6-PANEL
STANDARD REPORTING METHOD
FOR PROBLEM SOLVING
Project Leader: Judd Anderson, Matthew Hunt
Process Owner: Scott Stiff / P702 Launch Team
Project Champion: Bill Hodges
Project Location: Kansas City Integrated Stamping Plant
Project Completion Date: 8/7/2020
DMR Tilt Tables P552 FL34-1550202-A
Regular Cab Roof produced at P702 ML34-1550202-A
level, additional antennae holes
6-PANEL DEFINE
D M A I C R
Team Members:
❑ Scott Stiff - P702 Launch Leader
❑ Matthew Hunt, MPS Production Manager
❑ Archie Lyles - P702 Launch T & D Lead
❑ Chad Wuthrick - KCISP T & D ME
❑ Todd Zellak – KCISP Production Superintendent
❑ Therese Bayer (KCAP Blackbelt)
❑ Bill Hodges – KCISP Area Manager
❑ Brodie Schultz – Stamping Engineering
6-PANEL
PROBLEM STATEMENT
DEFINE
D M A I C R
VOICE OF THE CUSTOMER: Wooden tables are not ergo friendly and not efficient.
CTQ/CTF STATEMENT (Critical To Quality/Flow) - Customer Requirement:
KCISP must have tables that articulate to produce high quality re[pairs / metal finish.
COST OF POOR QUALITY/FLOW:
Potential rework of material not metal finished to standards as a result of the constraints imposed by the tables
on the process. Ergo optimization will prevent injuries.
SCOPE AND GOAL:
Reduce nonconforming parts by 100%.and improve Ergo conditions.
Plant: KCISPLine: KCISP P2 SchulerArea: KCISP Press
Part/Process Name: KCISP Part / Op.
No Standard exists for the DMR
tables.
6-PANEL
Method (Process)
Environment
Proper
Engineering
level of
parts
Manpower
Material Machine
- PCP / PVS - OK to run Process
D M A I C R
MEASURE
KPOV and KPIVs – Cause & Effect Diagram
X2
X1
Key Process Input Variables: In Y = f(X)
X1 = Tables must provide optimal position VOPQUN
X2 = Poor Ergo conditions potentially lead to injuries
- Poor Ergo conditions increase
potential for injuries.
- Tables do not articulate to
provide optimal position to
rework defects.
6-PANEL
Key Process Input Variable X1 : Tables must articulate to provide optimal
position to rework material.
D M A I C R
ANALYZE & IMPROVE
6-PANEL
Key Process Input Variable X1 : Tables must articulate to provide optimal
position to rework material.
D M A I C R
ANALYZE & IMPROVE
Tables were designed with a center post and bushing and
wheels on both sides for capability to rotate 360 degrees with
ease.
6-PANEL
Key Process Input Variable X1 : Tables must articulate to provide optimal
position to rework material.
D M A I C R
ANALYZE & IMPROVE
We used and acme screw and block to allow the table wheels
to be locked in any position of rotation with only a quarter turn.
Plan to add a rubber cap to avoid damaging the wheel
6-PANEL
Key Process Input Variable X1 : Tables must articulate to provide optimal
position to rework material.
D M A I C R
ANALYZE & IMPROVE
We fabricated a
mockup tilting lock
plate with 3 position of
tilt. Final machining
will add one more
hole per operators
request for an
additional position.
Current 2 pin
positions for flat and
15 degree working
angle.
Additional hole
location to allow
for a 38 degree
tilt for working
specific parts per
OP request.
6-PANEL
Key Process Input Variable X1 : Tables must articulate to provide optimal
position to rework material.
D M A I C R
ANALYZE & IMPROVE
Team installed aluminum slats
with 1” holes drilled on 6”
centers to allow multiple pin
configurations and also the
ability to work inboards on the
panels without the need of
flipping the part over.
6-PANEL
Key Process Input Variable X1 : Tables must articulate to provide optimal
position to rework material.
D M A I C R
ANALYZE & IMPROVE
All tilting locks and table slats have been
machined and are ready for install.
All table top frames are onsite and ready for
final assembly.
6-PANEL
Key Process Input Variable X1 : Tables must articulate to provide optimal
position to rework material.
D M A I C R
ANALYZE & IMPROVE
Floor has been painted and all 11 frames
have been painted. Team used flat black
antiskid paint to eliminate slip hazards with
the metal dust. Starting install the week of
8/3
6-PANEL
Key Process Input Variable X1 : Tables must articulate to provide optimal
position to rework material.
D M A I C R
ANALYZE & IMPROVE
With the new design the
Operator will be able to
Move the panel into
different positions to
eliminate potential
Ergo issues with
bending and reaching.
Also the part can be
worked from the under
side with out the need of
lifting the panel and
flipping it over.
This should help
eliminate moves that
would cost extra time.
6-PANEL
Key Process Input Variable X1 : VOPQUN 050 PSW Procedure (resource).
Analysis :
7.3.2. Re-sourced Parts:
❑ VOPQUN 050 (continued)
• Review with the Assembly Plant Representatives the PSW Package, Current
Surface/Dimensional Data, Control Point Boards, QPS Sheets, Process Verification
Check Sheet, Process Control Plans, Packaging Specifications, Checking Fixture
Certification, WERS Alerts/Concerns. Additionally, review any background quality
information (i.e. TCO's, Work Plans, Global 8-D's, DMAIC concern Resolution details,
and Customer Concerns
• KCISP did not follow the procedure and make the appropriate contacts at DTP.
Action
❑ New Bullseye Panel produced before next run, DTG 6/8/2020
❑ A reference panel was obtained from KCAP Truck Body.
Results:
❑ All future resources must adhere to the procedure.
D M A I C R
ANALYZE & IMPROVE
6-PANEL
Key Process Input Variable X2: PCP / PVS - OK to run process
Analysis: PVS / PCP
D M A I C R
ANALYZE & IMPROVE
First Piece Inspection Last Piece Off A) Appearance:
SC's
Free of Severe Die
Recoil Markings,
Wrinkles, Moderate or
Heavy Indentation,
Splits, Burrs, Impact
Lines or Other Issues
that Would Affect
Customer Satisfaction.
Visual Inspection 1 Panel Each Die
Set
Production Team
Inspector Submits for
Standard and Fill Out
Standard Tag SBU
7531
Reject Standard Notify Process
Coach, Correct Process and Initiate
Containment Procedure VOPQUG-
004
GO / NO-GO
Gage
B) Trim edge on DOP
Flanges
SC's
Trim edge is within
tolerance and burrs
within acceptable limits
Visual inspection for
burrs on both R &
L/Side
1 Panel Each Die
Set
Production Team
Inspector with Go/NoGo
Reject Standard, Notify Process
Coach, Correct Process and Initiate
Containment Procedure
C) # of Holes
SC's
17 Holes Visual inspection of
Holes per attached
Hole Count Sheet
1 Panel Each Die
Set
Production Team
Inspector number the
holes on the panel &
Enters on PHCS
Reject Standard, Notify Process
Coach, Correct Process and Initiate
Containment Procedure
D) Lot #
SC's
Lot # for Traceability Visual Inspection 1 Panel Each Die
Set
Production Team
Inspector Circle on
Panel & Enters on
PHCS
Reject Standard, Notify Process
Coach, Correct Process and Initiate
Containment Procedure
E) # of Bottomi Stamp
=1
SC's
Presence and legibility of
(1) Bottom Stamp
Visual inspection 1 Panel Each Die
Set
Production Team
Inspector Circle on
Panel & Enters on
PHCS
Follow Reject Standard Process,
Notify Process Coach, & Tool & Die
to verify die is on bottom. Issue
Priority1 Last Hit
F) Ford Logo
SC's
Presence of (1) Logo Visual inspection 1 Panel Each Die
Set
Production Team
Inspector Circle item
on Panel & Enters
PHCS
Follow Rejected Standard Process,
Issue Priority1 Last Hit.
Set Surface Std
Via FPA Process
SC's
Surface Standard / FPA Follow FPA Process 1 Panel 1st Hour of
Run
Production Team
Inspector Scores FPA
1st Hour of Run -
Record Data on FPA
Sheet. and Enters in
Quality Portal.
Reference during run,
then retain in Green
Rack
Process Coach Sets
Std.
Reject First Piece Inspection, Notify
Process Coach, Correct Process
and Initiate Containment Procedure
Hole count
was
performed
in error
6-PANEL
Key Process Input Variable X2: PCP / PVS - OK to run process
(continued)
Action :
❑ Retrained P702 inspectors in PVS / PCP process.
❑ DTG 6/2/2020
Results
❑ Inspectors retrained in the PCP /PVS process and capable of following 1st Piece
Inspection Process.
D M A I C R
ANALYZE & IMPROVE
6-PANEL
Key Process Input Variable X3: Die changeover capabilities
Actions:
❑ This die set was resourced to KCISP from DSP to facilitate Launching the newly installed
Schuler Press (KCISP P2).
❑ Die modifications were made at DTD for press compatibility.
❑ Die modifications were also performed at DTD to produce P702 level parts (2 added holes) in
addition to P552 level parts.
Results:
❑ 6/1/2020 Die function verified as correct.
❑ Additional capability will allow both P552 and P702 parts to be produced.
D M A I C R
ANALYZE & IMPROVE
6-PANEL D M A I C R
ANALYZE & IMPROVE
FL34-1550202-A
2020 – P552
ML34-1550202-A
2021 - P702
Two
antenna
holes
added for
P702
6-PANEL
Key Process Input Variable X4 : Press automated changeover capability
Analysis:
❑ Schuler Press is not engineered for fully automated changeover. All ports are constant
air.
Actions:
❑ Rework in process (added valves) to achieve capability to perform automated
changeovers.
❑ DTG 6/8/2020
Results
❑ This will allow the Schuler to run multiple unique parts per family of die sets and
facilitate service runs.
D M A I C R
ANALYZE & IMPROVE
6-PANEL
Key Process Input Variable X5 : Error Proofing at DTP
Analysis:
❑ No Error Proofing at DTP.
Actions:
❑ Investigating adding Error Proofing at DTP.
❑ DTG TBD
Results
❑ Prevent recurrence of P702 panels cycling through line.
D M A I C R
ANALYZE & IMPROVE
6-PANEL D M A I C R
CONTROL
6-PANEL D M A I C R
CONTROL
Replication Opportunities
❑ All Future Resource actions will incorporate X1 and X2 strict adherence.

Contenu connexe

Tendances

Tendances (7)

Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
PRESTIGE ENGINEERING L.L.C
PRESTIGE ENGINEERING L.L.CPRESTIGE ENGINEERING L.L.C
PRESTIGE ENGINEERING L.L.C
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
PWFRAC Company Overview
PWFRAC Company OverviewPWFRAC Company Overview
PWFRAC Company Overview
 
Instrument Technician
Instrument TechnicianInstrument Technician
Instrument Technician
 
Engineering Practice Magazine January 2021
Engineering Practice Magazine January 2021 Engineering Practice Magazine January 2021
Engineering Practice Magazine January 2021
 
KallalArunCV_TCS
KallalArunCV_TCSKallalArunCV_TCS
KallalArunCV_TCS
 

Similaire à Six sigma - dmr tilt table - matthew hunt

Die locator Pin Six-Sigma Project
Die locator Pin Six-Sigma ProjectDie locator Pin Six-Sigma Project
Die locator Pin Six-Sigma ProjectMatthew Hunt
 
Y2023 - Standoff Impovement V1.2.pdf
Y2023 - Standoff Impovement V1.2.pdfY2023 - Standoff Impovement V1.2.pdf
Y2023 - Standoff Impovement V1.2.pdfTheHoang19
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship PortfolioNicole Ripperda
 
DFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST CapDFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST CapKanissh GK
 
Syed salman abbas green belt nov15
Syed salman abbas green belt nov15Syed salman abbas green belt nov15
Syed salman abbas green belt nov15Edward Jones
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.maqsood1459
 
G.C.D_Co._Profile
G.C.D_Co._ProfileG.C.D_Co._Profile
G.C.D_Co._Profiledb
 
Motorcycle Engine Design
Motorcycle Engine DesignMotorcycle Engine Design
Motorcycle Engine DesignBoxuanSong
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...J. García - Verdugo
 
FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)Vignesh Venugopal
 
JSW Summer Internship Report 2017
JSW Summer Internship Report  2017JSW Summer Internship Report  2017
JSW Summer Internship Report 2017ASHISH JAISWAL
 
170614. Annual Report Finish.pptx
170614.  Annual Report Finish.pptx170614.  Annual Report Finish.pptx
170614. Annual Report Finish.pptxAgungYoke1
 

Similaire à Six sigma - dmr tilt table - matthew hunt (20)

Die locator Pin Six-Sigma Project
Die locator Pin Six-Sigma ProjectDie locator Pin Six-Sigma Project
Die locator Pin Six-Sigma Project
 
SMT Sales 2011
SMT Sales 2011SMT Sales 2011
SMT Sales 2011
 
SMT 2011
SMT 2011SMT 2011
SMT 2011
 
SMT 2011
SMT  2011SMT  2011
SMT 2011
 
Y2023 - Standoff Impovement V1.2.pdf
Y2023 - Standoff Impovement V1.2.pdfY2023 - Standoff Impovement V1.2.pdf
Y2023 - Standoff Impovement V1.2.pdf
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship Portfolio
 
DFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST CapDFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST Cap
 
Design notes5
Design notes5Design notes5
Design notes5
 
Design notes5
Design notes5Design notes5
Design notes5
 
Syed salman abbas green belt nov15
Syed salman abbas green belt nov15Syed salman abbas green belt nov15
Syed salman abbas green belt nov15
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.
 
3rd stage ppt black book
3rd stage ppt   black book3rd stage ppt   black book
3rd stage ppt black book
 
G.C.D_Co._Profile
G.C.D_Co._ProfileG.C.D_Co._Profile
G.C.D_Co._Profile
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
six sigma project
six sigma projectsix sigma project
six sigma project
 
Motorcycle Engine Design
Motorcycle Engine DesignMotorcycle Engine Design
Motorcycle Engine Design
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
 
FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)
 
JSW Summer Internship Report 2017
JSW Summer Internship Report  2017JSW Summer Internship Report  2017
JSW Summer Internship Report 2017
 
170614. Annual Report Finish.pptx
170614.  Annual Report Finish.pptx170614.  Annual Report Finish.pptx
170614. Annual Report Finish.pptx
 

Dernier

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Dernier (20)

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Six sigma - dmr tilt table - matthew hunt

  • 1. 6-PANEL STANDARD REPORTING METHOD FOR PROBLEM SOLVING Project Leader: Judd Anderson, Matthew Hunt Process Owner: Scott Stiff / P702 Launch Team Project Champion: Bill Hodges Project Location: Kansas City Integrated Stamping Plant Project Completion Date: 8/7/2020 DMR Tilt Tables P552 FL34-1550202-A Regular Cab Roof produced at P702 ML34-1550202-A level, additional antennae holes
  • 2. 6-PANEL DEFINE D M A I C R Team Members: ❑ Scott Stiff - P702 Launch Leader ❑ Matthew Hunt, MPS Production Manager ❑ Archie Lyles - P702 Launch T & D Lead ❑ Chad Wuthrick - KCISP T & D ME ❑ Todd Zellak – KCISP Production Superintendent ❑ Therese Bayer (KCAP Blackbelt) ❑ Bill Hodges – KCISP Area Manager ❑ Brodie Schultz – Stamping Engineering
  • 3. 6-PANEL PROBLEM STATEMENT DEFINE D M A I C R VOICE OF THE CUSTOMER: Wooden tables are not ergo friendly and not efficient. CTQ/CTF STATEMENT (Critical To Quality/Flow) - Customer Requirement: KCISP must have tables that articulate to produce high quality re[pairs / metal finish. COST OF POOR QUALITY/FLOW: Potential rework of material not metal finished to standards as a result of the constraints imposed by the tables on the process. Ergo optimization will prevent injuries. SCOPE AND GOAL: Reduce nonconforming parts by 100%.and improve Ergo conditions. Plant: KCISPLine: KCISP P2 SchulerArea: KCISP Press Part/Process Name: KCISP Part / Op. No Standard exists for the DMR tables.
  • 4. 6-PANEL Method (Process) Environment Proper Engineering level of parts Manpower Material Machine - PCP / PVS - OK to run Process D M A I C R MEASURE KPOV and KPIVs – Cause & Effect Diagram X2 X1 Key Process Input Variables: In Y = f(X) X1 = Tables must provide optimal position VOPQUN X2 = Poor Ergo conditions potentially lead to injuries - Poor Ergo conditions increase potential for injuries. - Tables do not articulate to provide optimal position to rework defects.
  • 5. 6-PANEL Key Process Input Variable X1 : Tables must articulate to provide optimal position to rework material. D M A I C R ANALYZE & IMPROVE
  • 6. 6-PANEL Key Process Input Variable X1 : Tables must articulate to provide optimal position to rework material. D M A I C R ANALYZE & IMPROVE Tables were designed with a center post and bushing and wheels on both sides for capability to rotate 360 degrees with ease.
  • 7. 6-PANEL Key Process Input Variable X1 : Tables must articulate to provide optimal position to rework material. D M A I C R ANALYZE & IMPROVE We used and acme screw and block to allow the table wheels to be locked in any position of rotation with only a quarter turn. Plan to add a rubber cap to avoid damaging the wheel
  • 8. 6-PANEL Key Process Input Variable X1 : Tables must articulate to provide optimal position to rework material. D M A I C R ANALYZE & IMPROVE We fabricated a mockup tilting lock plate with 3 position of tilt. Final machining will add one more hole per operators request for an additional position. Current 2 pin positions for flat and 15 degree working angle. Additional hole location to allow for a 38 degree tilt for working specific parts per OP request.
  • 9. 6-PANEL Key Process Input Variable X1 : Tables must articulate to provide optimal position to rework material. D M A I C R ANALYZE & IMPROVE Team installed aluminum slats with 1” holes drilled on 6” centers to allow multiple pin configurations and also the ability to work inboards on the panels without the need of flipping the part over.
  • 10. 6-PANEL Key Process Input Variable X1 : Tables must articulate to provide optimal position to rework material. D M A I C R ANALYZE & IMPROVE All tilting locks and table slats have been machined and are ready for install. All table top frames are onsite and ready for final assembly.
  • 11. 6-PANEL Key Process Input Variable X1 : Tables must articulate to provide optimal position to rework material. D M A I C R ANALYZE & IMPROVE Floor has been painted and all 11 frames have been painted. Team used flat black antiskid paint to eliminate slip hazards with the metal dust. Starting install the week of 8/3
  • 12. 6-PANEL Key Process Input Variable X1 : Tables must articulate to provide optimal position to rework material. D M A I C R ANALYZE & IMPROVE With the new design the Operator will be able to Move the panel into different positions to eliminate potential Ergo issues with bending and reaching. Also the part can be worked from the under side with out the need of lifting the panel and flipping it over. This should help eliminate moves that would cost extra time.
  • 13. 6-PANEL Key Process Input Variable X1 : VOPQUN 050 PSW Procedure (resource). Analysis : 7.3.2. Re-sourced Parts: ❑ VOPQUN 050 (continued) • Review with the Assembly Plant Representatives the PSW Package, Current Surface/Dimensional Data, Control Point Boards, QPS Sheets, Process Verification Check Sheet, Process Control Plans, Packaging Specifications, Checking Fixture Certification, WERS Alerts/Concerns. Additionally, review any background quality information (i.e. TCO's, Work Plans, Global 8-D's, DMAIC concern Resolution details, and Customer Concerns • KCISP did not follow the procedure and make the appropriate contacts at DTP. Action ❑ New Bullseye Panel produced before next run, DTG 6/8/2020 ❑ A reference panel was obtained from KCAP Truck Body. Results: ❑ All future resources must adhere to the procedure. D M A I C R ANALYZE & IMPROVE
  • 14. 6-PANEL Key Process Input Variable X2: PCP / PVS - OK to run process Analysis: PVS / PCP D M A I C R ANALYZE & IMPROVE First Piece Inspection Last Piece Off A) Appearance: SC's Free of Severe Die Recoil Markings, Wrinkles, Moderate or Heavy Indentation, Splits, Burrs, Impact Lines or Other Issues that Would Affect Customer Satisfaction. Visual Inspection 1 Panel Each Die Set Production Team Inspector Submits for Standard and Fill Out Standard Tag SBU 7531 Reject Standard Notify Process Coach, Correct Process and Initiate Containment Procedure VOPQUG- 004 GO / NO-GO Gage B) Trim edge on DOP Flanges SC's Trim edge is within tolerance and burrs within acceptable limits Visual inspection for burrs on both R & L/Side 1 Panel Each Die Set Production Team Inspector with Go/NoGo Reject Standard, Notify Process Coach, Correct Process and Initiate Containment Procedure C) # of Holes SC's 17 Holes Visual inspection of Holes per attached Hole Count Sheet 1 Panel Each Die Set Production Team Inspector number the holes on the panel & Enters on PHCS Reject Standard, Notify Process Coach, Correct Process and Initiate Containment Procedure D) Lot # SC's Lot # for Traceability Visual Inspection 1 Panel Each Die Set Production Team Inspector Circle on Panel & Enters on PHCS Reject Standard, Notify Process Coach, Correct Process and Initiate Containment Procedure E) # of Bottomi Stamp =1 SC's Presence and legibility of (1) Bottom Stamp Visual inspection 1 Panel Each Die Set Production Team Inspector Circle on Panel & Enters on PHCS Follow Reject Standard Process, Notify Process Coach, & Tool & Die to verify die is on bottom. Issue Priority1 Last Hit F) Ford Logo SC's Presence of (1) Logo Visual inspection 1 Panel Each Die Set Production Team Inspector Circle item on Panel & Enters PHCS Follow Rejected Standard Process, Issue Priority1 Last Hit. Set Surface Std Via FPA Process SC's Surface Standard / FPA Follow FPA Process 1 Panel 1st Hour of Run Production Team Inspector Scores FPA 1st Hour of Run - Record Data on FPA Sheet. and Enters in Quality Portal. Reference during run, then retain in Green Rack Process Coach Sets Std. Reject First Piece Inspection, Notify Process Coach, Correct Process and Initiate Containment Procedure Hole count was performed in error
  • 15. 6-PANEL Key Process Input Variable X2: PCP / PVS - OK to run process (continued) Action : ❑ Retrained P702 inspectors in PVS / PCP process. ❑ DTG 6/2/2020 Results ❑ Inspectors retrained in the PCP /PVS process and capable of following 1st Piece Inspection Process. D M A I C R ANALYZE & IMPROVE
  • 16. 6-PANEL Key Process Input Variable X3: Die changeover capabilities Actions: ❑ This die set was resourced to KCISP from DSP to facilitate Launching the newly installed Schuler Press (KCISP P2). ❑ Die modifications were made at DTD for press compatibility. ❑ Die modifications were also performed at DTD to produce P702 level parts (2 added holes) in addition to P552 level parts. Results: ❑ 6/1/2020 Die function verified as correct. ❑ Additional capability will allow both P552 and P702 parts to be produced. D M A I C R ANALYZE & IMPROVE
  • 17. 6-PANEL D M A I C R ANALYZE & IMPROVE FL34-1550202-A 2020 – P552 ML34-1550202-A 2021 - P702 Two antenna holes added for P702
  • 18. 6-PANEL Key Process Input Variable X4 : Press automated changeover capability Analysis: ❑ Schuler Press is not engineered for fully automated changeover. All ports are constant air. Actions: ❑ Rework in process (added valves) to achieve capability to perform automated changeovers. ❑ DTG 6/8/2020 Results ❑ This will allow the Schuler to run multiple unique parts per family of die sets and facilitate service runs. D M A I C R ANALYZE & IMPROVE
  • 19. 6-PANEL Key Process Input Variable X5 : Error Proofing at DTP Analysis: ❑ No Error Proofing at DTP. Actions: ❑ Investigating adding Error Proofing at DTP. ❑ DTG TBD Results ❑ Prevent recurrence of P702 panels cycling through line. D M A I C R ANALYZE & IMPROVE
  • 20. 6-PANEL D M A I C R CONTROL
  • 21. 6-PANEL D M A I C R CONTROL Replication Opportunities ❑ All Future Resource actions will incorporate X1 and X2 strict adherence.