The document is a resume for an applicant seeking a piping supervisor position. It summarizes his 7 years of experience in oil and gas projects, including maintenance, projects, pipelines, and more. It outlines his qualifications like a Bachelor's degree in mechanical engineering and certifications. The resume also details his responsibilities and skills like coordinating quality control, reviewing drawings, overseeing fabrication and testing, and ensuring safety standards. It provides employment history and contact information to support the application.
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
PIPING SUPERVISOR
1. OBJECTIVE
To acquire a challenging job in a firm where I can contribute my
maximum ability to uphold the objective of the organization and can
improve my professional skills so as to because a valuable resource to
the organization and to give my best to every assignment allotted and
growth in career.
SUMMARY- Total 07 years of Experience in Oil & Gas Project.
Experience in maintenance and projects, Upstream Projects Oil
gathering Station, Downstream projects, Refinery Gas Compression
Projects, Water Injection Projects, Green & Brown Field Projects,
Flowline, Pipeline, GRE Pipeline, Unit Piping.
PROFICIENCY FORTE
Maintenance (PM & CM), Inspection, Testing, Trouble Shooting and
Commissioning of Piping, Fabrication, Erection, Hydro Testing, Punch
List, Re-instatement, Commissioning, Pre-commissioning, Maintenance
and shut down work, well experienced in all types of Mechanical
construction activities, Effective knowledge of Permit to work system
(PTW), Proficiency in striking perfect co-ordination and managing
entire maintenance as well as organization operation, Familiar with
P&ID and ISO Drawings, Familiar with different types Materials,
Excellent communication and interpersonal skills.
CARRIERS OVERVIEW: TOTAL 07 YEARS
GULF EXPERIENCE - 05 YEARS
INDIAN EXPERIENCE - 02 YEARS1.
✓ Piping Supervisor, (Petro Rabigh Project Saudi Arabia)
Clint - AYTB
Company - Focus International Gen. Con. Est
Period - 10/01/2019 to 18/09/2021.
✓ Piping Supervisor (Maintenance), (Petro Rabigh Saudi Arabia)
Clint - SAIPEM
Company - Focus International Gen. Con. Est
Period - 01/01/2018 to 30/12/2018.
✓ Piping Supervisor, (NAUGP-A TURAIF Saudi Arabia)
Clint - JGC Gulf International Co. Ltd.
Company - Focus International Gen. Con. Est
Period - 30/02/2017 to 13/12/2017.
✓ Piping Supervisor, (Reliance J3 project Jamnagar Gujrat India)
Company - Das Construction Co.Pvt.Ltd.
Period - 15/09/2014 – 20/10/2016
MD SHAHID IQUBAL
PIPING SUPERVISOR
QUALIFICATION
B. TECH (MECH. ENGINEER)
NDT LEVEL II (RT, UT, LPT, MPT)
AUTO CAD 2010
PERSONAL DETAILS
Date of Birth : -30/12/1992
Sex : -Male
Nationality : -Indian
Marital Status : -Single
Language : -English, Hindi,
Urdu, Arabic
PASSPORT DETAILS
New Passport No : -W3294834
Old Passport No : -L9192876
Issued at : -Patna
Issued Date : - 16.08.2022
Expiry Date : - 15.08.2032
PERMANENT ADDRESS
Name : -Md Shahid Iqubal
S/O : -Md Ayoub Iqubal
Villa : -Shahjeewan Dargah
P. O : -Pinjranwan
P. S : -Kurtha
Dist. : -Arwal
State : -Bihar
Pin Code : -804423
md.shahidiqubal@yahoo.com
+918084640341
2. Page 2
KEY DELIVERABLES
✓ Reviewed project specifications, ITP, B31.3 and
applicable inspection procedures.
✓ Interacting & coordinating with Clients for Quality
parameters.
✓ Coordinating with Management representative for
Internal Quality Audits, Quality System and follow-up
✓ Raw material receiving inspection as per ASME Section
II and client requirement.
✓ Review of material test certificates
✓ Witness the fit-up inspection of weld joints
✓ Review of the project scope of work, material
specifications, and drawings for any conflict with the
requirement of the Quality standards and advise the
Engineering Dept to initiate the corrective actions with
the client prior to commencement of work
✓ To ensure related activities are carried out in accordance
with project specification
✓ Witness the hydro-static tests.
✓ Verification of punch list and test packages.
✓ Control of quality for piping fabrication such as
fit-up, visual and dimensional inspection
conforming to approved for construction drawings.
✓ Responsible for issuance of Non-Conformance Report
if any violation and out of standard for piping works.
✓ Conduct quality co-ordination meeting and initiate
corrective and preventive action.
✓ Prepare Test Packages (Hydro Test or Pneumatic Test
as per scope of work) and getting the package
approved after the completion of work of the system
and keeping the site ready for the test on specified day.
✓ Handling of work force, Manpower planning,
Material planning and welding plan as per various
Normal Piping and Erection drawing.
✓ Studying drawings of Piping, Plates and structure,
Preparation of work schedule to complete the project.
SOFT SKILLS
• Time Management,
• Monitoring Skills
• Leadership Qualities,
• Interpersonal Skills,
• Problem Solver,
• Communication Skills,
• Decision Making Skills,
• Convincing Capabilities
CORE COMPETENCIES
• Progress Report,
• Planning,
• Conducting Meeting,
• Following HSE
Procedures,
• Following Safety
Norms,
• Co-Ordination Man
Power,
• Management Strategic,
• Continual Improvement,
• Clint Relationship,
• Risk Management
• Team Building
Management,
PERSONAL TRAITS
• Strong commitment to
work
• Good managerial, team
work & Leadership
qualities.
• Excellent
communication skills,
potential to learn things
quickly.
• Ability to adapt and
present in an impressive
manner.
• Ability to work
accurately and pay
attention to details whilst
providing technical
assistance and resolution
3. Page 3
✓ Checking the piping material as per code and process
standard specifications.
✓ Studying identify the equipment location as per general
arrangement drawing and prepare the layout
measurement.
✓ Erection of piping systems as per approved IFC
isometric drawings
✓ Check installing pipe components as per P&ID.
✓ Co-Ordinate with engineers for all piping, Welding
work activities such as Radiography, Hydro testing of
valves and spools, and Insulation, back filling etc.
✓ Maintain Calibration certificates for gauges,
Equipment’s and measuring Instruments.
✓ Line checking and clearing punch items before the
pressure test.
✓ Arrangement and execution of Hydro Test, Air
blowing and water flushing.
✓ Coordinate the overall project execution plans to meet
the targeted schedule.
✓ Coordination with subcontractor construction team
before and after the execution of work.
✓ Coordination with other departments (I.e. Electrical,
Instrumentation, Rigging etc.) for completion of the
mechanical and Piping work.
✓ Inspection Coordination & Planning.
✓ To rise of bolt torqueing and reinstatement RFI’s and
execute work at site.
✓ Being part of the pre-commissioning team clearing all
“B” punches before reinstatement.
✓ Closing of all Mechanical completion punch’s (MCPL)
before handover system to start up and commissioning
group.
✓ Arrangement of the NDT and any other inspection
activity as per the requirements.
✓ Submit the everyday progress in planning department.
DECLARATION:
THE ABOVE-MENTIONED WORDS ARE CORRECT WITH MY
KNOWLEDGE AND BELIEVE.
MD SHAHID IQUBAL
COMPUTER KNOLEDGE
• Microsoft Office Word
• Microsoft Office Excel
• Window-XP
• Window-07
• Window-10