1. Mohamed Youssry Moussa Hafez
Personal Information
Hafez.Family Name:
Gender: Male.
Birth Date: 1-7-1983
Egyptian.Nationality:
Religion: Muslim.
Married.Marital Status:
YesChildren:
Military Status: Fully exempted
Education Particulars
Training experience
period company
2002 from 8 Sept. to 19 Sept Western desert operating PET CO. ( WEPCO )
2002 from 1 Aug. to 31 Aug Authority passengers transporting in Alexandria (A.P.T.A)
15 July to 14 Aug
2003 and 2004 from 6 June to 31 Aug
Authority passengers transporting in Alexandria(A.P.T.A)
MAF HYPERMARKETS ( CARREFOUR )
2004 from 1 Aug. to 31 Aug
2012 October
Abu Quir Fertilizers
KSB Factory – in Germany
University Alexandria.
Department power mechanical
Certificate BS.C Of mechanical engineer 2005
Graduation project Oil pipeline design, operation and construction
General Grade Good
Contact Information:
Address: “82 Memfes St. Ibrahimya station,
Alexandria, Egypt
Home Phone: +2 03 /5932962
Mobile No#: +2/ 01003047146
Iraq cell: +964 7815 60 7212
E-Mail: yousrawey@hotmail.com
2. WORK EXPERIENCE
Period company
1/7/2013 – till now
10/1/2012 – 30/6/2013
1/8/2011 –8/1/2012
15/12/2008 –19/7/2011
9/10/2005 – 13/12/2008
Arab contractors Iraq
Electromechanical Department
Arab contractors ( EQUATORIAL GUINEA, Ltd )
Electromechanical Department
Arab contractors ( EGYPT )
Electrical and Mechanical Department, General Building &Utilities
Arab contractors ( EQUATORIAL GUINEA, Ltd )
Electromechanical Department
Arab contractors ( EGYPT )
Electrical and Mechanical Projects Department.
Current Project: Basra Water Supply Improvement Project in Iraq
Period: From 2/2016 - till now
Client: Ministry of Municipalities and Public Works
Company: Joint Venture HITACHI-OTV-Arab Contractors
Consultant: NJS CONSULTANTS CO., LTD
Job title: MEP Project Manager.
Project (9): Al Diwaniyiah Power Station in Iraq 4*125MW
Period: From 7/2013 to 2/2016
Client: Ministry of Electricity - MOE
Company: Joint Venture between Arab Contractors & ElSEWEEDY Power
Consultant: General Electric - GE
Job title: MEP Project Manager.
Project (8): Potable water and sanitary drainage
IMPROVEMENT OF POTABLE WATER SUPPLY IN MALABO CITY
Water Treatment Plant 28000
3
m /day
Period: From 1/2012 to 6/2013
Client: Guinea’s Government
Company: Arab contractors (EQUATORIAL GUINEA, Ltd)
Consultant: FICHTNER
Job title: MEP Executive Manager.
Project (7): Development and modernization of Sedi Gaber station
CENTRAL AIR CONDITIONING AND FIRE FIGHTING SYSTEM
Period: From 8/2011 to 1/2012
Client: Egypt Railway Authority.
Company: Arab contractors (FOR GENERAL BUILDING AND UTILITES)
Consultant: Engineering Center (FACULTY OF ENGINEERING – ALEX. UNIVERSTY)
Job title: site (executive) engineer.
3. Project (6): Potable water and sanitary drainage
MALABO, SEWAGE TREATMENT PLANT 6000
3
m /day
Period: From 12/2008 to 7/2011
Client: Guinea’s Government
Company: Arab contractors (EQUATORIAL GUINEA, Ltd)
Consultant: EL-DAR CONSULTING ENGINEERS
Job title: site (executive) engineer.
Project (5): Potable water and sanitary drainage
Extension of QENA water treatment plant
Second stage, upgrade from 600 to 1200 L/Sec.
Period: From 6/2008 to 12/2008
Client: Ministry of housing and utilities
Company: Arab contractors
Consultant: UTILLITES
Job title: site (executive) engineer.
Project (4): EL KURIMAT POWER STATION (III)
(A) STEEL STRUCTURE: Combustion Turbine & Generator Building
(C.T.G) Weight 1200 TON
(B) STEEL STRUCTURE: Steam Turbine Generator Building
(S.T.G) Weight 1200 TON
(C) STEEL STRUCTURE: Circulating Water Pump House
(C.W.P) Weight 300 TON
Period: From 9/2007 to 6/2008
Company: Consortium of Arab Contractors and Worley Parson (CACWP)
Client: Upper Egypt Electrical Production Company (UEEPC)
Consultant: PGESCO
Job title: site (executive) engineer.
Project (3): Potable water and sanitary drainage
Extension of BEBA water treatment plant
Second stage, upgrade from 200 to 400 L/Sec.
Period: From 4/2007 to 9/2007
Client: Ministry of housing and utilities
Company: Arab contractors
Consultant: UTILLITES
Job title: site (executive) engineer.
Project (2): EL KURIMAT POWER STATION (II)
(A)STEEL STRUCTURE: Combustion Turbine & Generator building
(C.T.G) Weight 1200 TON
(B) STEEL STRUCTURE: Steam Turbine Generator building
(S.T.G) Weight 1200 TON
Period: From 4/2006 to 3/2007
Client: Upper Egypt Electrical Production Company (UEEPC)
Company: Consortium of Arab Contractors and Parson Energy & Chemicals (CACPEC)
Consultant: PGESCO
Job title: site (executive) engineer
4. Project (1): BORG EL ARAB STADUIM
STEEL STRUCTURE (SHED of Borg El Arab stadium) Weight 3200 ton
Period: From 10/2005 to 4/2006
Client: Egyptian army
Company: Arab contractors
Consultant: Dr. Hassan Osman office
Job title: site (executive) engineer
General Job description.
- Organizing and facilitating Project Steering, Operating Committees meetings and drive the
project team including any subcontractors.
- Ensure that all Construction Activities are completed in the most effective and cost efficient
manner possible.
- Ensure that all materials and equipment required to support the construction and startup of
projects are available when they are needed.
- Implemented and ensured that all operations and activates were certified to the QC standard.
- Provide accuracy of the project's plans.
- Updating project plans to include agreed changes.
- Negotiating difficult decisions with colleagues, senior manager and other third parties.
- Writing detailed and summarized project progress reports.
- Producing accurate financial reports.
- Reviewed and approved all project documentation.
- Responsible for the Health, Safety and Welfare of all team members.
- Fabrication and erection of the steel structure.
- Reporting & requesting the client.
- Make and implement method statement for each activities carried out.
Distinct Skills
Computer Skills:
Soft Skills:
-Having the ability to learn new skills.
-Team player but also able to work individually.
-Hard worker and able to work under pressure
Computer Programs General Estimate
Microsoft Office Very Good.
AutoCAD (2D) Very Good.