Task Name

Warehouse WBS
Duration

Start

Finish 17,Resource Names
Apr
'13
T

1 Pilkington Tenant Improvement Schedule
193 days
1.1 LEASE RELATED ACTIVITIES
15 days
1.1.1 Sign Letter of Intent to Start Design
0 days
1.1.2 Lease Review
3 wks
1.1.3 Sign Lease Agrement
0 days
1.2 DESIGN DEVELOPMENT
71 days
1.2.1 Preliminary Design Development (SD)
4 wks
1.2.2 Provide Racking Plan (Pilkington)
0 days
1.2.3 Approve Space Plan (Moves 1,2,3)
1 day
1.2.4 Approve Space Plan (Moves 4,5)
1 day
1.2.5 Approve Preliminary Warehouse Space Plan (Dock Locations)
0 days
1.2.6 Design Development (Moves 1,2,3)
2 wks
1.2.7 Design Development (Moves 4,5)
2 wks
1.2.8 Engineered Racking Drawings (Pilkington)
10 days
1.2.9 Office Allowance Budget Approval
0 days
1.2.10 Finalize Interior Finishes
1 day
1.2.11 Bid and Award MEP Design Build Subcontracts
2 days
1.2.12 MEP Design Documents
1 day
1.2.13 Approval of Final Design Documents (Pilkington) 0 days
1.2.14 Bid/Award General Trades/Finishes Packages
0 days
1.2.15 Reconcile Office/Warehouse Alowance Budget
0 days
1.2.16 Submit Permit Drawings (Moves 1,2,3)
4 wks
1.2.17 Submit Permit Drawings (Moves 4,5)
4 wks
1.3 PERMITS
61 days
1.3.1 State of Ohio Building Permit (Moves 1,2,3)
4 wks
1.3.2 State of Ohio Building Permit (Moves 4,5)
4 wks
1.3.3 Racking Plan Review
10 days
1.4 CONSTRUCTION (MOVES 1,2,3) (Phase A)
49 days
1.4.1 Warehouse Power/Lighting
2 days
1.4.1.1 Trench for Underground plumbing
1 day

Apr 24
Apr 24
May 14
Apr 24
May 14
May 14
May 15
May 14
Jun 26
Jun 26
Jun 11
Jun 12
Jun 12
May 15
Jun 26
Jun 27
Jul 1
Jun 28
Jun 26
Jun 26
Aug 21
Jun 27
Jun 27
May 29
Jul 25
Jul 25
May 29
Aug 22
Aug 22
Aug 23

Jan 17
May 14
May 14
May 14
May 14
Aug 21
Jun 11
May 14
Jun 26
Jun 26
Jun 11
Jun 25
Jun 25
May 28
Jun 26
Jun 27
Jul 2
Jun 28
Jun 26
Jun 26
Aug 21
Jul 24
Jul 24
Aug 21
Aug 21
Aug 21
Jun 11
Oct 29
Aug 23
Aug 23

Apr 24, '13
W T F

Mike Deskin
S

MDesign,Owner
MDesign,Owner
MDesign,Owner
MDesign
MDesign
Owner
Owner
Owner
MDesign
MDesign
MDesign
Owner
MDesign,Owner
MDesign,Owner
MDesign
Owner
MDesign
Owner
Owner
MDesign,Owner
Owner
Owner
MDesign,Owner

Cement Crew,Plumbers
Perpared for client: Jeff Suchy

S

M

T

May 1, '13
W T F

S

S

M

T

May 8, '13
W T F

S

S

M

T

May 15, '13
W T F

S

S

M

T

May 22, '13
W T F

S

5/14
MDesign,Owner
5/14

5/14

O

O
Nov 5
Task Name

Warehouse WBS
Duration

Start

Finish 17,Resource Names
Apr
'13
T

1.4.1.2 Temporary Lighting
1.4.2 Tenant Racking
1.4.2.1 Install Racks
1.4.3 Rough Framing/Carpentry
1.4.3.1 Install Steel Studs
1.4.3.2 Install Door Frames
1.4.3.3 Install Blocking
1.4.3.4 Install Drywall
1.4.4 Office MEP Rough-in
1.4.4.1 Rough in Electric
1.4.4.2 Run under slab Pipes for Plumbing
1.4.4.3 Run pipes under slab bathroom
1.4.4.4 Run HVAC
1.4.4.5 MEP Rough Inspection
1.4.5 Dock Pit Pour Back
1.4.5.1 FRIPS dock pit
1.4.5.2 Let Cure
1.4.5.3 Install Dock Equipment
1.4.5.4 Complete remaining millwork
1.4.6 Tenant Cabling
1.4.6.1 Install Telephone, Internet
1.4.6.2 Final runs electric
1.4.7 Drywall/Finishes/Ceiling
1.4.7.1 Install Ceiling tile grid
1.4.7.2 Install Ceiling Tiles
1.4.7.3 Mud/Sand Drywall
1.4.7.4 Install Carpet
1.4.7.5 Drop cloth Carpet
1.4.7.6 Paint 2 coats
1.4.7.7 Install tile

1 day
2 days
4 days
25 days
10 days
4 days
6 days
5 days
21 days
2 days
2 days
2 days
5 days
0 days
17 days
2 days
10 days
2 days
3 days
1 day
1 day
1 day
18 days
2 days
3 days
2 days
2 days
1 day
2 days
2 days

Aug 22
Sep 4
Sep 27
Aug 26
Aug 26
Sep 17
Sep 9
Sep 23
Aug 26
Sep 9
Aug 26
Aug 28
Sep 17
Sep 23
Aug 30
Aug 30
Sep 3
Sep 17
Sep 19
Sep 24
Sep 24
Sep 24
Sep 24
Oct 7
Sep 24
Sep 30
Oct 2
Oct 4
Oct 9
Oct 11

Aug 22
Sep 5
Oct 2
Sep 27
Sep 6
Sep 20
Sep 16
Sep 27
Sep 23
Sep 10
Aug 27
Aug 29
Sep 23
Sep 23
Sep 23
Sep 2
Sep 16
Sep 18
Sep 23
Sep 24
Sep 24
Sep 24
Oct 17
Oct 8
Sep 26
Oct 1
Oct 3
Oct 4
Oct 10
Oct 14

Apr 24, '13
W T F

Mike Deskin
S

Electrician
Labors 1
Rough Carpenters
Rough Carpenters
Rough Carpenters
Finish Carpenters
Electrician
Plumbers
Plumbers
HVAC
Inspectors
Cement Crew
Cement Crew
Labors 1
Finish Carpenters
Electrician
Electrician
Labors 2
Labors 2
Rough Carpenters
Carpet Layers
Painters
Painters
Tile Layers
Perpared for client: Jeff Suchy

S

M

T

May 1, '13
W T F

S

S

M

T

May 8, '13
W T F

S

S

M

T

May 15, '13
W T F

S

S

M

T

May 22, '13
W T F

S
Nov 5
Task Name

Warehouse WBS
Duration

Start

Finish 17,Resource Names
Apr
'13
T

1.4.7.8 Bathroom recepticles
1.4.8 MEP Finishes
1.4.8.1 Bathroom Fixtures
1.4.8.2 MEP Final Inspections
1.4.8.3 finish all life saftey
1.4.9 Final Inspections/Life Saftey
1.4.9.1 Final Structual Inspections
1.4.9.2 Testing of Life Saftey
1.4.9.3 Certificate of Occupancy
1.4.9.4 Substanial Completion
1.4.9.5 Punch List
1.4.9.6 Tenant Relocation (Move 1)
1.4.9.7 Tenant Relocation (Move 2)
1.4.9.8 Tenant Relocation (Move 3)
1.4.9.9 Phase A Complete
1.5 CONSTRUCTION (MOVES 4,5)(Phase B)
1.5.1 Warehouse Power/Lighting
1.5.1.1 Trench out for plumbing
1.5.1.2 Run under slab plumbing
1.5.1.3 Temporary Lighting
1.5.2 Tenant Racking
1.5.2.1 Install Racks
1.5.2.2 All Final Inspections
1.5.3 Rough Framing/Carpentry
1.5.3.1 Install Steel Studs
1.5.3.2 Install Door Frames
1.5.3.3 Install Blocking
1.5.3.4 Install Drywall
1.5.4 Office MEP Rough-in
1.5.4.1 Rough in electric

3 days
14 days
2 days
0 days
1 day
24 days
0 days
0 days
0 days
1 day
3 days
1 day
1 day
1 day
1 day
85 days
6 days
3 days
2 days
1 day
3 days
3 days
0 days
14 days
10 days
2 days
2 days
3 days
15 days
1 day

Oct 15
Sep 24
Oct 11
Sep 24
Sep 25
Sep 25
Oct 8
Sep 25
Oct 23
Oct 18
Oct 21
Oct 24
Oct 25
Oct 28
Oct 29
Jul 3
Jul 3
Jul 4
Jul 9
Jul 3
Aug 6
Aug 6
Aug 8
Jul 11
Jul 11
Jul 25
Jul 29
Jul 12
Jul 11
Jul 25

Oct 17
Oct 14
Oct 14
Sep 24
Sep 25
Oct 29
Oct 8
Sep 25
Oct 23
Oct 18
Oct 23
Oct 24
Oct 25
Oct 28
Oct 29
Oct 29
Jul 10
Jul 8
Jul 10
Jul 3
Aug 8
Aug 8
Aug 8
Jul 30
Jul 24
Jul 26
Jul 30
Jul 16
Jul 31
Jul 25

Apr 24, '13
W T F

Mike Deskin
S

Labors 1
Labors 1
Inspectors
Labors 1
Inspectors
Inspectors
Owner
Owner
Labors 1,Labors 2,MDesign
Owner
Owner
Owner
MDesign

Cement Crew,Plumbers
Plumbers
Electrician
Labors 1
Inspectors
Rough Carpenters
Rough Carpenters
Rough Carpenters
Rough Carpenters
Electrician
Perpared for client: Jeff Suchy

S

M

T

May 1, '13
W T F

S

S

M

T

May 8, '13
W T F

S

S

M

T

May 15, '13
W T F

S

S

M

T

May 22, '13
W T F

S
Nov 5
Task Name

Warehouse WBS
Duration

Start

Finish 17,Resource Names
Apr
'13
T

1.5.4.2 Install bathroom Pipes for Plumbing
1.5.4.3 Run HVAC
1.5.4.4 MEP Rough Inspection
1.5.5 Tenant Cabling
1.5.5.1 Install Telephone, Internet
1.5.5.2 Final electrical runs
1.5.6 Drywall/Finishes/Ceiling
1.5.6.1 Install Ceiling Rack
1.5.6.2 Install carpet and VCT
1.5.6.3 Install Ceiling Tiles
1.5.6.4 Mud/Sand Drywall
1.5.6.5 Paint 2 coats
1.5.7 MEP Finishes
1.5.7.1 Bathroom Fixtures
1.5.7.2 MEP Final Inspections
1.5.7.3 Substanial Completion
1.5.7.4 Punch List
1.5.7.5 Tenant Relocation (Move 4)
1.5.7.6 Phase B Complete
1.5.7.7 Project Complete
1.5.7.8 Tenant Relocation (Move 5)
1.5.7.9 Tenant Relocation (Move 5) ALTERNATE

1 day
1 day
0 days
3 days
2 days
1 day
21 days
2 days
4 days
3 days
2 days
4 days
61 days
2 days
0 days
1 day
2 days
1 day
0 days
0 days
1 day
1 day

Jul 11
Jul 31
Jul 31
Aug 1
Aug 1
Aug 5
Jul 17
Jul 31
Jul 17
Aug 6
Jul 23
Aug 9
Aug 5
Aug 15
Aug 5
Aug 9
Aug 19
Aug 21
Aug 22
Oct 29
Aug 21
Aug 22

Jul 11
Jul 31
Jul 31
Aug 5
Aug 2
Aug 5
Aug 14
Aug 1
Jul 22
Aug 8
Jul 24
Aug 14
Oct 29
Aug 16
Aug 5
Aug 9
Aug 20
Aug 21
Aug 22
Oct 29
Aug 21
Aug 22

Apr 24, '13
W T F

Mike Deskin
S

Plumbers
HVAC
Inspectors
Electrician
Electrician
Labors 2
Carpet Layers,Tile Layers
Labors 1
Rough Carpenters
Painters
Labors 2
Inspectors
MDesign,Owner
MDesign
Owner
MDesign,Owner
MDesign,Owner
Owner
Owner

Perpared for client: Jeff Suchy

S

M

T

May 1, '13
W T F

S

S

M

T

May 8, '13
W T F

S

S

M

T

May 15, '13
W T F

S

S

M

T

May 22, '13
W T F

S
Nov 5

Warehouse WBS

'13
S

S

M

T

May 29, '13
W T F

S

S

M

T

Jun 5, '13
W T F

S

S

M

T

Jun 12, '13
W T F

S

S

M

T

Jun 19, '13
W T F

S

S

M

T

Mike Deskin
Jun 26, '13
W T F

S

S

M

T

Jul 3, '13
W T F

S

MDesign
Owner
Owner
6/11
MDesign
MDesign
MDesign
6/26
MDesign,Owner
MDesign,Owner
MDesign
6/26
6/26

MDesign,Owner

Perpared for client: Jeff Suchy

S

M

T

Jul 10, '13
W T F

S

S

M

T

Jul 17, '13
W T F

S

S

M

T

W
Nov 5

Warehouse WBS

'13
S

S

M

T

May 29, '13
W T F

S

S

M

T

Jun 5, '13
W T F

S

S

M

T

Jun 12, '13
W T F

S

S

M

T

Jun 19, '13
W T F

S

S

M

T

Mike Deskin
Jun 26, '13
W T F

S

S

M

T

Jul 3, '13
W T F

S

S

M

T

Jul 10, '13
W T F

S

S

M

T

Jul 17, '13
W T F

S

S

M

T

W

H

F

Perpared for client: Jeff Suchy
Nov 5

Warehouse WBS

'13
S

S

M

T

May 29, '13
W T F

S

S

M

T

Jun 5, '13
W T F

S

S

M

T

Jun 12, '13
W T F

S

S

M

T

Jun 19, '13
W T F

S

S

M

T

Mike Deskin
Jun 26, '13
W T F

S

S

M

T

Jul 3, '13
W T F

S

S

M

T

Jul 10, '13
W T F

S

S

M

T

Jul 17, '13
W T F

S

Cement Crew,Plumbers
Plumbers
Electrician

Rough Carpenters

Perpared for client: Jeff Suchy

S

M

T

W
Nov 5

Warehouse WBS

'13
S

S

M

T

May 29, '13
W T F

S

S

M

T

Jun 5, '13
W T F

S

S

M

T

Jun 12, '13
W T F

S

S

M

T

Jun 19, '13
W T F

S

S

M

T

Mike Deskin
Jun 26, '13
W T F

S

S

M

T

Jul 3, '13
W T F

S

S

M

T

Jul 10, '13
W T F S S
Plumbers

M

T

Jul 17, '13
W T F

S

S

M

T

W

Carpet La

Perpared for client: Jeff Suchy
Nov 5
Jul 24, '13
W T F

Warehouse WBS
S

S

M

T

Jul 31, '13
W T F

S

S

M

T

Aug 7, '13
W T F

S

S

M

T

Aug 14, '13
W T F

S

S

M

T

Aug 21, '13
W T F

S

Mike Deskin
S

M

T

Aug 28, '13
W T F

8/21
Owner
MDesign,Owner
Owner
Owner

Cement Crew,Plumbers
Perpared for client: Jeff Suchy

S

S

M

T

Sep 4, '13
W T F

S

S

M

T

Sep 11, '13
W T F

S

S

M

T

Sep 18, '13
W T F

S

S
Nov 5
Jul 24, '13
W T F

Warehouse WBS
S

S

M

T

Jul 31, '13
W T F

S

S

M

T

Aug 7, '13
W T F

S

S

M

T

Aug 14, '13
W T F

S

S

M

T

Aug 21, '13
W T F S S
Electrician

Mike Deskin
M

T

Aug 28, '13
W T F

S

S

M

T

Sep 4, '13
W T F

S

S

M

T

Sep 11, '13
W T F

S

S

M

T

Sep 18, '13
W T F

S

S

Rough Carpenters

Rough Ca
Rough Carpenters

Electrician
Plumbers
Plumbers

Cement Crew
Cement Crew
Labors 1

Perpared for client: Jeff Suchy
Nov 5

Warehouse WBS

Jul 24, '13
W T F

S

S

M

T

Jul 31, '13
W T F

S

S

M

T

Aug 7, '13
W T F

S

S

M

T

Aug 14, '13
W T F

S

S

M

T

Aug 21, '13
W T F

S

Mike Deskin
S

Labors 1
8/8
Rough Carpenters
Rough Carpenters
Rough Carpenters

Electrician
Perpared for client: Jeff Suchy

M

T

Aug 28, '13
W T F

S

S

M

T

Sep 4, '13
W T F

S

S

M

T

Sep 11, '13
W T F

S

S

M

T

Sep 18, '13
W T F

S

S
Nov 5
Jul 24, '13
W T F

Warehouse WBS
S

S

M

T

Jul 31, '13
W T F

S

S

M

T

Aug 7, '13
W T F

S

S

M

T

Aug 14, '13
W T F

S

S

M

T

Aug 21, '13
W T F

S

Mike Deskin
S

HVAC
7/31
Electrician
Electrician
Labors 2
Carpet Layers,Tile Layers
Labors 1
Rough Carpenters
Painters
Labors 2
8/5
MDesign,Owner
MDesign
Owner
8/22
Owner
Owner

Perpared for client: Jeff Suchy

M

T

Aug 28, '13
W T F

S

S

M

T

Sep 4, '13
W T F

S

S

M

T

Sep 11, '13
W T F

S

S

M

T

Sep 18, '13
W T F

S

S
Nov 5
S

M

Warehouse WBS
T

Sep 25, '13
W T F

S

S

M

T

Oct 2, '13
W T F

S

S

M

T

Oct 9, '13
W T F

S

S

M

T

Oct 16, '13
W T F

S

S

M

T

Oct 23, '13
W T F

Perpared for client: Jeff Suchy

Mike Deskin
S

S

M

T

Oct 30, '13
W T F

S

S

M

T

Nov 6, '13
W T F

S

S

M

T

Nov 13, '13
W T F

S

S

M

T

Nov 20, '1
W T
Nov 5
S

M

Warehouse WBS
T

Sep 25, '13
W T F

S

S

M

T

Oct 2, '13
W T F

S

S

M

T

Oct 9, '13
W T F

S

S

M

T

Oct 16, '13
W T F

S

S

M

T

Oct 23, '13
W T F

Labors 1

Rough Carpenters

ers
Finish Carpenters

HVAC
9/23

s1
Finish Carpenters
Electrician
Electrician
Labors 2
Labors 2
Rough Carpenters
Carpet Layers
Painters
Painters
Tile Layers
Perpared for client: Jeff Suchy

Mike Deskin
S

S

M

T

Oct 30, '13
W T F

S

S

M

T

Nov 6, '13
W T F

S

S

M

T

Nov 13, '13
W T F

S

S

M

T

Nov 20, '1
W T
Nov 5
S

M

Warehouse WBS
T

Sep 25, '13
W T F

S

S

M

T

Oct 2, '13
W T F

S

S

M

T

Oct 9, '13
W T F

S

S

M

T

Oct 16, '13
W T F S S
Labors 1

M

T

Mike Deskin

Oct 23, '13
W T F

S

S

M

T

Oct 30, '13
W T F

Labors 1
9/24
Labors 1
10/8
9/25
10/23
Owner
Labors 1,Labors 2,MDesign
Owner
Owner
Owner
MDesign

Perpared for client: Jeff Suchy

S

S

M

T

Nov 6, '13
W T F

S

S

M

T

Nov 13, '13
W T F

S

S

M

T

Nov 20, '1
W T
Nov 5
S

M

Warehouse WBS
T

Sep 25, '13
W T F

S

S

M

T

Oct 2, '13
W T F

S

S

M

T

Oct 9, '13
W T F

S

S

M

T

Oct 16, '13
W T F

S

S

M

T

Oct 23, '13
W T F

Mike Deskin
S

S

M

T

Oct 30, '13
W T F

10/29

Perpared for client: Jeff Suchy

S

S

M

T

Nov 6, '13
W T F

S

S

M

T

Nov 13, '13
W T F

S

S

M

T

Nov 20, '1
W T
Nov 5
Nov 20, '13
T F

Warehouse WBS
S

S

M

T

Nov 27, '13
W T F

S

S

M

T

Dec 4, '13
W T F

S

S

M

T

Dec 11, '13
W T F

S

S

M

T

Dec 18, '13
W T F

S

S

Mike Deskin
M

Perpared for client: Jeff Suchy

T

Dec 25, '13
W T F

S

S

M

T

Jan 1, '13
W T F

S

S

M

T

Jan 8, '13
W T F

S

S

M

T

Jan 15, '13
W T F

S

S

M
Nov 5
Nov 20, '13
T F

Warehouse WBS
S

S

M

T

Nov 27, '13
W T F

S

S

M

T

Dec 4, '13
W T F

S

S

M

T

Dec 11, '13
W T F

S

S

M

T

Dec 18, '13
W T F

S

S

Mike Deskin
M

Perpared for client: Jeff Suchy

T

Dec 25, '13
W T F

S

S

M

T

Jan 1, '13
W T F

S

S

M

T

Jan 8, '13
W T F

S

S

M

T

Jan 15, '13
W T F

S

S

M
Nov 5
Nov 20, '13
T F

Warehouse WBS
S

S

M

T

Nov 27, '13
W T F

S

S

M

T

Dec 4, '13
W T F

S

S

M

T

Dec 11, '13
W T F

S

S

M

T

Dec 18, '13
W T F

S

S

Mike Deskin
M

Perpared for client: Jeff Suchy

T

Dec 25, '13
W T F

S

S

M

T

Jan 1, '13
W T F

S

S

M

T

Jan 8, '13
W T F

S

S

M

T

Jan 15, '13
W T F

S

S

M
Nov 5
Nov 20, '13
T F

Warehouse WBS
S

S

M

T

Nov 27, '13
W T F

S

S

M

T

Dec 4, '13
W T F

S

S

M

T

Dec 11, '13
W T F

S

S

M

T

Dec 18, '13
W T F

S

S

Mike Deskin
M

Perpared for client: Jeff Suchy

T

Dec 25, '13
W T F

S

S

M

T

Jan 1, '13
W T F

S

S

M

T

Jan 8, '13
W T F

S

S

M

T

Jan 15, '13
W T F

S

S

M

Contenu connexe

Tendances

Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
MohammedAliQazi
 
TUGAS ASESI_FARID RIDWANULLOH rev 1.pdf
TUGAS ASESI_FARID RIDWANULLOH rev 1.pdfTUGAS ASESI_FARID RIDWANULLOH rev 1.pdf
TUGAS ASESI_FARID RIDWANULLOH rev 1.pdf
AgusCns1
 
Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx
Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptxMateri Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx
Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx
SintaMarlina3
 
I MADE SUDARMA JAYA_MANAGER LAPANGAN PEKERJAAN GEDUNG.pptx
I MADE SUDARMA JAYA_MANAGER LAPANGAN PEKERJAAN GEDUNG.pptxI MADE SUDARMA JAYA_MANAGER LAPANGAN PEKERJAAN GEDUNG.pptx
I MADE SUDARMA JAYA_MANAGER LAPANGAN PEKERJAAN GEDUNG.pptx
Iketutsupartha
 
ppt SKK_AHLI K3 KONSTRUKSI_MADYA.pptx_1674719544.pptx
ppt SKK_AHLI K3 KONSTRUKSI_MADYA.pptx_1674719544.pptxppt SKK_AHLI K3 KONSTRUKSI_MADYA.pptx_1674719544.pptx
ppt SKK_AHLI K3 KONSTRUKSI_MADYA.pptx_1674719544.pptx
ArisSutriadi1
 

Tendances (20)

Avoiding unrealistic schedules
Avoiding unrealistic schedulesAvoiding unrealistic schedules
Avoiding unrealistic schedules
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time Analysis
 
Baseline schedule review and analysis
Baseline schedule review and analysisBaseline schedule review and analysis
Baseline schedule review and analysis
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
 
Delay analysis ... wise after the event.
Delay analysis ... wise after the event.Delay analysis ... wise after the event.
Delay analysis ... wise after the event.
 
TUGAS ASESI_FARID RIDWANULLOH rev 1.pdf
TUGAS ASESI_FARID RIDWANULLOH rev 1.pdfTUGAS ASESI_FARID RIDWANULLOH rev 1.pdf
TUGAS ASESI_FARID RIDWANULLOH rev 1.pdf
 
Primavera p6 advanced project planning
Primavera p6 advanced project planningPrimavera p6 advanced project planning
Primavera p6 advanced project planning
 
How Project Network Diagram's Can Help You Become A Better Project Manager
How Project Network Diagram's Can Help You Become A Better Project ManagerHow Project Network Diagram's Can Help You Become A Better Project Manager
How Project Network Diagram's Can Help You Become A Better Project Manager
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
 
HSE Weather working plan
HSE Weather working planHSE Weather working plan
HSE Weather working plan
 
Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx
Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptxMateri Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx
Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx
 
Project EHS Plan
Project EHS PlanProject EHS Plan
Project EHS Plan
 
HSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDURE
HSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDUREHSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDURE
HSE CONSULTATION AND COMMUNICATION MANAGEMENT PROCEDURE
 
I MADE SUDARMA JAYA_MANAGER LAPANGAN PEKERJAAN GEDUNG.pptx
I MADE SUDARMA JAYA_MANAGER LAPANGAN PEKERJAAN GEDUNG.pptxI MADE SUDARMA JAYA_MANAGER LAPANGAN PEKERJAAN GEDUNG.pptx
I MADE SUDARMA JAYA_MANAGER LAPANGAN PEKERJAAN GEDUNG.pptx
 
Env monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit TuaEnv monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit Tua
 
50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only
 
Eot claims hr__may2012
Eot claims hr__may2012Eot claims hr__may2012
Eot claims hr__may2012
 
ppt SKK_AHLI K3 KONSTRUKSI_MADYA.pptx_1674719544.pptx
ppt SKK_AHLI K3 KONSTRUKSI_MADYA.pptx_1674719544.pptxppt SKK_AHLI K3 KONSTRUKSI_MADYA.pptx_1674719544.pptx
ppt SKK_AHLI K3 KONSTRUKSI_MADYA.pptx_1674719544.pptx
 
Project Schedule Management
Project Schedule ManagementProject Schedule Management
Project Schedule Management
 
How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2
 

En vedette

Marlon_Resume_Jan 2014_Professional
Marlon_Resume_Jan 2014_ProfessionalMarlon_Resume_Jan 2014_Professional
Marlon_Resume_Jan 2014_Professional
Marlon Anatol
 
The general environment
The general environmentThe general environment
The general environment
Yakin Bakhtiar
 
Presentation on Balanced Scorecard
Presentation on Balanced Scorecard Presentation on Balanced Scorecard
Presentation on Balanced Scorecard
Sumayya Quadri
 

En vedette (16)

Marlon_Resume_Jan 2014_Professional
Marlon_Resume_Jan 2014_ProfessionalMarlon_Resume_Jan 2014_Professional
Marlon_Resume_Jan 2014_Professional
 
ERUP WBS
ERUP WBSERUP WBS
ERUP WBS
 
Building services planning manual 2007
Building services planning manual 2007Building services planning manual 2007
Building services planning manual 2007
 
Project Management Scope Templates for SharePoint
Project Management Scope Templates for SharePointProject Management Scope Templates for SharePoint
Project Management Scope Templates for SharePoint
 
How to Combine text from two or more cells in Excel
How to Combine text from two or more cells in ExcelHow to Combine text from two or more cells in Excel
How to Combine text from two or more cells in Excel
 
Project Timeline Template - Deliverable Based Consulting
Project Timeline Template - Deliverable Based ConsultingProject Timeline Template - Deliverable Based Consulting
Project Timeline Template - Deliverable Based Consulting
 
20 Unique Uses of Excel Spreadsheets
20 Unique Uses of Excel Spreadsheets20 Unique Uses of Excel Spreadsheets
20 Unique Uses of Excel Spreadsheets
 
The general environment
The general environmentThe general environment
The general environment
 
080613 Mega-Project Schedule Integration & Management RCF Method-1
080613 Mega-Project Schedule Integration & Management RCF Method-1 080613 Mega-Project Schedule Integration & Management RCF Method-1
080613 Mega-Project Schedule Integration & Management RCF Method-1
 
Editable PowerPoint Gantt chart timeline template for project management
Editable PowerPoint Gantt chart timeline template for project managementEditable PowerPoint Gantt chart timeline template for project management
Editable PowerPoint Gantt chart timeline template for project management
 
Lecture5---Gantt Chart
Lecture5---Gantt ChartLecture5---Gantt Chart
Lecture5---Gantt Chart
 
MEP- Building services
MEP- Building servicesMEP- Building services
MEP- Building services
 
Presentation on Balanced Scorecard
Presentation on Balanced Scorecard Presentation on Balanced Scorecard
Presentation on Balanced Scorecard
 
Balanace score card ppt
Balanace score card pptBalanace score card ppt
Balanace score card ppt
 
Building services
Building servicesBuilding services
Building services
 
Balanced Scorecard Presentation
Balanced Scorecard PresentationBalanced Scorecard Presentation
Balanced Scorecard Presentation
 

Similaire à Microsoft Project Gantt Chat

Residential Conctruction Gantt Chart
Residential Conctruction Gantt ChartResidential Conctruction Gantt Chart
Residential Conctruction Gantt Chart
Adrian Cocorocchio
 
ID WBS Task Name Duration Start Finish Predecessors Resource N.docx
ID WBS Task Name Duration Start Finish Predecessors Resource N.docxID WBS Task Name Duration Start Finish Predecessors Resource N.docx
ID WBS Task Name Duration Start Finish Predecessors Resource N.docx
wilcockiris
 
Sheet1Work Breakdown StructureProject NameDistrict 4 Warehouse Mo.docx
Sheet1Work Breakdown StructureProject NameDistrict 4 Warehouse Mo.docxSheet1Work Breakdown StructureProject NameDistrict 4 Warehouse Mo.docx
Sheet1Work Breakdown StructureProject NameDistrict 4 Warehouse Mo.docx
maoanderton
 
1. A certain developing country currently imports all its wheat bu.docx
1. A certain developing country currently imports all its wheat bu.docx1. A certain developing country currently imports all its wheat bu.docx
1. A certain developing country currently imports all its wheat bu.docx
dorishigh
 
Hu, Maria (Yue) Assign 2 B
Hu, Maria (Yue) Assign 2 BHu, Maria (Yue) Assign 2 B
Hu, Maria (Yue) Assign 2 B
Marina Hu
 
Directions for Downloading and Installing OpenProjMGT 402_Pro.docx
Directions for Downloading and Installing OpenProjMGT 402_Pro.docxDirections for Downloading and Installing OpenProjMGT 402_Pro.docx
Directions for Downloading and Installing OpenProjMGT 402_Pro.docx
duketjoy27252
 
Single Family Gantt Chart-John Mueller
Single Family Gantt Chart-John MuellerSingle Family Gantt Chart-John Mueller
Single Family Gantt Chart-John Mueller
John Mueller
 
Engineering and Permitting Schedule
Engineering and Permitting ScheduleEngineering and Permitting Schedule
Engineering and Permitting Schedule
Honolulu Civil Beat
 
Gantt chart-excel-export-sample pdf
Gantt chart-excel-export-sample pdfGantt chart-excel-export-sample pdf
Gantt chart-excel-export-sample pdf
Erkan Öztemel
 

Similaire à Microsoft Project Gantt Chat (20)

Microsoft Project Network Diagram
Microsoft Project Network DiagramMicrosoft Project Network Diagram
Microsoft Project Network Diagram
 
Residential Conctruction Gantt Chart
Residential Conctruction Gantt ChartResidential Conctruction Gantt Chart
Residential Conctruction Gantt Chart
 
ID WBS Task Name Duration Start Finish Predecessors Resource N.docx
ID WBS Task Name Duration Start Finish Predecessors Resource N.docxID WBS Task Name Duration Start Finish Predecessors Resource N.docx
ID WBS Task Name Duration Start Finish Predecessors Resource N.docx
 
A CLARK 16
A CLARK 16A CLARK 16
A CLARK 16
 
Sheet1Work Breakdown StructureProject NameDistrict 4 Warehouse Mo.docx
Sheet1Work Breakdown StructureProject NameDistrict 4 Warehouse Mo.docxSheet1Work Breakdown StructureProject NameDistrict 4 Warehouse Mo.docx
Sheet1Work Breakdown StructureProject NameDistrict 4 Warehouse Mo.docx
 
1. A certain developing country currently imports all its wheat bu.docx
1. A certain developing country currently imports all its wheat bu.docx1. A certain developing country currently imports all its wheat bu.docx
1. A certain developing country currently imports all its wheat bu.docx
 
Hu, Maria (Yue) Assign 2 B
Hu, Maria (Yue) Assign 2 BHu, Maria (Yue) Assign 2 B
Hu, Maria (Yue) Assign 2 B
 
Directions for Downloading and Installing OpenProjMGT 402_Pro.docx
Directions for Downloading and Installing OpenProjMGT 402_Pro.docxDirections for Downloading and Installing OpenProjMGT 402_Pro.docx
Directions for Downloading and Installing OpenProjMGT 402_Pro.docx
 
Gant chart
Gant chartGant chart
Gant chart
 
Single Family Gantt Chart-John Mueller
Single Family Gantt Chart-John MuellerSingle Family Gantt Chart-John Mueller
Single Family Gantt Chart-John Mueller
 
MS project Sample gantt chart
MS project Sample  gantt chartMS project Sample  gantt chart
MS project Sample gantt chart
 
matt fleming resume
matt fleming resumematt fleming resume
matt fleming resume
 
- ANDALUS HOUSE No 441
- ANDALUS HOUSE No 441- ANDALUS HOUSE No 441
- ANDALUS HOUSE No 441
 
itzcoatl
itzcoatlitzcoatl
itzcoatl
 
Popop
PopopPopop
Popop
 
Inm410 work-breakdown-schedule v2
Inm410 work-breakdown-schedule v2Inm410 work-breakdown-schedule v2
Inm410 work-breakdown-schedule v2
 
CV.2016
CV.2016CV.2016
CV.2016
 
John Rutherford
John RutherfordJohn Rutherford
John Rutherford
 
Engineering and Permitting Schedule
Engineering and Permitting ScheduleEngineering and Permitting Schedule
Engineering and Permitting Schedule
 
Gantt chart-excel-export-sample pdf
Gantt chart-excel-export-sample pdfGantt chart-excel-export-sample pdf
Gantt chart-excel-export-sample pdf
 

Dernier

Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 

Dernier (20)

B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 

Microsoft Project Gantt Chat

  • 1. Nov 5 Task Name Warehouse WBS Duration Start Finish 17,Resource Names Apr '13 T 1 Pilkington Tenant Improvement Schedule 193 days 1.1 LEASE RELATED ACTIVITIES 15 days 1.1.1 Sign Letter of Intent to Start Design 0 days 1.1.2 Lease Review 3 wks 1.1.3 Sign Lease Agrement 0 days 1.2 DESIGN DEVELOPMENT 71 days 1.2.1 Preliminary Design Development (SD) 4 wks 1.2.2 Provide Racking Plan (Pilkington) 0 days 1.2.3 Approve Space Plan (Moves 1,2,3) 1 day 1.2.4 Approve Space Plan (Moves 4,5) 1 day 1.2.5 Approve Preliminary Warehouse Space Plan (Dock Locations) 0 days 1.2.6 Design Development (Moves 1,2,3) 2 wks 1.2.7 Design Development (Moves 4,5) 2 wks 1.2.8 Engineered Racking Drawings (Pilkington) 10 days 1.2.9 Office Allowance Budget Approval 0 days 1.2.10 Finalize Interior Finishes 1 day 1.2.11 Bid and Award MEP Design Build Subcontracts 2 days 1.2.12 MEP Design Documents 1 day 1.2.13 Approval of Final Design Documents (Pilkington) 0 days 1.2.14 Bid/Award General Trades/Finishes Packages 0 days 1.2.15 Reconcile Office/Warehouse Alowance Budget 0 days 1.2.16 Submit Permit Drawings (Moves 1,2,3) 4 wks 1.2.17 Submit Permit Drawings (Moves 4,5) 4 wks 1.3 PERMITS 61 days 1.3.1 State of Ohio Building Permit (Moves 1,2,3) 4 wks 1.3.2 State of Ohio Building Permit (Moves 4,5) 4 wks 1.3.3 Racking Plan Review 10 days 1.4 CONSTRUCTION (MOVES 1,2,3) (Phase A) 49 days 1.4.1 Warehouse Power/Lighting 2 days 1.4.1.1 Trench for Underground plumbing 1 day Apr 24 Apr 24 May 14 Apr 24 May 14 May 14 May 15 May 14 Jun 26 Jun 26 Jun 11 Jun 12 Jun 12 May 15 Jun 26 Jun 27 Jul 1 Jun 28 Jun 26 Jun 26 Aug 21 Jun 27 Jun 27 May 29 Jul 25 Jul 25 May 29 Aug 22 Aug 22 Aug 23 Jan 17 May 14 May 14 May 14 May 14 Aug 21 Jun 11 May 14 Jun 26 Jun 26 Jun 11 Jun 25 Jun 25 May 28 Jun 26 Jun 27 Jul 2 Jun 28 Jun 26 Jun 26 Aug 21 Jul 24 Jul 24 Aug 21 Aug 21 Aug 21 Jun 11 Oct 29 Aug 23 Aug 23 Apr 24, '13 W T F Mike Deskin S MDesign,Owner MDesign,Owner MDesign,Owner MDesign MDesign Owner Owner Owner MDesign MDesign MDesign Owner MDesign,Owner MDesign,Owner MDesign Owner MDesign Owner Owner MDesign,Owner Owner Owner MDesign,Owner Cement Crew,Plumbers Perpared for client: Jeff Suchy S M T May 1, '13 W T F S S M T May 8, '13 W T F S S M T May 15, '13 W T F S S M T May 22, '13 W T F S 5/14 MDesign,Owner 5/14 5/14 O O
  • 2. Nov 5 Task Name Warehouse WBS Duration Start Finish 17,Resource Names Apr '13 T 1.4.1.2 Temporary Lighting 1.4.2 Tenant Racking 1.4.2.1 Install Racks 1.4.3 Rough Framing/Carpentry 1.4.3.1 Install Steel Studs 1.4.3.2 Install Door Frames 1.4.3.3 Install Blocking 1.4.3.4 Install Drywall 1.4.4 Office MEP Rough-in 1.4.4.1 Rough in Electric 1.4.4.2 Run under slab Pipes for Plumbing 1.4.4.3 Run pipes under slab bathroom 1.4.4.4 Run HVAC 1.4.4.5 MEP Rough Inspection 1.4.5 Dock Pit Pour Back 1.4.5.1 FRIPS dock pit 1.4.5.2 Let Cure 1.4.5.3 Install Dock Equipment 1.4.5.4 Complete remaining millwork 1.4.6 Tenant Cabling 1.4.6.1 Install Telephone, Internet 1.4.6.2 Final runs electric 1.4.7 Drywall/Finishes/Ceiling 1.4.7.1 Install Ceiling tile grid 1.4.7.2 Install Ceiling Tiles 1.4.7.3 Mud/Sand Drywall 1.4.7.4 Install Carpet 1.4.7.5 Drop cloth Carpet 1.4.7.6 Paint 2 coats 1.4.7.7 Install tile 1 day 2 days 4 days 25 days 10 days 4 days 6 days 5 days 21 days 2 days 2 days 2 days 5 days 0 days 17 days 2 days 10 days 2 days 3 days 1 day 1 day 1 day 18 days 2 days 3 days 2 days 2 days 1 day 2 days 2 days Aug 22 Sep 4 Sep 27 Aug 26 Aug 26 Sep 17 Sep 9 Sep 23 Aug 26 Sep 9 Aug 26 Aug 28 Sep 17 Sep 23 Aug 30 Aug 30 Sep 3 Sep 17 Sep 19 Sep 24 Sep 24 Sep 24 Sep 24 Oct 7 Sep 24 Sep 30 Oct 2 Oct 4 Oct 9 Oct 11 Aug 22 Sep 5 Oct 2 Sep 27 Sep 6 Sep 20 Sep 16 Sep 27 Sep 23 Sep 10 Aug 27 Aug 29 Sep 23 Sep 23 Sep 23 Sep 2 Sep 16 Sep 18 Sep 23 Sep 24 Sep 24 Sep 24 Oct 17 Oct 8 Sep 26 Oct 1 Oct 3 Oct 4 Oct 10 Oct 14 Apr 24, '13 W T F Mike Deskin S Electrician Labors 1 Rough Carpenters Rough Carpenters Rough Carpenters Finish Carpenters Electrician Plumbers Plumbers HVAC Inspectors Cement Crew Cement Crew Labors 1 Finish Carpenters Electrician Electrician Labors 2 Labors 2 Rough Carpenters Carpet Layers Painters Painters Tile Layers Perpared for client: Jeff Suchy S M T May 1, '13 W T F S S M T May 8, '13 W T F S S M T May 15, '13 W T F S S M T May 22, '13 W T F S
  • 3. Nov 5 Task Name Warehouse WBS Duration Start Finish 17,Resource Names Apr '13 T 1.4.7.8 Bathroom recepticles 1.4.8 MEP Finishes 1.4.8.1 Bathroom Fixtures 1.4.8.2 MEP Final Inspections 1.4.8.3 finish all life saftey 1.4.9 Final Inspections/Life Saftey 1.4.9.1 Final Structual Inspections 1.4.9.2 Testing of Life Saftey 1.4.9.3 Certificate of Occupancy 1.4.9.4 Substanial Completion 1.4.9.5 Punch List 1.4.9.6 Tenant Relocation (Move 1) 1.4.9.7 Tenant Relocation (Move 2) 1.4.9.8 Tenant Relocation (Move 3) 1.4.9.9 Phase A Complete 1.5 CONSTRUCTION (MOVES 4,5)(Phase B) 1.5.1 Warehouse Power/Lighting 1.5.1.1 Trench out for plumbing 1.5.1.2 Run under slab plumbing 1.5.1.3 Temporary Lighting 1.5.2 Tenant Racking 1.5.2.1 Install Racks 1.5.2.2 All Final Inspections 1.5.3 Rough Framing/Carpentry 1.5.3.1 Install Steel Studs 1.5.3.2 Install Door Frames 1.5.3.3 Install Blocking 1.5.3.4 Install Drywall 1.5.4 Office MEP Rough-in 1.5.4.1 Rough in electric 3 days 14 days 2 days 0 days 1 day 24 days 0 days 0 days 0 days 1 day 3 days 1 day 1 day 1 day 1 day 85 days 6 days 3 days 2 days 1 day 3 days 3 days 0 days 14 days 10 days 2 days 2 days 3 days 15 days 1 day Oct 15 Sep 24 Oct 11 Sep 24 Sep 25 Sep 25 Oct 8 Sep 25 Oct 23 Oct 18 Oct 21 Oct 24 Oct 25 Oct 28 Oct 29 Jul 3 Jul 3 Jul 4 Jul 9 Jul 3 Aug 6 Aug 6 Aug 8 Jul 11 Jul 11 Jul 25 Jul 29 Jul 12 Jul 11 Jul 25 Oct 17 Oct 14 Oct 14 Sep 24 Sep 25 Oct 29 Oct 8 Sep 25 Oct 23 Oct 18 Oct 23 Oct 24 Oct 25 Oct 28 Oct 29 Oct 29 Jul 10 Jul 8 Jul 10 Jul 3 Aug 8 Aug 8 Aug 8 Jul 30 Jul 24 Jul 26 Jul 30 Jul 16 Jul 31 Jul 25 Apr 24, '13 W T F Mike Deskin S Labors 1 Labors 1 Inspectors Labors 1 Inspectors Inspectors Owner Owner Labors 1,Labors 2,MDesign Owner Owner Owner MDesign Cement Crew,Plumbers Plumbers Electrician Labors 1 Inspectors Rough Carpenters Rough Carpenters Rough Carpenters Rough Carpenters Electrician Perpared for client: Jeff Suchy S M T May 1, '13 W T F S S M T May 8, '13 W T F S S M T May 15, '13 W T F S S M T May 22, '13 W T F S
  • 4. Nov 5 Task Name Warehouse WBS Duration Start Finish 17,Resource Names Apr '13 T 1.5.4.2 Install bathroom Pipes for Plumbing 1.5.4.3 Run HVAC 1.5.4.4 MEP Rough Inspection 1.5.5 Tenant Cabling 1.5.5.1 Install Telephone, Internet 1.5.5.2 Final electrical runs 1.5.6 Drywall/Finishes/Ceiling 1.5.6.1 Install Ceiling Rack 1.5.6.2 Install carpet and VCT 1.5.6.3 Install Ceiling Tiles 1.5.6.4 Mud/Sand Drywall 1.5.6.5 Paint 2 coats 1.5.7 MEP Finishes 1.5.7.1 Bathroom Fixtures 1.5.7.2 MEP Final Inspections 1.5.7.3 Substanial Completion 1.5.7.4 Punch List 1.5.7.5 Tenant Relocation (Move 4) 1.5.7.6 Phase B Complete 1.5.7.7 Project Complete 1.5.7.8 Tenant Relocation (Move 5) 1.5.7.9 Tenant Relocation (Move 5) ALTERNATE 1 day 1 day 0 days 3 days 2 days 1 day 21 days 2 days 4 days 3 days 2 days 4 days 61 days 2 days 0 days 1 day 2 days 1 day 0 days 0 days 1 day 1 day Jul 11 Jul 31 Jul 31 Aug 1 Aug 1 Aug 5 Jul 17 Jul 31 Jul 17 Aug 6 Jul 23 Aug 9 Aug 5 Aug 15 Aug 5 Aug 9 Aug 19 Aug 21 Aug 22 Oct 29 Aug 21 Aug 22 Jul 11 Jul 31 Jul 31 Aug 5 Aug 2 Aug 5 Aug 14 Aug 1 Jul 22 Aug 8 Jul 24 Aug 14 Oct 29 Aug 16 Aug 5 Aug 9 Aug 20 Aug 21 Aug 22 Oct 29 Aug 21 Aug 22 Apr 24, '13 W T F Mike Deskin S Plumbers HVAC Inspectors Electrician Electrician Labors 2 Carpet Layers,Tile Layers Labors 1 Rough Carpenters Painters Labors 2 Inspectors MDesign,Owner MDesign Owner MDesign,Owner MDesign,Owner Owner Owner Perpared for client: Jeff Suchy S M T May 1, '13 W T F S S M T May 8, '13 W T F S S M T May 15, '13 W T F S S M T May 22, '13 W T F S
  • 5. Nov 5 Warehouse WBS '13 S S M T May 29, '13 W T F S S M T Jun 5, '13 W T F S S M T Jun 12, '13 W T F S S M T Jun 19, '13 W T F S S M T Mike Deskin Jun 26, '13 W T F S S M T Jul 3, '13 W T F S MDesign Owner Owner 6/11 MDesign MDesign MDesign 6/26 MDesign,Owner MDesign,Owner MDesign 6/26 6/26 MDesign,Owner Perpared for client: Jeff Suchy S M T Jul 10, '13 W T F S S M T Jul 17, '13 W T F S S M T W
  • 6. Nov 5 Warehouse WBS '13 S S M T May 29, '13 W T F S S M T Jun 5, '13 W T F S S M T Jun 12, '13 W T F S S M T Jun 19, '13 W T F S S M T Mike Deskin Jun 26, '13 W T F S S M T Jul 3, '13 W T F S S M T Jul 10, '13 W T F S S M T Jul 17, '13 W T F S S M T W H F Perpared for client: Jeff Suchy
  • 7. Nov 5 Warehouse WBS '13 S S M T May 29, '13 W T F S S M T Jun 5, '13 W T F S S M T Jun 12, '13 W T F S S M T Jun 19, '13 W T F S S M T Mike Deskin Jun 26, '13 W T F S S M T Jul 3, '13 W T F S S M T Jul 10, '13 W T F S S M T Jul 17, '13 W T F S Cement Crew,Plumbers Plumbers Electrician Rough Carpenters Perpared for client: Jeff Suchy S M T W
  • 8. Nov 5 Warehouse WBS '13 S S M T May 29, '13 W T F S S M T Jun 5, '13 W T F S S M T Jun 12, '13 W T F S S M T Jun 19, '13 W T F S S M T Mike Deskin Jun 26, '13 W T F S S M T Jul 3, '13 W T F S S M T Jul 10, '13 W T F S S Plumbers M T Jul 17, '13 W T F S S M T W Carpet La Perpared for client: Jeff Suchy
  • 9. Nov 5 Jul 24, '13 W T F Warehouse WBS S S M T Jul 31, '13 W T F S S M T Aug 7, '13 W T F S S M T Aug 14, '13 W T F S S M T Aug 21, '13 W T F S Mike Deskin S M T Aug 28, '13 W T F 8/21 Owner MDesign,Owner Owner Owner Cement Crew,Plumbers Perpared for client: Jeff Suchy S S M T Sep 4, '13 W T F S S M T Sep 11, '13 W T F S S M T Sep 18, '13 W T F S S
  • 10. Nov 5 Jul 24, '13 W T F Warehouse WBS S S M T Jul 31, '13 W T F S S M T Aug 7, '13 W T F S S M T Aug 14, '13 W T F S S M T Aug 21, '13 W T F S S Electrician Mike Deskin M T Aug 28, '13 W T F S S M T Sep 4, '13 W T F S S M T Sep 11, '13 W T F S S M T Sep 18, '13 W T F S S Rough Carpenters Rough Ca Rough Carpenters Electrician Plumbers Plumbers Cement Crew Cement Crew Labors 1 Perpared for client: Jeff Suchy
  • 11. Nov 5 Warehouse WBS Jul 24, '13 W T F S S M T Jul 31, '13 W T F S S M T Aug 7, '13 W T F S S M T Aug 14, '13 W T F S S M T Aug 21, '13 W T F S Mike Deskin S Labors 1 8/8 Rough Carpenters Rough Carpenters Rough Carpenters Electrician Perpared for client: Jeff Suchy M T Aug 28, '13 W T F S S M T Sep 4, '13 W T F S S M T Sep 11, '13 W T F S S M T Sep 18, '13 W T F S S
  • 12. Nov 5 Jul 24, '13 W T F Warehouse WBS S S M T Jul 31, '13 W T F S S M T Aug 7, '13 W T F S S M T Aug 14, '13 W T F S S M T Aug 21, '13 W T F S Mike Deskin S HVAC 7/31 Electrician Electrician Labors 2 Carpet Layers,Tile Layers Labors 1 Rough Carpenters Painters Labors 2 8/5 MDesign,Owner MDesign Owner 8/22 Owner Owner Perpared for client: Jeff Suchy M T Aug 28, '13 W T F S S M T Sep 4, '13 W T F S S M T Sep 11, '13 W T F S S M T Sep 18, '13 W T F S S
  • 13. Nov 5 S M Warehouse WBS T Sep 25, '13 W T F S S M T Oct 2, '13 W T F S S M T Oct 9, '13 W T F S S M T Oct 16, '13 W T F S S M T Oct 23, '13 W T F Perpared for client: Jeff Suchy Mike Deskin S S M T Oct 30, '13 W T F S S M T Nov 6, '13 W T F S S M T Nov 13, '13 W T F S S M T Nov 20, '1 W T
  • 14. Nov 5 S M Warehouse WBS T Sep 25, '13 W T F S S M T Oct 2, '13 W T F S S M T Oct 9, '13 W T F S S M T Oct 16, '13 W T F S S M T Oct 23, '13 W T F Labors 1 Rough Carpenters ers Finish Carpenters HVAC 9/23 s1 Finish Carpenters Electrician Electrician Labors 2 Labors 2 Rough Carpenters Carpet Layers Painters Painters Tile Layers Perpared for client: Jeff Suchy Mike Deskin S S M T Oct 30, '13 W T F S S M T Nov 6, '13 W T F S S M T Nov 13, '13 W T F S S M T Nov 20, '1 W T
  • 15. Nov 5 S M Warehouse WBS T Sep 25, '13 W T F S S M T Oct 2, '13 W T F S S M T Oct 9, '13 W T F S S M T Oct 16, '13 W T F S S Labors 1 M T Mike Deskin Oct 23, '13 W T F S S M T Oct 30, '13 W T F Labors 1 9/24 Labors 1 10/8 9/25 10/23 Owner Labors 1,Labors 2,MDesign Owner Owner Owner MDesign Perpared for client: Jeff Suchy S S M T Nov 6, '13 W T F S S M T Nov 13, '13 W T F S S M T Nov 20, '1 W T
  • 16. Nov 5 S M Warehouse WBS T Sep 25, '13 W T F S S M T Oct 2, '13 W T F S S M T Oct 9, '13 W T F S S M T Oct 16, '13 W T F S S M T Oct 23, '13 W T F Mike Deskin S S M T Oct 30, '13 W T F 10/29 Perpared for client: Jeff Suchy S S M T Nov 6, '13 W T F S S M T Nov 13, '13 W T F S S M T Nov 20, '1 W T
  • 17. Nov 5 Nov 20, '13 T F Warehouse WBS S S M T Nov 27, '13 W T F S S M T Dec 4, '13 W T F S S M T Dec 11, '13 W T F S S M T Dec 18, '13 W T F S S Mike Deskin M Perpared for client: Jeff Suchy T Dec 25, '13 W T F S S M T Jan 1, '13 W T F S S M T Jan 8, '13 W T F S S M T Jan 15, '13 W T F S S M
  • 18. Nov 5 Nov 20, '13 T F Warehouse WBS S S M T Nov 27, '13 W T F S S M T Dec 4, '13 W T F S S M T Dec 11, '13 W T F S S M T Dec 18, '13 W T F S S Mike Deskin M Perpared for client: Jeff Suchy T Dec 25, '13 W T F S S M T Jan 1, '13 W T F S S M T Jan 8, '13 W T F S S M T Jan 15, '13 W T F S S M
  • 19. Nov 5 Nov 20, '13 T F Warehouse WBS S S M T Nov 27, '13 W T F S S M T Dec 4, '13 W T F S S M T Dec 11, '13 W T F S S M T Dec 18, '13 W T F S S Mike Deskin M Perpared for client: Jeff Suchy T Dec 25, '13 W T F S S M T Jan 1, '13 W T F S S M T Jan 8, '13 W T F S S M T Jan 15, '13 W T F S S M
  • 20. Nov 5 Nov 20, '13 T F Warehouse WBS S S M T Nov 27, '13 W T F S S M T Dec 4, '13 W T F S S M T Dec 11, '13 W T F S S M T Dec 18, '13 W T F S S Mike Deskin M Perpared for client: Jeff Suchy T Dec 25, '13 W T F S S M T Jan 1, '13 W T F S S M T Jan 8, '13 W T F S S M T Jan 15, '13 W T F S S M