Technology transfer could be considered as the corner stone of biodevelopment activities, as it is required each time people want to switch from a lab or a facility to another. It is expected to be handled in a methodical manner, following regulatory requirements, in order to ensure patients safety. Difficulties often come from differences between sending and receiving entities, where equipment, level of resources, internal culture, can be different. In case of failure, the cost can be huge for a drug maker.
This presentation will cover points to consider for successful tech transfers, and includes lessons learned from real cases.
In this webinar, you will learn:
● How to design a bioreactor model in order to scale up a process.
● How to build a team and tech transfer a process.
● How to accurately assess the success of a tech transfer.
obat aborsi jogja wa 081313339699 jual obat aborsi cytotec asli di jogja
Tech transfer and Scale-up - Tips and tricks from a Biodevelopment center
1. Merck KGaA
Darmstadt, Germany
Steven Strubbe, Technical Leader, BioReliance® End-to-End
Solutions
Guillaume Plane, Marketing and Development Manager,
BioReliance® End-to-End Solutions
Tips and Tricks from a Biodevelopment Center
Tech Transfer and
Scale-Up
2. Bioreactor Protection with the Viresolve® Barrier Filter | 16 August 2018
The life science business of
Merck KGaA, Darmstadt, Germany
operates as MilliporeSigma
in the U.S. and Canada.
2
3. 3 Managing process scaling and tech transfer
Process transfer is a cornerstone of manufacturing
Process Transfer
Process
development
lab
Pilot lab
Clinical
manufacturing
Commercial
manufacturing
(internal)
Commercial
manufacturing
(external)
4. 4 Managing process scaling and tech transfer
Process transfer is regulatory defined
ICH Q10:
“The goal of technology transfer activities is to transfer product and
process knowledge between development and manufacturing, and
within or between manufacturing sites to achieve product
realization. This knowledge forms the basis for the manufacturing
process, control strategy, process validation approach, and ongoing
continual improvement.”
Process Transfer
Transfers have to be performed in an organized, methodical manner, with appropriate documentation
We will focus on the transfer of process parameters and process knowledge (data)
5. Ishikawa diagram
5 Managing process scaling and tech transfer
Process Transfer Methodology
Method Material (Raw) Manpower
Machine (Equipment) Environment (Facility) Measurement
Successful
tech transfer
6. Ishikawa diagram
6 Managing process scaling and tech transfer
Process Transfer Methodology
Method Material (Raw) Manpower
Machine (Equipment) Environment (Facility) Measurement
Successful
tech transfer
7. Ishikawa diagram
7 Managing process scaling and tech transfer
Process Transfer Methodology
Method
Successful
tech transfer
Tech transfer protocol
Gap analysis
Acceptance criteria
Process knowledge (documentation)
Risk analysis
Responsibilities and accountabilities
8. Form tech transfer teams and governance structures,
Define project charter with goals and timelines,
Consolidate process knowledge into transferable documentation,
Analyze gaps and risks,
Execute the Tech Transfer: work the plan,
Demonstrate technical success: Meet Acceptance criteria,
Finalize transfer: documentation, support of regulatory activities, follow-up actions, lessons learned.
8 Managing process scaling and tech transfer
Process Transfer Key activities
9. 9 Managing process scaling and tech transfer
Process Transfer Key activities
Project Charter
Set expectations and responsibilities between partners
Project charter must include:
A well-defined team structure
Sub-teams for different disciplines
Connect counterparts
Establish communication paths
A well defined governance structure to address issues
Clearly described roles and responsibilities
Clearly established success criteria
10. 10 Managing process scaling and tech transfer
Process Transfer Key activities
Timeline
Kick off
meeting
Team
set up
Regulatory
requirements,
Technical and
Quality Agreement
Planning,
Risk analysis
Kick off meeting: Scope, transfer timelines and team members are defined
Team members: At least a project manager, a technical leader and a tech transfer team
Communication plan: Deliverables
Team members with their respective responsibilities
Communication flow path
Meeting frequency
Tech transfer protocol: Equipment
Raw materials and consumables
Detailed process description including critical parameters
Analytical methods
Tech Transfer
Protocol,
Reference
material
Tech
Transfer
report
Tech
Transfer
Closure
Experiments
11. A Process Description document with an overview of each step and key process parameters is required
Information should be described in a site and scale independent manner
Site-specific details from previous process installations should also be gathered as examples
For example:
Buffers may have been prepared in batch or via in-line dilution
Bioreactors may have been operated with different sparger configurations
Process Transfer Key activities
11 Managing process scaling and tech transfer
Consolidated Process Knowledge
Use an electronic file sharing system
for document hosting – not email
12. Process Transfer Key activities
12 Managing process scaling and tech transfer
Gap analysis
Gaps can be addressed by
changing equipment, procedures,
or the process.
Changes may require specific new
validation studies or may be
covered through the Process
Qualification validation.
13. Process Transfer Key activities
13 Managing process scaling and tech transfer
Quality Risk Management
Risks are inherent to
technology transfers
Identifying, assessing, and
mitigating - or - accepting
risks defines the project
work scope of a transfer
From ICH Q9, two primary principles
of quality risk management are:
Evaluation of risk to quality should be based
on scientific knowledge and ultimately link to
protection of patients
The level of effort, formality, and documentation of
The quality risk management process should be
commensurate with the level of risk
14. Process Transfer Key activities
14 Managing process scaling and tech transfer
Process “Q/q”ualification
It is a demonstration that the process is
performing correctly at the receiving unit.
It is important to have Pre-defined Success
Criteria: step yield, impurities, titer, etc.
15. Process Transfer Key activities
15 Managing process scaling and tech transfer
Process changes
Some process changes are inevitable based on
major differences in facility, equipment, or
operational practices.
Proper experiments must be performed to
determine acceptability of the change. Small-
scale models may be a good tool for examining
the effects of changes.
Pre-defined success criteria are key to timely
progress and make decisions. Otherwise, how
do you know if the proposed change is
acceptable?
16. Ishikawa diagram
16 Managing process scaling and tech transfer
Process Transfer Methodology
Method Material (Raw) Manpower
Machine (Equipment) Environment (Facility) Measurement
Successful
tech transfer
17. Ishikawa diagram
17 Managing process scaling and tech transfer
Process Transfer Methodology
Machine (Equipment)
Successful
tech transfer
Scale down model
Characteristics
Modelization
IQ/OQ/PQ
18. Systems characteristics have to be considered
Mixing efficiency can vary: Impeller type, position, size/tank….
Sparging efficiency can vary: Sparger size, sparger position, bubble size…
Fluid movement and G/L interaction can vary: Baffles type, position, interactions
18 Managing process scaling and tech transfer
Equipment knowledge and modelization
3 L 50 L 200 L 2 000 L
19. Systems characteristics have to be considered
Mass transfer modeling can help
KL.a: Volumetric mass transfer coefficient (s-1)
P/V: Power per unit volume (W.m-3)
Vs: Superficial gas velocity (m.s-1)
19 Managing process scaling and tech transfer
Equipment knowledge and modelization
Design-Expert® Software
Factor Coding: Actual
KLa (hr-1)
Design points above predicted value
Design points below predicted value
34.71
4.07
X1 = A: P/V
X2 = B: Vs
0.000145546
0.000291093
0.000436639
0.000582185
0.000727732
1
4.8
8.6
12.4
16.2
20
0
10
20
30
40
KLa(hr-1) A: P/V (W/m3)
B: Vs (m/s)
20. Systems characteristics have to be considered
20 Managing process scaling and tech transfer
Equipment knowledge and modelization
3 L 50 L 200 L 2 000 L
Design-Expert® Software
Factor Coding: Actual
KLa (hr -1)
Design points above predicted value
Design points below predicted value
22.17
1.88
X1 = A: P/V
X2 = B: Vs
0.00031
0.000568
0.000826
0.001084
0.001342
0.0016
1
4.8
8.6
12.4
16.2
20
0
5
10
15
20
25
KLa(hr-1)
A: P/V (W/M3)
B: Vs (m/s)
Design-Expert® Software
Factor Coding: Actual
KLa (hr-1)
Design points above predicted value
Design points below predicted value
34.71
4.07
X1 = A: P/V
X2 = B: Vs
0.000145546
0.000291093
0.000436639
0.000582185
0.000727732
1
4.8
8.6
12.4
16.2
20
0
10
20
30
40
KLa(hr-1)
A: P/V (W/m3)
B: Vs (m/s)
Design-Expert® Software
Factor Coding: Actual
KLa (hr-1)
Design points above predicted value
Design points below predicted value
29.63
1.91
X1 = A: P/V
X2 = B: Vs
9.17849E-005
0.00018357
0.000275355
0.000367139
0.000458924
1
4.8
8.6
12.4
16.2
20
0
5
10
15
20
25
30
KLa(hr-1)
A: P/V (W/m3)B: Vs (m/s)
-Expert® Software
Coding: Actual
-1)
gn points above predicted value
gn points below predicted value
P/V
Vs
2.26125E-005
3.95718E-005
5.65311E-005
7.34905E-005
9.04498E-005
1
4.8
8.6
12.4
16.2
20
2
3
4
5
6
7
8
9
KLa(hr-1)
A: P/V (W/m3)B: Vs (m/s)
21. Systems characteristics have to be considered
21 Managing process scaling and tech transfer
Equipment knowledge and modelization
3 L 50 L 200 L 2 000 L
Pug/V 10,40 10,48 10,42 10,70
Kla 5,12 5,14 5,16 5,17
22. From 3 L to 2,000 L:
From Equipment knowledge to Tech transfer and scale-up of any CHO Cell line
22 Managing process scaling and tech transfer
Case study: CHO Cell line
0
10
20
30
40
0 2 4 6 8 10 12 14
VCD(x10^6
cells/mL)
VCD
CHO-M CHO-K1 CHO-S
23. Ishikawa diagram
23 Managing process scaling and tech transfer
Process Transfer Methodology
Method Material (Raw) Manpower
Machine (Equipment) Environment (Facility) Measurement
Successful
tech transfer
24. Ishikawa diagram
24 Managing process scaling and tech transfer
Process Transfer Methodology
Material (Raw)
Successful
tech transfer
Supplier qualification
Supply chain
Regulation
25. Raw material assessment
Type Name Formula CAS # Supplier Manufacturer Reference ID interne Statut Id
MP Potassium Dihydrogenophosphate KH2PO4 7778-77-0 Merck Emprove
Created if
sufficient
grade
OK
Type Name Quality system Capacity Status
MP Potassium Dihydrogenophosphate OK OK OK
Supplier assessment
Global status OK
Type Nom Storage Conditions EHS risk Batch traceability Use statut
MP Potassium Dihydrogenophosphate OK OK OK OK
Use assessment
26. Case study
In-tech transfer of a stainless steel process to single use
PROCESS FITTING
• Load: ≤ 30 g/L
• Mode: Bind/Elute
• 3 wash steps
• Buffer elution: Formic acid
• Elution cond : 8 mS/cm
• Elution volume 6-7 BV
• Load: ≤ 30 g/L
• Mode: Bind/Elute
• 2 wash steps
• Buffer elution: citric acid
• Elution cond : 3.5 mS/cm
• Elution volume < 2.5 BV
Protein A capture
EHS Ok
27. Case study
In-tech transfer of a stainless steel process to single use
PROCESS FITTING
Cation Exchange Chromatography
• Resin
• Load: ≤ 30 g/L
• Mode: Bind/Elute
• Buffer eq: Acetate + NaCL gradient
• Elution cond: 15-20 mS/cm
• Resin
• Load: 500 – 700 g/L
• Mode: overloading
• Buffer eq: Acetate (No NaCl)
• No elution
• Cond 3 mS/cm
28. Case study
In-tech transfer of a stainless steel process to single use
PROCESS FITTING
Anion Exchange Chromatography
• Membrane
• Load dilution: 3X
• Load: 400 g/m²
• Mode: Flowthrough
• Resin
• No dilution
• Load: 300 g/L
• Mode: Flowthrough
29. Ishikawa diagram
29 Managing process scaling and tech transfer
Process Transfer Methodology
Method Material (Raw) Manpower
Machine (Equipment) Environment (Facility) Measurement
Successful
tech transfer
30. Ishikawa diagram
30 Managing process scaling and tech transfer
Process Transfer Methodology
Environment (Facility)
Successful
tech transfer
Flows in and out
Equipment limitation
Storage (raw material, buffer, product)
Supply (water, gas, etc.)
31. Case study
In-tech transfer of a stainless steel process to single use
Kick off
meeting
Team
members
Regulatory and
validation
requirements
Technical and
Quality Agreement
Planning
Communication
plan
Risk analysis
validated
Tech Transfer
Protocol
Reference
material provided
Tech
Transfer
report
Tech
Transfer
Closure
Experiments
32. Case study
In-tech transfer of a stainless steel process to single use
Kick off
meeting
Team
members
Regulatory and
validation
requirements
Technical and
Quality Agreement
Planning
Communication
plan
Risk analysis
validated
Tech Transfer
Protocol
Reference
material provided
Tech
Transfer
report
Tech
Transfer
Closure
Experiments
Different equipment
Different need of supply (No CIP)
Different need of storage (Bags)
Different flows in and out
33. Case study
In-tech transfer of a stainless steel process to single use
Kick off
meeting
Team
members
Regulatory and
validation
requirements
Technical and
Quality Agreement
Planning
Communication
plan
Risk analysis
validated
Tech Transfer
Protocol
Reference
material provided
Tech
Transfer
report
Tech
Transfer
Closure
Experiments
3 4 5 6 7 8 9 10 11 12 13 14 15
Titer(g/L)
Production days
200L Mobius 500L stainless steel
34. Case study
In-tech transfer of a stainless steel process to single use
Kick off
meeting
Team
members
Regulatory and
validation
requirements
Technical and
Quality Agreement
Planning
Communication
plan
Risk analysis
validated
Tech Transfer
Protocol
Reference
material provided
Tech
Transfer
report
Tech
Transfer
Closure
Experiments
0
20
40
60
80
100
K7153A
Lot RS10-004
K7153A
Lot N063813001
Abundance%
CEX-HPLC
Main peak Acidic peak Basic peak
35. Case study
In-tech transfer of a stainless steel process to single use
Kick off
meeting
Team
members
Regulatory and
validation
requirements
Technical and
Quality Agreement
Planning
Communication
plan
Risk analysis
validated
Tech Transfer
Protocol
Reference
material provided
Tech
Transfer
report
Tech
Transfer
Closure
Experiments
0.0
20.0
40.0
60.0
80.0
100.0
G0F
Abundance(%)
Most frequent glycan of interest
Drug susbtance from a production with a 500L stainless steel bioreactor
Drug susbtance from a production with a 200L Mobius bioreactor
36. Ishikawa diagram
36 Managing process scaling and tech transfer
Process Transfer Methodology
Method Material (Raw) Manpower
Machine (Equipment) Environment (Facility) Measurement
Successful
tech transfer
37. Ishikawa diagram
37 Managing process scaling and tech transfer
Process Transfer Methodology
Manpower
Successful
tech transfer
Equipment training
Process knowledge
GMP training
38. 38 Managing process scaling and tech transfer
Training
Process training
1. Scale down the process
2. Train operators in a development lab
Equipment training
1. Specificities of the receiving site have to be taken into account
2. Training should occur after gap analysis
GMP training
1. Training of operators should be controlled by QA
2. Traceability is required
39. Ishikawa diagram
39 Managing process scaling and tech transfer
Process Transfer Methodology
Method Material (Raw) Manpower
Machine (Equipment) Environment (Facility) Measurement
Successful
tech transfer
40. Ishikawa diagram
40 Managing process scaling and tech transfer
Process Transfer Methodology
Measurement
Successful
tech transfer
Method transfer
Method validation
Analytical transfer / Qualification
41. 41 Managing process scaling and tech transfer
Measurement
Process analytics should be transferred at first
Scale-down model of the process may help save money, time and resources
Qualification of reactants is key
42. 42 Managing process scaling and tech transfer
Review process performance
• If there are issues to be corrected, assign actions and plan the work
• If failures occurred due to flaws in the methods of transfer, amend
transfer procedures for future executions
Support Regulatory activities
• Document preparation for submissions
• Respond to questions
• Preparation for inspections
Implement systems for ongoing technical support of manufacturing