Ce diaporama a bien été signalé.
Nous utilisons votre profil LinkedIn et vos données d’activité pour vous proposer des publicités personnalisées et pertinentes. Vous pouvez changer vos préférences de publicités à tout moment.
RESUME OF MARK GREY
Name Mark Harold Caird Grey (Buttons)
Address 1732 Bokal East Arthur Road,
Arthur River WA 6315
Mobile...
Driver’s Licence - Western Australia lic no 3473362 expiry 17/1/2019
- HR (Heavy Rigid)
- DTECH Defensive Four Wheel Driving Techniques (gravel roads) 2006
WorkSafe Licence To Perform High Ri...
Trade skills
 Rigging/Dogging lift experience in heavy industrial and mining
industries
 Experienced EWP operator.
 Mec...
Andrew Hausler 0417003836 Clint Wood 0439720838 Dave Renton
0424386752
Company:GOODLINE
Date: 1st
July 2016 -4th
July 2016...
Company: JOHN HOLLAND GROUP
Date 5 September 2014 – 2 April 2015
Site: RIO TINTO YANDI SUSTAINING PROJECT Yandi-Coogina Mi...
Carl Kunde Construction Manager ph 0419346331
Company: Goodline
Date 15 May 2014- 22 May 2014
Site: Nelson Point BHPB Port...
Company:Goodline
Date: 23 April 2013 – 17 November 2013
Site: Blending Yards, BHPB Inner Harbour Developement Finucane Isl...
Position: Advanced Rigger
Key Responcibilities:
- Dogging various cranes
- Operating EWPs
- Part of the steel erection cre...
 Fitting out conveyors with pulleys and rollers, installing mechanical
equipment for a crushing plant;
 Participating in...
Company: Owner Builder
Date: 23 April 2009 – 25 May 2010
Company: John Holland Group
Date: 16 January 2009 – 22 April 2009...
Date: 4 September 2006 – 3 October 2007
Site: Yandi JSE. FI/FO 28/7
Position: Trade Assistant
References: Wayne Green - 04...
Resume MARK GREY AUG16
Prochain SlideShare
Chargement dans…5
×
Prochain SlideShare
Iner G Company Profile_2
Suivant
Télécharger pour lire hors ligne et voir en mode plein écran

0

Partager

Télécharger pour lire hors ligne

Resume MARK GREY AUG16

Télécharger pour lire hors ligne

  • Soyez le premier à aimer ceci

Resume MARK GREY AUG16

  1. 1. RESUME OF MARK GREY Name Mark Harold Caird Grey (Buttons) Address 1732 Bokal East Arthur Road, Arthur River WA 6315 Mobile Phone 0427 626 064 Email markgrey7@bigpond.com Occupation Rigger Profile Perth point of hire. Australian passport holder. I am a safety conscious worker who follows instructions and procedures. My commitment to a job and level of attendance is a matter of record. With over 10 years of industrial construction projects for all the major iron ore players I am used to FI/FO work in the Pilbara and living in camp. I place a high value on working as part of a team, communication and preparation, I am capable of writing up a JSA/JHA and associated paper work and doing the prestarts required prior to commencing a job. I believe in talking through a job and getting the correct gear together that will be necessary for the job, doing the job while being flexiable as a team player. I am always learning and working on my skill set, with safety a key consideration. Licences
  2. 2. Driver’s Licence - Western Australia lic no 3473362 expiry 17/1/2019
  3. 3. - HR (Heavy Rigid) - DTECH Defensive Four Wheel Driving Techniques (gravel roads) 2006 WorkSafe Licence To Perform High Risk Work - WL937505 expiry 27/11/2017 - LF - Forklift Truck - WP - Boom-type Elevated Work Platform - DG - Dogging - RB, RI, RA - Advanced Rigging Safety Tickets - Working Safely at Heights 2016 - Working in Confined Spaces, AST. Issue date 4/12/10 cert no CA57460 - Construction Safety Awareness Training Card no 02273 issued 1/09/2006 - Carry Out Basic Demolition. Construction Skills Training 11/8/2007 - Hot Work L2 For Workers, 2013 - Use Portable Fire Fighting Equipment, 2013 Other  First Aid Certificate – out of date  Mine Employees Health Surveillance Card. H.S.N.19838, exp3/5/2015  MSIC card expires 27-June-2016  BHPBilliton BIO and Port inductions  RIO Yandi-Coogina minesite induction.  Samsung Roy Hill induction ,commissioning ,rail, and lockholders 1  VOCs BHPBIO, RIO, ROYHILL ,Rigging, EWP. Safety Inductions  MARCSTA Induction  Construction Safety Awareness Training Card  Pilbara Iron HSE Induction  Pilbara Iron Lock Holders Safety Course  BHP BIO WORKING AT HEIGHTS GAP  BHPBIO PORT INDUCTIONS LOCK HOLDERS.  ROYHILL RAIL COMMISIONING LOCKHOLDERS  ROYHILL MINE SITE INDUCTION AND LOCKHOLDERS
  4. 4. Trade skills  Rigging/Dogging lift experience in heavy industrial and mining industries  Experienced EWP operator.  Mechanical aptitude extensive knowledge of most standard EWPs  Extensive knowledge of construction and mining industry operations  Excellent understanding of safe work practices  Strong problem solving and communication skills  Ability to work as a team member  Ability to read drawings, bolt lists, operating manuals ect.  Own tools  Commitment to follow procedures write and sign JHAs, Permits, Take 5s, do prestart checks and fill in log books  Ability to adhere to site and camp rules  Experienced FI/FO worker Employment History Company: GREENSTONE HOSPITALITY GROUP Date: 28th September 2016-10th January 2017 Site: Green Man Pub, Dylangers Bar and Brassiery, Leroys Dive Bar, Wellington,NZ. Position: Project facilitator- bar redevelopement. Key Responcibilities: Facilitate bar redevelopement liase between builders, designer, project manager, materials procurement,Labouring, handyman, landscaper , painter, girl Friday. References: Steve Drummond ph 64274881994 Steve@thegreenmanpub.co.nz Company: GOODLINE Date: 8th July-1 AUGUST 2016 Site: ROY HILL MINE Position: Advanced Rigger Key Responcibilities:  CHLORIDE REDUCTION PLANT, dogging franna and 55 ton all terrain crane, operating EWPS,removal and installation of pipework. References:
  5. 5. Andrew Hausler 0417003836 Clint Wood 0439720838 Dave Renton 0424386752 Company:GOODLINE Date: 1st July 2016 -4th July 2016 Site: BHPBIO NELSON POINT LRP3 SHUTDOWNPORT HEDLAND Position: Advanced Rigger Key Responcibilities:  Nightshift shutdown crew repair and modify vibrating screen chutes, fire watch. References: Ben Halford 0427906654 Company: GOODLINE Date: 16 April 2015 – 30th October 2015 Site: ROY HILL PORT LANDSIDE Position: Advanced Rigger Key Responcibilities:  Area C Screenhouse Rigger 600 ton crawler crane with Super lift set up and install hoppers and bins. Assemble lifting gear to lift study spreader bar shackles FSWR slings with Franna. Rig bins and hoppers with EWP set up superlift Pin hoppers and derigg with EWP. Lifts with 400ton Mani 16000 with maxer  Dogging and Rigging on.Various Frannas, 250 summi crawler, 200ton demag 70t Tadano.  Bolt out and rattleup screenhouse fine and lump bins with various EWPs including GENIE SX180 JLG 135, JLG125.  Install piping screenhouse  Punchlist Screenhouse.  Punchlist car dumper [night shift] References:Rod Murphy 0427906904 Ben Halford 0427906654 Brett Pengelly 0417784403
  6. 6. Company: JOHN HOLLAND GROUP Date 5 September 2014 – 2 April 2015 Site: RIO TINTO YANDI SUSTAINING PROJECT Yandi-Coogina Mine Site Position: Advanced Rigger Key Responcibilities:  Working on overland conveyor, building and installing modules, unloading large modules off trucks, setting up various cranes, 60 & 80 t roughys, 120t All Terrian, Dogging Franna.  Working on Dust collection tower. Steel erection with EWPs and cranes  Working on Surge Bin .Steel Erection with EWP and CRANES INCLUDING 350T LIEBEHERR CRAWLER with superlift. Several Heavy lifts over 100 tons lifting bins apron feeder, ring beams ect.  Instalation of switch rooms with 350t crane  Bolt out and rattle surge bin and punchlist. References: Mark Angel ph 0467492262. Andrew Kandalis ph 0403419763 Alan Rhoden 0407213468 . Mark Hayne 0419923105. Company: Downer Date 28 June 2014 – 30 July 2014 Site BHPBillton Shiploader 1&2 Replacement Project, Port Hedland Position Advanced Rigger Ship loader 1 shutdown crew Key Responcibilities  Dogging cranes on wharf and laydown yard loading and unloading conveyor modules and installing , installing steel, loading and unloading conveyor belt reels, and belt splicing gear, loading , unloading and set up of cable drums. Cranes used, 250t crawler, 220 & 70t all terrain and Franna .  Installing steel,bolting out ratteling up,fixing gridmesh and installing hydraulic pipework. References Sam McGill Rigging Supervisor ph 0400425528.
  7. 7. Carl Kunde Construction Manager ph 0419346331 Company: Goodline Date 15 May 2014- 22 May 2014 Site: Nelson Point BHPB Port Hedland Position: Advanced Rigger Key Responcibilities:  Shutdown drive truck set up containers onsite  Change out conveyor pulley  Replace and tighten bolts on reclaimer. References. Goodline Wedgefeild Office ph 0891602600 Chris Grey supervisor. 0427556334 Company: Goodline Date 2 December 2013 – 26 March 2014 Site: McArthur River Mine, Northern Territory. Expansion Project., FI/FO 21 /7 12hr days Position: Advanced Rigger Key Responcibilities:  Unload trucks with Franna and roughy cranes  Secoundary crusher pick and preassemble steel  Steel erection with crane and EWP.  Install chutes and mechanical components  Assist pipe fitters fab and install pipe systems, pressfit poly and threaded  Preassemble and load conveyor modules. References: Simon Johnson, Supervisor 0458730123 Steve Hall, supervisor 0427906267 Christian Goreham Superindendant ph 0427906627
  8. 8. Company:Goodline Date: 23 April 2013 – 17 November 2013 Site: Blending Yards, BHPB Inner Harbour Developement Finucane Island, Port Hedland. FI/FO 28/7 Position: Advanced Rigger Key Responcibilities:  Setting up and dogging various cranes up to 400ton  Assemble and place conveyors  Loading and unloading modules onto SPMTs  Steel erection of various structures ,transfer towers, take up towers ect  Mechanical installation  Operation of EWPs  Quarterly Inspect and tagging of rigging equipment  Shutdowns intergrating new stockyard References:Dustin Te Ata , rigging supervisor. Ph 0425256463 Graham Hinder (Dicki) Rigging Superintendant ph 0418941901 Bill Stewart, supervisor, ph 0427007172 Ashley Seymore Rigging Superintendant ph 0427906098 or 0416244830 Rob Buck Construction Superintendant 0427906605 Company: Monadelphous Date: 23 August 2012 – 9th January 2013 Site: BHPB Inner Harbour Redevelopement Finucane Island Car Dumper. FI/FO 28/7
  9. 9. Position: Advanced Rigger Key Responcibilities: - Dogging various cranes - Operating EWPs - Part of the steel erection crew, Car Dumper 5 Night Shift References: Graeme McINERNEY (rigging supervisor) 0402266871, MURRAY BEAMAN-YOUNG (rigging supervisor) 0458586689. Company: Programmed Construction & Maintenance Date: 21 June 2011 – 14 August 2012 Site Sino Iron Cape Preston. FI/FO 28/7 Position: Advanced Rigger Key responcibilities:  EWP work on conveyors, ratteling up, gridmesh  Piperacks, measuring up installing pipe brackets  Pipe rigging with 80 ton Roughy & EWP  Install pipe shoes with 150t crawer crane & ewp  Install pipe with Franna, Roughy & Crawler cranes & EWP  Steel erection ballmill structure, collums, beams, ,gridmesh, handrail, With EWP, 55t, 150t Cranes&Franna,  Pipe work with Franna pick carry place spools ect, dress cyclones. References: Mick James 0429959743 , Danny Withers 0408932496, Scott Markham 0417352134 Scott McLaren 0419042650 Company: CSI – Crushing Services International Date: 26 October 2010 – 11 April 2011 Site: Christmas Creek . FI/FO 28/7 Position: Advanced Rigger Key responsibilities:  Rigging and dogging for various cranes – 70T Tadano roughys, 150T Summitomo crawler, 50T Grove roughy, 20T Frannas;
  10. 10.  Fitting out conveyors with pulleys and rollers, installing mechanical equipment for a crushing plant;  Participating in dual crane lifts;  Working at heights from EWPs - Genie Z60, 80, 125 & 135;  Erection of structural steel;  Liaising with Structural Supervisors and Site Leading Hands  Working 200ton crawler, pipe racks, pipe.  Pipe rigging Desands building [steel & polypipe].  Asembley of rubber lined cone hoppers, tanks, cyclones  Use of Man Box on crane. References: Michael Rose- 0418 921 460[wont answer blocked numbers] Ezra Armitage 0407 645 907 Jim McCafferty 0419925550 Company: John Holland Group Date: 25 May 2010 – 8 October 2010 Site: Worsley Alumina Position: Basic Rigger Key responsibilities:  Dogging for Favell Falco 250T Tower crane, 280T Summitomo luffing boom, 25 & 20T Frannas, various roughies and crawlers;  Erection/installation of structural steel;  Heavy lifts - 50 ton prefab floor modules, large vessels, ducts and pipes;  Using chain blocks and cumalongs while installing piping and ducting;  Laying checker plate;  Unloading flat racks off trucks and steel off flat racks;  Operating EWPs, JLG 125;  Reading drawings References: Josh Lind, Supervisor - 0423 028 857 or 0414 763 748 Rick Southern, Leading Hand - 0427 053 981
  11. 11. Company: Owner Builder Date: 23 April 2009 – 25 May 2010 Company: John Holland Group Date: 16 January 2009 – 22 April 2009 Site: RGP4, Newman. FI/FO 28/7 Position: General Hand References: Peter Jackson, Supervisor - 0412 213 036 Company: United Group Resources Date: 21 November 2007 – 16 December 2008 Site: Cloudbreak Minesite. FI/FO 28/7 Position: Basic Rigger References: Graeme Daniel, Rigging Supervisor - 0458 567 937 JAMES JEAN PIERRE, SUPERVISOR my time as a TA -0488919439 Company: Laing O'Rourke
  12. 12. Date: 4 September 2006 – 3 October 2007 Site: Yandi JSE. FI/FO 28/7 Position: Trade Assistant References: Wayne Green - 0439973236 (They know me by my nickname “Buttons”) Company: O' Donnell Griffin Date: 1 August 2005 – 17 May 2006 Site: DCP Worsley Position: Trade Assistant References: Geoff Lawler, Foreman – 0408 968 470 Company: WA Skill Training (labour hire to O' Donnell Griffin) Date: 10 June 2005 – 30 July 2005 Site: DCP Worsley Position: Trade Assistant (Electrical) references: Brian Fearn, Supervisor - 9734 10 56 Company: Huddson and Hei Date: May 2005 – June 2005 Site: Kewdale Position: Trade Assistant

Vues

Nombre de vues

370

Sur Slideshare

0

À partir des intégrations

0

Nombre d'intégrations

2

Actions

Téléchargements

1

Partages

0

Commentaires

0

Mentions J'aime

0

×