PROJECT NAME
žž Data Center Cooling Unit
Change-Out
PROJECT LOCATION
žž Atlanta, Georgia
PROJECT TEAM
žž Owner: Global
Beverage Provider
žž Contractor: McKenney’s, Inc.
SPECIALIZATIONS
Energy Management
Pipe Shop Prefab
Sheet Metal Prefab
MARKETS
žž Mission Critical
M
cKenney’s installed multiple
replacement air cooling units
at a large Atlanta data center
that remained operational during the course
of the project.
THE CHALLENGE
McKenney’s had to install one new air cooling
unit per day at a data center that handles
global accounts and has no tolerance for
downtime. Detailed provisions were necessary
404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
to shut down and remove old units—and
install new ones—without disrupting cooling
in the massive server room.
each old unit and stabilizing the floor for the
next new unit. McKenney’s also rerouted the
ductwork without shutting down the servers.
THE SOLUTION
The McKenney’s team carefully planned each
step, working long hours to stage installation
in sequence so operating units would remain
online while each one was being replaced.
The structure of the raised floors were modified to supported the unit transfers; removing
THE RESULTS
All units were operational on schedule with
no data center downtime. For another more
complicated data center—where space
is even more restricted—the customer has
requested that the same McKenney’s team
perform the work.
www.mckenneys.com
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214
© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
The content of this document is not intended as an endorsement.