germany. However, Shell’s US data center, the Houston Information Center, was built over forty years ago. A good reason for Shell, being a frontrunner in the use of advanced technologies and innovative approaches, to move to a new, more advanced datacenter. InMarch2014,acontractwassignedforthe Houston Information Center Accelerated Exit Migration Program, the largest under- taking of its kind in the company’s history. OVER 100 BUSINESS-CRITICAL SERVICES, BUT ONLY ONE DESTINATION For the relocation to the Houston West data center, clearly defined goals were set out by Shell IT leadership: no disruptions, no down- time, and Phase 1 was to be completed by the end of June 2015. T-Systems’ task was not just to migrate IT resources to the new fa- cility, but also to decommission and dispose of old property. This comprised no less than 69 business-critical IT application land- scapes and more than 7,000 IT infrastruc- ture assets (e.g. servers, storage filers, switches and racks) on 3,500 square meters of raised floor space. It was a huge project, so John Kiest, Program Director at T-Systems USA, put together an international team comprising as many as 220 T-Systems pro- fessionals to master it. As Kiest reported, “The goal for Phase 1 was to move all Shell business-critical landscapes and 102 essen- tialITservices.Thisincludedapplicationsfor oil production and energy trading, and two large SAP landscapes for Shell’s Down- stream Business Unit in the US”. 15 months and over 7,166 man days later, Kiest and his team proudly declared Self-check You want to move to another data center? Here are some things you should do: 1. Identify all the hardware and software that needs to be moved from one data center to the other. 2. Determine site architecture and design specifications based on the “footprint” required in the new data center. 3. Complete capex approvals for required new equipment. 4. Submit procurement requests. 5. Complete high-level design for the migration architecture and processes based on the estate to be moved. 6. Commence migration planning based on the high-level design and the agreed-upon migration paths. 7. Begin staffing up the teams (as required) to do the migration work. 8. Complete migration wave planning and set it out in writing. 9. Begin to execute migration waves in accordance with plan. 10. As waves complete, do the necessary logical and physical decommissioning and disposal. Contact us for more information Konrad.Bauer@t-systems.com this mission accomplished. “Apart from two agreed step-outs, we completed the migra- tion of all Shell’s business-critical services to the new data center on time, and under budget – without a single situation,” said Kiest. “Our success was down to careful planning, and close collaboration and com- munication among all participating teams – including Shell and our technology part- ners, HP and AT&T.” Each and every step was carefully defined, agreed, prepared and executed – with a consistent focus on always making sure someone was in charge, and someone was on duty. This in- cluded weekends, when all stakeholders had to maintain sufficient resources avail- able 24 hours a day to be able to intervene if there were complications. NEW VIRTUALIZATION TECHNOLOGY MINIMIZES TESTING EFFORT Phase 2, which began immediately after Phase 1, was no less strenuous: the busi- ness-critical IT landscapes had been suc- cessfully migrated. But now the team had to tackle the remaining systems and decom- mission and dispose of the legacy assets in order to allow Shell to put the building on the market for sale. “This meant handling an IT volume that was five to six times greater. But we had far less time than in the previous phase,” emphasized Kiest, “So we thought about how we could migrate the maximum number of services with the leanest possible process.” They were assisted by an innova- tive network technology recommended by T-Systems colleagues in Germany: Cisco’s Overlay Transport Virtualization. This solu- tion enabled T-Systems to migrate 550 vir- tual servers for a huge number of dynamic cloud hosted applications and services with- outhavingtochangetheirIPaddresses.This greatly reduced the effort on Shell’s part for testing and approval. “It was a great piece of advice and a prime example of our transat- lantic teamwork, as well as our strong part- nership with Cisco,” attested Kiest. The move went smoothly. But there was still work to be done. The T-Systems team turned to the hardware that was now surplus to requirements – 7,200 servers, storage devices, tape libraries, server 7200Servers storage devices and other hardware assets had to be decommissioned 69IT landscapes had to be migrated from the old data center to the new one 220professionals of T-Systems managed the big move “THE HOUSTON IC ACCELERATED EXIT MIGRATION PROGRAM WAS A VERY SUCCESSFUL ONE, ESPECIALLY FROM A BUSINESS CONTINUITY POINT OF VIEW.” Doutie Nadema, Manager Shell Supplier Services Platforms and ITSO representative on ERP LT (Run Better) enclosures and other assorted IT assets. They had to be either sold off or disposed of. By late June 2016, this task too was com- pleted, and the legacy data center was handed over on time to Shell’s Real Estate department. A MIX OF TRANSITION AND TRANSFORMATION T-Systems has now been hosting Shell’s IT infrastructure from the new data center for around six months. And as John Kiest ex- plained, this has done more not just im- prove the availability and reliability of IT services: “This was not just a simple transi- tion. It meant transforming infrastructure, improving efficiency and being ever ready for future changes and technology disrup- tions. For example, we implemented new storage networks and tape libraries, and we shifted a large number of applications from the legacy DCS 2.5 to the new DSC 3.0 plat- form.” Shell Supplier Services Platform Manager Doutie Nadema also expressed her appreciation for the results of the migra- tion program: “The Houston IC Accelerated Exit Migration Program was a very success- ful one, especially from a business continu- ity point of view.” The complicated multi-million migra- tion was completed without any major mis- haps. That’s an excellent outcome for Shell and T-Systems. As Kiest pointed out, “From the outset, we had said that failure is not an option. And through constructive coopera- tion, transparent governance and commu- nication at all levels, plus clearly defined escalation paths, we succeeded.” It is an experience that should stand T-Systems and Shell in very good stead with other pro- grams of this type. High on the agenda is the ongoing activity to consolidate data center resources in three large data halls in the European Global Data Center in Amsterdam, the Netherlands. <Contact> stefan.heiss@t-systems.com <Links> cases.t-systems.com/shell www.shell.com BEST PRACTICES 39 Shell data center relocation The Houston West data center: new home of Shell’s IT. Houston Texas