SlideShare une entreprise Scribd logo
1  sur  5
Page 1 of 5
SYNOPSIS
Acquired Degree in Mechanical Power Engineering, having over 10 years of professional experiences in EPC
sector both at Home & International locations for Refinery, Petrochemicals, NGL Plant, etc.
HIGHER EDUCATION QUALIFICATIONS
Bachelor of Science in Engineering: May2006: Major: Mechanical Power Engineering, Helwan University
SUMMARY OF EXPERIENCES
 Highly ambitious and self-motivated Project Management Professional with over 10 years in the Oil & Gas
Industry in the fields of Project Construction & Commissioning. All experience enhanced by multi-functional
business trips in United Arab Emirates, Oman, Algeria and Egypt for large scale EPC projects with Major
EPC and Petroleum companies’ region.
 My Professional acumen being ability to oversee total Project Engineering, Procurement, Construction &
Commissioning of large EPC Projects to ensure project is in accordance with scope, quality requirements,
budget and schedule. Skilled at interfacing with client representatives, vendors, subcontractors and other
stakeholders.
SKILLS AND SPECIALTIES
 Proactive with an excellent leadership skills, good communicative skills & Analysis with a clear focus on
improvement of processes, ability to work in customer focused way & to handle time pressure and to set
priorities/supports.
 Good awareness and analysis with various national and international Codes & Standards such as DEPs
(PDO Specs.), SHELL STDs, GASCO Specs. (DGS) ASTM, DIN, BS EN ISO, ASME B31.3, B31.4, B31.8,
API 5L, API 1110, SAUDI ARAMCO Spec. and AUSTRALIAN STANDARD (AS 1978-1987).
 Assists in work pack initiation through understanding the quality requirements, ensuring the full
implementation for COMPLETION CERTIFICATION MANAGEMENT SYSTEM (CCMS) in site level.
CAREER DETAILS
The Petroleum Projects and Technical Consultations Co.(PETROJET) (From 20/03/2007 to Till Date):
PETROJET is a Multidisciplinary EPC Contractor specialized in providing Design, Engineering, Construction,
Procurement, Pre-commissioning and commissioning services basically associated with Oil, Gas, Petrochemical,
Chemical and Power Industries. Operations spread over two continents /12 Countries with reputed clients at the
upper end of the market like Saudi Aramco (Saudi Arabia), Khafji Joint Operations (Saudi Arabia/Kuwait),
Sonatrach (Algeria),TOTAL (Yemen), Eni (Libya), PDO (Oman),GASCO (UAE),ADCO(UAE) TRANSCO,ADDC,
ADM (UAE) etc.
PROJECTS ACCOMPLISHED:
A. Position: Deputy Project Manager
Client: Abu Dhabi Gas Industries Ltd. (GASCO)
EPC: PETROJET ABU DHABI, UAE
Engineering Consultant: PENSPEN, ABU DHABI, UAE
PMC: Tebodin
Project Description: 24” x 6 km (Approx.) Carbon Steel Natural Gas Pipeline SV-02 to Yas Island.
16’’ x 2.2 km (Approx.) Carbon Steel Pipeline from Yas Island to Saadiyat Island.
Two Secondary Pressure Reduction Stations SPRS-1&2 are provided to secure flow of NG to
the distribution mains with the pressure 4barg and one Primary Pressure Regulating Station (PPRS) has
(H2S Removal Unit, Gas Filter, Custody Transfer Skid with check meter, Pressure reduction skid, Odorant
injection, Gas chromatography, Communication and Instrumentation, Emergency Power Generation
System, etc.)
SENIOR PIPELINE/ PIPING MECHANICAL ENGINEER
CONSTRUCTION & COMMISSIONING
(ADNOC Distribution/ GASCO/ PDO/ SONATRACH/ ANADARKO/ PETROFAC/ HILL INTERNATIONAL)
APPROVED PROFESSIONAL
E-mail address: eng.mohamed_mostafa@yahoo.com,
Mob: 002-01003074086/ 002-01149252549/00971-(0)796900405
Page 2 of 5
Responsibilities: As Client, Approved Commissioning Manager: GASCO PROJECT No. 5275
 Day to day basis following up the progress, and ensure that the reports and drawings are in line
with the specifications and time schedule.
 Review the reports to ensure that the same are meeting the requirements.
 Review all the design discipline output to make sure that all the meeting the specifications and
client requirements.
 Interfacing with the client to get the final approval on the drawings and the green light to start the
execution at site.
 Prepare the bids, evaluating the bidders and choose the best bid and offer.
 Get all the approvals required to start the site activities.
 Monitor the site execution for the packages
 Review and approve the work plans, time schedules and manpower histograms.
 Report to the Project Manager on overall progress and cost performance of the Project, using the
support of Project Controls.
 Ensure that Project objectives (safety, quality, cost, and time) for each Area and Package are well
defined, communicated and followed-up.
 Provide guidance and expertise to project stakeholders.
B. Position: Pre-Commissioning and Commissioning Manager
Client: Abu Dhabi Gas Industries Ltd. (GASCO)
EPC: PETROJET ABU DHABI, UAE
Engineering Consultant: PENSPEN, ABU DHABI, UAE
PMC: EIL
Project Description: 24” x 18 km (Approx.) Carbon Steel Natural Gas Pipeline from Yas Island to Saadiyat
Island from the existing facilities PPRS/SPRS-1/SPRS-2, GAS-in.
400mm x 7 km (Approx.) High Density Polyethylene (HDPE) Pipeline from Saadiyat CRS to tie-in with the
existing 400mm HDPE pipeline on Mina Zayed and 16’’ x 4.2 km (Approx.) Carbon Steel Pipeline from
Saadiyat CRS to Reem Island receiving station.
CRS station has (Gas Filter, metering skid, Pressure reduction skid, Odorant vessel, etc.)
Responsibilities: As Client Approved Commissioning Manager: GASCO PROJECT No. 5275
 Responsible Pre-commissioning, Mechanical completion and Commissioning Procedures write
ups, submissions and approval.
 Leads all dynamic Pre-commissioning activities including oversee cleaning the pipe line, gauging,
drying and leak testing activities carried as per EPC Scope
Responsible for compliance to PTW systems, Activity Risk Assessment and identifies and mitigate
risks posed to the workforce during commissioning and start-up.
 Responsible for successful Mechanical Completion, Punch list close out and System Completion
dossiers prior to acceptance not limited to NCR, Site Queries, and Field Change request, as built
etc. prior to CAC.
 Participate in Process system walk down audit and identify critical punch lists and progressing
towards efficient close out.
 Manage implementation of joint integrity plan following completion of leak testing to provide
assurance full proof leak free plant, prior to introduction of hydrocarbons.
 Ensure that any chemicals, packing, special tools, commissioning spares or other materials
required to support commissioning and start-up prior to schedule are available.
 Monitoring/Supervision of N2 Leak Testing of all Critical Systems carrying-out prior to Introduction of
Hydrocarbons. Supervise pre-commissioning team for purging pipeline and piping by nitrogen using
nitrogen generation unit membrane type.
 Categorization of Punch Lists (A, B & C) including the closeout of all punch list items.
 Preparation for Commissioning, Tie-in, Leak test and Bolt tightening procedures and reports.
 Co-ordinate with GASCO OPN/Commissioning team for introducing Hydrocarbon.
 Supervise the team for Caliper pigging survey for integrity of pipelines. Participated in preparation of
HSE required documentation as Cause and effect - ERP (Internal & External)-Commissioning HSE
Plan - Zone classification – Process studies, recommendation of various studies e.g. HAZOP –
HAZID/QRA etc.
 Prepare calculation required to identify time and noise level will be taken for Venting to
atmosphere.
 Prepare a list of critical valves to be tested and maintenance prior to gas in.
 Prepare a list of commissioning spare parts stock to be made available prior gas in.
Page 3 of 5
C. Position: Pre-Commissioning/ Commissioning Manager
Client: Petroleum Development Oman (PDO)
EPC: PETROJET, OMAN
PMC: VELOSI
Engineering Consultant: MOTT MCDONALD
Project Description: 20” Internally/ externally coated Carbon steel 157 Km ISO 1381-PSL2 Grade L415 (X60)
gas Pipeline for PDO from BARIK to BVS-08.
Responsibilities: Approved as Commissioning Manager from PDO contract No. C31/1376
 Responsible for Mechanical Completion, pre-commissioning/ commissioning activities.
 Verification of all systems completion requirements associated with the scope of work of all the
disciplines.
 Creation and administration of Technical queries and Engineering queries / punch list register.
 Prepare a list of commissioning spare parts stock to be made available prior gas in.
 Coordinate with other projects department engineers to complete certification and completions
management system (CCMS).
 Creation and administration of Technical queries and Engineering queries / punch list register.
 System definition and marking-up of system with use of Adobe Acrobat Professional.
 Writing of commissioning procedure for each systems with their mark-up P&ID and PFD Drawings.
 Work closely with operations personnel/control room operators and contractors during the
commissioning and start-up.
 Coordinate with other projects department engineers, operation personnel and contractor group to
ensure that all requirements for commissioning work of all the units/systems are fulfilled.
 Proven project leader with experience in handling projects from design to commissioning stage.
 Effectively involved in performing pipeline construction and Pre-commissioning including pigging,
Flooding and Testing in accordance to approved procedure and international standard.
D. Position: Pre-commissioning/ Commissioning Manager
Client: ANADARKO/ SONATRACH
EPC: PETROJET, ALGERIA
Project Description: ELMERK FLOW PIPELINES LOT 3&4 different sizes from 4" up to 24" (GAS-OIL-
WATER) with approximate length 200 KM.
Responsibilities:
 Checking for readiness of mechanical completion dossiers of systems, accordingly with QA&OC
system, in collaboration with others departments and client representatives.
 Develop punch item database by systems, checking for completion and close-out of punch items
accordingly with client and company agreed standards.
 Preparation of Mechanical Completion Certificate, Exceptions List and Ready for Commissioning
forms of systems and submitted to company and client management for approval.
 Supervise of Purging by using nitrogen generation membrane type unit for pipeline.
 Lead PETROJET Pre-Commissioning team for initial drying and final drying for pipeline and Leak
test for piping on plot.
 Prepare the Pre-commissioning/ commissioning documents in advance before the commencement of
commissioning work (Method of statement of Tie-In, Demolishing, reinstatement, bolt tightening, final
drying and purging by nitrogen).
 Work with other discipline engineers and operations personnel for manpower and supporting resources
to conduct commissioning work.
 Supervise commissioning of units/system, assist with complications that may arise, sign-off and
handover of certification packs to platform operation team.
 Ensuring necessary HSE reviews are undertaken and identified actions completed.
 Provided Calculation, Procedures, Drawings, data sheets and all engineering documents for Pre-
commissioning, Commissioning and Testing Activity of onshore Pipeline and Process Plants service.
 Interpret all Engineering Documentation to ensure works are conducted as required.
 Recorded operating data required to ensure complete reporting documentation during Pre-
commissioning, Commissioning and testing phase.
 Contributed to the provision of solutions to internal interface problems.
 Actively participated in the engineering function of Project Tendering.
Page 4 of 5
E. Position: Pre-commissioning/ Commissioning Manager
Client: SONATRACH
EPC: PETROJET, ALGERIA
Project Description: 48” GAS PIPELINE IN ALGERIA LOT1&2 WITH APPROXIMATE LENGTH 430 KM
Responsibilities:
 Follow up for all Pre-commissioning activity (Cleaning, Gauging, Flooding, and Hydrostatic Test).
 Checking for readiness of mechanical completion dossiers of systems, accordingly with QA&OC
system, in collaboration with others departments and client representatives.
 Creation and administration of Technical queries and Engineering queries / punch list register.
 Writing of commissioning procedure for each systems with their mark-up P&ID and PFD Drawings.
 Inspection of packaged process skid and equipment supplied by vendors if piping components are
complete and to ascertain the compatibility with the outside process piping.
 Assist in developing procedures to conduct chemical degreasing cleaning and performance test for
new plant equipment upon start-up.
 To coordinate/ Interface between commissioning and Pre-commissioning for system turn over to
commissioning after pre-commissioning.
 Preparing all site drawing, Pipeline joint History, Pressure Test, Flooding, Gauging documents and
report.
 Effectively involved in performing pipeline construction and Pre-commissioning including pigging,
Flooding and Testing in accordance to approved procedure and international standard.
F. Position: Pre-commissioning Engineer
Client: KHALDA PETROLEUM CO.
EPC: PETROFAC
Contractor: PETROJET, EGYPT
Project Description: Salam gas trains (SGT 3 & 4 project) two new gas processing trains.
Responsibilities:
 Inspection of packaged process system and equipment supply by the vendor if piping components
are complete.
 Mark-up Process Engineering Flow Scheme of system for mechanical cleaning.
 Write/assist in developing procedures to conduct performance test for new plant equipment upon
start-up. Assist with conducting tests, gathering data and verifying results. Implement strategies to
improve Commissioning and Start-Up.
 Quality control of system in accordance with the Commissioning Quality control procedure.
 Record and Report all non-conformances actions in accordance with the Commissioning start-up
procedure during start-up.
 Document control for changes and deviations from detail design reflected by CTQ field notes and
site instruction (SEI)
 Carry-out function checks on systems and equipment to ensure that the suction and discharge
valves are functioning very well and equipment in good conditions.
 Capable to Plan Schedule, Manpower, and Necessary Tools/Equipment required for Pre-
Commissioning/ Commissioning.
G. Position: Technical Office Engineer
Client: EMETHANEX (METHANOL Project)
EPC: TECHINT CO.
Contractor: PETROJET, EGYPT
Project Description: Plant produces methanol
Responsibilities:
 Checking Isometrics for piping lines and preparation of AS-BUILT drawings.
 Definition and Preparation of Piping Hydro Test limit on PI&D for Utilities and Process units.
 Follow up Modifications on Site concerning piping layout, Isometrics and PID in accordance to site
conditions.
 Preparation of complete programming Database (MS ACCESS) for follow- up of piping Test
package submission including Punch list, Fabrication and related tests.
 Follow up piping punch list done before Hydro test.
 Inspect and check the installed Piping & Supports at sites.
 Follow up Flange Management done before Hydro test.
 Follow-up Flushing and Chemical Cleaning for Suction of Compressors.
 Supervisor for Tighten all flanges accordance to project specifications (By using Tension Machine,
Hydraulic Torque wrench and Manual Torque wrench) and putting the procedures of tighten.
 Follow-up Leak and Tightness test, Flushing and Blowing of lines for Process Unit.
Page 5 of 5
H. Position: Pre-Commissioning Engineer
Client: GASCO EGYPT
EPC: ENPPI
PMC: HILL INTERNATIONAL
Contractor: PETROJET, EGYPT
Project Description: DAHSHOUR COMPRESSION STATION
Responsibilities:
 Check and supervise on all mechanical piping spool fabrication (fit up, dimension, orientation, and
alignment).
 Arrange with contractors at site, manpower and resources which meet the target productivity of
project.
 Check on Material tractability plan and bill of material per each spool to be sure from right material
for right spool
 Follow up and monitoring at site (pipe rack, piping supports, piping line up and assembly
of valves with accessories – by loops or by systems ).
 Supervise on all UG piping construction and test (facilities and infrastructure) as sewage network,
potable water network, firefighting network and hydrants).
 Supervise on site tank building (pressurized and non-pressurized) as settlement, nozzle
orientation, hydrostatic test, vacuum test and review all QC/ QA reports related to tanks.
 Check, Review, Supervise and Approve All Hydrostatic Tests procedure for All Piping Systems.
 Supervise on CLT (commissioning leak test) And GLT (gross leak test) Activities.
Skill Development Courses Accomplished:
Technical Skill Courses:
- Welding engineering in Egyptian Engineering Associations.
- Design and construction of pipe networks in Higher Technological Institute.
- Calculations of Electrical Loads and Design in Ein Shams University.
- Maintenance for pumps and compressors in Helwan University.
- Types of bearing and Gears in Cairo University.
Communication Courses:
- Managerial Skills Developing for Engineers in American Supplier Institute (ASI)
- Management Training Program in Career Development & Consultations Academy.
- Report writing and Preparation in Professional Management Expertise Center (PMEC).
- Communications skills.
HSE Skills:
During my service, HSE skills have been remained as Top priority and working towards continual
improvement followings:
- Safe commissioning procedure and Permit to Work System.
- Job Hazardous Analysis and process risk management.
Fire /gas alarm and first Aids skill at work site.-
- Impart colleagues H2S and SO2 skilled upgrade course at field (awareness/escape).
- Working safely with high H2S contents areas.
Personal Information:
Full Name: Mohamed Mostafa Mohamed Mohamed
Date of Birth: 25- February-1984
Place of Birth: Cairo, Egypt.
Present Address: Abu Dhabi
Military Status: Exempted
Marital Status: Married
Passport number: A09298687
Oman residence until November - 2017
UAE Residence until August - 2018
E-mail address: eng.mohamed_mostafa@yahoo.com
GSM EGYPT: 002- 01003074086 / 002- 01149252549
GSM ABU DHABI: +971- (0)504099687

Contenu connexe

Tendances

En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpSURENDRA BABU
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016D Venkatesh
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorAsad Ahsan
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERHabeeb Omer
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTORNASEEB AHMAD
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_VEERAKAMU C
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 

Tendances (20)

En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding Inspector
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 

En vedette

LinkedIn Profile Improvement Tips
LinkedIn Profile Improvement TipsLinkedIn Profile Improvement Tips
LinkedIn Profile Improvement TipsRaghunath Ramaswamy
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-JuffrieJuffrie Cuevas
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1John Raj BE, MBA
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiBùi Minh Hải
 
Mechanical Engineer Lead
Mechanical Engineer LeadMechanical Engineer Lead
Mechanical Engineer LeadOscar Juncosa
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVMOHAMMED ABDUL AZEEM
 
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie Casinillo
 
CV-Mechanical engineer
CV-Mechanical engineerCV-Mechanical engineer
CV-Mechanical engineerMuhammad Umair
 
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceCV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceSameh Sameh
 
Mohamed Sayed CV - Senior Mechanical Engineer
Mohamed Sayed CV - Senior Mechanical EngineerMohamed Sayed CV - Senior Mechanical Engineer
Mohamed Sayed CV - Senior Mechanical EngineerMohamed Sayed
 
Top 8 production engineer resume samples
Top 8 production engineer resume samplesTop 8 production engineer resume samples
Top 8 production engineer resume samplesGunnarSolskjaer345
 
Mechanical engineer curriculum vitae
Mechanical engineer curriculum vitaeMechanical engineer curriculum vitae
Mechanical engineer curriculum vitaeNuno Freitas
 

En vedette (17)

Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 
LinkedIn Profile Improvement Tips
LinkedIn Profile Improvement TipsLinkedIn Profile Improvement Tips
LinkedIn Profile Improvement Tips
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
 
Abbott Resume
Abbott ResumeAbbott Resume
Abbott Resume
 
The CV
The CVThe CV
The CV
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh Hai
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
Mechanical Engineer Lead
Mechanical Engineer LeadMechanical Engineer Lead
Mechanical Engineer Lead
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CV
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and Piping
 
CV-Mechanical engineer
CV-Mechanical engineerCV-Mechanical engineer
CV-Mechanical engineer
 
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceCV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
 
Mohamed Sayed CV - Senior Mechanical Engineer
Mohamed Sayed CV - Senior Mechanical EngineerMohamed Sayed CV - Senior Mechanical Engineer
Mohamed Sayed CV - Senior Mechanical Engineer
 
Top 8 production engineer resume samples
Top 8 production engineer resume samplesTop 8 production engineer resume samples
Top 8 production engineer resume samples
 
Mechanical engineer curriculum vitae
Mechanical engineer curriculum vitaeMechanical engineer curriculum vitae
Mechanical engineer curriculum vitae
 

Similaire à Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning

Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkatesh Rajendran
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Hegab
 
Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1Mohamed Hashim
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Ibrahim
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_gobinath gobinath
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand Dhawan
 

Similaire à Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning (20)

Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 
SHREYAS__SABNIS CV
SHREYAS__SABNIS CVSHREYAS__SABNIS CV
SHREYAS__SABNIS CV
 
Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_Resume
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Waseem CV
Waseem CVWaseem CV
Waseem CV
 
Rakesh
RakeshRakesh
Rakesh
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
MP Singh_ Resume 001
MP Singh_ Resume 001MP Singh_ Resume 001
MP Singh_ Resume 001
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 

Dernier

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Dernier (20)

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning

  • 1. Page 1 of 5 SYNOPSIS Acquired Degree in Mechanical Power Engineering, having over 10 years of professional experiences in EPC sector both at Home & International locations for Refinery, Petrochemicals, NGL Plant, etc. HIGHER EDUCATION QUALIFICATIONS Bachelor of Science in Engineering: May2006: Major: Mechanical Power Engineering, Helwan University SUMMARY OF EXPERIENCES  Highly ambitious and self-motivated Project Management Professional with over 10 years in the Oil & Gas Industry in the fields of Project Construction & Commissioning. All experience enhanced by multi-functional business trips in United Arab Emirates, Oman, Algeria and Egypt for large scale EPC projects with Major EPC and Petroleum companies’ region.  My Professional acumen being ability to oversee total Project Engineering, Procurement, Construction & Commissioning of large EPC Projects to ensure project is in accordance with scope, quality requirements, budget and schedule. Skilled at interfacing with client representatives, vendors, subcontractors and other stakeholders. SKILLS AND SPECIALTIES  Proactive with an excellent leadership skills, good communicative skills & Analysis with a clear focus on improvement of processes, ability to work in customer focused way & to handle time pressure and to set priorities/supports.  Good awareness and analysis with various national and international Codes & Standards such as DEPs (PDO Specs.), SHELL STDs, GASCO Specs. (DGS) ASTM, DIN, BS EN ISO, ASME B31.3, B31.4, B31.8, API 5L, API 1110, SAUDI ARAMCO Spec. and AUSTRALIAN STANDARD (AS 1978-1987).  Assists in work pack initiation through understanding the quality requirements, ensuring the full implementation for COMPLETION CERTIFICATION MANAGEMENT SYSTEM (CCMS) in site level. CAREER DETAILS The Petroleum Projects and Technical Consultations Co.(PETROJET) (From 20/03/2007 to Till Date): PETROJET is a Multidisciplinary EPC Contractor specialized in providing Design, Engineering, Construction, Procurement, Pre-commissioning and commissioning services basically associated with Oil, Gas, Petrochemical, Chemical and Power Industries. Operations spread over two continents /12 Countries with reputed clients at the upper end of the market like Saudi Aramco (Saudi Arabia), Khafji Joint Operations (Saudi Arabia/Kuwait), Sonatrach (Algeria),TOTAL (Yemen), Eni (Libya), PDO (Oman),GASCO (UAE),ADCO(UAE) TRANSCO,ADDC, ADM (UAE) etc. PROJECTS ACCOMPLISHED: A. Position: Deputy Project Manager Client: Abu Dhabi Gas Industries Ltd. (GASCO) EPC: PETROJET ABU DHABI, UAE Engineering Consultant: PENSPEN, ABU DHABI, UAE PMC: Tebodin Project Description: 24” x 6 km (Approx.) Carbon Steel Natural Gas Pipeline SV-02 to Yas Island. 16’’ x 2.2 km (Approx.) Carbon Steel Pipeline from Yas Island to Saadiyat Island. Two Secondary Pressure Reduction Stations SPRS-1&2 are provided to secure flow of NG to the distribution mains with the pressure 4barg and one Primary Pressure Regulating Station (PPRS) has (H2S Removal Unit, Gas Filter, Custody Transfer Skid with check meter, Pressure reduction skid, Odorant injection, Gas chromatography, Communication and Instrumentation, Emergency Power Generation System, etc.) SENIOR PIPELINE/ PIPING MECHANICAL ENGINEER CONSTRUCTION & COMMISSIONING (ADNOC Distribution/ GASCO/ PDO/ SONATRACH/ ANADARKO/ PETROFAC/ HILL INTERNATIONAL) APPROVED PROFESSIONAL E-mail address: eng.mohamed_mostafa@yahoo.com, Mob: 002-01003074086/ 002-01149252549/00971-(0)796900405
  • 2. Page 2 of 5 Responsibilities: As Client, Approved Commissioning Manager: GASCO PROJECT No. 5275  Day to day basis following up the progress, and ensure that the reports and drawings are in line with the specifications and time schedule.  Review the reports to ensure that the same are meeting the requirements.  Review all the design discipline output to make sure that all the meeting the specifications and client requirements.  Interfacing with the client to get the final approval on the drawings and the green light to start the execution at site.  Prepare the bids, evaluating the bidders and choose the best bid and offer.  Get all the approvals required to start the site activities.  Monitor the site execution for the packages  Review and approve the work plans, time schedules and manpower histograms.  Report to the Project Manager on overall progress and cost performance of the Project, using the support of Project Controls.  Ensure that Project objectives (safety, quality, cost, and time) for each Area and Package are well defined, communicated and followed-up.  Provide guidance and expertise to project stakeholders. B. Position: Pre-Commissioning and Commissioning Manager Client: Abu Dhabi Gas Industries Ltd. (GASCO) EPC: PETROJET ABU DHABI, UAE Engineering Consultant: PENSPEN, ABU DHABI, UAE PMC: EIL Project Description: 24” x 18 km (Approx.) Carbon Steel Natural Gas Pipeline from Yas Island to Saadiyat Island from the existing facilities PPRS/SPRS-1/SPRS-2, GAS-in. 400mm x 7 km (Approx.) High Density Polyethylene (HDPE) Pipeline from Saadiyat CRS to tie-in with the existing 400mm HDPE pipeline on Mina Zayed and 16’’ x 4.2 km (Approx.) Carbon Steel Pipeline from Saadiyat CRS to Reem Island receiving station. CRS station has (Gas Filter, metering skid, Pressure reduction skid, Odorant vessel, etc.) Responsibilities: As Client Approved Commissioning Manager: GASCO PROJECT No. 5275  Responsible Pre-commissioning, Mechanical completion and Commissioning Procedures write ups, submissions and approval.  Leads all dynamic Pre-commissioning activities including oversee cleaning the pipe line, gauging, drying and leak testing activities carried as per EPC Scope Responsible for compliance to PTW systems, Activity Risk Assessment and identifies and mitigate risks posed to the workforce during commissioning and start-up.  Responsible for successful Mechanical Completion, Punch list close out and System Completion dossiers prior to acceptance not limited to NCR, Site Queries, and Field Change request, as built etc. prior to CAC.  Participate in Process system walk down audit and identify critical punch lists and progressing towards efficient close out.  Manage implementation of joint integrity plan following completion of leak testing to provide assurance full proof leak free plant, prior to introduction of hydrocarbons.  Ensure that any chemicals, packing, special tools, commissioning spares or other materials required to support commissioning and start-up prior to schedule are available.  Monitoring/Supervision of N2 Leak Testing of all Critical Systems carrying-out prior to Introduction of Hydrocarbons. Supervise pre-commissioning team for purging pipeline and piping by nitrogen using nitrogen generation unit membrane type.  Categorization of Punch Lists (A, B & C) including the closeout of all punch list items.  Preparation for Commissioning, Tie-in, Leak test and Bolt tightening procedures and reports.  Co-ordinate with GASCO OPN/Commissioning team for introducing Hydrocarbon.  Supervise the team for Caliper pigging survey for integrity of pipelines. Participated in preparation of HSE required documentation as Cause and effect - ERP (Internal & External)-Commissioning HSE Plan - Zone classification – Process studies, recommendation of various studies e.g. HAZOP – HAZID/QRA etc.  Prepare calculation required to identify time and noise level will be taken for Venting to atmosphere.  Prepare a list of critical valves to be tested and maintenance prior to gas in.  Prepare a list of commissioning spare parts stock to be made available prior gas in.
  • 3. Page 3 of 5 C. Position: Pre-Commissioning/ Commissioning Manager Client: Petroleum Development Oman (PDO) EPC: PETROJET, OMAN PMC: VELOSI Engineering Consultant: MOTT MCDONALD Project Description: 20” Internally/ externally coated Carbon steel 157 Km ISO 1381-PSL2 Grade L415 (X60) gas Pipeline for PDO from BARIK to BVS-08. Responsibilities: Approved as Commissioning Manager from PDO contract No. C31/1376  Responsible for Mechanical Completion, pre-commissioning/ commissioning activities.  Verification of all systems completion requirements associated with the scope of work of all the disciplines.  Creation and administration of Technical queries and Engineering queries / punch list register.  Prepare a list of commissioning spare parts stock to be made available prior gas in.  Coordinate with other projects department engineers to complete certification and completions management system (CCMS).  Creation and administration of Technical queries and Engineering queries / punch list register.  System definition and marking-up of system with use of Adobe Acrobat Professional.  Writing of commissioning procedure for each systems with their mark-up P&ID and PFD Drawings.  Work closely with operations personnel/control room operators and contractors during the commissioning and start-up.  Coordinate with other projects department engineers, operation personnel and contractor group to ensure that all requirements for commissioning work of all the units/systems are fulfilled.  Proven project leader with experience in handling projects from design to commissioning stage.  Effectively involved in performing pipeline construction and Pre-commissioning including pigging, Flooding and Testing in accordance to approved procedure and international standard. D. Position: Pre-commissioning/ Commissioning Manager Client: ANADARKO/ SONATRACH EPC: PETROJET, ALGERIA Project Description: ELMERK FLOW PIPELINES LOT 3&4 different sizes from 4" up to 24" (GAS-OIL- WATER) with approximate length 200 KM. Responsibilities:  Checking for readiness of mechanical completion dossiers of systems, accordingly with QA&OC system, in collaboration with others departments and client representatives.  Develop punch item database by systems, checking for completion and close-out of punch items accordingly with client and company agreed standards.  Preparation of Mechanical Completion Certificate, Exceptions List and Ready for Commissioning forms of systems and submitted to company and client management for approval.  Supervise of Purging by using nitrogen generation membrane type unit for pipeline.  Lead PETROJET Pre-Commissioning team for initial drying and final drying for pipeline and Leak test for piping on plot.  Prepare the Pre-commissioning/ commissioning documents in advance before the commencement of commissioning work (Method of statement of Tie-In, Demolishing, reinstatement, bolt tightening, final drying and purging by nitrogen).  Work with other discipline engineers and operations personnel for manpower and supporting resources to conduct commissioning work.  Supervise commissioning of units/system, assist with complications that may arise, sign-off and handover of certification packs to platform operation team.  Ensuring necessary HSE reviews are undertaken and identified actions completed.  Provided Calculation, Procedures, Drawings, data sheets and all engineering documents for Pre- commissioning, Commissioning and Testing Activity of onshore Pipeline and Process Plants service.  Interpret all Engineering Documentation to ensure works are conducted as required.  Recorded operating data required to ensure complete reporting documentation during Pre- commissioning, Commissioning and testing phase.  Contributed to the provision of solutions to internal interface problems.  Actively participated in the engineering function of Project Tendering.
  • 4. Page 4 of 5 E. Position: Pre-commissioning/ Commissioning Manager Client: SONATRACH EPC: PETROJET, ALGERIA Project Description: 48” GAS PIPELINE IN ALGERIA LOT1&2 WITH APPROXIMATE LENGTH 430 KM Responsibilities:  Follow up for all Pre-commissioning activity (Cleaning, Gauging, Flooding, and Hydrostatic Test).  Checking for readiness of mechanical completion dossiers of systems, accordingly with QA&OC system, in collaboration with others departments and client representatives.  Creation and administration of Technical queries and Engineering queries / punch list register.  Writing of commissioning procedure for each systems with their mark-up P&ID and PFD Drawings.  Inspection of packaged process skid and equipment supplied by vendors if piping components are complete and to ascertain the compatibility with the outside process piping.  Assist in developing procedures to conduct chemical degreasing cleaning and performance test for new plant equipment upon start-up.  To coordinate/ Interface between commissioning and Pre-commissioning for system turn over to commissioning after pre-commissioning.  Preparing all site drawing, Pipeline joint History, Pressure Test, Flooding, Gauging documents and report.  Effectively involved in performing pipeline construction and Pre-commissioning including pigging, Flooding and Testing in accordance to approved procedure and international standard. F. Position: Pre-commissioning Engineer Client: KHALDA PETROLEUM CO. EPC: PETROFAC Contractor: PETROJET, EGYPT Project Description: Salam gas trains (SGT 3 & 4 project) two new gas processing trains. Responsibilities:  Inspection of packaged process system and equipment supply by the vendor if piping components are complete.  Mark-up Process Engineering Flow Scheme of system for mechanical cleaning.  Write/assist in developing procedures to conduct performance test for new plant equipment upon start-up. Assist with conducting tests, gathering data and verifying results. Implement strategies to improve Commissioning and Start-Up.  Quality control of system in accordance with the Commissioning Quality control procedure.  Record and Report all non-conformances actions in accordance with the Commissioning start-up procedure during start-up.  Document control for changes and deviations from detail design reflected by CTQ field notes and site instruction (SEI)  Carry-out function checks on systems and equipment to ensure that the suction and discharge valves are functioning very well and equipment in good conditions.  Capable to Plan Schedule, Manpower, and Necessary Tools/Equipment required for Pre- Commissioning/ Commissioning. G. Position: Technical Office Engineer Client: EMETHANEX (METHANOL Project) EPC: TECHINT CO. Contractor: PETROJET, EGYPT Project Description: Plant produces methanol Responsibilities:  Checking Isometrics for piping lines and preparation of AS-BUILT drawings.  Definition and Preparation of Piping Hydro Test limit on PI&D for Utilities and Process units.  Follow up Modifications on Site concerning piping layout, Isometrics and PID in accordance to site conditions.  Preparation of complete programming Database (MS ACCESS) for follow- up of piping Test package submission including Punch list, Fabrication and related tests.  Follow up piping punch list done before Hydro test.  Inspect and check the installed Piping & Supports at sites.  Follow up Flange Management done before Hydro test.  Follow-up Flushing and Chemical Cleaning for Suction of Compressors.  Supervisor for Tighten all flanges accordance to project specifications (By using Tension Machine, Hydraulic Torque wrench and Manual Torque wrench) and putting the procedures of tighten.  Follow-up Leak and Tightness test, Flushing and Blowing of lines for Process Unit.
  • 5. Page 5 of 5 H. Position: Pre-Commissioning Engineer Client: GASCO EGYPT EPC: ENPPI PMC: HILL INTERNATIONAL Contractor: PETROJET, EGYPT Project Description: DAHSHOUR COMPRESSION STATION Responsibilities:  Check and supervise on all mechanical piping spool fabrication (fit up, dimension, orientation, and alignment).  Arrange with contractors at site, manpower and resources which meet the target productivity of project.  Check on Material tractability plan and bill of material per each spool to be sure from right material for right spool  Follow up and monitoring at site (pipe rack, piping supports, piping line up and assembly of valves with accessories – by loops or by systems ).  Supervise on all UG piping construction and test (facilities and infrastructure) as sewage network, potable water network, firefighting network and hydrants).  Supervise on site tank building (pressurized and non-pressurized) as settlement, nozzle orientation, hydrostatic test, vacuum test and review all QC/ QA reports related to tanks.  Check, Review, Supervise and Approve All Hydrostatic Tests procedure for All Piping Systems.  Supervise on CLT (commissioning leak test) And GLT (gross leak test) Activities. Skill Development Courses Accomplished: Technical Skill Courses: - Welding engineering in Egyptian Engineering Associations. - Design and construction of pipe networks in Higher Technological Institute. - Calculations of Electrical Loads and Design in Ein Shams University. - Maintenance for pumps and compressors in Helwan University. - Types of bearing and Gears in Cairo University. Communication Courses: - Managerial Skills Developing for Engineers in American Supplier Institute (ASI) - Management Training Program in Career Development & Consultations Academy. - Report writing and Preparation in Professional Management Expertise Center (PMEC). - Communications skills. HSE Skills: During my service, HSE skills have been remained as Top priority and working towards continual improvement followings: - Safe commissioning procedure and Permit to Work System. - Job Hazardous Analysis and process risk management. Fire /gas alarm and first Aids skill at work site.- - Impart colleagues H2S and SO2 skilled upgrade course at field (awareness/escape). - Working safely with high H2S contents areas. Personal Information: Full Name: Mohamed Mostafa Mohamed Mohamed Date of Birth: 25- February-1984 Place of Birth: Cairo, Egypt. Present Address: Abu Dhabi Military Status: Exempted Marital Status: Married Passport number: A09298687 Oman residence until November - 2017 UAE Residence until August - 2018 E-mail address: eng.mohamed_mostafa@yahoo.com GSM EGYPT: 002- 01003074086 / 002- 01149252549 GSM ABU DHABI: +971- (0)504099687