This presentation will describe how our planet operates and will summarize the impact AML reclamation has had on the local environment and the communities in Revloc and Nandy Glo, and the expected impact of the next AML reclamation project.
4. Ebensburg Power Company
• Consume about 500,000 tons coal refuse/year
since initial operation – 10,700,000 tons
• Utilize about 480,000 tons ash/year for beneficial
use
• Neutralize about 15,000,000 lb/year of sulfuric
acid with beneficial use ash – since initial
operation about 250,000,000 lbs
• Remove about 46,000,000 lbs/year of sulfuric
acid away from PA waterways - since initial
operation about 1,000,000,000 lbs
6. Revloc I and II Coal Refuse Sites
• Approximately 86 acres of land
• About 4,000,000 tons of coal refuse
• Initial operation 1990
• Reclamation completed 2012
• Removed about 3,000,000 tons coal refuse
• Total cost $24,000,000 or $280,000/acre
• Site Available for Industrial Development
10. Revloc Sites After Reclamation
• Baseline Pollution Load Reduction to South
Branch Blacklick Creek
– 93% reduction in acidity
– 92% reduction in iron
– 71% reduction in manganese
– 95% reduction in aluminum
• Restoration of aquatic life to approximately six
miles of stream
14. Nanty Glo West and East
• Approximately 100 acres of land
• Located along Pergrin Run – Kiski-Conemaugh
• About 3,500,000 tons of coal refuse
• Initial operation 2005
• Reclamation completed ????
• Removed about 1,700,000 tons coal refuse to
date
• Total cost to date $23,000,000
17. Nanty Glo West Reclamation
Impact on Pergrin Run To Date
• Baseline Pollution Load Reduction to Pergrin Run
– 95% reduction in acidity
– 93% reduction in iron
– 29% reduction in manganese
– 94% reduction in aluminum
• Mining parameters Before / Today
ph <4 ph / >6 ph
Sulfate >1000 mg/ml / <100 mg/ml
Iron/aluminum >100 mg/ml / < 2 mg/ml
20. Mine 37 Coal Refuse Pile
• Located along Paint Creek-tributary of Stonycreek
• Approximately 63 acres of land
• About 1,600,000 tons of coal refuse
• Initial operation ????
• Reclamation completed 5 -8 years
• Expect to remove about 1,200,000 tons of coal
refuse
21. Mine 37- Impact on Paint Creek
Watershed
• Mine 37 water runoff contributes
– 801 tons/yr acidity - 91% of watershed total
– 94 tons/yr iron - 87% of watershed total
– 33 tons/yr manganese - 93.5% of watershed total
– 126 tons/yr aluminum - 95% of watershed total
Values provided by Paint Creek Restoration Plan