SlideShare une entreprise Scribd logo
1  sur  44
Télécharger pour lire hors ligne
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F1 of 44
Transformer Protection in Transmission Networks
ABB
Transformer Protection
in
Transmission Networks
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F2 of 44
Transformer Protection in Transmission Networks
ABB
Power transformers in a power system
400 kV AC Transmission
130 kV Subtransmission
Distribution
MV
Generation
LV
M
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F3 of 44
Transformer Protection in Transmission Networks
ABB
Different vector group and neutral connections
Y d + z
YN d11 + zn
Y y
YN yn0 (d1)
Y d
YN d1
D y
D yn11
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F4 of 44
Transformer Protection in Transmission Networks
ABB
Different winding arrangements
2 windings
+ unloaded
tertiary
3 windings Autotransformer
+ tertiary
e.g. Yy 6 d1
e.g. YN Auto d1
2-winding transf.
+ Auxiliary
transformer
0
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F5 of 44
Transformer Protection in Transmission Networks
ABB
Possible Faults
Insulation breakdown
Short circuits phase-to-phase
Inter-turns
Ground faults
Overvoltage U> (overexcitation U/f>)
Overtemperature
Oil leakage or contamination
Oil level monitor
Reduced cooling
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F6 of 44
Transformer Protection in Transmission Networks
ABB
Possible Transformer Failures
Winding failures
Tap changer failures
Bushing failures
Core failures
Miscellaneous failures
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F7 of 44
Transformer Protection in Transmission Networks
ABB
Selective Protection of:
- two or
- three winding transformer
- autotransformer
- generator-transformer unit
Detection of:
- all-phase faults
- earth-faults at solidly or
low-impedance earthed systems
- interturn faults
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F8 of 44
Transformer Protection in Transmission Networks
ABB
Recommended Transformer Protection
Functions Rating
up to 2 MVA 2 - 5 MVA less 60 MVA over 60 MVA
Gas Detector
Relay (Buchholz)
Overload Protection
(Thermal or
temperature
monitoring relay)
Overcurrent
Protection
Differential
Protection
Ground Fault
Protection
Voltage Regulating
Relay
for exposed overvoltage
situations
Oil level monitor
Overexcitation
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F9 of 44
Transformer Protection in Transmission Networks
ABB
Transformer Protection Basic Versions
Transformer Protection Basic Versions
Type of Transformer Unit High-Voltage Side Medium-Voltage Side Low-Voltage Sid
Prot. Prot. 1 Prot. 2 Prot. 1 Prot. 2
(Main) (Back-up) (Main) (Back-up)
2-Winding (Star/Delta) Id I> + IN + TH + SBEF I>
Id REF I> + IN + TH + SBEF I>
2-Winding (Star/Stern) Id I> + IN + TH I> + IN + SBEF
Id REF I> + IN + TH REF I> + IN + SBEF
2-Winding (Star/Delta) + Earth.transf. Id I> + IN + TH I> + IN + SBEF
Id REF I> + IN + TH I> + IN + SBEF
3-Winding (Star/Star/Delta) Id I> + IN + TH I> + IN + SBEF I>
Id REF I> + IN + TH REF I> + IN + SBEF I>
3-Winding (Star/Star/Delta) + Earth.transf. Id I> + IN + TH I> + IN I> + IN + SBEF
Id REF I> + IN + TH REF I> + IN I> + IN + SBEF
2-Winding (Auto) Id + REF I> + IN + TH I> + IN
3-Winding (Auto) Id + REF I> + IN + TH I> + IN I>
Remark: The SBEF-Function (Stand-by EF Prot.) is only needed if earthing resistor is installed
Transformer Rating
S < 60 MVA S > 60 MVA
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F10 of 44
Transformer Protection in Transmission Networks
ABB
Transformer protection example (1)
Bu / LOL
OT / WT
I >
IN
TH
I
I >>
•
IN
IN
I >
REF
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F11 of 44
Transformer Protection in Transmission Networks
ABB
Transformer protection example (2)
- Differential prot. (87T)
- REF (87N)
- Overcurrent (51T)
- E/F protection (51N)
- Thermal overload prot. (49)
- Overvoltage prot. (59)
I> 51T υ 49
REF 87N I0 51N
87T
U> 59
B
87T
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F12 of 44
Transformer Protection in Transmission Networks
ABB
Transformer protection example (3)
I
Bu / LOL
OT / WT
I>
IN
TH
Id
I>
I>
I N
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F13 of 44
Transformer Protection in Transmission Networks
ABB
I
Bu / LOL
OT / WT
I >
IN
TH
Id
I >
IN
I >
REF
I >>
REF
Transformer protection example (4)
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F14 of 44
Transformer Protection in Transmission Networks
ABB
Differential protection (87T)
Features / requirements
• low impedance principle
• for two and three-winding
transformers
• non-linear current-dependant
tripping characteristic
• high stability during through-
fault and CT-saturation
• compensation for vector group
• compensation for current
amplitude (CT-ratio)
• inrush restraint
Causes
• phase faults in the
protection zone
effects
• high currents
• potential damage to
transformer winding
• expensive outage and
repair due to damage
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F15 of 44
Transformer Protection in Transmission Networks
ABB
Features
Differential Protection
includes:
• C.T. Ratio adaption
• Connection group adaption
• Back-up functions
• Large setting ranges
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F16 of 44
Transformer Protection in Transmission Networks
ABB
Differential protection (87T)
• Id= ¦I1+I2 ¦
• by external faults can due to
-ratio errors
-saturation
-losses in the transfomer
-tapchanger
a differential current can occur,
therefore a stabilized tripping
characteristic is needed
• Inrush can also provoke differential
current
87T Protection
zone
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F17 of 44
Transformer Protection in Transmission Networks
ABB
Differential protection (87T)
Features
• True measurement for three-wind.
transformer
– compares the greatest current the with
sum of the two others
• I-instantaneous independ. of inrush
• Inrush
– eval.ratio 2nd.harm to fundamental
– detection of largest phase current
– detection of energised transformer using
load current
• Adaptive characteristic (b-line)
Id/ IN
No Trip
Trip for
I1 / IN < b or
I2 / IN < b
Trip
v
g-high
g
b
Ih/ IN
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F18 of 44
Transformer Protection in Transmission Networks
ABB
Differential protection (87T)
AI 7,8,9
AI 1,2,3
A
D
DIFF A
D
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F19 of 44
Transformer Protection in Transmission Networks
ABB
Differential protection for 3 windings
AI 1,2,3
AI 7,8,9
A
D
DIFF
A
D
A
D
AI 4,5,6
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F20 of 44
Transformer Protection in Transmission Networks
ABB
Differential protection 87T
• CT's at the Aux. transformer
must have the same ratio as
the other two.
• Correction of the ratio with
Ref.-Value or a-Factor in the
protection function
G
87GT
10'000/ 5
30MVA
18/ 6 KV
800/ 5
300MVA
220/ 18 KV
300MVA
18 KV
10'000/ 5
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F21 of 44
Transformer Protection in Transmission Networks
ABB
Fault inside protected zone
I1 I2 ∆I
1
2
3
4
1 2 3 4 5 IH
cos α < 0
IH = 0
g
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F22 of 44
Transformer Protection in Transmission Networks
ABB
Fault outside protected zone
Low short circuit current
Load I < (1.5...3) * Irated
I1 I2
v=50%
∆I
4
cos α = 1
IH I1 I2 cos
= • • α
3
2
1
IH = I1 = I2 =
ILoad < (1.5...3)*Irated g
IH
1 2 3 4 5
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F23 of 44
Transformer Protection in Transmission Networks
ABB
Fault outside protected zone
High short circuit current
Isc
1
2
3
4
1 2 3 4 5 IH
∆I
v=50%
I1 I2
IH = I1 = I2
g
I > (1.5....3) * Irated
cos α = 1
v= infinite
IH I1 I2 cos
= • • α
b
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F24 of 44
Transformer Protection in Transmission Networks
ABB
Effect from different time constants
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F25 of 44
Transformer Protection in Transmission Networks
ABB
Operating characteristic of the RE..16 differential protection
v
g
1 2 3
b
Restraint
I
IN
Operation
Operation for
I1
IN
< b
or
I2
IN
< b
IH
IN
Protected unit
I 1 I 2
2)
-
1;
1
2
2
1
1
H
2
1
H
H
3
2
1
I
(I
α
I
-
I
I
I
;
I
of
greatest
I
:
where
0
α
cos
for
0
I
0
α
cos
for
α
cos
I
I
I
current
.Restraint
..........
..........
I
current
Operating
....
I
I
I
I
∠
=
∆
=
=
<
=
≥
⋅
⋅
=
+
+
=
∆
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F26 of 44
Transformer Protection in Transmission Networks
ABB
Vector group adoption for Yd5 transformer
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F27 of 44
Transformer Protection in Transmission Networks
ABB
Protection example of a Yd11 Transformer with a Zig-Zag grouding
on low voltage side within the protected zone
Set Yz11 connection group
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F28 of 44
Transformer Protection in Transmission Networks
ABB
Transformer with a Zig-Zag grouding on low voltage side
within the protected zone (conventional solution)
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F29 of 44
Transformer Protection in Transmission Networks
ABB
Restricted earth-fault protection (REF)
AI
Trip
REF
Id
REF
Id Trip
• Used at direct and low
impedance earthing
• Clears internal EFs
instantaneously
• Unaffected by inrush current
and external fault
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F30 of 44
Transformer Protection in Transmission Networks
ABB
<<<
200/1A
<<<
>
Yd1
10MVA
66/33kV
100/1A
<
>
<
<
>
<
<
>
R
IE=3IO
S
<<<
<<<
<<<
l >
T
>
>
1/0,33 A
200/1A
>
<<<
REF
<
<
<<
R
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F31 of 44
Transformer Protection in Transmission Networks
ABB
High-impedance restricted earthfault protection REF
All CT‘s have identical ratios
REF
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F32 of 44
Transformer Protection in Transmission Networks
ABB
Thermal overload protection
Rise of temperature
τ
0,63
Time
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F33 of 44
Transformer Protection in Transmission Networks
ABB
Overexcitation protection
t
Definite
V/Hz inverse
V/Hz
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F34 of 44
Transformer Protection in Transmission Networks
ABB
Requirements for overcurrent protection
Fast operation for primary short circuit
Non operation for inrush
Discrimination with other overcurrent
protection
Non operation at short or long term overload
Back up protection for network faults,
outside the transformer
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F35 of 44
Transformer Protection in Transmission Networks
ABB
Application, typical HV bay
Transformer protection
R
E
C
Control unit
Autoreclosure*
Busbar protection
OFF 1
ON
OFF 2
* ev. separate unit
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F36 of 44
Transformer Protection in Transmission Networks
ABB
Protection function structure
Ir12 = 0,80 A
Ir22 = 0,98 A
110 V
√3
Ur22 = 110/√3 V
30 MVA
145 kV
11 kV
Ir1 = 120 A
Ir2 = 1575 A
1600 / 1 A
150 / 1 A
11 kV
√3
150 / 1 A IrN12 = 0,80 A
A/D
conv.
BI
DIFF
TOC
REF
etc.
NOV
Trip
logic
Trip
F
i
l
t
e
r
i
n
g
>1
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F37 of 44
Transformer Protection in Transmission Networks
ABB
Main functions
• Compact design including:
• Basic SW functions and transformer protection functions:
- Differential protection
- Overcurrent protection
(Definite time or inverse functions)
- Thermal overload
- Overvoltage protection
- Metering U I f P Q
- Distance protection
- Overexcitation U/f
- FUPLA
- Logic functions,
delay & counter
- Disturbance Recording
- Check functions (I, U)
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F38 of 44
Transformer Protection in Transmission Networks
ABB
Main Features
- No interposing CT's
- Standard wiring diagram
- Inputs for external functions (Buchholz, temperature sensors) available
- Programmable indication of tripping and signalling
- Indication of measuring values
- Continuous self-monitoring
- Modular SW protection functions
- 4 serial interfaces:
* one front for local commmunication (PC)
* one rear for remote communication SPA or VDEW6
* two others (spare)
- Member of the 316*4-family and part of PYRAMID
- Fits into ABB solution
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F39 of 44
Transformer Protection in Transmission Networks
ABB
Transformer Protection Options
• I> back up
• Sensitive earth fault I0>
for not grounded windings
• Restricted earth fault
(High impedance principle)
• Thermal overload
• U>, U<
• Distance Protection
2W only
2W only
2W only
2W only
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F40 of 44
Transformer Protection in Transmission Networks
ABB
Additional Logic
Additional Logic
A
A
Monitoring
Monitoring
Communication
Communication
Power Supply
Power Supply
Protection Functions
Protection Functions
Additional Logic
Additional Logic
B
Monitoring
Monitoring
Communication
Communication
Power Supply
Power Supply
Protection Functions
Protection Functions
INTERBAY BUS
COMMUNICATION
Station A
B8 B9
C1
T1 T2
B1 B2
B3 B4 B5 B6 C7
C2
B7
DEC 3000 AXP
Alpha
1252 123 123 123 123 123 123 123 123 123 123 123 123 123
123 123
SCS/ SMS
Q1
Q53
Q51
Q2
Q0
Q9
G
Redundancy
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F41 of 44
Transformer Protection in Transmission Networks
ABB
Redundancy example
Transformer protection
A
B
Transformer protection
R
E
C
R
E
C
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F42 of 44
Transformer Protection in Transmission Networks
ABB
Signal data flow
etc.
Trip
MUX
1 DiffGen on
2 Current on
3 BinInp 2 off
COM
I>
U<
etc.
A/D
S
H
DSP
COM
SCS/
SMS
Analog to
digital
conversion
A/I
MMI Numerical
signal
processing
Binary
signal
processing
B/I
B/O
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F43 of 44
Transformer Protection in Transmission Networks
ABB
∼
∼
∼
A/I B/O
∼
∼
∼
Binary
output
isolation
Algorithm and Logic
processor
Digital
filter
Amplifier
Low pass
filter
Shunt
Analog
input
isolation
4
7
2
3
0
0 ms 0 ms 3 ms 5 ms 12 ms 21 ms 25 ms
Z<
I >
I
etc
FUPLA
etc
9
A/D
S
H
Typical tripping time
MUX
ABB Power Automation Ltd
T2314 / trafoprot_a.ppt / F44 of 44
Transformer Protection in Transmission Networks
ABB
Advantages
• Self monitoring
• Long term stability
• Event recorder
• Self documentation
• Number of CT cores reduced
• User designed performance
• Selectable protection functions
• Facility for communication to SMS/SCS

Contenu connexe

Similaire à 03_Prot.transmission_Trafo.pdf

Advanced motion controls b40a40ac
Advanced motion controls b40a40acAdvanced motion controls b40a40ac
Advanced motion controls b40a40acElectromate
 
SETfuse All Product and Application ENG Version Jun 2 2015
SETfuse All Product and Application ENG Version Jun 2 2015SETfuse All Product and Application ENG Version Jun 2 2015
SETfuse All Product and Application ENG Version Jun 2 2015Apple Yu
 
Ionnic Switching Systems
Ionnic Switching SystemsIonnic Switching Systems
Ionnic Switching SystemsRimsky Cheng
 
ANAVIEW Class-D Amplifier AMS1000-2600
ANAVIEW Class-D Amplifier  AMS1000-2600ANAVIEW Class-D Amplifier  AMS1000-2600
ANAVIEW Class-D Amplifier AMS1000-2600HTCS LLC
 
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.com
 Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.comBeeteco
 
Advanced motion controls avb125a200
Advanced motion controls avb125a200Advanced motion controls avb125a200
Advanced motion controls avb125a200Electromate
 
2-Circuit Breakers and Type Tested Assembly (X-Energy)
2-Circuit Breakers and Type Tested Assembly (X-Energy)2-Circuit Breakers and Type Tested Assembly (X-Energy)
2-Circuit Breakers and Type Tested Assembly (X-Energy)Eng. Ahmed Lotfy
 
overview-GIS-currenttransfo_rev12-2010.pdf
overview-GIS-currenttransfo_rev12-2010.pdfoverview-GIS-currenttransfo_rev12-2010.pdf
overview-GIS-currenttransfo_rev12-2010.pdfenghashimmh
 
Advanced motion controls b100a40
Advanced motion controls b100a40Advanced motion controls b100a40
Advanced motion controls b100a40Electromate
 
Advanced motion controls b30a40
Advanced motion controls b30a40Advanced motion controls b30a40
Advanced motion controls b30a40Electromate
 
Advanced motion controls b100a8
Advanced motion controls b100a8Advanced motion controls b100a8
Advanced motion controls b100a8Electromate
 
three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...Vikram Rawani
 
Advanced motion controls b100a40ac
Advanced motion controls b100a40acAdvanced motion controls b100a40ac
Advanced motion controls b100a40acElectromate
 
Exp no 1 edited Analog electronics
Exp no 1 edited Analog electronicsExp no 1 edited Analog electronics
Exp no 1 edited Analog electronicsOmkar Rane
 

Similaire à 03_Prot.transmission_Trafo.pdf (20)

Advanced motion controls b40a40ac
Advanced motion controls b40a40acAdvanced motion controls b40a40ac
Advanced motion controls b40a40ac
 
SETfuse All Product and Application ENG Version Jun 2 2015
SETfuse All Product and Application ENG Version Jun 2 2015SETfuse All Product and Application ENG Version Jun 2 2015
SETfuse All Product and Application ENG Version Jun 2 2015
 
Ionnic Switching Systems
Ionnic Switching SystemsIonnic Switching Systems
Ionnic Switching Systems
 
ABB uno TL Plus
ABB uno TL PlusABB uno TL Plus
ABB uno TL Plus
 
ANAVIEW Class-D Amplifier AMS1000-2600
ANAVIEW Class-D Amplifier  AMS1000-2600ANAVIEW Class-D Amplifier  AMS1000-2600
ANAVIEW Class-D Amplifier AMS1000-2600
 
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.com
 Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.com
 
Advanced motion controls avb125a200
Advanced motion controls avb125a200Advanced motion controls avb125a200
Advanced motion controls avb125a200
 
2-Circuit Breakers and Type Tested Assembly (X-Energy)
2-Circuit Breakers and Type Tested Assembly (X-Energy)2-Circuit Breakers and Type Tested Assembly (X-Energy)
2-Circuit Breakers and Type Tested Assembly (X-Energy)
 
overview-GIS-currenttransfo_rev12-2010.pdf
overview-GIS-currenttransfo_rev12-2010.pdfoverview-GIS-currenttransfo_rev12-2010.pdf
overview-GIS-currenttransfo_rev12-2010.pdf
 
Advanced motion controls b100a40
Advanced motion controls b100a40Advanced motion controls b100a40
Advanced motion controls b100a40
 
Trio 20.0-27
Trio 20.0-27Trio 20.0-27
Trio 20.0-27
 
Trio 20.0-tl-outd-400
Trio 20.0-tl-outd-400Trio 20.0-tl-outd-400
Trio 20.0-tl-outd-400
 
Gic product catalogue
Gic product catalogueGic product catalogue
Gic product catalogue
 
Advanced motion controls b30a40
Advanced motion controls b30a40Advanced motion controls b30a40
Advanced motion controls b30a40
 
Advanced motion controls b100a8
Advanced motion controls b100a8Advanced motion controls b100a8
Advanced motion controls b100a8
 
three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...
 
ABB Trio
ABB TrioABB Trio
ABB Trio
 
PVI-10
PVI-10PVI-10
PVI-10
 
Advanced motion controls b100a40ac
Advanced motion controls b100a40acAdvanced motion controls b100a40ac
Advanced motion controls b100a40ac
 
Exp no 1 edited Analog electronics
Exp no 1 edited Analog electronicsExp no 1 edited Analog electronics
Exp no 1 edited Analog electronics
 

Dernier

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 

Dernier (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 

03_Prot.transmission_Trafo.pdf

  • 1. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F1 of 44 Transformer Protection in Transmission Networks ABB Transformer Protection in Transmission Networks
  • 2. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F2 of 44 Transformer Protection in Transmission Networks ABB Power transformers in a power system 400 kV AC Transmission 130 kV Subtransmission Distribution MV Generation LV M
  • 3. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F3 of 44 Transformer Protection in Transmission Networks ABB Different vector group and neutral connections Y d + z YN d11 + zn Y y YN yn0 (d1) Y d YN d1 D y D yn11
  • 4. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F4 of 44 Transformer Protection in Transmission Networks ABB Different winding arrangements 2 windings + unloaded tertiary 3 windings Autotransformer + tertiary e.g. Yy 6 d1 e.g. YN Auto d1 2-winding transf. + Auxiliary transformer 0
  • 5. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F5 of 44 Transformer Protection in Transmission Networks ABB Possible Faults Insulation breakdown Short circuits phase-to-phase Inter-turns Ground faults Overvoltage U> (overexcitation U/f>) Overtemperature Oil leakage or contamination Oil level monitor Reduced cooling
  • 6. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F6 of 44 Transformer Protection in Transmission Networks ABB Possible Transformer Failures Winding failures Tap changer failures Bushing failures Core failures Miscellaneous failures
  • 7. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F7 of 44 Transformer Protection in Transmission Networks ABB Selective Protection of: - two or - three winding transformer - autotransformer - generator-transformer unit Detection of: - all-phase faults - earth-faults at solidly or low-impedance earthed systems - interturn faults
  • 8. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F8 of 44 Transformer Protection in Transmission Networks ABB Recommended Transformer Protection Functions Rating up to 2 MVA 2 - 5 MVA less 60 MVA over 60 MVA Gas Detector Relay (Buchholz) Overload Protection (Thermal or temperature monitoring relay) Overcurrent Protection Differential Protection Ground Fault Protection Voltage Regulating Relay for exposed overvoltage situations Oil level monitor Overexcitation
  • 9. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F9 of 44 Transformer Protection in Transmission Networks ABB Transformer Protection Basic Versions Transformer Protection Basic Versions Type of Transformer Unit High-Voltage Side Medium-Voltage Side Low-Voltage Sid Prot. Prot. 1 Prot. 2 Prot. 1 Prot. 2 (Main) (Back-up) (Main) (Back-up) 2-Winding (Star/Delta) Id I> + IN + TH + SBEF I> Id REF I> + IN + TH + SBEF I> 2-Winding (Star/Stern) Id I> + IN + TH I> + IN + SBEF Id REF I> + IN + TH REF I> + IN + SBEF 2-Winding (Star/Delta) + Earth.transf. Id I> + IN + TH I> + IN + SBEF Id REF I> + IN + TH I> + IN + SBEF 3-Winding (Star/Star/Delta) Id I> + IN + TH I> + IN + SBEF I> Id REF I> + IN + TH REF I> + IN + SBEF I> 3-Winding (Star/Star/Delta) + Earth.transf. Id I> + IN + TH I> + IN I> + IN + SBEF Id REF I> + IN + TH REF I> + IN I> + IN + SBEF 2-Winding (Auto) Id + REF I> + IN + TH I> + IN 3-Winding (Auto) Id + REF I> + IN + TH I> + IN I> Remark: The SBEF-Function (Stand-by EF Prot.) is only needed if earthing resistor is installed Transformer Rating S < 60 MVA S > 60 MVA
  • 10. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F10 of 44 Transformer Protection in Transmission Networks ABB Transformer protection example (1) Bu / LOL OT / WT I > IN TH I I >> • IN IN I > REF
  • 11. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F11 of 44 Transformer Protection in Transmission Networks ABB Transformer protection example (2) - Differential prot. (87T) - REF (87N) - Overcurrent (51T) - E/F protection (51N) - Thermal overload prot. (49) - Overvoltage prot. (59) I> 51T υ 49 REF 87N I0 51N 87T U> 59 B 87T
  • 12. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F12 of 44 Transformer Protection in Transmission Networks ABB Transformer protection example (3) I Bu / LOL OT / WT I> IN TH Id I> I> I N
  • 13. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F13 of 44 Transformer Protection in Transmission Networks ABB I Bu / LOL OT / WT I > IN TH Id I > IN I > REF I >> REF Transformer protection example (4)
  • 14. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F14 of 44 Transformer Protection in Transmission Networks ABB Differential protection (87T) Features / requirements • low impedance principle • for two and three-winding transformers • non-linear current-dependant tripping characteristic • high stability during through- fault and CT-saturation • compensation for vector group • compensation for current amplitude (CT-ratio) • inrush restraint Causes • phase faults in the protection zone effects • high currents • potential damage to transformer winding • expensive outage and repair due to damage
  • 15. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F15 of 44 Transformer Protection in Transmission Networks ABB Features Differential Protection includes: • C.T. Ratio adaption • Connection group adaption • Back-up functions • Large setting ranges
  • 16. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F16 of 44 Transformer Protection in Transmission Networks ABB Differential protection (87T) • Id= ¦I1+I2 ¦ • by external faults can due to -ratio errors -saturation -losses in the transfomer -tapchanger a differential current can occur, therefore a stabilized tripping characteristic is needed • Inrush can also provoke differential current 87T Protection zone
  • 17. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F17 of 44 Transformer Protection in Transmission Networks ABB Differential protection (87T) Features • True measurement for three-wind. transformer – compares the greatest current the with sum of the two others • I-instantaneous independ. of inrush • Inrush – eval.ratio 2nd.harm to fundamental – detection of largest phase current – detection of energised transformer using load current • Adaptive characteristic (b-line) Id/ IN No Trip Trip for I1 / IN < b or I2 / IN < b Trip v g-high g b Ih/ IN
  • 18. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F18 of 44 Transformer Protection in Transmission Networks ABB Differential protection (87T) AI 7,8,9 AI 1,2,3 A D DIFF A D
  • 19. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F19 of 44 Transformer Protection in Transmission Networks ABB Differential protection for 3 windings AI 1,2,3 AI 7,8,9 A D DIFF A D A D AI 4,5,6
  • 20. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F20 of 44 Transformer Protection in Transmission Networks ABB Differential protection 87T • CT's at the Aux. transformer must have the same ratio as the other two. • Correction of the ratio with Ref.-Value or a-Factor in the protection function G 87GT 10'000/ 5 30MVA 18/ 6 KV 800/ 5 300MVA 220/ 18 KV 300MVA 18 KV 10'000/ 5
  • 21. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F21 of 44 Transformer Protection in Transmission Networks ABB Fault inside protected zone I1 I2 ∆I 1 2 3 4 1 2 3 4 5 IH cos α < 0 IH = 0 g
  • 22. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F22 of 44 Transformer Protection in Transmission Networks ABB Fault outside protected zone Low short circuit current Load I < (1.5...3) * Irated I1 I2 v=50% ∆I 4 cos α = 1 IH I1 I2 cos = • • α 3 2 1 IH = I1 = I2 = ILoad < (1.5...3)*Irated g IH 1 2 3 4 5
  • 23. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F23 of 44 Transformer Protection in Transmission Networks ABB Fault outside protected zone High short circuit current Isc 1 2 3 4 1 2 3 4 5 IH ∆I v=50% I1 I2 IH = I1 = I2 g I > (1.5....3) * Irated cos α = 1 v= infinite IH I1 I2 cos = • • α b
  • 24. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F24 of 44 Transformer Protection in Transmission Networks ABB Effect from different time constants
  • 25. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F25 of 44 Transformer Protection in Transmission Networks ABB Operating characteristic of the RE..16 differential protection v g 1 2 3 b Restraint I IN Operation Operation for I1 IN < b or I2 IN < b IH IN Protected unit I 1 I 2 2) - 1; 1 2 2 1 1 H 2 1 H H 3 2 1 I (I α I - I I I ; I of greatest I : where 0 α cos for 0 I 0 α cos for α cos I I I current .Restraint .......... .......... I current Operating .... I I I I ∠ = ∆ = = < = ≥ ⋅ ⋅ = + + = ∆
  • 26. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F26 of 44 Transformer Protection in Transmission Networks ABB Vector group adoption for Yd5 transformer
  • 27. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F27 of 44 Transformer Protection in Transmission Networks ABB Protection example of a Yd11 Transformer with a Zig-Zag grouding on low voltage side within the protected zone Set Yz11 connection group
  • 28. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F28 of 44 Transformer Protection in Transmission Networks ABB Transformer with a Zig-Zag grouding on low voltage side within the protected zone (conventional solution)
  • 29. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F29 of 44 Transformer Protection in Transmission Networks ABB Restricted earth-fault protection (REF) AI Trip REF Id REF Id Trip • Used at direct and low impedance earthing • Clears internal EFs instantaneously • Unaffected by inrush current and external fault
  • 30. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F30 of 44 Transformer Protection in Transmission Networks ABB <<< 200/1A <<< > Yd1 10MVA 66/33kV 100/1A < > < < > < < > R IE=3IO S <<< <<< <<< l > T > > 1/0,33 A 200/1A > <<< REF < < << R
  • 31. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F31 of 44 Transformer Protection in Transmission Networks ABB High-impedance restricted earthfault protection REF All CT‘s have identical ratios REF
  • 32. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F32 of 44 Transformer Protection in Transmission Networks ABB Thermal overload protection Rise of temperature τ 0,63 Time
  • 33. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F33 of 44 Transformer Protection in Transmission Networks ABB Overexcitation protection t Definite V/Hz inverse V/Hz
  • 34. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F34 of 44 Transformer Protection in Transmission Networks ABB Requirements for overcurrent protection Fast operation for primary short circuit Non operation for inrush Discrimination with other overcurrent protection Non operation at short or long term overload Back up protection for network faults, outside the transformer
  • 35. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F35 of 44 Transformer Protection in Transmission Networks ABB Application, typical HV bay Transformer protection R E C Control unit Autoreclosure* Busbar protection OFF 1 ON OFF 2 * ev. separate unit
  • 36. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F36 of 44 Transformer Protection in Transmission Networks ABB Protection function structure Ir12 = 0,80 A Ir22 = 0,98 A 110 V √3 Ur22 = 110/√3 V 30 MVA 145 kV 11 kV Ir1 = 120 A Ir2 = 1575 A 1600 / 1 A 150 / 1 A 11 kV √3 150 / 1 A IrN12 = 0,80 A A/D conv. BI DIFF TOC REF etc. NOV Trip logic Trip F i l t e r i n g >1
  • 37. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F37 of 44 Transformer Protection in Transmission Networks ABB Main functions • Compact design including: • Basic SW functions and transformer protection functions: - Differential protection - Overcurrent protection (Definite time or inverse functions) - Thermal overload - Overvoltage protection - Metering U I f P Q - Distance protection - Overexcitation U/f - FUPLA - Logic functions, delay & counter - Disturbance Recording - Check functions (I, U)
  • 38. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F38 of 44 Transformer Protection in Transmission Networks ABB Main Features - No interposing CT's - Standard wiring diagram - Inputs for external functions (Buchholz, temperature sensors) available - Programmable indication of tripping and signalling - Indication of measuring values - Continuous self-monitoring - Modular SW protection functions - 4 serial interfaces: * one front for local commmunication (PC) * one rear for remote communication SPA or VDEW6 * two others (spare) - Member of the 316*4-family and part of PYRAMID - Fits into ABB solution
  • 39. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F39 of 44 Transformer Protection in Transmission Networks ABB Transformer Protection Options • I> back up • Sensitive earth fault I0> for not grounded windings • Restricted earth fault (High impedance principle) • Thermal overload • U>, U< • Distance Protection 2W only 2W only 2W only 2W only
  • 40. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F40 of 44 Transformer Protection in Transmission Networks ABB Additional Logic Additional Logic A A Monitoring Monitoring Communication Communication Power Supply Power Supply Protection Functions Protection Functions Additional Logic Additional Logic B Monitoring Monitoring Communication Communication Power Supply Power Supply Protection Functions Protection Functions INTERBAY BUS COMMUNICATION Station A B8 B9 C1 T1 T2 B1 B2 B3 B4 B5 B6 C7 C2 B7 DEC 3000 AXP Alpha 1252 123 123 123 123 123 123 123 123 123 123 123 123 123 123 123 SCS/ SMS Q1 Q53 Q51 Q2 Q0 Q9 G Redundancy
  • 41. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F41 of 44 Transformer Protection in Transmission Networks ABB Redundancy example Transformer protection A B Transformer protection R E C R E C
  • 42. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F42 of 44 Transformer Protection in Transmission Networks ABB Signal data flow etc. Trip MUX 1 DiffGen on 2 Current on 3 BinInp 2 off COM I> U< etc. A/D S H DSP COM SCS/ SMS Analog to digital conversion A/I MMI Numerical signal processing Binary signal processing B/I B/O
  • 43. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F43 of 44 Transformer Protection in Transmission Networks ABB ∼ ∼ ∼ A/I B/O ∼ ∼ ∼ Binary output isolation Algorithm and Logic processor Digital filter Amplifier Low pass filter Shunt Analog input isolation 4 7 2 3 0 0 ms 0 ms 3 ms 5 ms 12 ms 21 ms 25 ms Z< I > I etc FUPLA etc 9 A/D S H Typical tripping time MUX
  • 44. ABB Power Automation Ltd T2314 / trafoprot_a.ppt / F44 of 44 Transformer Protection in Transmission Networks ABB Advantages • Self monitoring • Long term stability • Event recorder • Self documentation • Number of CT cores reduced • User designed performance • Selectable protection functions • Facility for communication to SMS/SCS