Characterizing the Software
Process: A Maturity Framework
• Watts S. Humphrey
• March 1988, Software Engineering Institute
Presented by: Maryam Ebrahimi
Cs5391 Spring 2003
Overview
• Introduction
• Characteristic of Ideal Software Process
Predictability
statistical control
Measurement
• Development-process improvement
1- understanding the current status of development process
2- developing a vision of the desired process.
3- establishing a list of prioritized required actions.
4- producing a plan to accomplish these actions
5- commit the resources to execute the plan.
Overview
• Five levels of Process Maturity Framework by SEI:
1- Initial Process
1-1 Project management
1-2 Management oversight
1-3 Quality assurance group
1-4 Change control
2- Repeatable Process
2-1 Establish a process group
2-2 Establish a software-development process architecture
2-3 introduce a family of software-engineering methods and
technologies
Overview
3- Defined Process
3-1 Establish a minimum, basic set of process measurements
3-2 Establish a process database
3-3 provide sufficient process resources to gather and maintain this
data
3-4 Assess the relative quality of each product
4- Managed Process
4-1 Support automatic gathering of process data
4-2 Analyze and modify the process
5- Optimizing Process
• How to use this framework
• Conclusion
Introduction
This article presents a maturity framework
that can be used by any software organization to:
1- Identify its highest priority problems
2- Assess its own capabilities
3- Start making improvements.
Characteristic of Ideal
Software Process
Predictable: Cost estimates and schedule commitments
are met with reasonable consistency and the quality of the
resulting products generally meet user needs.
Statistical Control To achieve better result, the
development process must be under statistical control.when a
process is under statistical control, repeating the work in
roughly the same way will produce roughly the same result.
While there are some important differences, the concepts of
statistical control applied to industry are applicable to software as well.
Characteristics of Ideal
Software Process
Measurement The basic principle behind statistical control is
measurement. If our knowledge can not be expressed in numbers, it is of a
meager and unsatisfactory kind.
There are several factors to consider in measuring the programming
process.Perhaps the most important is that the mere act of measuring
human processes changes them. Since people’s fears and motivations are
involved, the results must be viewed in a different light than data on
natural phenomena.
Development-process
improvement
• First important step in addressing software problems is to treat the entire
development task as a process that can be controlled, measured, and
improved.
• To improve their software capabilities, organizations must take five steps:
• 1- understand the current status of their development process
• 2- develop a vision of the desired process.
• 3- establish a list of required process improvement actions in order
of priority.
• 4- produce a plan to accomplish these actions
• 5- commit the resources to execute the plan.
A Maturity Framework
• The maturity framework, developed at the SEI,
addresses these five steps by characterizing a
software process into one of the five maturity
levels.
• By establishing their organization’s position in this
maturity structure, software professionals and
management can more readily identify those areas
where improvement actions are most likely to
produce results.
Basic
management
control
Initial
Repeatable
Defined
Managed
Optimizing
Process evolution
Process
Definition
Process
measurement
Process
control
Process Maturity levels
• 1- Initial Process: Is called ad hoc and often even chaotic. The
organization operates without formalized procedures, cost estimates,
and project plans.
• If there is formal procedures for project control, there is no
management mechanism to ensure they are used. The best test to
observe how such an organization behaves in a crisis is:
• Abandoning established procedures and reverting to merely coding and
testing.
• Organizations at this level can improve their performance by
instituting basic project controls. The most important are:
Initial process(cont.)
• 1-1 Project management. The fundamental role of a p.m.
system is to ensure effective control of commitments which requires
adequate preparation, clear responsibility, a public declaration, and a
dedication to performance.
– In any projects, a plan must be developed to determine the best schedule
and the resources required. In the absence of such an orderly plan, no
commitment can be better than an educated guess.
• 1-2- Management oversight. A disciplined software
development organization must have senior management oversight that
review and approve all major plans before official commitment.
Initial process
• 1-3- Quality assurance. A quality assurance group is charged
with assuring management that the software development work is
actually done the way it is supposed to be done. To be effective, the
assurance organization must have an independent reporting line to
senior management and sufficient resources to monitor performance of
all key planning, implementation, and verification activities.
• 1-4- Change control. To develop quality software on a predictable
schedule, the requirements must be maintained with reasonable
stability throughout the development cycle. Changes will have to be
made, but must be managed and introduced in an orderly way.
Repeatable Process(cont.)
• 2- Repeatable Process:
• The organization has achieved a stable process with a repeatable level
of statistical control by initiating rigorous project management of
commitments, cost, schedule, and changes.
• This process has one important strength over the initial process: it
provides commitment control.
• Organizations at this level face major risks when they are presented
with new challenges. Examples of the changes that represent the
highest risk are:
• It is possible for a new technology to do more harm than good, if there
is no defined process framework.
Repeatable Process(cont.)
• When the organization must develop a new kind of product, it is
entering new territory. For example, a software group that has
experience developing compilers will likely have design, scheduling,
and estimating problems if assigned to write a control program.
Similarly, a group that has developed small, self-contained programs
will not understand the interface and integration issues involved in
large scale projects. These changes can be disruptive.
• In this level, a new manager has no orderly basis for understanding
what is going on and new team members must learn the ropes through
word of mouth.
• The key actions required to advance from the Repeatable Process to
the Defined Process are:
Repeatable Process(cont.)
– 2-1- Establish a process group which is a technical group
that focuses exclusively on improving the software developing
process. In most software organizations, people are entirely
devoted to product work.. Until someone is given a full-time
assignment to work on the process, little orderly progress can be
made in improving it.
– The responsibilities of process groups include: defining the
development process, identifying technology needs and
opportunities, conducting quarterly management that reviews
process status and performance.
– Typically, the process group should be about 1 to 3 percent the size
of the organization, small organizations should address these issues
through specially formed committees of experienced professionals
or by retaining consultants.
Repeatable Process
• 2-2- Establish a software-development process
architecture that describes the technical and management activities
required for proper execution of the development process.
The architecture is a structural decomposition of the development
cycle into tasks, each of which has entry criteria, fundamental
descriptions, verification procedures, and exit criteria. The
decomposition continues until each defined task is performed by an
individual or single management unit.
• 2-3- If they are not already in place, introduce a family of software-
engineering methods and technologies. These include design and
code inspections, formal design methods, library-control systems, and
comprehensive testing methods, prototyping and adoption of modern
implementation languages..
Defined Process(cont.)
• 3- Defined process:To ensure consistent implementation and
provide a basis for better understanding of the process, the
organization has defined the process. At this point that the
organization achieved the foundation for major and continuing
progress, advanced technology can usefully be introduced. The
development group, when faced with a crisis, will likely continue to
use the Defined Process.
• The foundation has now been established for examining the process
and deciding how to improve it
• As powerful as this step is, it is still only qualitative: There is little data
to indicate what is going on or how effective the process really is.
There is considerable debate about the value of software process
measurements and the best ones to use.
Defined Process(cont.)
• This uncertainty stems from a lack of process definition and the
consequent confusion about the specific items to be measured.With a
defined process, we can focus the measurements on specific tasks.
• The key steps to advance to the Managed Process are:
3-1- Establish a minimum, basic set of process
measurements to identify the quality and cost parameters of
each process step. The objective is to quantify the relative costs
and benefits of each major process activity, such as the cost and
yield of error detection and correction methods.
3-2- Establish a process database with the resources to
manage and maintain it.Cost and yield data should be maintained
centrally to guard against loss, to make it available for all projects,
and to facilitate process quality and productivity analysis.
Defined Process
3-3- provide sufficient process resources to gather and
maintain this data and to advise project members on its use. Assign
skilled professionals to monitor the quality of the data before entry
in the database and to provide guidance on analysis methods and
interpretation.
3-4- Assess the relative quality of each product and inform
management where quality targets are not being met. An independent
quality-assurance group should assess the quality actions of each
project and track its progress against its quality plan.When this
progress is compared with the historical experience on similar projects,
an informed assessment generally can be made.
Managed Process(cont.)
• 4- Managed Process: The organization has initiated
comprehensive process measurements, beyond those of cost and
schedule performance. This is when the most significant quality
improvements begin.
• The greatest potential problem with the Managed Process is the cost of
gathering data. There are an enormous number of potentially valuable
measures of software development and support, but such data is
expensive to gather and maintain.
• Process data must not be used to compare projects or individuals. Its
purpose is to illuminate the product being developed and to provide an
informed basis for improving the process.
Managed Process
• The followings are two fundamental requirements to advance from the
Managed Process to the Optimizing Process:
• 4-1-Support automatic gathering of process data. Some data cannot
be gathered by hand, and all manually gathered data is subject to error
and omission.
• 4-2- Analyzing and modifying the process by using this data to
prevent problems and improve efficiency.
Optimizing Process(cont.)
• 5- Optimizing Process: In varying degrees, Process
Optimization goes on at all levels of process maturity. However, with
the step from the Managed to the Optimizing Process there is a
paradigm. Up to this point, software development managers have
largely focused on their products and will typically only gather and
analyze data that directly relates to product improvement. In the
Optimizing Process, the data is available to actually tune the process
itself.
• With a little experience, management will see that process optimization
can produce major quality and productivity improvements.
• For example, many errors can be identified and fixed far more
economically by code inspections than through testing. It takes about
one to four working hours to find and fix a bug through inspections
and about 15 to 20 working hours to find and fix a bug in a function or
system test. It is thus clear that testing is not a cost-effective way to
find and fix most bugs. But it would be unwise to eliminate testing
completely because it provides a useful check against human errors.
• In the optimizing process, the organization has the means to identify
the weakest elements of the process and fix them, the data is available
to justify the application of technology to various critical tasks.
Optimizing Process(cont.)
Optimizing Process
• The Optimizing Process provides a disciplined environment for
professional work. Discipline is required in large software projects to
ensure, for example, that the people involved use the same
conventions, don’t damage each other’s products, and properly
synchronize their work.
• There is little data on how long it takes for software organizations to
advance through these maturity levels toward the Optimizing Process.
Based on author’s experience, transition from level 1 to level 2 or from
level 2 to level 3 takes from one to three years, even with a dedicated
management commitment to process improvement. To date, no
complete organizations have been observed at levels 4 or 5.
How to use this framework
• This process-maturity structure is intended to be
used with an assessment methodology and a
management system. Using this framework, the
SEI has developed an assessment questionnaire
and methodology.
• The questionnaire has been reviewed by more than
400 organizations. Also, it has been completed by
more than 50 programming professionals from
nearly as many software organizations.
Conclusion
– This software-development process maturity
model provides a framework for assessing
software organizations and identifying the
priority areas for immediate improvement.
– It also helps identify those places where
advanced technology can be most valuable in
improving the software development process.

Contenu connexe

Similaire à Software process and characters

Capability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptxCapability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptxPerumalPitchandi
 
Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210pbaxter
 
Do You Need A Release Manager For Your SDLC Workflow?
Do You Need A Release Manager For Your SDLC Workflow?Do You Need A Release Manager For Your SDLC Workflow?
Do You Need A Release Manager For Your SDLC Workflow?Enov8
 
Models of quality assessment
Models of quality assessmentModels of quality assessment
Models of quality assessmentAsila AL-harthi
 
Software quality system - Quality Engineering
Software quality system - Quality EngineeringSoftware quality system - Quality Engineering
Software quality system - Quality EngineeringYash Trivedi
 
Module-4 PART-2&3.ppt
Module-4 PART-2&3.pptModule-4 PART-2&3.ppt
Module-4 PART-2&3.pptSharatNaik11
 
UNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptxUNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptxDevnath13
 
Project and Process Management_Nov4th.pptx
Project and Process Management_Nov4th.pptxProject and Process Management_Nov4th.pptx
Project and Process Management_Nov4th.pptxRashmi Gowda KM
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software EngineeringMajane Padua
 
Logical roadmap of creating pmo with cm mi prospective
Logical roadmap of creating pmo with cm mi prospectiveLogical roadmap of creating pmo with cm mi prospective
Logical roadmap of creating pmo with cm mi prospectiveAshok Jain
 
SEI-CMM.pptx
SEI-CMM.pptxSEI-CMM.pptx
SEI-CMM.pptxsuchita74
 
Hsc project management 2018pptx
Hsc project management 2018pptxHsc project management 2018pptx
Hsc project management 2018pptxgreg robertson
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process groupHossam Maghrabi
 
Integrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi ProspectiveIntegrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi ProspectiveAshok Jain
 

Similaire à Software process and characters (20)

Capability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptxCapability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptx
 
Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210
 
Do You Need A Release Manager For Your SDLC Workflow?
Do You Need A Release Manager For Your SDLC Workflow?Do You Need A Release Manager For Your SDLC Workflow?
Do You Need A Release Manager For Your SDLC Workflow?
 
Models of quality assessment
Models of quality assessmentModels of quality assessment
Models of quality assessment
 
Software quality system - Quality Engineering
Software quality system - Quality EngineeringSoftware quality system - Quality Engineering
Software quality system - Quality Engineering
 
Module-4 PART-2&3.ppt
Module-4 PART-2&3.pptModule-4 PART-2&3.ppt
Module-4 PART-2&3.ppt
 
Cmmi
CmmiCmmi
Cmmi
 
Cmmi (2)
Cmmi (2)Cmmi (2)
Cmmi (2)
 
UNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptxUNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptx
 
Project and Process Management_Nov4th.pptx
Project and Process Management_Nov4th.pptxProject and Process Management_Nov4th.pptx
Project and Process Management_Nov4th.pptx
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
 
SDLC
SDLCSDLC
SDLC
 
Logical roadmap of creating pmo with cm mi prospective
Logical roadmap of creating pmo with cm mi prospectiveLogical roadmap of creating pmo with cm mi prospective
Logical roadmap of creating pmo with cm mi prospective
 
SEI-CMM.pptx
SEI-CMM.pptxSEI-CMM.pptx
SEI-CMM.pptx
 
Proj Mgmt.ppt
Proj Mgmt.pptProj Mgmt.ppt
Proj Mgmt.ppt
 
Hsc project management 2018pptx
Hsc project management 2018pptxHsc project management 2018pptx
Hsc project management 2018pptx
 
Process Models IN software Engineering
Process Models IN software EngineeringProcess Models IN software Engineering
Process Models IN software Engineering
 
Cmm Level5
Cmm Level5Cmm Level5
Cmm Level5
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process group
 
Integrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi ProspectiveIntegrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi Prospective
 

Dernier

20240509 QFM015 Engineering Leadership Reading List April 2024.pdf
20240509 QFM015 Engineering Leadership Reading List April 2024.pdf20240509 QFM015 Engineering Leadership Reading List April 2024.pdf
20240509 QFM015 Engineering Leadership Reading List April 2024.pdfMatthew Sinclair
 
20240508 QFM014 Elixir Reading List April 2024.pdf
20240508 QFM014 Elixir Reading List April 2024.pdf20240508 QFM014 Elixir Reading List April 2024.pdf
20240508 QFM014 Elixir Reading List April 2024.pdfMatthew Sinclair
 
一比一原版(Offer)康考迪亚大学毕业证学位证靠谱定制
一比一原版(Offer)康考迪亚大学毕业证学位证靠谱定制一比一原版(Offer)康考迪亚大学毕业证学位证靠谱定制
一比一原版(Offer)康考迪亚大学毕业证学位证靠谱定制pxcywzqs
 
APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...
APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...
APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...APNIC
 
Russian Call girls in Abu Dhabi 0508644382 Abu Dhabi Call girls
Russian Call girls in Abu Dhabi 0508644382 Abu Dhabi Call girlsRussian Call girls in Abu Dhabi 0508644382 Abu Dhabi Call girls
Russian Call girls in Abu Dhabi 0508644382 Abu Dhabi Call girlsMonica Sydney
 
Abu Dhabi Escorts Service 0508644382 Escorts in Abu Dhabi
Abu Dhabi Escorts Service 0508644382 Escorts in Abu DhabiAbu Dhabi Escorts Service 0508644382 Escorts in Abu Dhabi
Abu Dhabi Escorts Service 0508644382 Escorts in Abu DhabiMonica Sydney
 
Nagercoil Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nagercoil
Nagercoil Escorts Service Girl ^ 9332606886, WhatsApp Anytime NagercoilNagercoil Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nagercoil
Nagercoil Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nagercoilmeghakumariji156
 
原版制作美国爱荷华大学毕业证(iowa毕业证书)学位证网上存档可查
原版制作美国爱荷华大学毕业证(iowa毕业证书)学位证网上存档可查原版制作美国爱荷华大学毕业证(iowa毕业证书)学位证网上存档可查
原版制作美国爱荷华大学毕业证(iowa毕业证书)学位证网上存档可查ydyuyu
 
Indian Escort in Abu DHabi 0508644382 Abu Dhabi Escorts
Indian Escort in Abu DHabi 0508644382 Abu Dhabi EscortsIndian Escort in Abu DHabi 0508644382 Abu Dhabi Escorts
Indian Escort in Abu DHabi 0508644382 Abu Dhabi EscortsMonica Sydney
 
Tadepalligudem Escorts Service Girl ^ 9332606886, WhatsApp Anytime Tadepallig...
Tadepalligudem Escorts Service Girl ^ 9332606886, WhatsApp Anytime Tadepallig...Tadepalligudem Escorts Service Girl ^ 9332606886, WhatsApp Anytime Tadepallig...
Tadepalligudem Escorts Service Girl ^ 9332606886, WhatsApp Anytime Tadepallig...meghakumariji156
 
Story Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
Story Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrStory Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
Story Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrHenryBriggs2
 
20240507 QFM013 Machine Intelligence Reading List April 2024.pdf
20240507 QFM013 Machine Intelligence Reading List April 2024.pdf20240507 QFM013 Machine Intelligence Reading List April 2024.pdf
20240507 QFM013 Machine Intelligence Reading List April 2024.pdfMatthew Sinclair
 
Trump Diapers Over Dems t shirts Sweatshirt
Trump Diapers Over Dems t shirts SweatshirtTrump Diapers Over Dems t shirts Sweatshirt
Trump Diapers Over Dems t shirts Sweatshirtrahman018755
 
best call girls in Hyderabad Finest Escorts Service 📞 9352988975 📞 Available ...
best call girls in Hyderabad Finest Escorts Service 📞 9352988975 📞 Available ...best call girls in Hyderabad Finest Escorts Service 📞 9352988975 📞 Available ...
best call girls in Hyderabad Finest Escorts Service 📞 9352988975 📞 Available ...kajalverma014
 
Real Men Wear Diapers T Shirts sweatshirt
Real Men Wear Diapers T Shirts sweatshirtReal Men Wear Diapers T Shirts sweatshirt
Real Men Wear Diapers T Shirts sweatshirtrahman018755
 
Vip Firozabad Phone 8250092165 Escorts Service At 6k To 30k Along With Ac Room
Vip Firozabad Phone 8250092165 Escorts Service At 6k To 30k Along With Ac RoomVip Firozabad Phone 8250092165 Escorts Service At 6k To 30k Along With Ac Room
Vip Firozabad Phone 8250092165 Escorts Service At 6k To 30k Along With Ac Roommeghakumariji156
 
Mira Road Housewife Call Girls 07506202331, Nalasopara Call Girls
Mira Road Housewife Call Girls 07506202331, Nalasopara Call GirlsMira Road Housewife Call Girls 07506202331, Nalasopara Call Girls
Mira Road Housewife Call Girls 07506202331, Nalasopara Call GirlsPriya Reddy
 
20240510 QFM016 Irresponsible AI Reading List April 2024.pdf
20240510 QFM016 Irresponsible AI Reading List April 2024.pdf20240510 QFM016 Irresponsible AI Reading List April 2024.pdf
20240510 QFM016 Irresponsible AI Reading List April 2024.pdfMatthew Sinclair
 
在线制作约克大学毕业证(yu毕业证)在读证明认证可查
在线制作约克大学毕业证(yu毕业证)在读证明认证可查在线制作约克大学毕业证(yu毕业证)在读证明认证可查
在线制作约克大学毕业证(yu毕业证)在读证明认证可查ydyuyu
 

Dernier (20)

20240509 QFM015 Engineering Leadership Reading List April 2024.pdf
20240509 QFM015 Engineering Leadership Reading List April 2024.pdf20240509 QFM015 Engineering Leadership Reading List April 2024.pdf
20240509 QFM015 Engineering Leadership Reading List April 2024.pdf
 
20240508 QFM014 Elixir Reading List April 2024.pdf
20240508 QFM014 Elixir Reading List April 2024.pdf20240508 QFM014 Elixir Reading List April 2024.pdf
20240508 QFM014 Elixir Reading List April 2024.pdf
 
一比一原版(Offer)康考迪亚大学毕业证学位证靠谱定制
一比一原版(Offer)康考迪亚大学毕业证学位证靠谱定制一比一原版(Offer)康考迪亚大学毕业证学位证靠谱定制
一比一原版(Offer)康考迪亚大学毕业证学位证靠谱定制
 
APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...
APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...
APNIC Policy Roundup, presented by Sunny Chendi at the 5th ICANN APAC-TWNIC E...
 
Russian Call girls in Abu Dhabi 0508644382 Abu Dhabi Call girls
Russian Call girls in Abu Dhabi 0508644382 Abu Dhabi Call girlsRussian Call girls in Abu Dhabi 0508644382 Abu Dhabi Call girls
Russian Call girls in Abu Dhabi 0508644382 Abu Dhabi Call girls
 
Abu Dhabi Escorts Service 0508644382 Escorts in Abu Dhabi
Abu Dhabi Escorts Service 0508644382 Escorts in Abu DhabiAbu Dhabi Escorts Service 0508644382 Escorts in Abu Dhabi
Abu Dhabi Escorts Service 0508644382 Escorts in Abu Dhabi
 
Nagercoil Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nagercoil
Nagercoil Escorts Service Girl ^ 9332606886, WhatsApp Anytime NagercoilNagercoil Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nagercoil
Nagercoil Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nagercoil
 
call girls in Anand Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls in Anand Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7call girls in Anand Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls in Anand Vihar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
原版制作美国爱荷华大学毕业证(iowa毕业证书)学位证网上存档可查
原版制作美国爱荷华大学毕业证(iowa毕业证书)学位证网上存档可查原版制作美国爱荷华大学毕业证(iowa毕业证书)学位证网上存档可查
原版制作美国爱荷华大学毕业证(iowa毕业证书)学位证网上存档可查
 
Indian Escort in Abu DHabi 0508644382 Abu Dhabi Escorts
Indian Escort in Abu DHabi 0508644382 Abu Dhabi EscortsIndian Escort in Abu DHabi 0508644382 Abu Dhabi Escorts
Indian Escort in Abu DHabi 0508644382 Abu Dhabi Escorts
 
Tadepalligudem Escorts Service Girl ^ 9332606886, WhatsApp Anytime Tadepallig...
Tadepalligudem Escorts Service Girl ^ 9332606886, WhatsApp Anytime Tadepallig...Tadepalligudem Escorts Service Girl ^ 9332606886, WhatsApp Anytime Tadepallig...
Tadepalligudem Escorts Service Girl ^ 9332606886, WhatsApp Anytime Tadepallig...
 
Story Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
Story Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrStory Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
Story Board.pptxrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
 
20240507 QFM013 Machine Intelligence Reading List April 2024.pdf
20240507 QFM013 Machine Intelligence Reading List April 2024.pdf20240507 QFM013 Machine Intelligence Reading List April 2024.pdf
20240507 QFM013 Machine Intelligence Reading List April 2024.pdf
 
Trump Diapers Over Dems t shirts Sweatshirt
Trump Diapers Over Dems t shirts SweatshirtTrump Diapers Over Dems t shirts Sweatshirt
Trump Diapers Over Dems t shirts Sweatshirt
 
best call girls in Hyderabad Finest Escorts Service 📞 9352988975 📞 Available ...
best call girls in Hyderabad Finest Escorts Service 📞 9352988975 📞 Available ...best call girls in Hyderabad Finest Escorts Service 📞 9352988975 📞 Available ...
best call girls in Hyderabad Finest Escorts Service 📞 9352988975 📞 Available ...
 
Real Men Wear Diapers T Shirts sweatshirt
Real Men Wear Diapers T Shirts sweatshirtReal Men Wear Diapers T Shirts sweatshirt
Real Men Wear Diapers T Shirts sweatshirt
 
Vip Firozabad Phone 8250092165 Escorts Service At 6k To 30k Along With Ac Room
Vip Firozabad Phone 8250092165 Escorts Service At 6k To 30k Along With Ac RoomVip Firozabad Phone 8250092165 Escorts Service At 6k To 30k Along With Ac Room
Vip Firozabad Phone 8250092165 Escorts Service At 6k To 30k Along With Ac Room
 
Mira Road Housewife Call Girls 07506202331, Nalasopara Call Girls
Mira Road Housewife Call Girls 07506202331, Nalasopara Call GirlsMira Road Housewife Call Girls 07506202331, Nalasopara Call Girls
Mira Road Housewife Call Girls 07506202331, Nalasopara Call Girls
 
20240510 QFM016 Irresponsible AI Reading List April 2024.pdf
20240510 QFM016 Irresponsible AI Reading List April 2024.pdf20240510 QFM016 Irresponsible AI Reading List April 2024.pdf
20240510 QFM016 Irresponsible AI Reading List April 2024.pdf
 
在线制作约克大学毕业证(yu毕业证)在读证明认证可查
在线制作约克大学毕业证(yu毕业证)在读证明认证可查在线制作约克大学毕业证(yu毕业证)在读证明认证可查
在线制作约克大学毕业证(yu毕业证)在读证明认证可查
 

Software process and characters

  • 1. Characterizing the Software Process: A Maturity Framework • Watts S. Humphrey • March 1988, Software Engineering Institute Presented by: Maryam Ebrahimi Cs5391 Spring 2003
  • 2. Overview • Introduction • Characteristic of Ideal Software Process Predictability statistical control Measurement • Development-process improvement 1- understanding the current status of development process 2- developing a vision of the desired process. 3- establishing a list of prioritized required actions. 4- producing a plan to accomplish these actions 5- commit the resources to execute the plan.
  • 3. Overview • Five levels of Process Maturity Framework by SEI: 1- Initial Process 1-1 Project management 1-2 Management oversight 1-3 Quality assurance group 1-4 Change control 2- Repeatable Process 2-1 Establish a process group 2-2 Establish a software-development process architecture 2-3 introduce a family of software-engineering methods and technologies
  • 4. Overview 3- Defined Process 3-1 Establish a minimum, basic set of process measurements 3-2 Establish a process database 3-3 provide sufficient process resources to gather and maintain this data 3-4 Assess the relative quality of each product 4- Managed Process 4-1 Support automatic gathering of process data 4-2 Analyze and modify the process 5- Optimizing Process • How to use this framework • Conclusion
  • 5. Introduction This article presents a maturity framework that can be used by any software organization to: 1- Identify its highest priority problems 2- Assess its own capabilities 3- Start making improvements.
  • 6. Characteristic of Ideal Software Process Predictable: Cost estimates and schedule commitments are met with reasonable consistency and the quality of the resulting products generally meet user needs. Statistical Control To achieve better result, the development process must be under statistical control.when a process is under statistical control, repeating the work in roughly the same way will produce roughly the same result. While there are some important differences, the concepts of statistical control applied to industry are applicable to software as well.
  • 7. Characteristics of Ideal Software Process Measurement The basic principle behind statistical control is measurement. If our knowledge can not be expressed in numbers, it is of a meager and unsatisfactory kind. There are several factors to consider in measuring the programming process.Perhaps the most important is that the mere act of measuring human processes changes them. Since people’s fears and motivations are involved, the results must be viewed in a different light than data on natural phenomena.
  • 8. Development-process improvement • First important step in addressing software problems is to treat the entire development task as a process that can be controlled, measured, and improved. • To improve their software capabilities, organizations must take five steps: • 1- understand the current status of their development process • 2- develop a vision of the desired process. • 3- establish a list of required process improvement actions in order of priority. • 4- produce a plan to accomplish these actions • 5- commit the resources to execute the plan.
  • 9. A Maturity Framework • The maturity framework, developed at the SEI, addresses these five steps by characterizing a software process into one of the five maturity levels. • By establishing their organization’s position in this maturity structure, software professionals and management can more readily identify those areas where improvement actions are most likely to produce results.
  • 11. Process Maturity levels • 1- Initial Process: Is called ad hoc and often even chaotic. The organization operates without formalized procedures, cost estimates, and project plans. • If there is formal procedures for project control, there is no management mechanism to ensure they are used. The best test to observe how such an organization behaves in a crisis is: • Abandoning established procedures and reverting to merely coding and testing. • Organizations at this level can improve their performance by instituting basic project controls. The most important are:
  • 12. Initial process(cont.) • 1-1 Project management. The fundamental role of a p.m. system is to ensure effective control of commitments which requires adequate preparation, clear responsibility, a public declaration, and a dedication to performance. – In any projects, a plan must be developed to determine the best schedule and the resources required. In the absence of such an orderly plan, no commitment can be better than an educated guess. • 1-2- Management oversight. A disciplined software development organization must have senior management oversight that review and approve all major plans before official commitment.
  • 13. Initial process • 1-3- Quality assurance. A quality assurance group is charged with assuring management that the software development work is actually done the way it is supposed to be done. To be effective, the assurance organization must have an independent reporting line to senior management and sufficient resources to monitor performance of all key planning, implementation, and verification activities. • 1-4- Change control. To develop quality software on a predictable schedule, the requirements must be maintained with reasonable stability throughout the development cycle. Changes will have to be made, but must be managed and introduced in an orderly way.
  • 14. Repeatable Process(cont.) • 2- Repeatable Process: • The organization has achieved a stable process with a repeatable level of statistical control by initiating rigorous project management of commitments, cost, schedule, and changes. • This process has one important strength over the initial process: it provides commitment control. • Organizations at this level face major risks when they are presented with new challenges. Examples of the changes that represent the highest risk are: • It is possible for a new technology to do more harm than good, if there is no defined process framework.
  • 15. Repeatable Process(cont.) • When the organization must develop a new kind of product, it is entering new territory. For example, a software group that has experience developing compilers will likely have design, scheduling, and estimating problems if assigned to write a control program. Similarly, a group that has developed small, self-contained programs will not understand the interface and integration issues involved in large scale projects. These changes can be disruptive. • In this level, a new manager has no orderly basis for understanding what is going on and new team members must learn the ropes through word of mouth. • The key actions required to advance from the Repeatable Process to the Defined Process are:
  • 16. Repeatable Process(cont.) – 2-1- Establish a process group which is a technical group that focuses exclusively on improving the software developing process. In most software organizations, people are entirely devoted to product work.. Until someone is given a full-time assignment to work on the process, little orderly progress can be made in improving it. – The responsibilities of process groups include: defining the development process, identifying technology needs and opportunities, conducting quarterly management that reviews process status and performance. – Typically, the process group should be about 1 to 3 percent the size of the organization, small organizations should address these issues through specially formed committees of experienced professionals or by retaining consultants.
  • 17. Repeatable Process • 2-2- Establish a software-development process architecture that describes the technical and management activities required for proper execution of the development process. The architecture is a structural decomposition of the development cycle into tasks, each of which has entry criteria, fundamental descriptions, verification procedures, and exit criteria. The decomposition continues until each defined task is performed by an individual or single management unit. • 2-3- If they are not already in place, introduce a family of software- engineering methods and technologies. These include design and code inspections, formal design methods, library-control systems, and comprehensive testing methods, prototyping and adoption of modern implementation languages..
  • 18. Defined Process(cont.) • 3- Defined process:To ensure consistent implementation and provide a basis for better understanding of the process, the organization has defined the process. At this point that the organization achieved the foundation for major and continuing progress, advanced technology can usefully be introduced. The development group, when faced with a crisis, will likely continue to use the Defined Process. • The foundation has now been established for examining the process and deciding how to improve it • As powerful as this step is, it is still only qualitative: There is little data to indicate what is going on or how effective the process really is. There is considerable debate about the value of software process measurements and the best ones to use.
  • 19. Defined Process(cont.) • This uncertainty stems from a lack of process definition and the consequent confusion about the specific items to be measured.With a defined process, we can focus the measurements on specific tasks. • The key steps to advance to the Managed Process are: 3-1- Establish a minimum, basic set of process measurements to identify the quality and cost parameters of each process step. The objective is to quantify the relative costs and benefits of each major process activity, such as the cost and yield of error detection and correction methods. 3-2- Establish a process database with the resources to manage and maintain it.Cost and yield data should be maintained centrally to guard against loss, to make it available for all projects, and to facilitate process quality and productivity analysis.
  • 20. Defined Process 3-3- provide sufficient process resources to gather and maintain this data and to advise project members on its use. Assign skilled professionals to monitor the quality of the data before entry in the database and to provide guidance on analysis methods and interpretation. 3-4- Assess the relative quality of each product and inform management where quality targets are not being met. An independent quality-assurance group should assess the quality actions of each project and track its progress against its quality plan.When this progress is compared with the historical experience on similar projects, an informed assessment generally can be made.
  • 21. Managed Process(cont.) • 4- Managed Process: The organization has initiated comprehensive process measurements, beyond those of cost and schedule performance. This is when the most significant quality improvements begin. • The greatest potential problem with the Managed Process is the cost of gathering data. There are an enormous number of potentially valuable measures of software development and support, but such data is expensive to gather and maintain. • Process data must not be used to compare projects or individuals. Its purpose is to illuminate the product being developed and to provide an informed basis for improving the process.
  • 22. Managed Process • The followings are two fundamental requirements to advance from the Managed Process to the Optimizing Process: • 4-1-Support automatic gathering of process data. Some data cannot be gathered by hand, and all manually gathered data is subject to error and omission. • 4-2- Analyzing and modifying the process by using this data to prevent problems and improve efficiency.
  • 23. Optimizing Process(cont.) • 5- Optimizing Process: In varying degrees, Process Optimization goes on at all levels of process maturity. However, with the step from the Managed to the Optimizing Process there is a paradigm. Up to this point, software development managers have largely focused on their products and will typically only gather and analyze data that directly relates to product improvement. In the Optimizing Process, the data is available to actually tune the process itself. • With a little experience, management will see that process optimization can produce major quality and productivity improvements.
  • 24. • For example, many errors can be identified and fixed far more economically by code inspections than through testing. It takes about one to four working hours to find and fix a bug through inspections and about 15 to 20 working hours to find and fix a bug in a function or system test. It is thus clear that testing is not a cost-effective way to find and fix most bugs. But it would be unwise to eliminate testing completely because it provides a useful check against human errors. • In the optimizing process, the organization has the means to identify the weakest elements of the process and fix them, the data is available to justify the application of technology to various critical tasks. Optimizing Process(cont.)
  • 25. Optimizing Process • The Optimizing Process provides a disciplined environment for professional work. Discipline is required in large software projects to ensure, for example, that the people involved use the same conventions, don’t damage each other’s products, and properly synchronize their work. • There is little data on how long it takes for software organizations to advance through these maturity levels toward the Optimizing Process. Based on author’s experience, transition from level 1 to level 2 or from level 2 to level 3 takes from one to three years, even with a dedicated management commitment to process improvement. To date, no complete organizations have been observed at levels 4 or 5.
  • 26. How to use this framework • This process-maturity structure is intended to be used with an assessment methodology and a management system. Using this framework, the SEI has developed an assessment questionnaire and methodology. • The questionnaire has been reviewed by more than 400 organizations. Also, it has been completed by more than 50 programming professionals from nearly as many software organizations.
  • 27. Conclusion – This software-development process maturity model provides a framework for assessing software organizations and identifying the priority areas for immediate improvement. – It also helps identify those places where advanced technology can be most valuable in improving the software development process.