SlideShare une entreprise Scribd logo
1  sur  51
KNOWLEDGE SHARING 
SYSTEM WORK 
PRESENTED BY 
MOHD ZAMIR ABDUL RAHMAN 
QUANTITY SURVEYOR 
MMC CORPORATION BERHAD GAMUDA BERHAD
TRACTION & 
POWER 
SUPPLY (TPS) 
 INTRODUCTION 
 PURPOSE OF 
TRACTION & POWER 
SUPPLY 
 EQUIPMENTS & 
FUNCTIONS 
 JMI PROCEDURE 
 ISSUES/PROBLEM 
RELATED DURING 
JMI 
MMC CORPORATION BERHAD GAMUDA BERHAD
INTRODUCTION 
 Electric power from a generating station is transmitted to grid 
substations using a three-phase distribution system. 
 At the grid substation, a step-down transformer is connected across 
two of the three phases of the high-voltage supply. 
 The transformer lowers the voltage to 25 kV which is supplied to a 
railway feeder station located beside the tracks 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Power Supply is used for signalling operation, communication 
equipment, station and buildings, etc 
 Receive electrical power from TNB, transform it to the required voltage 
and distribute it to electric trains continuously along the railway. 
Requirement for Traction Power: 
 Reliability 
 Availability 
 Maintainability 
 Safety 
MMC CORPORATION BERHAD GAMUDA BERHAD
 132Kv/25Kv Power Transformer 
This transformer is installed in a 
traction sub-stations along side the 
rail track and is used to feed 25KV. 
AC power to railway electric 
locomotives. It will receive from 
TNB Power Supply 132 and reduce 
the voltage to 25 Kv using the 
transformer. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Circuit Breaker 132/25 Kv 
A circuit breaker in a substation is a 
form of protection, designed to 
break fault current (the large volume 
of current that flows when a fault is 
detected. 
A protection device used to protect 
equipment from damage and people 
from dying, that may be in contact. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Circuit Switchgear 25 Kv 
A switchgear has the main function of 
protecting a circuit. This also 
provides the isolation of circuits 
from power supplies thus protecting 
the people working. 
To maintain it and enhancement of the 
system availability by allowing more 
than one electric current source to 
flow through a load. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Isolator / Disconnector 
To ensure that an electrical circuit is 
completely de-energised for service 
or maintenance. 
High-voltage isolation switches are 
used in electrical substations to 
allow isolation of apparatus such as 
circuit breakers, transformers, and 
transmission lines, for maintenance. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Voltage & Current Transformer 
Used for measurement of alternating 
electric currents. When current in a 
circuit is too high to apply directly to 
measuring instruments. 
A current transformer produces a 
reduced current accurately 
proportional to the current in the 
circuit. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Control & Protection Panel 
To control and protect all equipment in 
the modular buildings 
Consist of relays, cabling, metering 
panels, battery and other 
equipments inside the panels. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Prefabricated Modular Building 
Consist of equipment, protection 
panel, battery room, RTU cabinet, 
comm’s rack, circuit breaker, 
disconnector. 
Located at each Feeder Station (FS) 
along the railway track and also Mid 
Point Track Section Location 
(MPTSL), DFL & TCBL. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Remote Terminal Unit (RTU) 
Brain to the equipments inside 
Modular Building and at the 
trackside. For communication at the 
trackside. 
Install at each Feeder Station (FS) 
along the railway track and also Mid 
Point Track Section Location 
(MPTSL), DFL & TCBL. 
MMC CORPORATION BERHAD GAMUDA BERHAD
JMI PROCEDURE 
Request For Inspection 
(RFI) being issued by 
BBASJV 
KSET will review JMI 
document & drawings 
Going to site & do 
inspection with KSET, 
BBAS & MGJV 
Comment by KSET and 
put under SNAGLIST 
KSET will sign JMI 
document after 
inspection. BBAS needs to 
rectify SNAGLIST before 
T&C 
MMC CORPORATION BERHAD GAMUDA BERHAD
 
 
 
 
MMC CORPORATION BERHAD GAMUDA BERHAD
 An overhead line or overhead wire is used to transmit electrical 
energy to the trains. 
 Electric trains that collect their current from overhead line use a 
device such as a pantograph 
 It presses against the underside of the lowest overhead wire, the 
contact wire. 
 Current collectors are electrically conductive and allow current 
to flow through to the train and back to the feeder station 
MMC CORPORATION BERHAD GAMUDA BERHAD
 As the contact wire makes contact with the pantograph, the carbon 
insert on top of the pantograph is worn down. 
 On straight track, the contact wire is zigzagged slightly to the left and 
right of centre at each successive support so that the pantograph wears 
evenly 
 Dropper wires provide physical support of the contact wire without 
joining the catenary and contact wires electrically. 
MMC CORPORATION BERHAD GAMUDA BERHAD
REW wire Insulator Contact Wire CatenaryWire 
Dropper Wire 
OCS Mast 
Overhead Catenary System 
MMC CORPORATION BERHAD GAMUDA BERHAD
OCS Mast 
 Erected to convey REW wire and 
contact and catenary wire. 
 A soil test will be carried out first 
then an auger machine will drill a 
hole to required depth. 
 They will check before mast been 
put and lastly concreting work to 
strengthen the mast. 
MMC CORPORATION BERHAD GAMUDA BERHAD
Pre-Wiring 
 Consist of aluminum tube with 
clip and bracket used to hold the 
contact and catenary wire. 
 Also attached with insulator to 
divide the contact system into 
some unattached electrical 
departments. 
MMC CORPORATION BERHAD GAMUDA BERHAD
Wiring 
 Used to supply electricity power 
to the train. 
 Consist of contact & catenary 
wire attached at cantilever. 
 Made from copper wire cause it 
is a good conductor. 
 A wiring train that have a drum 
cable will be used in this activity. 
MMC CORPORATION BERHAD GAMUDA BERHAD
Registration 
 After finish install pre wiring 
and wiring work, a team will do 
registration works. 
 They will check the height and 
stagger and all bracket were 
tighten to ensure that everything 
install smoothly. 
MMC CORPORATION BERHAD GAMUDA BERHAD
Dropper Wire 
 Dropper wires traditionally 
provide physical support of the 
contact wire without joining the 
contact and catenary wires 
electrically. 
Dropper 
Wire 
MMC CORPORATION BERHAD GAMUDA BERHAD
Balance Weight 
 Catenary wires are kept at a 
mechanical tension because the 
pantograph causes mechanical 
oscillations. 
 The wave must travel faster than the 
train to avoid producing standing 
waves that would cause wire 
breakage. 
 By using balance weight and 
tensioning the line will makes waves 
travel faster. 
MMC CORPORATION BERHAD GAMUDA BERHAD
Drop Tube 
 Usually installed at station 
where mast cannot be used to 
hold the wire. 
 Made from steel structures to 
give more stability to hold 
contact & catenary wire. 
MMC CORPORATION BERHAD GAMUDA BERHAD
APC Magnet 
 The APC magnet instructs an 
electric locomotive to open the 
circuit breaker and switch back 
afterwards. 
 Ease of installation and de-mounting 
of this super-strength 
low-maintenance magnet saves 
significant time and money. 
MMC CORPORATION BERHAD GAMUDA BERHAD
Motorised Isolator RTU 
 To isolate an electrical section 
 High-voltage isolation switches 
are used in electrical substations 
to allow isolation of apparatus 
such as circuit breakers and 
transformers, and transmission 
lines, for maintenance. 
MMC CORPORATION BERHAD GAMUDA BERHAD
Neutral Section 
 Short insulated dead overhead 
equipment separating sectors fed by 
two adjacent substations which are 
normally connected to different 
phases. 
 The neutral section is a dead zone 
and therefore, the locomotive has to 
negotiate the section in momentum. 
 The locomotive is switched off while 
negotiating the neutral section to 
avoid flash over. 
MMC CORPORATION BERHAD GAMUDA BERHAD
Track Bonding 
 Current discharge path to track 
to prevent imbalance current. 
 All equipment attached to the 
rails shall be designed to 
withstand the currents and 
voltages associated with the 
electric traction current 
MMC CORPORATION BERHAD GAMUDA BERHAD
SIGNALLING 
 INTRODUCTION 
 EQUIPMENTS & 
FUNCTIONS 
 JMI PROCEDURE 
 ISSUES/PROBLEM 
RELATED DURING 
JMI 
MMC CORPORATION BERHAD GAMUDA BERHAD
INTRODUCTION 
Signalling is a device by which the movement of the 
train is controlled. 
Purpose of Signalling: 
Operating rail traffic, safely, speedily and economically 
Increasing line capacity 
Providing systems on safe principles 
Preventing conflict movement on trains 
MMC CORPORATION BERHAD GAMUDA BERHAD
EQUIPMENTS & FUNCTIONS 
 Signalling cable 
- To connect all equipments to the 
trackside. Power supply cable consist 
of 4 Core (6mm) diameter. 
Point Machine 
- An electro mechanical device attached 
to turnouts to provide remote 
operation capability, thus allowing 
different routes for trains to be set. 
MMC CORPORATION BERHAD GAMUDA BERHAD
EQUIPMENTS & FUNCTIONS 
Automatic Train 
Protection 
- A safety system comprises of track 
mounted equipment which relays speed 
information to the train equipment and 
the drivers cab. 
 Axle Counter 
- A detection point comprises two 
independent sensors, detect the 
direction of a train by the order in which 
the sensors are passed. 
MMC CORPORATION BERHAD GAMUDA BERHAD
EQUIPMENTS & FUNCTIONS 
 Precast Foundation 
- Foundation for Signalling equipment 
cases such as EB, DB, TPCP, LSC, 
Signal. 
 Track Circuit 
- To detect the condition of the track 
segment which is occupied or not. 
Consist of a power supply & the system 
works under all weather condition. 
MMC CORPORATION BERHAD GAMUDA BERHAD
EQUIPMENTS & FUNCTIONS 
 Signal Post 
- Carries signal lights unit consisting 
one or more aspects. Made of steel 
structures. 
 Signal Head 
- Signal head consist of red, yellow & 
green lights. Gives the train 
driver necessary order & warning 
about the track. 
MMC CORPORATION BERHAD GAMUDA BERHAD
EQUIPMENTS & FUNCTIONS 
 Equipment Box (EB) 
- Consist of power supply, relays and 
terminal rack for signalling 
equipments. 
 Distribution Box (DB) 
- Consist of power supply, relays and 
terminal rack for signalling 
equipments. 
MMC CORPORATION BERHAD GAMUDA BERHAD
EQUIPMENTS & FUNCTIONS 
 Technician Point 
Control Panel (TPCP) 
- Consist of power supply to control the 
point machine operation. 
 SER Equipment Room 
- Monitoring all signalling equipments 
at the trackside. Located at the station. 
MMC CORPORATION BERHAD GAMUDA BERHAD
EQUIPMENTS & FUNCTIONS 
 Block Line Side 
Cabinet (LSC) 
- Control signalling equipments at 
trackside but with less equipments. 
Consist of relays, terminal rack & 
power supply. 
 Station Line Side 
Cabinet (LSC) 
- Control signalling equipments at 
trackside but with many equipments. 
Consist of relays, terminal rack & 
power supply. 
MMC CORPORATION BERHAD GAMUDA BERHAD
EQUIPMENTS & FUNCTIONS 
 Level Crossing 
- A safety barrier to stop all the traffic 
and clear the track so train can pass 
by. Consist of traffic light and barrier 
also with alarm sound. 
Uninterruptible Power 
Supply (UPS) 
- For back-up if there is a power failure 
and to avoid any interruptions on the 
systems traffic. Consist of Power 
Module & Battery Module. 
MMC CORPORATION BERHAD GAMUDA BERHAD
EQUIPMENTS & FUNCTIONS 
 Industrial Computer 
- To monitor all equipments, detect any 
failure from equipments. Located at 
station master office. 
 Shunter Panels/Local 
Control Panel 
- Used for shunter to get acceptance for 
signal such as shunt signal. 
MMC CORPORATION BERHAD GAMUDA BERHAD
COMMUNICATIONS 
 INTRODUCTION 
 EQUIPMENTS & 
FUNCTIONS 
 JMI PROCEDURE 
 ISSUES/PROBLEM 
RELATED DURING 
JMI 
MMC CORPORATION BERHAD GAMUDA BERHAD
INTRODUCTION 
 The primary purpose of the communications system is to rapidly 
transport data and voice signals for particular subsystems 
between passenger stations and halts, operational facilities, 
electrification facilities and CTC. 
 The secondary purpose is to present information to various end-users 
in desired formats. 
 Digital Transmission System comprises 24-core fiber optic cable system 
to be installed along the railway route. All voice and data traffic 
throughout the system is carried within this DTS. 
MMC CORPORATION BERHAD GAMUDA BERHAD
INTRODUCTION 
Main System:- 
 Digital Transmission System (DTS) / Backbone or Fiber-Optic Trunk 
Subsystems:- 
 Private Automatic Branch Exchange (PABX) – internal telephone 
network 
 PAX Type Signal Post Telephone (SPT) – wayside telephone network 
 Passenger Information System (PIS) - PIDS & PA System 
 Closed Circuit Television (CCTV) & Station SCADA 
 Video Wall System – CTC mimic panel 
 Primary Master Clock System – for standardization of time 
 Uninterruptible Power Supply (UPS) & Power Surge Protector 
 Data Transmission for systems by others 
MMC CORPORATION BERHAD GAMUDA BERHAD
MMC CORPORATION BERHAD GAMUDA BERHAD
 Private Automatic Branch 
Exchange (PABX) 
To provide voice communication to 
all stations, halts, new railway 
offices, CTC office, new depots, 
workshops, feeder Station 
buildings and Line side cabinets. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Passenger Information 
Display System (PIDS) 
The system will provide free-format 
information on the running of 
trains. This information will be 
displayed in key areas of stations 
and halts 
Type A1 Display – Terminal 
Type A2 Display –Waiting Hall 
Type A3 Display – Platform at Station 
Type A4 Display – Main entrance 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Public Address System (PA) 
The Long Line Public Address 
System will allow a central point 
to make announcements (by 
announcer or voice synthesizer) 
To remote stations and halts either 
independently or in groups. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Telephone System (PABX) 
To provide voice communication 
within the railway premise 
among railway personnel and 
the passengers. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 CCTV 
The purpose of CCTV is to provide 
surveillance of critical locations 
throughout the rail system for 
security purposes, crowd control 
and safety of passengers. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 Centralized Clock System 
The purpose of the Centralized 
Clock System is to provide real 
time synchronization of the 
sub-systems that may require 
accurate real time information. 
MMC CORPORATION BERHAD GAMUDA BERHAD
 24 Core Fibre Optic Cable 
To connect all equipment at the 
platform such as CCTV, speaker, 
PIDS and other Comms 
equipments. 
MMC CORPORATION BERHAD GAMUDA BERHAD
ELECTRIFIED DOUBLE TRACK 
PROJECT 
IPOH - PADANG BESAR 
MMC CORPORATION BERHAD GAMUDA BERHAD

Contenu connexe

Tendances

Report on Ajni electric Loco shed Nagpur
Report on Ajni electric Loco shed NagpurReport on Ajni electric Loco shed Nagpur
Report on Ajni electric Loco shed Nagpurrushi1234rap
 
Operation management in METRO RAIL.pptx
Operation management in METRO RAIL.pptxOperation management in METRO RAIL.pptx
Operation management in METRO RAIL.pptxmaurya parkara
 
coach care report railway
coach care report railwaycoach care report railway
coach care report railwaysharmalokesh47
 
Summer internship report on DMRC(Delhi Metro Rail Pvt. Ltd.)
Summer internship report on DMRC(Delhi Metro Rail Pvt. Ltd.)Summer internship report on DMRC(Delhi Metro Rail Pvt. Ltd.)
Summer internship report on DMRC(Delhi Metro Rail Pvt. Ltd.)Nalini Ranjan Panday
 
Summer Training in DMRC
Summer Training in DMRCSummer Training in DMRC
Summer Training in DMRCAsim Ghatak
 
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report Aditya Pratap Singh
 
An Overview of Artificial Intelligence Application in Infrastructure Systems ...
An Overview of Artificial Intelligence Application in Infrastructure Systems ...An Overview of Artificial Intelligence Application in Infrastructure Systems ...
An Overview of Artificial Intelligence Application in Infrastructure Systems ...mohammad noori
 
NWR summer training report
NWR summer training reportNWR summer training report
NWR summer training reportKaushu Deshwal
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiPrabjeet Singh
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipurLokesh Judani
 
2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsx2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsxMohd. Aslam Siddiqui
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanAamir Rajput Khan
 
HS2 Tunnel Ventilation - lessons learned from Crossrail 2018_12_12
HS2 Tunnel Ventilation - lessons learned from Crossrail 2018_12_12HS2 Tunnel Ventilation - lessons learned from Crossrail 2018_12_12
HS2 Tunnel Ventilation - lessons learned from Crossrail 2018_12_12Quintus Murphy
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentationahmedalvi01
 

Tendances (20)

Report on Ajni electric Loco shed Nagpur
Report on Ajni electric Loco shed NagpurReport on Ajni electric Loco shed Nagpur
Report on Ajni electric Loco shed Nagpur
 
Operation management in METRO RAIL.pptx
Operation management in METRO RAIL.pptxOperation management in METRO RAIL.pptx
Operation management in METRO RAIL.pptx
 
coach care report railway
coach care report railwaycoach care report railway
coach care report railway
 
Summer internship report on DMRC(Delhi Metro Rail Pvt. Ltd.)
Summer internship report on DMRC(Delhi Metro Rail Pvt. Ltd.)Summer internship report on DMRC(Delhi Metro Rail Pvt. Ltd.)
Summer internship report on DMRC(Delhi Metro Rail Pvt. Ltd.)
 
Metro Signalling Revolution in India
Metro Signalling Revolution in IndiaMetro Signalling Revolution in India
Metro Signalling Revolution in India
 
Summer Training in DMRC
Summer Training in DMRCSummer Training in DMRC
Summer Training in DMRC
 
yash_report
yash_reportyash_report
yash_report
 
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report
 
An Overview of Artificial Intelligence Application in Infrastructure Systems ...
An Overview of Artificial Intelligence Application in Infrastructure Systems ...An Overview of Artificial Intelligence Application in Infrastructure Systems ...
An Overview of Artificial Intelligence Application in Infrastructure Systems ...
 
NWR summer training report
NWR summer training reportNWR summer training report
NWR summer training report
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipur
 
12
1212
12
 
2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsx2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsx
 
Metro project in inda
Metro project in indaMetro project in inda
Metro project in inda
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir Khan
 
Tp metro
Tp metroTp metro
Tp metro
 
Railway training
Railway trainingRailway training
Railway training
 
HS2 Tunnel Ventilation - lessons learned from Crossrail 2018_12_12
HS2 Tunnel Ventilation - lessons learned from Crossrail 2018_12_12HS2 Tunnel Ventilation - lessons learned from Crossrail 2018_12_12
HS2 Tunnel Ventilation - lessons learned from Crossrail 2018_12_12
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentation
 

Similaire à System Works Knowledge Sharing

Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada pptanilakib
 
Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada pptanilakib
 
NMRC Summer Tanning/Internship PPT(Anand Mohan )
NMRC Summer Tanning/Internship PPT(Anand Mohan )NMRC Summer Tanning/Internship PPT(Anand Mohan )
NMRC Summer Tanning/Internship PPT(Anand Mohan )AnandMohan271812
 
Seminar Report on 220 KV Grid Sub Station on Bundi
Seminar Report on 220 KV  Grid Sub Station on Bundi Seminar Report on 220 KV  Grid Sub Station on Bundi
Seminar Report on 220 KV Grid Sub Station on Bundi SahilQureshi14
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid designsusanta das
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at JassureShuvam Pathania
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFjang041
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxsohaib268827
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportAneel-k Suthar
 
Electric traction system
Electric traction systemElectric traction system
Electric traction systemAmitKumar6931
 
Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...ravi9898000178
 
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...Abrar Ahmad
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedKishan Gabel
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviyaAnuj Bansal
 
internship report of 220/132 kV substation
internship report of 220/132 kV substationinternship report of 220/132 kV substation
internship report of 220/132 kV substationShivamUpadhyay86734
 

Similaire à System Works Knowledge Sharing (20)

System Works Knowledge Sharing
System Works Knowledge SharingSystem Works Knowledge Sharing
System Works Knowledge Sharing
 
System Works Knowledge Sharing
System Works Knowledge SharingSystem Works Knowledge Sharing
System Works Knowledge Sharing
 
Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada ppt
 
Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada ppt
 
NMRC Summer Tanning/Internship PPT(Anand Mohan )
NMRC Summer Tanning/Internship PPT(Anand Mohan )NMRC Summer Tanning/Internship PPT(Anand Mohan )
NMRC Summer Tanning/Internship PPT(Anand Mohan )
 
Seminar Report on 220 KV Grid Sub Station on Bundi
Seminar Report on 220 KV  Grid Sub Station on Bundi Seminar Report on 220 KV  Grid Sub Station on Bundi
Seminar Report on 220 KV Grid Sub Station on Bundi
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid design
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...
 
Bochure
BochureBochure
Bochure
 
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...
PPT ON SUMMER VOCATIONAL TRAINING ON 132/33 KV AT MOHADDIPUR, SUB-STATION, GO...
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power Limited
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
 
internship report of 220/132 kV substation
internship report of 220/132 kV substationinternship report of 220/132 kV substation
internship report of 220/132 kV substation
 

Dernier

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 

Dernier (20)

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 

System Works Knowledge Sharing

  • 1. KNOWLEDGE SHARING SYSTEM WORK PRESENTED BY MOHD ZAMIR ABDUL RAHMAN QUANTITY SURVEYOR MMC CORPORATION BERHAD GAMUDA BERHAD
  • 2. TRACTION & POWER SUPPLY (TPS)  INTRODUCTION  PURPOSE OF TRACTION & POWER SUPPLY  EQUIPMENTS & FUNCTIONS  JMI PROCEDURE  ISSUES/PROBLEM RELATED DURING JMI MMC CORPORATION BERHAD GAMUDA BERHAD
  • 3. INTRODUCTION  Electric power from a generating station is transmitted to grid substations using a three-phase distribution system.  At the grid substation, a step-down transformer is connected across two of the three phases of the high-voltage supply.  The transformer lowers the voltage to 25 kV which is supplied to a railway feeder station located beside the tracks MMC CORPORATION BERHAD GAMUDA BERHAD
  • 4.  Power Supply is used for signalling operation, communication equipment, station and buildings, etc  Receive electrical power from TNB, transform it to the required voltage and distribute it to electric trains continuously along the railway. Requirement for Traction Power:  Reliability  Availability  Maintainability  Safety MMC CORPORATION BERHAD GAMUDA BERHAD
  • 5.  132Kv/25Kv Power Transformer This transformer is installed in a traction sub-stations along side the rail track and is used to feed 25KV. AC power to railway electric locomotives. It will receive from TNB Power Supply 132 and reduce the voltage to 25 Kv using the transformer. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 6.  Circuit Breaker 132/25 Kv A circuit breaker in a substation is a form of protection, designed to break fault current (the large volume of current that flows when a fault is detected. A protection device used to protect equipment from damage and people from dying, that may be in contact. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 7.  Circuit Switchgear 25 Kv A switchgear has the main function of protecting a circuit. This also provides the isolation of circuits from power supplies thus protecting the people working. To maintain it and enhancement of the system availability by allowing more than one electric current source to flow through a load. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 8.  Isolator / Disconnector To ensure that an electrical circuit is completely de-energised for service or maintenance. High-voltage isolation switches are used in electrical substations to allow isolation of apparatus such as circuit breakers, transformers, and transmission lines, for maintenance. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 9.  Voltage & Current Transformer Used for measurement of alternating electric currents. When current in a circuit is too high to apply directly to measuring instruments. A current transformer produces a reduced current accurately proportional to the current in the circuit. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 10.  Control & Protection Panel To control and protect all equipment in the modular buildings Consist of relays, cabling, metering panels, battery and other equipments inside the panels. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 11.  Prefabricated Modular Building Consist of equipment, protection panel, battery room, RTU cabinet, comm’s rack, circuit breaker, disconnector. Located at each Feeder Station (FS) along the railway track and also Mid Point Track Section Location (MPTSL), DFL & TCBL. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 12.  Remote Terminal Unit (RTU) Brain to the equipments inside Modular Building and at the trackside. For communication at the trackside. Install at each Feeder Station (FS) along the railway track and also Mid Point Track Section Location (MPTSL), DFL & TCBL. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 13. JMI PROCEDURE Request For Inspection (RFI) being issued by BBASJV KSET will review JMI document & drawings Going to site & do inspection with KSET, BBAS & MGJV Comment by KSET and put under SNAGLIST KSET will sign JMI document after inspection. BBAS needs to rectify SNAGLIST before T&C MMC CORPORATION BERHAD GAMUDA BERHAD
  • 14.     MMC CORPORATION BERHAD GAMUDA BERHAD
  • 15.  An overhead line or overhead wire is used to transmit electrical energy to the trains.  Electric trains that collect their current from overhead line use a device such as a pantograph  It presses against the underside of the lowest overhead wire, the contact wire.  Current collectors are electrically conductive and allow current to flow through to the train and back to the feeder station MMC CORPORATION BERHAD GAMUDA BERHAD
  • 16.  As the contact wire makes contact with the pantograph, the carbon insert on top of the pantograph is worn down.  On straight track, the contact wire is zigzagged slightly to the left and right of centre at each successive support so that the pantograph wears evenly  Dropper wires provide physical support of the contact wire without joining the catenary and contact wires electrically. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 17. REW wire Insulator Contact Wire CatenaryWire Dropper Wire OCS Mast Overhead Catenary System MMC CORPORATION BERHAD GAMUDA BERHAD
  • 18. OCS Mast  Erected to convey REW wire and contact and catenary wire.  A soil test will be carried out first then an auger machine will drill a hole to required depth.  They will check before mast been put and lastly concreting work to strengthen the mast. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 19. Pre-Wiring  Consist of aluminum tube with clip and bracket used to hold the contact and catenary wire.  Also attached with insulator to divide the contact system into some unattached electrical departments. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 20. Wiring  Used to supply electricity power to the train.  Consist of contact & catenary wire attached at cantilever.  Made from copper wire cause it is a good conductor.  A wiring train that have a drum cable will be used in this activity. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 21. Registration  After finish install pre wiring and wiring work, a team will do registration works.  They will check the height and stagger and all bracket were tighten to ensure that everything install smoothly. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 22. Dropper Wire  Dropper wires traditionally provide physical support of the contact wire without joining the contact and catenary wires electrically. Dropper Wire MMC CORPORATION BERHAD GAMUDA BERHAD
  • 23. Balance Weight  Catenary wires are kept at a mechanical tension because the pantograph causes mechanical oscillations.  The wave must travel faster than the train to avoid producing standing waves that would cause wire breakage.  By using balance weight and tensioning the line will makes waves travel faster. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 24. Drop Tube  Usually installed at station where mast cannot be used to hold the wire.  Made from steel structures to give more stability to hold contact & catenary wire. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 25. APC Magnet  The APC magnet instructs an electric locomotive to open the circuit breaker and switch back afterwards.  Ease of installation and de-mounting of this super-strength low-maintenance magnet saves significant time and money. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 26. Motorised Isolator RTU  To isolate an electrical section  High-voltage isolation switches are used in electrical substations to allow isolation of apparatus such as circuit breakers and transformers, and transmission lines, for maintenance. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 27. Neutral Section  Short insulated dead overhead equipment separating sectors fed by two adjacent substations which are normally connected to different phases.  The neutral section is a dead zone and therefore, the locomotive has to negotiate the section in momentum.  The locomotive is switched off while negotiating the neutral section to avoid flash over. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 28. Track Bonding  Current discharge path to track to prevent imbalance current.  All equipment attached to the rails shall be designed to withstand the currents and voltages associated with the electric traction current MMC CORPORATION BERHAD GAMUDA BERHAD
  • 29. SIGNALLING  INTRODUCTION  EQUIPMENTS & FUNCTIONS  JMI PROCEDURE  ISSUES/PROBLEM RELATED DURING JMI MMC CORPORATION BERHAD GAMUDA BERHAD
  • 30. INTRODUCTION Signalling is a device by which the movement of the train is controlled. Purpose of Signalling: Operating rail traffic, safely, speedily and economically Increasing line capacity Providing systems on safe principles Preventing conflict movement on trains MMC CORPORATION BERHAD GAMUDA BERHAD
  • 31. EQUIPMENTS & FUNCTIONS  Signalling cable - To connect all equipments to the trackside. Power supply cable consist of 4 Core (6mm) diameter. Point Machine - An electro mechanical device attached to turnouts to provide remote operation capability, thus allowing different routes for trains to be set. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 32. EQUIPMENTS & FUNCTIONS Automatic Train Protection - A safety system comprises of track mounted equipment which relays speed information to the train equipment and the drivers cab.  Axle Counter - A detection point comprises two independent sensors, detect the direction of a train by the order in which the sensors are passed. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 33. EQUIPMENTS & FUNCTIONS  Precast Foundation - Foundation for Signalling equipment cases such as EB, DB, TPCP, LSC, Signal.  Track Circuit - To detect the condition of the track segment which is occupied or not. Consist of a power supply & the system works under all weather condition. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 34. EQUIPMENTS & FUNCTIONS  Signal Post - Carries signal lights unit consisting one or more aspects. Made of steel structures.  Signal Head - Signal head consist of red, yellow & green lights. Gives the train driver necessary order & warning about the track. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 35. EQUIPMENTS & FUNCTIONS  Equipment Box (EB) - Consist of power supply, relays and terminal rack for signalling equipments.  Distribution Box (DB) - Consist of power supply, relays and terminal rack for signalling equipments. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 36. EQUIPMENTS & FUNCTIONS  Technician Point Control Panel (TPCP) - Consist of power supply to control the point machine operation.  SER Equipment Room - Monitoring all signalling equipments at the trackside. Located at the station. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 37. EQUIPMENTS & FUNCTIONS  Block Line Side Cabinet (LSC) - Control signalling equipments at trackside but with less equipments. Consist of relays, terminal rack & power supply.  Station Line Side Cabinet (LSC) - Control signalling equipments at trackside but with many equipments. Consist of relays, terminal rack & power supply. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 38. EQUIPMENTS & FUNCTIONS  Level Crossing - A safety barrier to stop all the traffic and clear the track so train can pass by. Consist of traffic light and barrier also with alarm sound. Uninterruptible Power Supply (UPS) - For back-up if there is a power failure and to avoid any interruptions on the systems traffic. Consist of Power Module & Battery Module. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 39. EQUIPMENTS & FUNCTIONS  Industrial Computer - To monitor all equipments, detect any failure from equipments. Located at station master office.  Shunter Panels/Local Control Panel - Used for shunter to get acceptance for signal such as shunt signal. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 40. COMMUNICATIONS  INTRODUCTION  EQUIPMENTS & FUNCTIONS  JMI PROCEDURE  ISSUES/PROBLEM RELATED DURING JMI MMC CORPORATION BERHAD GAMUDA BERHAD
  • 41. INTRODUCTION  The primary purpose of the communications system is to rapidly transport data and voice signals for particular subsystems between passenger stations and halts, operational facilities, electrification facilities and CTC.  The secondary purpose is to present information to various end-users in desired formats.  Digital Transmission System comprises 24-core fiber optic cable system to be installed along the railway route. All voice and data traffic throughout the system is carried within this DTS. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 42. INTRODUCTION Main System:-  Digital Transmission System (DTS) / Backbone or Fiber-Optic Trunk Subsystems:-  Private Automatic Branch Exchange (PABX) – internal telephone network  PAX Type Signal Post Telephone (SPT) – wayside telephone network  Passenger Information System (PIS) - PIDS & PA System  Closed Circuit Television (CCTV) & Station SCADA  Video Wall System – CTC mimic panel  Primary Master Clock System – for standardization of time  Uninterruptible Power Supply (UPS) & Power Surge Protector  Data Transmission for systems by others MMC CORPORATION BERHAD GAMUDA BERHAD
  • 43. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 44.  Private Automatic Branch Exchange (PABX) To provide voice communication to all stations, halts, new railway offices, CTC office, new depots, workshops, feeder Station buildings and Line side cabinets. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 45.  Passenger Information Display System (PIDS) The system will provide free-format information on the running of trains. This information will be displayed in key areas of stations and halts Type A1 Display – Terminal Type A2 Display –Waiting Hall Type A3 Display – Platform at Station Type A4 Display – Main entrance MMC CORPORATION BERHAD GAMUDA BERHAD
  • 46.  Public Address System (PA) The Long Line Public Address System will allow a central point to make announcements (by announcer or voice synthesizer) To remote stations and halts either independently or in groups. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 47.  Telephone System (PABX) To provide voice communication within the railway premise among railway personnel and the passengers. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 48.  CCTV The purpose of CCTV is to provide surveillance of critical locations throughout the rail system for security purposes, crowd control and safety of passengers. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 49.  Centralized Clock System The purpose of the Centralized Clock System is to provide real time synchronization of the sub-systems that may require accurate real time information. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 50.  24 Core Fibre Optic Cable To connect all equipment at the platform such as CCTV, speaker, PIDS and other Comms equipments. MMC CORPORATION BERHAD GAMUDA BERHAD
  • 51. ELECTRIFIED DOUBLE TRACK PROJECT IPOH - PADANG BESAR MMC CORPORATION BERHAD GAMUDA BERHAD