PROFESSIONAL PROFILE
Senior MEP Coordinator with the ability to analyze complex engineering problems, evaluate and recommend
alternatives and communicate recommendations effectively, B.Tech , Electrical engineering Graduate) & previously
worked in reputed organizations involved in Contracting, and Manufacturing works.
Around 8 years of versatile experience (6 years in U.A.E & 2 year in EYGPT) and successful execution of various
projects (Residential & Commercial Buildings) has given me the confidence to shoulder my challenging
responsibilities and execute the job to the best satisfaction to the client, consultant & organization.
Well versed in installation, pre-commissioning and commissioning of Electrical services such as Nurse call system,
Fire Alarm system, Central Emergency system, CCTV & Access Control system, Master clock System, public address
system etc...
EMPLOYMENT HISTORY
2014 Jan – present
JOHN SISK & SON CONSTRUCTION
Main Contractor
General Contractors for Commercial, Industrial, and Residential projects.
The project involves construction of a hospital comprising a basement level, a ground floor and 4 additional floors
which will offer 220 beds. It will consist of two residential buildings for medical staff and a mosque, emergency
helipad, air-conditioned ambulance garage, armory, chemical storage facility, and security gatehouse. The
hospital will also cater for dignitaries by providing VIP medical suites. As well as offering medical services, the
hospital will function as a cutting-edge medical education facility geared to the latest research and excellence in
medical education. An entire floor will consist of three lecture theaters, a library, and associated offices. The total
built-up area of the complex is 60,000 square meters, and it will house 3,000 visitors, staff members, and patients
at capacity.
Position: SENIOR MEP COORDINATOR
Zayed Military Hospital (Basement, Ground to fourth), Male, female, doctor, Armory &
MEP bldgs. & External work
Duties and Responsibilities:-
 Preparation & updating of weekly procurement schedules / material site progress report / Tracking
 Schedules (drawing & technical / material submittals status) and Method statements. 
 Calculations including Load flow, voltage drop and short circuit calculations. 
 Preparation of Electrical Cable schedule, Single line drawings, wiring diagrams, interconnection
drawings etc... 
 Issue Non-Conformance Reports (NCR)/ Observations notes to Engineer and Ensure that corrective
actions and preventive measures are taken to close NCRs
 Site Monitoring and evaluates construction progress, accomplishment and balance of work to be
 completed inclusive of monitoring equipment and material requirement to complete the project. 
  inspecting the Site work as per Approved Drawings/ Project Specification/Authorities requirements. 
 Witness Testing and Commissioning of all Electrical equipment & work prior to handling over to
 Client after completion. 
  Project coordination and planning work and follow MEP subcontractor for work progress. 
  Preparation of Weekly progress Reports/Progress monitoring for the activities 
  Raising R.F.I’s (Request for Information) to consultant for Technical Clarifications 
 Coordinate with various aspects of MEP works such as Electrical, HVAC ,Fire Fighting, Plumbing etc
 to avoid any Clashes during execution of work. 
  Resolution of site issues including support clashes, material shortages etc. 
 Assisting Project Manager for the Preparation of Interim Bills (Monthly Billing) and Cost variations e
 tc. and follow up with consultant & Main contractor obtaining approvals. 
 Commissioning & Functional testing of various electrical systems such as Bus Bar system, Generator,
 Lighting, Power, and Low Current Wiring Systems. 
  Meeting with client & Consultants as per the project requirement. 
 Represent the company in the pre-Qualification approval of projects. 
Project Involvement:-
Zayed Military hospital (Maliha/Al bataeh)
Sharjha, Maliha
Contractor
Client: Commander Military work
MEP Consultant: AE7
Sharjha, United Arab Emirates
2011 Dec – 2013 Dec
AL SHAMAT Electromechanical Contracting EST
Electrical & Mechanical Contractor
General Contractors for Commercial, Industrial, and Residential projects.
P.O. Box 41584, Abu Dhabi, U.A.E. Tel: 02-6223516
Position: MEP Coordinator
Mudon Town House 348 Villas AL Ruwayah- MEP Works & Design and Build
Duties and Responsibilities:-
 Review various designs and design submittals to ensure compliance with intended purpose. 
 Preparation & updating of weekly procurement schedules / material site progress report / Tracking
 Schedules (drawing & technical / material submittals status) and Method statements. 
 Request quotation from suppliers and prepares comparison sheet used as basis in purchasing
 Materials. 
  Preparation of Load Schedule as per DEWA, ADDC (Dubai Electricity Water Authority) Regulations. 
  Calculations including Load flow, voltage drop and short circuit calculations. 
 Preparation of Electrical Cable schedule, Single line drawings, wiring diagrams, interconnection
drawings etc... drawings etc... 
 Preparation of Bill of Quantities (B.O.Q), Assist Purchase department to raise L.O.I (Letter
 Of Intent) & L.P.O (Letter of Purchase orders).

 Manage, follow up and supervise the construction contractors and their on-site and offsite activities. 
 Preparation of Work Progress Chart Programme and Labor Histogram and Weekly progress
 Reports/Progress monitoring for the activities 
Project Involvement:-
Mudon Town House 348 Villas
AL Ruwayah
MEP Works Package Client:
Dubai Properties Consultant:
Arif & Bin Toak Dubai,
United Arab Emirates
Al Raha Gardens 136 Villas
136 Villas and 5 Substations, Street Light, (LV,HV)
MEP Works Package
Client : Sorouh
Consultant : EWAN
Abu Dhabi, United Arab Emirates (Khalifa A)
Watani Residential Development 400 Two Storey Villas
MEP Works Package
Client : Sorouh
Consultant : EWAN
Abu Dhabi, United Arab Emirates ( Khalifa A )
2008 March - November 2011
EHAF Consulting Engineering
P.O. Box 3805, Abu Dhabi, U.A.E. Tel: 026319161, Mob:-0505801747
Position: ELECT INSPECTOR
Marasy Development Project in Abu Dhabi for International Capital Trading, Al Batten
Duties and Responsibilities:-
  Investigated the Quality of work of every Contractor’s Project 
 Supervised the Construction of around 7 Building (1 Basement + Ground + 5 floors + 2 Roof Floor), 5
Substations, 2 landscapes. 
 Monitored the Issuance of Materials to every Contractor. o Investigated the Quality of Work to every
Contractor. 
 Prepare the Contractor’s Weekly Accomplishment Report such as Billing. 
 Assessed the Performance of every Contractor for the Awarding of Projects. o Reported the 
  Daily Accomplishment Report of the Project to the Superior. 
 Rejected any Sub-standard / Defective Materials Delivered. 
 Conducted Random Checking and Report Quality of Materials received by the Contractor at Site. 
 Prepared Letter / Memorandum to Contractors. 
 Inspects the works at each stage of construction. Prepare check lists. Advise contractor of non-
conforming works. Ensure correction of works if required. 
 Ensures that the work complies with the requirements of the specification and relevant codes and
standards. 
 Ensures that the contractors approved shop drawings, method statements, quality control
procedures and safety plans are being implemented on site. 
 Monitors the structure which is being constructed, any adjacent structures which may be affected by
construction activities and temporary structures, for any problems related to accidental damage,
safety and/or stability. 
  Investigated the Quality of work of every Contractor’s Project 
 Review and approve contractor shop drawing / as built drawing in compliance with project
specification, National and International standards. 
 Review, approve and process all electrical Submittals and samples for compliance to the project
specification. 
 Preparation of detailed construction shop drawing, power & lighting, load schedules all all related
plans for client approval. 
 Coordinates the construction schedule and as well as work interface with other trade contractor. 
 Responsible for monitoring the supervision of all electrical activities, associated inspections and 
Quality control of the project.
 Provide assistance to the senior and assistant engineers. 
 Coordination and reporting on general site inspection and routine checking of the contractors
construction and installation activities by all other parties. 
 Coordination and liaison with other discipline of the project team 
 Assisting with the inspection and documentation for all electrical material and components delivered
to site for inclusion in work. 
 Site monitoring and evaluates construction progress, accomplishment and balance of work to be
completed inclusive of monitoring equipment and material requirement to complete the project. 
 Perform all other duties that may be requested by the MEP Manager / project Manager. 
 Issued field observation notice and non-conformance report to those electrical works that are not
according to specification and sub- standard workmanship 
 Preparation of Program of works cost estimates, bill of quantities and material take off. 
 Reviews and coordinate the construction plans to ensure high quality structures. 
 Witnesses on site testing of materials, record results, and order the removal and replacement of non-
compliant materials. 
 The preparation of Bills and/or Schedules of Quantities of materials, labour and services required in
the construction and equipment of building, or engineering works. 
 The preparation and valuation of progress and final payments in connection with any contract or sub-
 Contract. 
 Responsible for maintaining manpower schedule & minimizing labor cost. o Update the weekly status
report using MS Project and other software. 
 Keep track of project as per planning schedule and coordinate with higher management. 

Project Involvement:-
 Marasy Development Project in Abu Dhabi for International Capital Trading.
7 Building (1 Basement + Ground + 5 floors + 2 Roof Floor), 5 Substations, 2 landscapes
Client: Sorouh
Consultant: EHAF
Abu Dhabi, United Arab Emirates
2006 January - March 2008
Egypt Power for Electromechanical Engineering
Giza, EYGPT
Position: ELECT ENGINEER
Kureimat Power Project
Duties and Responsibilities:-
 Perform responsibilities of carrying out minor power distribution and setting up of electrical
equipment at customer site.
 Responsible for overseeing and monitoring the work and operating activities of Mechanical
contractor.
 Handle the tasks of preparing and updating all electrical issues especially on installation to the
electrical site engineer.
 Assigned responsibilities of supporting electrical engineers in testing and installing electrical
equipment at different work stations.
PROFESIONAL QUALIFICATIONS:-
 Has proficient knowledge in MS Office
 Familiar with Microsoft Office Applications (Word – Excel – Power point).
 Familiar with all Windows (XP - VISTA & Windows 7) Installation, Configuration, Upgrading,
Diagnosing and Troubleshooting.
 V.Good Internet skills.
TRAININGS / SEMINARS ATTENDED:-
  Telecom Egypt: types of cables, terrestrial and cable used to connect to the exchanges 
 Electricity Channel Co” Operation of Electrical Power Systems. 
 LEGEND Technologies course in (Mobile package "GSM, GPRS & UMTS"). 
PROFESIONAL PARTICULARS:-
Age : 28 Years Old
Date of Birth : 23 November 1986
Gender : Male
Marital Status : Single
Religion : Muslim
Nationality : Egypt
Driving License : Valid UAE Driving License
Languages Known : Arabic: Mother Tongue, English: V.Good

Contenu connexe

Tendances

MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMohammed Akbar
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Islam Elshoura
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction ManagerEdwardo Figuracion
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar Sheikh
 
CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.Salem Hashish
 
Copy of english_CV123
Copy of english_CV123Copy of english_CV123
Copy of english_CV123mansour74
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume Arun Das
 
1. Sharib Reza(CV)
1. Sharib Reza(CV)1. Sharib Reza(CV)
1. Sharib Reza(CV)sharib reza
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINHossam Fattah
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan
 
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Ibrahem Sakkot
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 
Ahmed cv 2014-1
Ahmed cv  2014-1Ahmed cv  2014-1
Ahmed cv 2014-1AHMED RAAI
 

Tendances (19)

MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
F.M.Camus (CV 2016)
F.M.Camus (CV 2016)F.M.Camus (CV 2016)
F.M.Camus (CV 2016)
 
CV Power Plant
CV Power PlantCV Power Plant
CV Power Plant
 
CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.
 
Electrical Enginneer.
Electrical Enginneer.Electrical Enginneer.
Electrical Enginneer.
 
Copy of english_CV123
Copy of english_CV123Copy of english_CV123
Copy of english_CV123
 
CV
CVCV
CV
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
1. Sharib Reza(CV)
1. Sharib Reza(CV)1. Sharib Reza(CV)
1. Sharib Reza(CV)
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Ahmed cv 2014-1
Ahmed cv  2014-1Ahmed cv  2014-1
Ahmed cv 2014-1
 

Similaire à F. CV (20)

CV _ Azhar Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,
 
Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
 
Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 
Resume 1
Resume 1Resume 1
Resume 1
 
Eng.ahmed
Eng.ahmedEng.ahmed
Eng.ahmed
 
Resume 1
Resume 1Resume 1
Resume 1
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 
Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATOR
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
Resume
ResumeResume
Resume
 
Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)
 
update
updateupdate
update
 
JAY CV 2016
JAY CV 2016JAY CV 2016
JAY CV 2016
 
Profile (1).pdf
Profile (1).pdfProfile (1).pdf
Profile (1).pdf
 
MICHAEL H. NILO1
MICHAEL H. NILO1MICHAEL H. NILO1
MICHAEL H. NILO1
 

F. CV

  • 1. CURRICULUM VITAE MOHAMMED AHMED FOUAD Mobile: +971558998939 +971528668064 E-mail: mohamedfouad_m86@yahoo.com PROFESSIONAL PROFILE Senior MEP Coordinator with the ability to analyze complex engineering problems, evaluate and recommend alternatives and communicate recommendations effectively, B.Tech , Electrical engineering Graduate) & previously worked in reputed organizations involved in Contracting, and Manufacturing works. Around 8 years of versatile experience (6 years in U.A.E & 2 year in EYGPT) and successful execution of various projects (Residential & Commercial Buildings) has given me the confidence to shoulder my challenging responsibilities and execute the job to the best satisfaction to the client, consultant & organization. Well versed in installation, pre-commissioning and commissioning of Electrical services such as Nurse call system, Fire Alarm system, Central Emergency system, CCTV & Access Control system, Master clock System, public address system etc... EMPLOYMENT HISTORY 2014 Jan – present JOHN SISK & SON CONSTRUCTION Main Contractor General Contractors for Commercial, Industrial, and Residential projects. The project involves construction of a hospital comprising a basement level, a ground floor and 4 additional floors which will offer 220 beds. It will consist of two residential buildings for medical staff and a mosque, emergency helipad, air-conditioned ambulance garage, armory, chemical storage facility, and security gatehouse. The hospital will also cater for dignitaries by providing VIP medical suites. As well as offering medical services, the hospital will function as a cutting-edge medical education facility geared to the latest research and excellence in medical education. An entire floor will consist of three lecture theaters, a library, and associated offices. The total built-up area of the complex is 60,000 square meters, and it will house 3,000 visitors, staff members, and patients at capacity. Position: SENIOR MEP COORDINATOR Zayed Military Hospital (Basement, Ground to fourth), Male, female, doctor, Armory & MEP bldgs. & External work Duties and Responsibilities:-  Preparation & updating of weekly procurement schedules / material site progress report / Tracking  Schedules (drawing & technical / material submittals status) and Method statements.   Calculations including Load flow, voltage drop and short circuit calculations.   Preparation of Electrical Cable schedule, Single line drawings, wiring diagrams, interconnection drawings etc...   Issue Non-Conformance Reports (NCR)/ Observations notes to Engineer and Ensure that corrective actions and preventive measures are taken to close NCRs  Site Monitoring and evaluates construction progress, accomplishment and balance of work to be  completed inclusive of monitoring equipment and material requirement to complete the project.    inspecting the Site work as per Approved Drawings/ Project Specification/Authorities requirements.   Witness Testing and Commissioning of all Electrical equipment & work prior to handling over to
  • 2.  Client after completion.    Project coordination and planning work and follow MEP subcontractor for work progress.    Preparation of Weekly progress Reports/Progress monitoring for the activities    Raising R.F.I’s (Request for Information) to consultant for Technical Clarifications   Coordinate with various aspects of MEP works such as Electrical, HVAC ,Fire Fighting, Plumbing etc  to avoid any Clashes during execution of work.    Resolution of site issues including support clashes, material shortages etc.   Assisting Project Manager for the Preparation of Interim Bills (Monthly Billing) and Cost variations e  tc. and follow up with consultant & Main contractor obtaining approvals.   Commissioning & Functional testing of various electrical systems such as Bus Bar system, Generator,  Lighting, Power, and Low Current Wiring Systems.    Meeting with client & Consultants as per the project requirement.   Represent the company in the pre-Qualification approval of projects.  Project Involvement:- Zayed Military hospital (Maliha/Al bataeh) Sharjha, Maliha Contractor Client: Commander Military work MEP Consultant: AE7 Sharjha, United Arab Emirates 2011 Dec – 2013 Dec AL SHAMAT Electromechanical Contracting EST Electrical & Mechanical Contractor General Contractors for Commercial, Industrial, and Residential projects. P.O. Box 41584, Abu Dhabi, U.A.E. Tel: 02-6223516 Position: MEP Coordinator Mudon Town House 348 Villas AL Ruwayah- MEP Works & Design and Build Duties and Responsibilities:-  Review various designs and design submittals to ensure compliance with intended purpose.   Preparation & updating of weekly procurement schedules / material site progress report / Tracking  Schedules (drawing & technical / material submittals status) and Method statements.   Request quotation from suppliers and prepares comparison sheet used as basis in purchasing  Materials.    Preparation of Load Schedule as per DEWA, ADDC (Dubai Electricity Water Authority) Regulations.    Calculations including Load flow, voltage drop and short circuit calculations.   Preparation of Electrical Cable schedule, Single line drawings, wiring diagrams, interconnection drawings etc... drawings etc...   Preparation of Bill of Quantities (B.O.Q), Assist Purchase department to raise L.O.I (Letter  Of Intent) & L.P.O (Letter of Purchase orders).   Manage, follow up and supervise the construction contractors and their on-site and offsite activities.   Preparation of Work Progress Chart Programme and Labor Histogram and Weekly progress  Reports/Progress monitoring for the activities  Project Involvement:- Mudon Town House 348 Villas AL Ruwayah MEP Works Package Client: Dubai Properties Consultant: Arif & Bin Toak Dubai, United Arab Emirates Al Raha Gardens 136 Villas 136 Villas and 5 Substations, Street Light, (LV,HV) MEP Works Package Client : Sorouh Consultant : EWAN Abu Dhabi, United Arab Emirates (Khalifa A)
  • 3. Watani Residential Development 400 Two Storey Villas MEP Works Package Client : Sorouh Consultant : EWAN Abu Dhabi, United Arab Emirates ( Khalifa A ) 2008 March - November 2011 EHAF Consulting Engineering P.O. Box 3805, Abu Dhabi, U.A.E. Tel: 026319161, Mob:-0505801747 Position: ELECT INSPECTOR Marasy Development Project in Abu Dhabi for International Capital Trading, Al Batten Duties and Responsibilities:-   Investigated the Quality of work of every Contractor’s Project   Supervised the Construction of around 7 Building (1 Basement + Ground + 5 floors + 2 Roof Floor), 5 Substations, 2 landscapes.   Monitored the Issuance of Materials to every Contractor. o Investigated the Quality of Work to every Contractor.   Prepare the Contractor’s Weekly Accomplishment Report such as Billing.   Assessed the Performance of every Contractor for the Awarding of Projects. o Reported the    Daily Accomplishment Report of the Project to the Superior.   Rejected any Sub-standard / Defective Materials Delivered.   Conducted Random Checking and Report Quality of Materials received by the Contractor at Site.   Prepared Letter / Memorandum to Contractors.   Inspects the works at each stage of construction. Prepare check lists. Advise contractor of non- conforming works. Ensure correction of works if required.   Ensures that the work complies with the requirements of the specification and relevant codes and standards.   Ensures that the contractors approved shop drawings, method statements, quality control procedures and safety plans are being implemented on site.   Monitors the structure which is being constructed, any adjacent structures which may be affected by construction activities and temporary structures, for any problems related to accidental damage, safety and/or stability.    Investigated the Quality of work of every Contractor’s Project   Review and approve contractor shop drawing / as built drawing in compliance with project specification, National and International standards.   Review, approve and process all electrical Submittals and samples for compliance to the project specification.   Preparation of detailed construction shop drawing, power & lighting, load schedules all all related plans for client approval.   Coordinates the construction schedule and as well as work interface with other trade contractor.   Responsible for monitoring the supervision of all electrical activities, associated inspections and  Quality control of the project.  Provide assistance to the senior and assistant engineers.   Coordination and reporting on general site inspection and routine checking of the contractors construction and installation activities by all other parties.   Coordination and liaison with other discipline of the project team   Assisting with the inspection and documentation for all electrical material and components delivered to site for inclusion in work.   Site monitoring and evaluates construction progress, accomplishment and balance of work to be completed inclusive of monitoring equipment and material requirement to complete the project.   Perform all other duties that may be requested by the MEP Manager / project Manager.   Issued field observation notice and non-conformance report to those electrical works that are not according to specification and sub- standard workmanship   Preparation of Program of works cost estimates, bill of quantities and material take off.   Reviews and coordinate the construction plans to ensure high quality structures.   Witnesses on site testing of materials, record results, and order the removal and replacement of non- compliant materials.   The preparation of Bills and/or Schedules of Quantities of materials, labour and services required in the construction and equipment of building, or engineering works.   The preparation and valuation of progress and final payments in connection with any contract or sub-  Contract.   Responsible for maintaining manpower schedule & minimizing labor cost. o Update the weekly status report using MS Project and other software.   Keep track of project as per planning schedule and coordinate with higher management.  
  • 4. Project Involvement:-  Marasy Development Project in Abu Dhabi for International Capital Trading. 7 Building (1 Basement + Ground + 5 floors + 2 Roof Floor), 5 Substations, 2 landscapes Client: Sorouh Consultant: EHAF Abu Dhabi, United Arab Emirates 2006 January - March 2008 Egypt Power for Electromechanical Engineering Giza, EYGPT Position: ELECT ENGINEER Kureimat Power Project Duties and Responsibilities:-  Perform responsibilities of carrying out minor power distribution and setting up of electrical equipment at customer site.  Responsible for overseeing and monitoring the work and operating activities of Mechanical contractor.  Handle the tasks of preparing and updating all electrical issues especially on installation to the electrical site engineer.  Assigned responsibilities of supporting electrical engineers in testing and installing electrical equipment at different work stations. PROFESIONAL QUALIFICATIONS:-  Has proficient knowledge in MS Office  Familiar with Microsoft Office Applications (Word – Excel – Power point).  Familiar with all Windows (XP - VISTA & Windows 7) Installation, Configuration, Upgrading, Diagnosing and Troubleshooting.  V.Good Internet skills. TRAININGS / SEMINARS ATTENDED:-   Telecom Egypt: types of cables, terrestrial and cable used to connect to the exchanges   Electricity Channel Co” Operation of Electrical Power Systems.   LEGEND Technologies course in (Mobile package "GSM, GPRS & UMTS").  PROFESIONAL PARTICULARS:- Age : 28 Years Old Date of Birth : 23 November 1986 Gender : Male Marital Status : Single Religion : Muslim Nationality : Egypt Driving License : Valid UAE Driving License Languages Known : Arabic: Mother Tongue, English: V.Good