1. Mike Kirby
4098 West Island Hwy
Qualicum B.C V9K2B1
250-713-2640
MCMKIRBY@GMAIL.COM
Certifications
Interprovincial Trades Qualification (Red Seal)
Alberta CSTS and Leadership in Safety Excellence Training
Work History
2015 Mackenzie Pulp Corporation
Journeyman involved with annual maintanence shutdown
2015 Lander General Power Kitimat Expansion Project on
Journeyman on loan to Rio Tinto responsible for
identifying and repairing deficiencies
2012-2014 PCL Intrcon
Supervisor responsible for tool cribs and warehousing duties including
ordering and expediting consumables and project materialsat Kearl Lake oil
sand project
2011-2012 F&M Installations
Various sites throughout B.C. and Alberta
Site Supervisor responsible for the installation or modifications to Electrical
sub stations and switchyards
2011 Ledcor Industrial
Encana Cabin Gas Plant
Foreman in the early stages of construction responsible for all aspects of the
electrical trade
2. 2010-2011 Ledcorindustrial
Suncor Energy’ Firebag Site
Foreman responsible for general electrical installations including tray, cable
and instrumentation. Terminations of same also responsible for pre-
commissioning inspections
2009 (Sept-Dec) Westwood Electric
Firebag Site
Responsible for Q.C. inspections and high voltage stress cone installations
2008-2009 Western Technical Installations
Nanaimo BC
Site Supervisor various locations throughout BC responsible for BC Hydro
high voltage disconnectupgrades from 230kv to 500kv electrical systems
Site Supervisor Petro Canada Nanaimo tank farm responsible for
instrumentation and level control tank modifications
2007-2008 Nuecal Specialty Cellulose
PortAlice BC
Electrical, Instrumentation and I.T. Superintendent
Responsible for but not limited to the following
Ensuring daily maintenance rounds were completed
Ensuring ongoing preventative maintenance was taking place
Supervising contractorcrews to ensure projects were completed on time and
on budget
Responsible for all safety procedures being followed
Involved in all projects from inception to completion
2007 Western Technical Installations
General Foreman responsible for high voltage distribution electrical and
3. instrumentation installations for a new wash press project at Nuecel
Cellulose pulp mill located at PortAlice BC
2006-2007 Westwood Electric
CNRL site
Member of quality controlteam ensuring that electrical installations met
with specifications
2004-2006 Firestone Energy
Fort McMurray
General Foreman responsible for power distribution, instrumentation, heat
trace installations site temporary power installations also responsible for
supervising sub contractors, estimate and budget control
2002-2003 Raylec Power
Foreman responsible for installation and commissioning for LNG-Methane
power generating station and various other light industrial installations
Mike Kirby
4098 WestIsland Highway
Qualicum Beach B.C.
V9K2B1
250-713-2640
MCMKIRBY@GMAIL.COM
--------------------------------------------------------------------------------------------
Letter of Introduction
4. Please consider me an interested applicant in your firm. For your
consideration I am enclosing a resume, which outlines my most recent
employment and qualifications.
You will find that I have a solid background as a qualified electrician and
that I am competent in installation commissioning, quality control and start
up procedures in industrial applications. My previous employment has aided
me to develop organizational skills, good interpersonal skills, and able to
function as a supervisor or as a member of a team. I am confident that with
my experience and abilities, I can make an immediate and valuable
contribution to your company.
I am available to meet with you to discuss my qualifications at your
convenience. I would like to thank you in advance for your time and any
consideration you may give me. I look forward to hearing from you at your
earliest convenience.
Yours truly
Mike Kirby