SlideShare une entreprise Scribd logo
1  sur  27
Télécharger pour lire hors ligne
201 
Gemba ! 
Observe, Engage, Improve 
- An effective lean method 
The leaders in visual safety.
How Gemba* can Help 
KNOW YOUR STRENGTHS 
Gemba can be a powerful 
piece of your Lean toolbox. 
* The term Gemba means “The real 
place”, and is the location where any real 
action is taking place. Thus the need 
for the walk - to see it first hand.
Gemba as a tool 
Gemba is a straightforward 
way for business owners and 
managers to find and remedy 
issues that can affect their 
production. 
Gemba walks can easily fit into 
any improvement regimen that 
is planned or already in motion.
Gemba Refresher 
During a Gemba walk, observations will 
be made regarding specific or various 
systems within 
the business.
Gemba Refresher (cont.) 
After the walk, the 
observations will be used 
to make improvements in 
how the business runs. 
The end goal will be to 
cut down on waste and to 
skyrocket efficiency 
levels overall.
Things to observe during 
a Gemba Walk: 
EFFICIENCY 
• How well (or badly) a process currently runs. 
• Where employees appear to be struggling or 
where bottlenecks are potentially occurring.
Things to observe during 
a Gemba Walk: (cont.) 
POTENTIAL SAFETY HAZARDS 
• Employee behavior, both 
positive and negative. 
• The state of the facility 
itself.
Preparing for the First 
Gemba Walk: 
DO NOT BE REACTIONARY 
• Don’t just grab a notepad 
or iPad and head out onto 
the work floor. 
• Plan ahead.
Preparing for the First 
Gemba Walk: (cont.) 
PREPARE 
• Preparation 
is the key to 
a successful 
Gemba walk.
Employee Knowledge 
When planning a Gemba 
walk it is important to 
consider how the employees 
will react. 
In nearly every case, it is 
best if employees never 
even hear the term “Gemba 
walk” before it is conducted.
Employee Knowledge (cont.) 
The biggest tool for authenticity 
and accuracy in the results is 
observing the continued normal 
behavior of workers 
over time.
Employee Knowledge (cont.) 
If workers are on their 
best behavior, the 
observation results will 
be skewed as it is not 
going to be a truly 
average workday. 
Normal = true measure.
Narrowing Down the Goals 
Gemba is usually 
considered a holistic 
approach, basically 
observing a production 
line or system from 
start to finish.
Narrowing Down the Goals 
Observing too much of 
a business at one time 
can make Gemba 
observations too 
general and thus less 
helpful in the end. 
Stagger your walks. 
Week 1 Week 3 
Week 4 
Week 2 
Week 6
Narrowing Down the Goals 
(cont.) 
The best way to prepare for a Gemba 
walk is to section off a small piece of 
the operation that you really want to 
work on and improve. 
Consider taking brief walkthroughs 
over time to get an idea of some other 
areas that may need improvement.
Narrowing Down the Goals 
Once an area has been chosen to focus on, stop! 
Take a step back. Don’t formulate theories about 
why things are or aren’t working from a distance. 
A big part of Gemba is objective observations, this 
means not entering the scene with any pre-conceived 
assumptions. 
(cont.)
Forming Questions 
A framework needs to be in 
place outlining what it is you 
want to learn. 
Do you want to improve 
production, enhance safety, 
simplify processes? What is 
the overall goal?
Transforming observations 
into Actionable Results 
First, you need to 
enlist a few others to 
help sift through your 
observations and 
decide what changes 
need to be made.
Transforming observations 
into Actionable Results (cont.) 
Once you have decided on a 
few ideas, you need to create 
actionable plans with specific 
roles. 
Any plan created should be 
clear and easy to follow.
Transforming observations 
into Actionable Results (cont.) 
The plan should lay out specific 
changes for specific teams or team 
members. 
Plans should also be publicly 
displayed and serve as a reminder 
to workers as to what is expected of 
them going forward.
What Are You Waiting For? 
GET TO THE GEMBA!! 
• Observe the Gemba 
• Engage with Employees 
• Continue to Improve Operations 
• Sustain your Lean Practices 
• Strengthen your Culture
What Are You Waiting For? 
You + Gemba = Improvement
Gemba Walk 201
Gemba Walk 201
Gemba Walk 201
Gemba Walk 201
Gemba Walk 201

Contenu connexe

Tendances

Gemba walk: the start of your lean journey
Gemba walk: the start of your lean journeyGemba walk: the start of your lean journey
Gemba walk: the start of your lean journeyboscollkid
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can seeRenee Troughton
 
Lean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleLean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleFrank-G. Adler
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basicssarah bridge
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)Zeeshan Syed
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_previewJaroslaw Gadek, MBA
 
WEBINAR: How Leaders Can Support Lean Using Leader Standard Work
WEBINAR: How Leaders Can Support Lean Using Leader Standard WorkWEBINAR: How Leaders Can Support Lean Using Leader Standard Work
WEBINAR: How Leaders Can Support Lean Using Leader Standard WorkGoLeanSixSigma.com
 
A Kaizen - Continues Improvement
A Kaizen - Continues ImprovementA Kaizen - Continues Improvement
A Kaizen - Continues ImprovementShravan Bhumkar
 
Connecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True NorthConnecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True NorthW3 Group Canada Inc.
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3TKMG, Inc.
 

Tendances (20)

Gemba walk: the start of your lean journey
Gemba walk: the start of your lean journeyGemba walk: the start of your lean journey
Gemba walk: the start of your lean journey
 
Gemba walk discussion
Gemba walk  discussionGemba walk  discussion
Gemba walk discussion
 
Gemba Walk 02.04.19
Gemba Walk 02.04.19Gemba Walk 02.04.19
Gemba Walk 02.04.19
 
The 12 steps of successful gemba walks
The 12 steps of successful gemba walks The 12 steps of successful gemba walks
The 12 steps of successful gemba walks
 
Four Steps of Gemba Walk Poster
Four Steps of Gemba Walk PosterFour Steps of Gemba Walk Poster
Four Steps of Gemba Walk Poster
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Gemba walk
Gemba walkGemba walk
Gemba walk
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can see
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Lean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleLean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training Module
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Lean basics
Lean basicsLean basics
Lean basics
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) PosterTPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_preview
 
WEBINAR: How Leaders Can Support Lean Using Leader Standard Work
WEBINAR: How Leaders Can Support Lean Using Leader Standard WorkWEBINAR: How Leaders Can Support Lean Using Leader Standard Work
WEBINAR: How Leaders Can Support Lean Using Leader Standard Work
 
A Kaizen - Continues Improvement
A Kaizen - Continues ImprovementA Kaizen - Continues Improvement
A Kaizen - Continues Improvement
 
Connecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True NorthConnecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True North
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3
 

En vedette

Stdw for managers and supervisors october 2016
Stdw for managers and supervisors   october 2016Stdw for managers and supervisors   october 2016
Stdw for managers and supervisors october 2016W3 Group Canada Inc.
 
Gemba Walk Checks 6 pack
Gemba Walk Checks 6 pack Gemba Walk Checks 6 pack
Gemba Walk Checks 6 pack Tom Curtis
 
Experiment board - Lean Startup Machine
Experiment board - Lean Startup MachineExperiment board - Lean Startup Machine
Experiment board - Lean Startup MachineLorenzo Dee
 
Walk the Gemba to Improve Your Leadership Abilities
Walk the Gemba to Improve Your Leadership AbilitiesWalk the Gemba to Improve Your Leadership Abilities
Walk the Gemba to Improve Your Leadership AbilitiesMichael Bremer
 
Robert Xiong's 5 whys Methodology
Robert Xiong's 5 whys MethodologyRobert Xiong's 5 whys Methodology
Robert Xiong's 5 whys MethodologyRobert Xiong
 
How to care ? (Medlove - Berlin, November 23, 2012)
How to care ? (Medlove - Berlin, November 23, 2012)How to care ? (Medlove - Berlin, November 23, 2012)
How to care ? (Medlove - Berlin, November 23, 2012)Sylvain Cottong
 
5 Whys Presentation For Dorset Bxc
5 Whys Presentation For Dorset Bxc5 Whys Presentation For Dorset Bxc
5 Whys Presentation For Dorset BxcPhil Thomas
 
Go and See: why go to the gemba and what to do when you are there
Go and See: why go to the gemba and what to do when you are thereGo and See: why go to the gemba and what to do when you are there
Go and See: why go to the gemba and what to do when you are thereChet Marchwinski
 
Ejemplos de gestion visual
Ejemplos de gestion visualEjemplos de gestion visual
Ejemplos de gestion visualLEANBOX S.L.
 
Lean Sales Method Cap Do
Lean Sales Method Cap DoLean Sales Method Cap Do
Lean Sales Method Cap DoBusiness901
 
LEANER STARTUP MODELING: A Value Innovation Storydeck of Standardized Tools f...
LEANER STARTUP MODELING: A Value Innovation Storydeck of Standardized Tools f...LEANER STARTUP MODELING: A Value Innovation Storydeck of Standardized Tools f...
LEANER STARTUP MODELING: A Value Innovation Storydeck of Standardized Tools f...Rod King, Ph.D.
 
Gemba Academy Culture Code - A Guide to the Way of Life at Gemba Academy
Gemba Academy Culture Code - A Guide to the Way of Life at Gemba AcademyGemba Academy Culture Code - A Guide to the Way of Life at Gemba Academy
Gemba Academy Culture Code - A Guide to the Way of Life at Gemba AcademyGemba Academy LLC
 

En vedette (15)

Stdw for managers and supervisors october 2016
Stdw for managers and supervisors   october 2016Stdw for managers and supervisors   october 2016
Stdw for managers and supervisors october 2016
 
Gemba Walk Checks 6 pack
Gemba Walk Checks 6 pack Gemba Walk Checks 6 pack
Gemba Walk Checks 6 pack
 
Experiment board - Lean Startup Machine
Experiment board - Lean Startup MachineExperiment board - Lean Startup Machine
Experiment board - Lean Startup Machine
 
Walk the Gemba to Improve Your Leadership Abilities
Walk the Gemba to Improve Your Leadership AbilitiesWalk the Gemba to Improve Your Leadership Abilities
Walk the Gemba to Improve Your Leadership Abilities
 
Robert Xiong's 5 whys Methodology
Robert Xiong's 5 whys MethodologyRobert Xiong's 5 whys Methodology
Robert Xiong's 5 whys Methodology
 
How to care ? (Medlove - Berlin, November 23, 2012)
How to care ? (Medlove - Berlin, November 23, 2012)How to care ? (Medlove - Berlin, November 23, 2012)
How to care ? (Medlove - Berlin, November 23, 2012)
 
The 5 whys system
The 5 whys systemThe 5 whys system
The 5 whys system
 
5 Whys Presentation For Dorset Bxc
5 Whys Presentation For Dorset Bxc5 Whys Presentation For Dorset Bxc
5 Whys Presentation For Dorset Bxc
 
Go and See: why go to the gemba and what to do when you are there
Go and See: why go to the gemba and what to do when you are thereGo and See: why go to the gemba and what to do when you are there
Go and See: why go to the gemba and what to do when you are there
 
5 whys
5 whys5 whys
5 whys
 
9akk105151d0113 5 whys
9akk105151d0113 5 whys9akk105151d0113 5 whys
9akk105151d0113 5 whys
 
Ejemplos de gestion visual
Ejemplos de gestion visualEjemplos de gestion visual
Ejemplos de gestion visual
 
Lean Sales Method Cap Do
Lean Sales Method Cap DoLean Sales Method Cap Do
Lean Sales Method Cap Do
 
LEANER STARTUP MODELING: A Value Innovation Storydeck of Standardized Tools f...
LEANER STARTUP MODELING: A Value Innovation Storydeck of Standardized Tools f...LEANER STARTUP MODELING: A Value Innovation Storydeck of Standardized Tools f...
LEANER STARTUP MODELING: A Value Innovation Storydeck of Standardized Tools f...
 
Gemba Academy Culture Code - A Guide to the Way of Life at Gemba Academy
Gemba Academy Culture Code - A Guide to the Way of Life at Gemba AcademyGemba Academy Culture Code - A Guide to the Way of Life at Gemba Academy
Gemba Academy Culture Code - A Guide to the Way of Life at Gemba Academy
 

Similaire à Gemba Walk 201

Introduction to the Gemba walk
Introduction to the Gemba walkIntroduction to the Gemba walk
Introduction to the Gemba walkBen Geck
 
Gemba Walks: Frequently Asked Questions (FAQ)
Gemba Walks: Frequently Asked Questions (FAQ)Gemba Walks: Frequently Asked Questions (FAQ)
Gemba Walks: Frequently Asked Questions (FAQ)Charles-Olivier Bisson
 
Business Process Improvement - SIPOC and Toolkit
Business Process Improvement -   SIPOC  and ToolkitBusiness Process Improvement -   SIPOC  and Toolkit
Business Process Improvement - SIPOC and Toolkittmtrnr
 
Agile Marketing: Managing Marketing in High Gear
Agile Marketing: Managing Marketing in High GearAgile Marketing: Managing Marketing in High Gear
Agile Marketing: Managing Marketing in High Gearion interactive
 
Modern agile devspace - 2017-10-14
Modern agile   devspace - 2017-10-14Modern agile   devspace - 2017-10-14
Modern agile devspace - 2017-10-14Daniel Heater
 
Gemba walk within pharmaceutical industry .pptx
Gemba walk  within pharmaceutical industry .pptxGemba walk  within pharmaceutical industry .pptx
Gemba walk within pharmaceutical industry .pptxzohaibmaqsoodneutrop
 
5 Continuous Improvement Tools for Process Success
5 Continuous Improvement Tools for Process Success5 Continuous Improvement Tools for Process Success
5 Continuous Improvement Tools for Process SuccessKashish Trivedi
 
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...Gurunanak institute of hotel management
 
Easy steps to cmmi l5 success
Easy steps to cmmi l5 successEasy steps to cmmi l5 success
Easy steps to cmmi l5 successDipen Vadodaria
 
6 Sigma Project - 2014
6 Sigma Project - 20146 Sigma Project - 2014
6 Sigma Project - 2014Salman Khan
 
Emiliano soldi’s update to an agile SAFe mind map
Emiliano soldi’s update to an agile SAFe mind mapEmiliano soldi’s update to an agile SAFe mind map
Emiliano soldi’s update to an agile SAFe mind mapSteven Brovero
 
Startup KPIs and A/B Testing
Startup KPIs and A/B TestingStartup KPIs and A/B Testing
Startup KPIs and A/B TestingJeff McClelland
 
Congratulations You Have Lots of Employee Ideas! Now What?
Congratulations You Have Lots of Employee Ideas! Now What?Congratulations You Have Lots of Employee Ideas! Now What?
Congratulations You Have Lots of Employee Ideas! Now What?KaiNexus
 
Htm 3050 week 3 class notes
Htm 3050 week 3   class notesHtm 3050 week 3   class notes
Htm 3050 week 3 class notesHans van Wees
 
QM-021-PDCA
QM-021-PDCAQM-021-PDCA
QM-021-PDCAhandbook
 
How-To Guide - Agile Marketing
How-To Guide - Agile MarketingHow-To Guide - Agile Marketing
How-To Guide - Agile MarketingDemand Metric
 
XLerants Presentation On 10 Day Budgeting
XLerants Presentation On 10 Day BudgetingXLerants Presentation On 10 Day Budgeting
XLerants Presentation On 10 Day BudgetingLServen
 
How to Manage Marketing Projects and People (Without Going Insane)
How to Manage Marketing Projects and People (Without Going Insane)How to Manage Marketing Projects and People (Without Going Insane)
How to Manage Marketing Projects and People (Without Going Insane)LeadMD
 

Similaire à Gemba Walk 201 (20)

Introduction to the Gemba walk
Introduction to the Gemba walkIntroduction to the Gemba walk
Introduction to the Gemba walk
 
Gemba Walks: Frequently Asked Questions (FAQ)
Gemba Walks: Frequently Asked Questions (FAQ)Gemba Walks: Frequently Asked Questions (FAQ)
Gemba Walks: Frequently Asked Questions (FAQ)
 
Gemba lean tool
Gemba   lean toolGemba   lean tool
Gemba lean tool
 
Business Process Improvement - SIPOC and Toolkit
Business Process Improvement -   SIPOC  and ToolkitBusiness Process Improvement -   SIPOC  and Toolkit
Business Process Improvement - SIPOC and Toolkit
 
Agile Marketing: Managing Marketing in High Gear
Agile Marketing: Managing Marketing in High GearAgile Marketing: Managing Marketing in High Gear
Agile Marketing: Managing Marketing in High Gear
 
Modern agile devspace - 2017-10-14
Modern agile   devspace - 2017-10-14Modern agile   devspace - 2017-10-14
Modern agile devspace - 2017-10-14
 
Gemba walk within pharmaceutical industry .pptx
Gemba walk  within pharmaceutical industry .pptxGemba walk  within pharmaceutical industry .pptx
Gemba walk within pharmaceutical industry .pptx
 
5 Continuous Improvement Tools for Process Success
5 Continuous Improvement Tools for Process Success5 Continuous Improvement Tools for Process Success
5 Continuous Improvement Tools for Process Success
 
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...
 
Easy steps to cmmi l5 success
Easy steps to cmmi l5 successEasy steps to cmmi l5 success
Easy steps to cmmi l5 success
 
6 Sigma Project - 2014
6 Sigma Project - 20146 Sigma Project - 2014
6 Sigma Project - 2014
 
Emiliano soldi’s update to an agile SAFe mind map
Emiliano soldi’s update to an agile SAFe mind mapEmiliano soldi’s update to an agile SAFe mind map
Emiliano soldi’s update to an agile SAFe mind map
 
Startup KPIs and A/B Testing
Startup KPIs and A/B TestingStartup KPIs and A/B Testing
Startup KPIs and A/B Testing
 
Congratulations You Have Lots of Employee Ideas! Now What?
Congratulations You Have Lots of Employee Ideas! Now What?Congratulations You Have Lots of Employee Ideas! Now What?
Congratulations You Have Lots of Employee Ideas! Now What?
 
Htm 3050 week 3 class notes
Htm 3050 week 3   class notesHtm 3050 week 3   class notes
Htm 3050 week 3 class notes
 
QM-021-PDCA
QM-021-PDCAQM-021-PDCA
QM-021-PDCA
 
PDCA
PDCAPDCA
PDCA
 
How-To Guide - Agile Marketing
How-To Guide - Agile MarketingHow-To Guide - Agile Marketing
How-To Guide - Agile Marketing
 
XLerants Presentation On 10 Day Budgeting
XLerants Presentation On 10 Day BudgetingXLerants Presentation On 10 Day Budgeting
XLerants Presentation On 10 Day Budgeting
 
How to Manage Marketing Projects and People (Without Going Insane)
How to Manage Marketing Projects and People (Without Going Insane)How to Manage Marketing Projects and People (Without Going Insane)
How to Manage Marketing Projects and People (Without Going Insane)
 

Plus de Creative Safety Supply

Plus de Creative Safety Supply (11)

10 Floor Marking Tips
10 Floor Marking Tips10 Floor Marking Tips
10 Floor Marking Tips
 
10 Tips for Working Safely Around Cement
10 Tips for Working Safely Around Cement10 Tips for Working Safely Around Cement
10 Tips for Working Safely Around Cement
 
19 Ways to Deal With Combustible Dust
19 Ways to Deal With Combustible Dust19 Ways to Deal With Combustible Dust
19 Ways to Deal With Combustible Dust
 
10 Rules for Working Safely Around Machines
10 Rules for Working Safely Around Machines10 Rules for Working Safely Around Machines
10 Rules for Working Safely Around Machines
 
12 reasons you should invest in safety training
12 reasons you should invest in safety training12 reasons you should invest in safety training
12 reasons you should invest in safety training
 
The Visual Workplace
The Visual WorkplaceThe Visual Workplace
The Visual Workplace
 
Toyotas 8 Steps To Problem Solving
Toyotas 8 Steps To Problem SolvingToyotas 8 Steps To Problem Solving
Toyotas 8 Steps To Problem Solving
 
10 Forklift Safety Rules - A Review
10 Forklift Safety Rules - A Review10 Forklift Safety Rules - A Review
10 Forklift Safety Rules - A Review
 
10 Tips For 5S Success
10 Tips For 5S Success10 Tips For 5S Success
10 Tips For 5S Success
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
 
10 Continuous Improvement Strategies That Work
10 Continuous Improvement Strategies That Work10 Continuous Improvement Strategies That Work
10 Continuous Improvement Strategies That Work
 

Dernier

Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 

Dernier (20)

Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 

Gemba Walk 201

  • 1. 201 Gemba ! Observe, Engage, Improve - An effective lean method The leaders in visual safety.
  • 2. How Gemba* can Help KNOW YOUR STRENGTHS Gemba can be a powerful piece of your Lean toolbox. * The term Gemba means “The real place”, and is the location where any real action is taking place. Thus the need for the walk - to see it first hand.
  • 3. Gemba as a tool Gemba is a straightforward way for business owners and managers to find and remedy issues that can affect their production. Gemba walks can easily fit into any improvement regimen that is planned or already in motion.
  • 4. Gemba Refresher During a Gemba walk, observations will be made regarding specific or various systems within the business.
  • 5. Gemba Refresher (cont.) After the walk, the observations will be used to make improvements in how the business runs. The end goal will be to cut down on waste and to skyrocket efficiency levels overall.
  • 6. Things to observe during a Gemba Walk: EFFICIENCY • How well (or badly) a process currently runs. • Where employees appear to be struggling or where bottlenecks are potentially occurring.
  • 7. Things to observe during a Gemba Walk: (cont.) POTENTIAL SAFETY HAZARDS • Employee behavior, both positive and negative. • The state of the facility itself.
  • 8. Preparing for the First Gemba Walk: DO NOT BE REACTIONARY • Don’t just grab a notepad or iPad and head out onto the work floor. • Plan ahead.
  • 9. Preparing for the First Gemba Walk: (cont.) PREPARE • Preparation is the key to a successful Gemba walk.
  • 10. Employee Knowledge When planning a Gemba walk it is important to consider how the employees will react. In nearly every case, it is best if employees never even hear the term “Gemba walk” before it is conducted.
  • 11. Employee Knowledge (cont.) The biggest tool for authenticity and accuracy in the results is observing the continued normal behavior of workers over time.
  • 12. Employee Knowledge (cont.) If workers are on their best behavior, the observation results will be skewed as it is not going to be a truly average workday. Normal = true measure.
  • 13. Narrowing Down the Goals Gemba is usually considered a holistic approach, basically observing a production line or system from start to finish.
  • 14. Narrowing Down the Goals Observing too much of a business at one time can make Gemba observations too general and thus less helpful in the end. Stagger your walks. Week 1 Week 3 Week 4 Week 2 Week 6
  • 15. Narrowing Down the Goals (cont.) The best way to prepare for a Gemba walk is to section off a small piece of the operation that you really want to work on and improve. Consider taking brief walkthroughs over time to get an idea of some other areas that may need improvement.
  • 16. Narrowing Down the Goals Once an area has been chosen to focus on, stop! Take a step back. Don’t formulate theories about why things are or aren’t working from a distance. A big part of Gemba is objective observations, this means not entering the scene with any pre-conceived assumptions. (cont.)
  • 17. Forming Questions A framework needs to be in place outlining what it is you want to learn. Do you want to improve production, enhance safety, simplify processes? What is the overall goal?
  • 18. Transforming observations into Actionable Results First, you need to enlist a few others to help sift through your observations and decide what changes need to be made.
  • 19. Transforming observations into Actionable Results (cont.) Once you have decided on a few ideas, you need to create actionable plans with specific roles. Any plan created should be clear and easy to follow.
  • 20. Transforming observations into Actionable Results (cont.) The plan should lay out specific changes for specific teams or team members. Plans should also be publicly displayed and serve as a reminder to workers as to what is expected of them going forward.
  • 21. What Are You Waiting For? GET TO THE GEMBA!! • Observe the Gemba • Engage with Employees • Continue to Improve Operations • Sustain your Lean Practices • Strengthen your Culture
  • 22. What Are You Waiting For? You + Gemba = Improvement