SlideShare une entreprise Scribd logo
1  sur  4
Télécharger pour lire hors ligne
Mohamed Youssry Moussa Hafez
Personal Information
Hafez.Family Name:
Gender: Male.
Birth Date: 1-7-1983
Egyptian.Nationality:
Religion: Muslim.
Married.Marital Status:
YesChildren:
Military Status: Fully exempted
Education Particulars
Training experience
period company
2002 from 8 Sept. to 19 Sept Western desert operating PET CO. ( WEPCO )
2002 from 1 Aug. to 31 Aug Authority passengers transporting in Alexandria (A.P.T.A)
15 July to 14 Aug
2003 and 2004 from 6 June to 31 Aug
Authority passengers transporting in Alexandria(A.P.T.A)
MAF HYPERMARKETS ( CARREFOUR )
2004 from 1 Aug. to 31 Aug
2012 October
Abu Quir Fertilizers
KSB Factory – in Germany
University Alexandria.
Department power mechanical
Certificate BS.C Of mechanical engineer 2005
Graduation project Oil pipeline design, operation and construction
General Grade Good
Contact Information:
Address: “82 Memfes St. Ibrahimya station,
Alexandria, Egypt
Home Phone: +2 03 /5932962
Mobile No#: +2/ 01003047146
Iraq cell: +964 7815 60 7212
E-Mail: yousrawey@hotmail.com
WORK EXPERIENCE
Period company
1/7/2013 – till now
10/1/2012 – 30/6/2013
1/8/2011 –8/1/2012
15/12/2008 –19/7/2011
9/10/2005 – 13/12/2008
Arab contractors Iraq
Electromechanical Department
Arab contractors ( EQUATORIAL GUINEA, Ltd )
Electromechanical Department
Arab contractors ( EGYPT )
Electrical and Mechanical Department, General Building &Utilities
Arab contractors ( EQUATORIAL GUINEA, Ltd )
Electromechanical Department
Arab contractors ( EGYPT )
Electrical and Mechanical Projects Department.
Current Project: Basra Water Supply Improvement Project in Iraq
Period: From 2/2016 - till now
Client: Ministry of Municipalities and Public Works
Company: Joint Venture HITACHI-OTV-Arab Contractors
Consultant: NJS CONSULTANTS CO., LTD
Job title: MEP Project Manager.
Project (9): Al Diwaniyiah Power Station in Iraq 4*125MW
Period: From 7/2013 to 2/2016
Client: Ministry of Electricity - MOE
Company: Joint Venture between Arab Contractors & ElSEWEEDY Power
Consultant: General Electric - GE
Job title: MEP Project Manager.
Project (8): Potable water and sanitary drainage
IMPROVEMENT OF POTABLE WATER SUPPLY IN MALABO CITY
Water Treatment Plant 28000
3
m /day
Period: From 1/2012 to 6/2013
Client: Guinea’s Government
Company: Arab contractors (EQUATORIAL GUINEA, Ltd)
Consultant: FICHTNER
Job title: MEP Executive Manager.
Project (7): Development and modernization of Sedi Gaber station
CENTRAL AIR CONDITIONING AND FIRE FIGHTING SYSTEM
Period: From 8/2011 to 1/2012
Client: Egypt Railway Authority.
Company: Arab contractors (FOR GENERAL BUILDING AND UTILITES)
Consultant: Engineering Center (FACULTY OF ENGINEERING – ALEX. UNIVERSTY)
Job title: site (executive) engineer.
Project (6): Potable water and sanitary drainage
MALABO, SEWAGE TREATMENT PLANT 6000
3
m /day
Period: From 12/2008 to 7/2011
Client: Guinea’s Government
Company: Arab contractors (EQUATORIAL GUINEA, Ltd)
Consultant: EL-DAR CONSULTING ENGINEERS
Job title: site (executive) engineer.
Project (5): Potable water and sanitary drainage
 Extension of QENA water treatment plant
Second stage, upgrade from 600 to 1200 L/Sec.
Period: From 6/2008 to 12/2008
Client: Ministry of housing and utilities
Company: Arab contractors
Consultant: UTILLITES
Job title: site (executive) engineer.
Project (4): EL KURIMAT POWER STATION (III)
(A) STEEL STRUCTURE: Combustion Turbine & Generator Building
(C.T.G) Weight 1200 TON
(B) STEEL STRUCTURE: Steam Turbine Generator Building
(S.T.G) Weight 1200 TON
(C) STEEL STRUCTURE: Circulating Water Pump House
(C.W.P) Weight 300 TON
Period: From 9/2007 to 6/2008
Company: Consortium of Arab Contractors and Worley Parson (CACWP)
Client: Upper Egypt Electrical Production Company (UEEPC)
Consultant: PGESCO
Job title: site (executive) engineer.
Project (3): Potable water and sanitary drainage
 Extension of BEBA water treatment plant
Second stage, upgrade from 200 to 400 L/Sec.
Period: From 4/2007 to 9/2007
Client: Ministry of housing and utilities
Company: Arab contractors
Consultant: UTILLITES
Job title: site (executive) engineer.
Project (2): EL KURIMAT POWER STATION (II)
(A)STEEL STRUCTURE: Combustion Turbine & Generator building
(C.T.G) Weight 1200 TON
(B) STEEL STRUCTURE: Steam Turbine Generator building
(S.T.G) Weight 1200 TON
Period: From 4/2006 to 3/2007
Client: Upper Egypt Electrical Production Company (UEEPC)
Company: Consortium of Arab Contractors and Parson Energy & Chemicals (CACPEC)
Consultant: PGESCO
Job title: site (executive) engineer
Project (1): BORG EL ARAB STADUIM
STEEL STRUCTURE (SHED of Borg El Arab stadium) Weight 3200 ton
Period: From 10/2005 to 4/2006
Client: Egyptian army
Company: Arab contractors
Consultant: Dr. Hassan Osman office
Job title: site (executive) engineer
General Job description.
- Organizing and facilitating Project Steering, Operating Committees meetings and drive the
project team including any subcontractors.
- Ensure that all Construction Activities are completed in the most effective and cost efficient
manner possible.
- Ensure that all materials and equipment required to support the construction and startup of
projects are available when they are needed.
- Implemented and ensured that all operations and activates were certified to the QC standard.
- Provide accuracy of the project's plans.
- Updating project plans to include agreed changes.
- Negotiating difficult decisions with colleagues, senior manager and other third parties.
- Writing detailed and summarized project progress reports.
- Producing accurate financial reports.
- Reviewed and approved all project documentation.
- Responsible for the Health, Safety and Welfare of all team members.
- Fabrication and erection of the steel structure.
- Reporting & requesting the client.
- Make and implement method statement for each activities carried out.
Distinct Skills
 Computer Skills:
Soft Skills:
-Having the ability to learn new skills.
-Team player but also able to work individually.
-Hard worker and able to work under pressure
Computer Programs General Estimate
Microsoft Office Very Good.
AutoCAD (2D) Very Good.

Contenu connexe

Tendances

QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorM.ZUBAIR KHAN
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping EngineerPopovici Adrian
 
Electrical Supervisor CV
Electrical Supervisor CVElectrical Supervisor CV
Electrical Supervisor CVMuhammad Naeem
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez K
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP SupervisorArun Arun
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)ahmed elazazy
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMUTHUKUMAR428109
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarGowrijayashankar S V
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 

Tendances (20)

QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC Inspector
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
Electrical Supervisor CV
Electrical Supervisor CVElectrical Supervisor CV
Electrical Supervisor CV
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CV
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
Balaji CV - 2015
Balaji CV - 2015Balaji CV - 2015
Balaji CV - 2015
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 

En vedette

Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume Arun Das
 
MSCI's decision to delay A share' inclusion won't slow China's pace to furthe...
MSCI's decision to delay A share' inclusion won't slow China's pace to furthe...MSCI's decision to delay A share' inclusion won't slow China's pace to furthe...
MSCI's decision to delay A share' inclusion won't slow China's pace to furthe...Nan BAI,CFA
 
เทคโนโลยีสารสนเทศและการสื่อสาร
เทคโนโลยีสารสนเทศและการสื่อสาร เทคโนโลยีสารสนเทศและการสื่อสาร
เทคโนโลยีสารสนเทศและการสื่อสาร gozungki
 
Ms Marvel Asian American Issues
Ms Marvel Asian American IssuesMs Marvel Asian American Issues
Ms Marvel Asian American IssuesRachel Howe
 
Employees Assignment Help
Employees Assignment HelpEmployees Assignment Help
Employees Assignment Helpcheapcouk
 
كيفية حل مع نماذج القطعة الخارجية -جاهزةة للطباعة
كيفية حل مع نماذج القطعة الخارجية -جاهزةة للطباعةكيفية حل مع نماذج القطعة الخارجية -جاهزةة للطباعة
كيفية حل مع نماذج القطعة الخارجية -جاهزةة للطباعةAhmed Allehibi
 
Understanding “Illegality”: The Consequences & Impacts Of Immigration Status ...
Understanding “Illegality”: The Consequences & Impacts Of Immigration Status ...Understanding “Illegality”: The Consequences & Impacts Of Immigration Status ...
Understanding “Illegality”: The Consequences & Impacts Of Immigration Status ...Foundation for Healthy Generations
 
各大音樂流行網站
各大音樂流行網站各大音樂流行網站
各大音樂流行網站Wang Kenny
 

En vedette (19)

Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
MSCI's decision to delay A share' inclusion won't slow China's pace to furthe...
MSCI's decision to delay A share' inclusion won't slow China's pace to furthe...MSCI's decision to delay A share' inclusion won't slow China's pace to furthe...
MSCI's decision to delay A share' inclusion won't slow China's pace to furthe...
 
primer periodo
primer periodoprimer periodo
primer periodo
 
Colgate palmolive
Colgate palmoliveColgate palmolive
Colgate palmolive
 
Mr
MrMr
Mr
 
150210107048_CE_ppt
150210107048_CE_ppt150210107048_CE_ppt
150210107048_CE_ppt
 
Motifs on indian sarees
Motifs on indian sareesMotifs on indian sarees
Motifs on indian sarees
 
เทคโนโลยีสารสนเทศและการสื่อสาร
เทคโนโลยีสารสนเทศและการสื่อสาร เทคโนโลยีสารสนเทศและการสื่อสาร
เทคโนโลยีสารสนเทศและการสื่อสาร
 
Finding Leverage with System Dynamics
Finding Leverage with System DynamicsFinding Leverage with System Dynamics
Finding Leverage with System Dynamics
 
Opuntia garden
Opuntia gardenOpuntia garden
Opuntia garden
 
Ms Marvel Asian American Issues
Ms Marvel Asian American IssuesMs Marvel Asian American Issues
Ms Marvel Asian American Issues
 
Employees Assignment Help
Employees Assignment HelpEmployees Assignment Help
Employees Assignment Help
 
كيفية حل مع نماذج القطعة الخارجية -جاهزةة للطباعة
كيفية حل مع نماذج القطعة الخارجية -جاهزةة للطباعةكيفية حل مع نماذج القطعة الخارجية -جاهزةة للطباعة
كيفية حل مع نماذج القطعة الخارجية -جاهزةة للطباعة
 
Understanding “Illegality”: The Consequences & Impacts Of Immigration Status ...
Understanding “Illegality”: The Consequences & Impacts Of Immigration Status ...Understanding “Illegality”: The Consequences & Impacts Of Immigration Status ...
Understanding “Illegality”: The Consequences & Impacts Of Immigration Status ...
 
Weekly updates 2
Weekly updates 2Weekly updates 2
Weekly updates 2
 
Francky Carter - Dossier de Presse
Francky Carter - Dossier de PresseFrancky Carter - Dossier de Presse
Francky Carter - Dossier de Presse
 
各大音樂流行網站
各大音樂流行網站各大音樂流行網站
各大音樂流行網站
 

Similaire à MEP Manager CV)

Mohammed Walid C.v-2
Mohammed Walid C.v-2Mohammed Walid C.v-2
Mohammed Walid C.v-2walid agamy
 
Moh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaaMoh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaaMohamed Roshdy
 
AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04Ahmed gemeiy
 
CV Walid (10-2016)
CV Walid (10-2016)CV Walid (10-2016)
CV Walid (10-2016)Walid Zaki
 
ENG- AhmedHussien _ CV
ENG- AhmedHussien _ CVENG- AhmedHussien _ CV
ENG- AhmedHussien _ CVAhmed Hussien
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years expsameh todary
 
site manager /construction manager
site manager /construction managersite manager /construction manager
site manager /construction managerMohamed Roshdy
 
1 c.v gomaa khamis osman
1  c.v  gomaa khamis osman1  c.v  gomaa khamis osman
1 c.v gomaa khamis osmanGomaa Khamis
 
Ahmed zain -mechanical engineer
Ahmed zain -mechanical engineerAhmed zain -mechanical engineer
Ahmed zain -mechanical engineerahmed zain
 
Mohamed Farid Gomaa
Mohamed Farid Gomaa  Mohamed Farid Gomaa
Mohamed Farid Gomaa mohamed farid
 
SITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - CopySITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - Copyyoussef youssef
 

Similaire à MEP Manager CV) (20)

Mahmoud
MahmoudMahmoud
Mahmoud
 
Mohammed Walid C.v-2
Mohammed Walid C.v-2Mohammed Walid C.v-2
Mohammed Walid C.v-2
 
Moh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaaMoh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaa
 
C.v gaber a. elrazek
C.v   gaber a. elrazekC.v   gaber a. elrazek
C.v gaber a. elrazek
 
CV Ahmed1
CV Ahmed1CV Ahmed1
CV Ahmed1
 
Ayman mohamed11 (2)
Ayman mohamed11 (2)Ayman mohamed11 (2)
Ayman mohamed11 (2)
 
AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04
 
CV Walid (10-2016)
CV Walid (10-2016)CV Walid (10-2016)
CV Walid (10-2016)
 
ENG- AhmedHussien _ CV
ENG- AhmedHussien _ CVENG- AhmedHussien _ CV
ENG- AhmedHussien _ CV
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 
site manager /construction manager
site manager /construction managersite manager /construction manager
site manager /construction manager
 
C.v
C.vC.v
C.v
 
1 c.v gomaa khamis osman
1  c.v  gomaa khamis osman1  c.v  gomaa khamis osman
1 c.v gomaa khamis osman
 
Ahmed zain -mechanical engineer
Ahmed zain -mechanical engineerAhmed zain -mechanical engineer
Ahmed zain -mechanical engineer
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
hassan aly
hassan aly hassan aly
hassan aly
 
Fouad, Mohd. CV
Fouad, Mohd. CVFouad, Mohd. CV
Fouad, Mohd. CV
 
Mohamed Farid Gomaa
Mohamed Farid Gomaa  Mohamed Farid Gomaa
Mohamed Farid Gomaa
 
elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
 
SITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - CopySITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - Copy
 

MEP Manager CV)

  • 1. Mohamed Youssry Moussa Hafez Personal Information Hafez.Family Name: Gender: Male. Birth Date: 1-7-1983 Egyptian.Nationality: Religion: Muslim. Married.Marital Status: YesChildren: Military Status: Fully exempted Education Particulars Training experience period company 2002 from 8 Sept. to 19 Sept Western desert operating PET CO. ( WEPCO ) 2002 from 1 Aug. to 31 Aug Authority passengers transporting in Alexandria (A.P.T.A) 15 July to 14 Aug 2003 and 2004 from 6 June to 31 Aug Authority passengers transporting in Alexandria(A.P.T.A) MAF HYPERMARKETS ( CARREFOUR ) 2004 from 1 Aug. to 31 Aug 2012 October Abu Quir Fertilizers KSB Factory – in Germany University Alexandria. Department power mechanical Certificate BS.C Of mechanical engineer 2005 Graduation project Oil pipeline design, operation and construction General Grade Good Contact Information: Address: “82 Memfes St. Ibrahimya station, Alexandria, Egypt Home Phone: +2 03 /5932962 Mobile No#: +2/ 01003047146 Iraq cell: +964 7815 60 7212 E-Mail: yousrawey@hotmail.com
  • 2. WORK EXPERIENCE Period company 1/7/2013 – till now 10/1/2012 – 30/6/2013 1/8/2011 –8/1/2012 15/12/2008 –19/7/2011 9/10/2005 – 13/12/2008 Arab contractors Iraq Electromechanical Department Arab contractors ( EQUATORIAL GUINEA, Ltd ) Electromechanical Department Arab contractors ( EGYPT ) Electrical and Mechanical Department, General Building &Utilities Arab contractors ( EQUATORIAL GUINEA, Ltd ) Electromechanical Department Arab contractors ( EGYPT ) Electrical and Mechanical Projects Department. Current Project: Basra Water Supply Improvement Project in Iraq Period: From 2/2016 - till now Client: Ministry of Municipalities and Public Works Company: Joint Venture HITACHI-OTV-Arab Contractors Consultant: NJS CONSULTANTS CO., LTD Job title: MEP Project Manager. Project (9): Al Diwaniyiah Power Station in Iraq 4*125MW Period: From 7/2013 to 2/2016 Client: Ministry of Electricity - MOE Company: Joint Venture between Arab Contractors & ElSEWEEDY Power Consultant: General Electric - GE Job title: MEP Project Manager. Project (8): Potable water and sanitary drainage IMPROVEMENT OF POTABLE WATER SUPPLY IN MALABO CITY Water Treatment Plant 28000 3 m /day Period: From 1/2012 to 6/2013 Client: Guinea’s Government Company: Arab contractors (EQUATORIAL GUINEA, Ltd) Consultant: FICHTNER Job title: MEP Executive Manager. Project (7): Development and modernization of Sedi Gaber station CENTRAL AIR CONDITIONING AND FIRE FIGHTING SYSTEM Period: From 8/2011 to 1/2012 Client: Egypt Railway Authority. Company: Arab contractors (FOR GENERAL BUILDING AND UTILITES) Consultant: Engineering Center (FACULTY OF ENGINEERING – ALEX. UNIVERSTY) Job title: site (executive) engineer.
  • 3. Project (6): Potable water and sanitary drainage MALABO, SEWAGE TREATMENT PLANT 6000 3 m /day Period: From 12/2008 to 7/2011 Client: Guinea’s Government Company: Arab contractors (EQUATORIAL GUINEA, Ltd) Consultant: EL-DAR CONSULTING ENGINEERS Job title: site (executive) engineer. Project (5): Potable water and sanitary drainage  Extension of QENA water treatment plant Second stage, upgrade from 600 to 1200 L/Sec. Period: From 6/2008 to 12/2008 Client: Ministry of housing and utilities Company: Arab contractors Consultant: UTILLITES Job title: site (executive) engineer. Project (4): EL KURIMAT POWER STATION (III) (A) STEEL STRUCTURE: Combustion Turbine & Generator Building (C.T.G) Weight 1200 TON (B) STEEL STRUCTURE: Steam Turbine Generator Building (S.T.G) Weight 1200 TON (C) STEEL STRUCTURE: Circulating Water Pump House (C.W.P) Weight 300 TON Period: From 9/2007 to 6/2008 Company: Consortium of Arab Contractors and Worley Parson (CACWP) Client: Upper Egypt Electrical Production Company (UEEPC) Consultant: PGESCO Job title: site (executive) engineer. Project (3): Potable water and sanitary drainage  Extension of BEBA water treatment plant Second stage, upgrade from 200 to 400 L/Sec. Period: From 4/2007 to 9/2007 Client: Ministry of housing and utilities Company: Arab contractors Consultant: UTILLITES Job title: site (executive) engineer. Project (2): EL KURIMAT POWER STATION (II) (A)STEEL STRUCTURE: Combustion Turbine & Generator building (C.T.G) Weight 1200 TON (B) STEEL STRUCTURE: Steam Turbine Generator building (S.T.G) Weight 1200 TON Period: From 4/2006 to 3/2007 Client: Upper Egypt Electrical Production Company (UEEPC) Company: Consortium of Arab Contractors and Parson Energy & Chemicals (CACPEC) Consultant: PGESCO Job title: site (executive) engineer
  • 4. Project (1): BORG EL ARAB STADUIM STEEL STRUCTURE (SHED of Borg El Arab stadium) Weight 3200 ton Period: From 10/2005 to 4/2006 Client: Egyptian army Company: Arab contractors Consultant: Dr. Hassan Osman office Job title: site (executive) engineer General Job description. - Organizing and facilitating Project Steering, Operating Committees meetings and drive the project team including any subcontractors. - Ensure that all Construction Activities are completed in the most effective and cost efficient manner possible. - Ensure that all materials and equipment required to support the construction and startup of projects are available when they are needed. - Implemented and ensured that all operations and activates were certified to the QC standard. - Provide accuracy of the project's plans. - Updating project plans to include agreed changes. - Negotiating difficult decisions with colleagues, senior manager and other third parties. - Writing detailed and summarized project progress reports. - Producing accurate financial reports. - Reviewed and approved all project documentation. - Responsible for the Health, Safety and Welfare of all team members. - Fabrication and erection of the steel structure. - Reporting & requesting the client. - Make and implement method statement for each activities carried out. Distinct Skills  Computer Skills: Soft Skills: -Having the ability to learn new skills. -Team player but also able to work individually. -Hard worker and able to work under pressure Computer Programs General Estimate Microsoft Office Very Good. AutoCAD (2D) Very Good.