Software Project Management
1
PMI Knowledge Areas
Project Management Institute
Project Integration Management
Project Scope Management
Project Time Management
Project Cost Management
Project Quality Management
Project Risk Management
Project Human Resources Management
Project Communications Management
Project Procurement Management
2
Project Stakeholder Management
Project Integration Management
Processes required to ensure that the various elements
of the project are Properly coordinated.
Making tradeoffs among competing Objectives and
alternatives to meet or exceed stakeholder needs and
expectations.
•Plan Development
•Plan Execution
•Integrated Change Control
•Project Charter
•Life Cycle and Milestones
•Project Stakeholders 3
Needs vs. Expectation
Project Scope Management
Processes required to ensure that the project includes
the work requires and only the work requires, to
complete the project successfully.
•Initiation
•Scope Planning, Definition and Verification
•Scope Change Control
•Requirements Definition
•Work Breakdown Structure
•Product Baseline Control
•Project Baseline Control
4
Project Time Management
Processes required to ensure timely completion of the
project.
•Activity Definition
•Activity Sequencing
•Activity Duration Estimating
•Project Schedule Development
•Schedule Control
•Schedule Estimating
•Critical Path Analysis
•Schedule Tracking
5
Project Cost Management
Processes required to ensure that the project is
completed within the approved budget.
•Resource Planning
•Cost Estimating
•Cost Budgeting
•Cost Control
•Cost and Schedule Control System
•Cost Analysis
6
Project Quality Management
Processes required to ensure that the project will
satisfy the needs for which it was undertaken.
•Quality Assurance Plan
•Quality Management
•Quality Metrics, Measurements and Controls
•Continuous Quality Improvement
7
Project Human Resource Management
Processes required to make the most effective use of
the people involved with the project. Includes all of the
project stakeholders – sponsors, customers, and
individual contributors.
•Organizational Planning
•Staff Acquisition and Development
•Project Leadership
•Staffing Plan
•Project Organization
•Project Team Building
8
Project Communication Management
Processes required to ensure timely and appropriate
generation, collection, dissemination, storage and
ultimate disposition of project information. It provides
the critical links among people, ideas, and information
that are necessary for success.
•Communications Planning
•Information Distribution
•Program Reviews, Design Reviews and Reporting
•Project Documentation and Records
9
Project Risk Management
The systematic process of identifying, analyzing, and
responding to project risk. It includes maximizing the
probability and consequences of positive events and
minimizing the probability and consequences of adverse
events to project Objectives.
•Risk Management Plan
•Risk Identification
•Risk Element Analysis & Metrics
•Risk Avoidance & Mitigation
•Qualitative Risk Analysis
•Quantitative Risk Analysis
10
Project Procurement Management
Processes required to acquire goods and services, to
attain project scope, from outside the performing
organization.
•Procurement Planning
•Solicitation Planning
•Solicitation
•Source Selection
•Contract Administration
•Contract Closeout
11
Project Stakeholder Management (added in 2013)
Processes required to identify all individuals or
organizations impacted by the project, analyzing
stakeholder expectations and impact on the project,
and developing the appropriate management
strategies for effectively engaging stakeholders in
project decisions and execution.
• Identification of Stakeholders
• Planning Stakeholder Management
• Managing Stakeholder Engagement
• Controlling Stakeholder Engagement
What is going to be our Approach for the
Project?
• The first decision made on any project is what
methodology/approach is best suited for that
type of project
• One size/type Project Management approach
does not fit all projects…comfortably
What are some choices?
Taxonomy of Project Management Approaches
• Traditional/Waterfall Approach
– In play for 50 years….Origin in engineering / construction
– Projects will follow a very detailed plan that is built before any
work is done on the project…plan is linear
– “Best Practices”…… PMI doctrine
• Traditional Approach works well when:
– The project goal and solution are clearly defined
– You do not expect many scope change requests
– The projects are often routine, repetitive and linear
• NOTE: The completed project can be deployed
incrementally:
– To start harvesting business value
– To deal with the likelihood of some change requests
Linear and Incremental
Plan
Define
Execute
Close
Monitor
Control
Define
Plan
Execute
Monitor
Control
Monitor
Control
Partition the
Solution
Close
.....
Taxonomy of Project Management Approaches
• Adaptive (Agile) Approach
– What if the goal is clear but the solution is not clear?
– Project will follow a very detailed plan (not built at the
beginning of the project)…the plan is built in stages at the
completion of each project cycle/phase… it is iterative.
– The budget and time line is specified at the outset of the project
• Adaptive Approach works well:
– If you feel the requirements are apt to change
– If you feel you will learn about remaining requirements during
the course of doing the project
– If the project is oriented to new product development or
process improvement
– If the development schedule is tight and you can’t afford rework
or planning
– Requires that empowered individuals are readily available for
input.
Adaptive Approach (Iterative)
Define
Customer
Feedback
High end
Planning
Closing
Monitor &
Control
Incorp.
Feedback
Detailed
Planning
Launching
Taxonomy of Project Management Approaches
• Extreme Approach
– The goal is not clear…solution is not clear
– Projects do not follow a plan in the manner deployed
with the traditional or adaptive approaches
– The project proceeds based on informed, non-specific
“guesses” of what the final goal (or solution) will be
– At the conclusion of each cycle, what was learned or
discovered is factored into a newly specified goal
– Uses an open, elastic, undeterministic approach. Best
fitted for R&D Projects
Measuring and Reporting – Metrics
(Can build trust, communicate progress, expose problems and illustrate
effectiveness of the Process)
Traditional/Waterfall Adaptive/Agile
• Focus is on tracking efforts
on each activity
• GANTT Chart
• Percent complete
• Time per team member per
task
• Actual time versus
estimated time
• Focus on tracking what has been
incrementally delivered
• Velocity
• Burn Down – what features have
been completed
• Burn Up – what features have
been promised
• Running tested features
• Defect density
• Cycle time
• Code quality
• Earned Business Value

Contenu connexe

Similaire à 02.pptx

Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project Management Body of Knowledge. Chapters 1-3
Project Management Body of Knowledge.  Chapters 1-3Project Management Body of Knowledge.  Chapters 1-3
Project Management Body of Knowledge. Chapters 1-3Brian Davis
 
Project management lecture 33.pptx
Project management lecture 33.pptxProject management lecture 33.pptx
Project management lecture 33.pptxFarhanullah46
 
D1 l5 project management
D1 l5 project managementD1 l5 project management
D1 l5 project managementggwachha
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsJacobs Engineering
 
Software Project Management Basics
Software Project Management BasicsSoftware Project Management Basics
Software Project Management BasicsAmarjeet Singh
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process GroupsBhuWan Khadka
 
project integration mgmt.pdf
project integration mgmt.pdfproject integration mgmt.pdf
project integration mgmt.pdfIvarsLinde1
 
Project Management
Project ManagementProject Management
Project ManagementXubitech
 
Project Management Training.pptx
Project Management Training.pptxProject Management Training.pptx
Project Management Training.pptxMohameAbullahi
 
Managing the Consulting Engagement
Managing the Consulting EngagementManaging the Consulting Engagement
Managing the Consulting EngagementSaumya Ganguly
 
Project management by Dr. Huda Hassan
Project management by Dr. Huda HassanProject management by Dr. Huda Hassan
Project management by Dr. Huda HassanDr Ghaiath Hussein
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdfSAMPREET3
 
projectplanningandprojectworkplan-130828212658-phpapp02 (1).pdf
projectplanningandprojectworkplan-130828212658-phpapp02 (1).pdfprojectplanningandprojectworkplan-130828212658-phpapp02 (1).pdf
projectplanningandprojectworkplan-130828212658-phpapp02 (1).pdfJyotiYadav916744
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptxvamsnrsfdevuqsrtmy
 

Similaire à 02.pptx (20)

Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project Management Body of Knowledge. Chapters 1-3
Project Management Body of Knowledge.  Chapters 1-3Project Management Body of Knowledge.  Chapters 1-3
Project Management Body of Knowledge. Chapters 1-3
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Project management lecture 33.pptx
Project management lecture 33.pptxProject management lecture 33.pptx
Project management lecture 33.pptx
 
D1 l5 project management
D1 l5 project managementD1 l5 project management
D1 l5 project management
 
1. introduction
1. introduction1. introduction
1. introduction
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cards
 
Software Project Management Basics
Software Project Management BasicsSoftware Project Management Basics
Software Project Management Basics
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process Groups
 
project integration mgmt.pdf
project integration mgmt.pdfproject integration mgmt.pdf
project integration mgmt.pdf
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management Training.pptx
Project Management Training.pptxProject Management Training.pptx
Project Management Training.pptx
 
Managing the Consulting Engagement
Managing the Consulting EngagementManaging the Consulting Engagement
Managing the Consulting Engagement
 
Project management by Dr. Huda Hassan
Project management by Dr. Huda HassanProject management by Dr. Huda Hassan
Project management by Dr. Huda Hassan
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdf
 
projectplanningandprojectworkplan-130828212658-phpapp02 (1).pdf
projectplanningandprojectworkplan-130828212658-phpapp02 (1).pdfprojectplanningandprojectworkplan-130828212658-phpapp02 (1).pdf
projectplanningandprojectworkplan-130828212658-phpapp02 (1).pdf
 
Project planning and project work plan
Project planning and project work planProject planning and project work plan
Project planning and project work plan
 
PM LnL
PM LnLPM LnL
PM LnL
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptx
 

Dernier

Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Velvetech LLC
 
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...Cizo Technology Services
 
Ahmed Motair CV April 2024 (Senior SW Developer)
Ahmed Motair CV April 2024 (Senior SW Developer)Ahmed Motair CV April 2024 (Senior SW Developer)
Ahmed Motair CV April 2024 (Senior SW Developer)Ahmed Mater
 
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanySuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanyChristoph Pohl
 
What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....kzayra69
 
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company OdishaBalasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odishasmiwainfosol
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024StefanoLambiase
 
Unveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsUnveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsAhmed Mohamed
 
PREDICTING RIVER WATER QUALITY ppt presentation
PREDICTING  RIVER  WATER QUALITY  ppt presentationPREDICTING  RIVER  WATER QUALITY  ppt presentation
PREDICTING RIVER WATER QUALITY ppt presentationvaddepallysandeep122
 
What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...Technogeeks
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio, Inc.
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxTier1 app
 
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...Angel Borroy López
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEEVICTOR MAESTRE RAMIREZ
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样umasea
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesPhilip Schwarz
 
Best Web Development Agency- Idiosys USA.pdf
Best Web Development Agency- Idiosys USA.pdfBest Web Development Agency- Idiosys USA.pdf
Best Web Development Agency- Idiosys USA.pdfIdiosysTechnologies1
 
Odoo 14 - eLearning Module In Odoo 14 Enterprise
Odoo 14 - eLearning Module In Odoo 14 EnterpriseOdoo 14 - eLearning Module In Odoo 14 Enterprise
Odoo 14 - eLearning Module In Odoo 14 Enterprisepreethippts
 

Dernier (20)

Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...
 
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
 
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
 
Ahmed Motair CV April 2024 (Senior SW Developer)
Ahmed Motair CV April 2024 (Senior SW Developer)Ahmed Motair CV April 2024 (Senior SW Developer)
Ahmed Motair CV April 2024 (Senior SW Developer)
 
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanySuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
 
What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....
 
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company OdishaBalasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
 
Unveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsUnveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML Diagrams
 
PREDICTING RIVER WATER QUALITY ppt presentation
PREDICTING  RIVER  WATER QUALITY  ppt presentationPREDICTING  RIVER  WATER QUALITY  ppt presentation
PREDICTING RIVER WATER QUALITY ppt presentation
 
What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
 
2.pdf Ejercicios de programación competitiva
2.pdf Ejercicios de programación competitiva2.pdf Ejercicios de programación competitiva
2.pdf Ejercicios de programación competitiva
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
 
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEE
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a series
 
Best Web Development Agency- Idiosys USA.pdf
Best Web Development Agency- Idiosys USA.pdfBest Web Development Agency- Idiosys USA.pdf
Best Web Development Agency- Idiosys USA.pdf
 
Odoo 14 - eLearning Module In Odoo 14 Enterprise
Odoo 14 - eLearning Module In Odoo 14 EnterpriseOdoo 14 - eLearning Module In Odoo 14 Enterprise
Odoo 14 - eLearning Module In Odoo 14 Enterprise
 

02.pptx

  • 2. Project Management Institute Project Integration Management Project Scope Management Project Time Management Project Cost Management Project Quality Management Project Risk Management Project Human Resources Management Project Communications Management Project Procurement Management 2 Project Stakeholder Management
  • 3. Project Integration Management Processes required to ensure that the various elements of the project are Properly coordinated. Making tradeoffs among competing Objectives and alternatives to meet or exceed stakeholder needs and expectations. •Plan Development •Plan Execution •Integrated Change Control •Project Charter •Life Cycle and Milestones •Project Stakeholders 3 Needs vs. Expectation
  • 4. Project Scope Management Processes required to ensure that the project includes the work requires and only the work requires, to complete the project successfully. •Initiation •Scope Planning, Definition and Verification •Scope Change Control •Requirements Definition •Work Breakdown Structure •Product Baseline Control •Project Baseline Control 4
  • 5. Project Time Management Processes required to ensure timely completion of the project. •Activity Definition •Activity Sequencing •Activity Duration Estimating •Project Schedule Development •Schedule Control •Schedule Estimating •Critical Path Analysis •Schedule Tracking 5
  • 6. Project Cost Management Processes required to ensure that the project is completed within the approved budget. •Resource Planning •Cost Estimating •Cost Budgeting •Cost Control •Cost and Schedule Control System •Cost Analysis 6
  • 7. Project Quality Management Processes required to ensure that the project will satisfy the needs for which it was undertaken. •Quality Assurance Plan •Quality Management •Quality Metrics, Measurements and Controls •Continuous Quality Improvement 7
  • 8. Project Human Resource Management Processes required to make the most effective use of the people involved with the project. Includes all of the project stakeholders – sponsors, customers, and individual contributors. •Organizational Planning •Staff Acquisition and Development •Project Leadership •Staffing Plan •Project Organization •Project Team Building 8
  • 9. Project Communication Management Processes required to ensure timely and appropriate generation, collection, dissemination, storage and ultimate disposition of project information. It provides the critical links among people, ideas, and information that are necessary for success. •Communications Planning •Information Distribution •Program Reviews, Design Reviews and Reporting •Project Documentation and Records 9
  • 10. Project Risk Management The systematic process of identifying, analyzing, and responding to project risk. It includes maximizing the probability and consequences of positive events and minimizing the probability and consequences of adverse events to project Objectives. •Risk Management Plan •Risk Identification •Risk Element Analysis & Metrics •Risk Avoidance & Mitigation •Qualitative Risk Analysis •Quantitative Risk Analysis 10
  • 11. Project Procurement Management Processes required to acquire goods and services, to attain project scope, from outside the performing organization. •Procurement Planning •Solicitation Planning •Solicitation •Source Selection •Contract Administration •Contract Closeout 11
  • 12. Project Stakeholder Management (added in 2013) Processes required to identify all individuals or organizations impacted by the project, analyzing stakeholder expectations and impact on the project, and developing the appropriate management strategies for effectively engaging stakeholders in project decisions and execution. • Identification of Stakeholders • Planning Stakeholder Management • Managing Stakeholder Engagement • Controlling Stakeholder Engagement
  • 13.
  • 14. What is going to be our Approach for the Project? • The first decision made on any project is what methodology/approach is best suited for that type of project • One size/type Project Management approach does not fit all projects…comfortably What are some choices?
  • 15. Taxonomy of Project Management Approaches • Traditional/Waterfall Approach – In play for 50 years….Origin in engineering / construction – Projects will follow a very detailed plan that is built before any work is done on the project…plan is linear – “Best Practices”…… PMI doctrine • Traditional Approach works well when: – The project goal and solution are clearly defined – You do not expect many scope change requests – The projects are often routine, repetitive and linear • NOTE: The completed project can be deployed incrementally: – To start harvesting business value – To deal with the likelihood of some change requests
  • 17. Taxonomy of Project Management Approaches • Adaptive (Agile) Approach – What if the goal is clear but the solution is not clear? – Project will follow a very detailed plan (not built at the beginning of the project)…the plan is built in stages at the completion of each project cycle/phase… it is iterative. – The budget and time line is specified at the outset of the project • Adaptive Approach works well: – If you feel the requirements are apt to change – If you feel you will learn about remaining requirements during the course of doing the project – If the project is oriented to new product development or process improvement – If the development schedule is tight and you can’t afford rework or planning – Requires that empowered individuals are readily available for input.
  • 18. Adaptive Approach (Iterative) Define Customer Feedback High end Planning Closing Monitor & Control Incorp. Feedback Detailed Planning Launching
  • 19. Taxonomy of Project Management Approaches • Extreme Approach – The goal is not clear…solution is not clear – Projects do not follow a plan in the manner deployed with the traditional or adaptive approaches – The project proceeds based on informed, non-specific “guesses” of what the final goal (or solution) will be – At the conclusion of each cycle, what was learned or discovered is factored into a newly specified goal – Uses an open, elastic, undeterministic approach. Best fitted for R&D Projects
  • 20. Measuring and Reporting – Metrics (Can build trust, communicate progress, expose problems and illustrate effectiveness of the Process) Traditional/Waterfall Adaptive/Agile • Focus is on tracking efforts on each activity • GANTT Chart • Percent complete • Time per team member per task • Actual time versus estimated time • Focus on tracking what has been incrementally delivered • Velocity • Burn Down – what features have been completed • Burn Up – what features have been promised • Running tested features • Defect density • Cycle time • Code quality • Earned Business Value