S.No DESCRIPTION VENDOR TO SPECIFY
1
a
Supply, installation, testing & commissioning of VRF/VRV Air-Conditioning
system complete with indoor units, outdoor units, refrigerant, control
cabling, earthing, insulation and the required controls for automatic
temperature control excluding air distribution ducting in the MDP Hall.
b Cooling Range by the VRF unit in the MDP hall shall be 22 + 2 deg celsius
2
Refrigerant should be of R410a including full charging of refrigerant gas
3
a
The total capacity of IDU should be minimum 34TR with multiple units of
minimum 03 units of various capacities as per OEM standards
b No of indoor units
c Indoor unit make and model
d Remote Controls for the indoor units
4
a
Variable Refrigerant Flow Outdoor unit consists of inverter driven
compressor (combination of constant speed + variable speed or all variable
speed, Scroll/DC twin rotary), air cooled condenser, fan motor, stands for
outdoor units, vibration isolation pads etc.
b
The total Output capacity of oudoor unit shall be minimum 42 HP. The
Outdoor unit shall have multiple compressors of minimum 03 nos of various
capacities (minimum of 10HP & maximum of 24HP) as per OEM standards.
c Outdoor Unit make and model
5
Central Monitoring Unit shall monitor and control all indoor/outdoor units
of the VRF AC system and set the desired temperature, speed of fan etc.
6
a
The refrigerant piping shall be hard drawn heavy duty copper of various
sizes with necessary supports, fittings between condensing unit & indoor
units along with suitable insulation.
b
Necessary drain piping with supports/clamps from indoor unit to the
ground level is in the scope of the supplier.
CENTRAL MONITORING UNIT:
PIPING DETAILS:
Annexure - C to Tender BAP/CAP/2013-14/OT-01
TECHNICAL SPECIFICATION FOR VRF AC IN MDP HALL
BILL OF QUANTITIES
VRF SYSTEM DESCRIPTION
REFRIGERANT:
INDOOR UNIT:
OUTDOOR UNIT:
Page 1 of 2
7
All control/communication cables between IDUs and ODUs shall be in the
scope of supplier. All power cables for the IDUs and ODUs shall be in the
scope of BHEL.
8
The vendor has to connect each outlet of IDU to the common duct of the
existing Air distribution system. The necessary dampers, flexible joints
required for connection with the existing duct is in the scope of the
supplier. The existing distribution system drawing is enclosed in the
annexure.
9
Dismantling of existing Package AC units at AHU room consist of following
equipments. ( 10TR x 3 Nos and 5TR x 1 No = 35 TR )
a Indoor compressor units
b Cooling tower with connected pipings
10
Guarantee period should be for a period of 24 months from the date of
commissioning.
11
DOCUMENTATION (To be furnished along with supply):
Three sets of Operating & Maintenance Manuals (Hard copies) in English
language should be supplied along with the VRF unit
12
a
Supplier shall be responsible for carrying out dismantling of the existing
Package AC units, erection, testing and commissioning of the VRF AC
system.
b
Indoor units are to be mounted/fixed in the AHU room in the appropriate
location as instructed by Engineer-in-charge.
c
Outdoor units shall be mounted/fixed in pedestal on the roof of the
building as instructed by Engineer-in-charge. Necessary civil works shall be
carried out by BHEL.
d
Wall opening for drain water pipes, refrigerant pipes entry and cable entry
shall be done by supplier and shall be closed and finished with white
cement after installation work is completed.
e
The indoor units and outdoor units shall be factory assembled, tested and
filled with first charge of refrigerant before delivering at site. Final
acceptance will be given after the equipment is installed and tested at site
to give satisfactory performance.
13
The erection and commissioning time period shall be 30 days from the date
of handing over of site by BHEL.
CABLING:
AIR DISTRIBUTION SYSTEM:
DISMANTLING OF THE EXISTING PAC UNITS:
ERECTION & COMMISSIONING:
TIME PERIOD FOR ERECTION & COMMISSIONING:
GUARANTEE PERIOD:
Page 2 of 2
372601839 boq-vrf

Contenu connexe

Tendances

Technical Standard for Cold Storage
Technical Standard for Cold StorageTechnical Standard for Cold Storage
Technical Standard for Cold Storagekalshah12
 
PROJECT REPORT ON PELTIER REFRIGERATOR
PROJECT REPORT ON PELTIER REFRIGERATORPROJECT REPORT ON PELTIER REFRIGERATOR
PROJECT REPORT ON PELTIER REFRIGERATORram143526
 
Report on Air Cooler
Report on Air CoolerReport on Air Cooler
Report on Air CoolerSuman Gop
 
HVAC Preventive maintenance Presentation EVRaju
HVAC Preventive maintenance  Presentation EVRajuHVAC Preventive maintenance  Presentation EVRaju
HVAC Preventive maintenance Presentation EVRajuVenkata Raju Edarapalli
 
A report on combine system of air cooler and water chiller by Sanjay Neolia.
A report on combine system of air cooler and water chiller by Sanjay Neolia.A report on combine system of air cooler and water chiller by Sanjay Neolia.
A report on combine system of air cooler and water chiller by Sanjay Neolia.SANJAY NEOLIA
 
Air cooling systems
Air cooling systemsAir cooling systems
Air cooling systemsSiya Agarwal
 
Working of inverter ac
Working of inverter  acWorking of inverter  ac
Working of inverter acRohit Raj
 
Gea evaporation technology-brochure_en_tcm11-16319
Gea evaporation technology-brochure_en_tcm11-16319Gea evaporation technology-brochure_en_tcm11-16319
Gea evaporation technology-brochure_en_tcm11-16319hung do
 
EVAPORATOR.pptx
EVAPORATOR.pptxEVAPORATOR.pptx
EVAPORATOR.pptxMrman210
 
AIR HANDLING UNIT
AIR HANDLING UNITAIR HANDLING UNIT
AIR HANDLING UNITSaba Naz
 
Refrigration & air conditioning
Refrigration & air conditioningRefrigration & air conditioning
Refrigration & air conditioningSiddharth Bedarker
 
Design and Fabrication of Thermo Electric Refrigerator
Design and Fabrication of Thermo Electric RefrigeratorDesign and Fabrication of Thermo Electric Refrigerator
Design and Fabrication of Thermo Electric Refrigeratorijtsrd
 
HVAC Systems- A Complete Guide
HVAC Systems- A Complete GuideHVAC Systems- A Complete Guide
HVAC Systems- A Complete GuideFordly
 

Tendances (20)

Technical Standard for Cold Storage
Technical Standard for Cold StorageTechnical Standard for Cold Storage
Technical Standard for Cold Storage
 
PROJECT REPORT ON PELTIER REFRIGERATOR
PROJECT REPORT ON PELTIER REFRIGERATORPROJECT REPORT ON PELTIER REFRIGERATOR
PROJECT REPORT ON PELTIER REFRIGERATOR
 
Solar refrigeration
Solar refrigerationSolar refrigeration
Solar refrigeration
 
Report on Air Cooler
Report on Air CoolerReport on Air Cooler
Report on Air Cooler
 
HVAC Preventive maintenance Presentation EVRaju
HVAC Preventive maintenance  Presentation EVRajuHVAC Preventive maintenance  Presentation EVRaju
HVAC Preventive maintenance Presentation EVRaju
 
A report on combine system of air cooler and water chiller by Sanjay Neolia.
A report on combine system of air cooler and water chiller by Sanjay Neolia.A report on combine system of air cooler and water chiller by Sanjay Neolia.
A report on combine system of air cooler and water chiller by Sanjay Neolia.
 
VRF II VRV
VRF II VRVVRF II VRV
VRF II VRV
 
HVAC Basic Concepts of Air Conditioning
HVAC Basic Concepts of Air ConditioningHVAC Basic Concepts of Air Conditioning
HVAC Basic Concepts of Air Conditioning
 
Air cooling systems
Air cooling systemsAir cooling systems
Air cooling systems
 
Chiller-vs-vrf.ppt
Chiller-vs-vrf.pptChiller-vs-vrf.ppt
Chiller-vs-vrf.ppt
 
Working of inverter ac
Working of inverter  acWorking of inverter  ac
Working of inverter ac
 
Gea evaporation technology-brochure_en_tcm11-16319
Gea evaporation technology-brochure_en_tcm11-16319Gea evaporation technology-brochure_en_tcm11-16319
Gea evaporation technology-brochure_en_tcm11-16319
 
EVAPORATOR.pptx
EVAPORATOR.pptxEVAPORATOR.pptx
EVAPORATOR.pptx
 
AIR HANDLING UNIT
AIR HANDLING UNITAIR HANDLING UNIT
AIR HANDLING UNIT
 
solar-powered liquid desiccant
solar-powered liquid desiccantsolar-powered liquid desiccant
solar-powered liquid desiccant
 
Refrigration & air conditioning
Refrigration & air conditioningRefrigration & air conditioning
Refrigration & air conditioning
 
Design and Fabrication of Thermo Electric Refrigerator
Design and Fabrication of Thermo Electric RefrigeratorDesign and Fabrication of Thermo Electric Refrigerator
Design and Fabrication of Thermo Electric Refrigerator
 
Water cooling system
Water cooling systemWater cooling system
Water cooling system
 
How to Calculate Chiller’s Performance & ROI when Replacing- كيف تحسب كفاءة ا...
How to Calculate Chiller’s Performance & ROI when Replacing- كيف تحسب كفاءة ا...How to Calculate Chiller’s Performance & ROI when Replacing- كيف تحسب كفاءة ا...
How to Calculate Chiller’s Performance & ROI when Replacing- كيف تحسب كفاءة ا...
 
HVAC Systems- A Complete Guide
HVAC Systems- A Complete GuideHVAC Systems- A Complete Guide
HVAC Systems- A Complete Guide
 

Similaire à 372601839 boq-vrf

Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between SystemsVictor Ashkenazy
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdfShahrukhKhan424745
 
BR08 Proposed Section B - B
BR08 Proposed Section B - BBR08 Proposed Section B - B
BR08 Proposed Section B - Bsarah ralphs
 
Eberspacher D3L/B3L Installation Manual
Eberspacher D3L/B3L Installation ManualEberspacher D3L/B3L Installation Manual
Eberspacher D3L/B3L Installation ManualButler Technik
 
Technical specification EEE
Technical specification EEETechnical specification EEE
Technical specification EEEAmit Kumar
 
Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Ashutosh Sachan
 
PRESENTATION AIRWELL VRF 2014 GB
PRESENTATION  AIRWELL VRF 2014 GBPRESENTATION  AIRWELL VRF 2014 GB
PRESENTATION AIRWELL VRF 2014 GBArjang Ahmadi
 
BR07 Proposed Section A - A
BR07 Proposed Section A - ABR07 Proposed Section A - A
BR07 Proposed Section A - Asarah ralphs
 
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdf
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdfMHRC-AE-060-VS-01_Submittal_Rev._1.15.pdf
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdfnamnguyen62772
 
Bluon TdX 20 Compared to R-22 Testing Summary
Bluon TdX 20 Compared to R-22 Testing SummaryBluon TdX 20 Compared to R-22 Testing Summary
Bluon TdX 20 Compared to R-22 Testing SummaryBluon Energy
 
ICS flue system installation instructions
ICS flue system installation instructionsICS flue system installation instructions
ICS flue system installation instructionsSchiedel UK
 
specif-dust-extraction-system.pdf
specif-dust-extraction-system.pdfspecif-dust-extraction-system.pdf
specif-dust-extraction-system.pdfSergioPereira229337
 
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxMoturiVinodKumar
 
Edus391004 n vrviii installation manual 2
Edus391004 n vrviii installation manual 2Edus391004 n vrviii installation manual 2
Edus391004 n vrviii installation manual 2Hangkheang Khy
 
Kidde co2 product manual 050128
Kidde co2 product manual 050128Kidde co2 product manual 050128
Kidde co2 product manual 050128Bao Nguyen Dinh
 
ICID flue system installation instructions
ICID flue system installation instructionsICID flue system installation instructions
ICID flue system installation instructionsSchiedel UK
 

Similaire à 372601839 boq-vrf (20)

15780 english
15780   english15780   english
15780 english
 
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between Systems
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf
 
BR08 Proposed Section B - B
BR08 Proposed Section B - BBR08 Proposed Section B - B
BR08 Proposed Section B - B
 
Eberspacher D3L/B3L Installation Manual
Eberspacher D3L/B3L Installation ManualEberspacher D3L/B3L Installation Manual
Eberspacher D3L/B3L Installation Manual
 
Technical specification EEE
Technical specification EEETechnical specification EEE
Technical specification EEE
 
Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)
 
Linear heat detection_spec
Linear heat detection_specLinear heat detection_spec
Linear heat detection_spec
 
PRESENTATION AIRWELL VRF 2014 GB
PRESENTATION  AIRWELL VRF 2014 GBPRESENTATION  AIRWELL VRF 2014 GB
PRESENTATION AIRWELL VRF 2014 GB
 
BR07 Proposed Section A - A
BR07 Proposed Section A - ABR07 Proposed Section A - A
BR07 Proposed Section A - A
 
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdf
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdfMHRC-AE-060-VS-01_Submittal_Rev._1.15.pdf
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdf
 
Brookvent part f compliance guide
Brookvent part f compliance guideBrookvent part f compliance guide
Brookvent part f compliance guide
 
Bluon TdX 20 Compared to R-22 Testing Summary
Bluon TdX 20 Compared to R-22 Testing SummaryBluon TdX 20 Compared to R-22 Testing Summary
Bluon TdX 20 Compared to R-22 Testing Summary
 
ICS flue system installation instructions
ICS flue system installation instructionsICS flue system installation instructions
ICS flue system installation instructions
 
specif-dust-extraction-system.pdf
specif-dust-extraction-system.pdfspecif-dust-extraction-system.pdf
specif-dust-extraction-system.pdf
 
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
 
Gen specs
Gen specsGen specs
Gen specs
 
Edus391004 n vrviii installation manual 2
Edus391004 n vrviii installation manual 2Edus391004 n vrviii installation manual 2
Edus391004 n vrviii installation manual 2
 
Kidde co2 product manual 050128
Kidde co2 product manual 050128Kidde co2 product manual 050128
Kidde co2 product manual 050128
 
ICID flue system installation instructions
ICID flue system installation instructionsICID flue system installation instructions
ICID flue system installation instructions
 

Plus de Mohd Zulhairi Mohd Noor

273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptxMohd Zulhairi Mohd Noor
 
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxFUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxMohd Zulhairi Mohd Noor
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).pptMohd Zulhairi Mohd Noor
 
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.pptMohd Zulhairi Mohd Noor
 
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.pptMohd Zulhairi Mohd Noor
 
525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.pptMohd Zulhairi Mohd Noor
 
271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.pptMohd Zulhairi Mohd Noor
 
258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.ppt258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.pptMohd Zulhairi Mohd Noor
 

Plus de Mohd Zulhairi Mohd Noor (20)

(1)_Terminologi_Kuasa.pdf
(1)_Terminologi_Kuasa.pdf(1)_Terminologi_Kuasa.pdf
(1)_Terminologi_Kuasa.pdf
 
ASAS_KAWALAN.ppt
ASAS_KAWALAN.pptASAS_KAWALAN.ppt
ASAS_KAWALAN.ppt
 
Dental_Chair_2.doc
Dental_Chair_2.docDental_Chair_2.doc
Dental_Chair_2.doc
 
CONVENTIONS_OF_CASE_WRITING.ppt
CONVENTIONS_OF_CASE_WRITING.pptCONVENTIONS_OF_CASE_WRITING.ppt
CONVENTIONS_OF_CASE_WRITING.ppt
 
120595370-CARA-PEMBINAAN-RUMAH.pptx
120595370-CARA-PEMBINAAN-RUMAH.pptx120595370-CARA-PEMBINAAN-RUMAH.pptx
120595370-CARA-PEMBINAAN-RUMAH.pptx
 
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
273109087-Kursus-Asas-Rekabentuk-Sistem-Pam-Pengairan-Pertanian.pptx
 
All-about-Tokyo.pptx
All-about-Tokyo.pptxAll-about-Tokyo.pptx
All-about-Tokyo.pptx
 
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptxFUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
FUTURE_CHALLENGES_IN_PROJECT_MANAGEMENT.pptx
 
61973559-Unit-5-Kerja-Tanah.ppt
61973559-Unit-5-Kerja-Tanah.ppt61973559-Unit-5-Kerja-Tanah.ppt
61973559-Unit-5-Kerja-Tanah.ppt
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt
 
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
59794367-JENTERA-PEMBINAAN-JALAN-RAYA.ppt
 
22513791-Lantai.ppt
22513791-Lantai.ppt22513791-Lantai.ppt
22513791-Lantai.ppt
 
95123497-CESMM-Malaysia.ppt
95123497-CESMM-Malaysia.ppt95123497-CESMM-Malaysia.ppt
95123497-CESMM-Malaysia.ppt
 
57910334-5-MEP-Fire-Protection-rev.ppt
57910334-5-MEP-Fire-Protection-rev.ppt57910334-5-MEP-Fire-Protection-rev.ppt
57910334-5-MEP-Fire-Protection-rev.ppt
 
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
20306223-3-Tips-For-Professional-Engineer-Interview-in-Malaysia.ppt
 
525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt
 
271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt
 
258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.ppt258681760-Asphaltic-Concrete-Mix-Design.ppt
258681760-Asphaltic-Concrete-Mix-Design.ppt
 
29629597 psychrometric-course
29629597 psychrometric-course29629597 psychrometric-course
29629597 psychrometric-course
 
316825480 diffuser-tech data
316825480 diffuser-tech data316825480 diffuser-tech data
316825480 diffuser-tech data
 

Dernier

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 

Dernier (20)

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 

372601839 boq-vrf

  • 1. S.No DESCRIPTION VENDOR TO SPECIFY 1 a Supply, installation, testing & commissioning of VRF/VRV Air-Conditioning system complete with indoor units, outdoor units, refrigerant, control cabling, earthing, insulation and the required controls for automatic temperature control excluding air distribution ducting in the MDP Hall. b Cooling Range by the VRF unit in the MDP hall shall be 22 + 2 deg celsius 2 Refrigerant should be of R410a including full charging of refrigerant gas 3 a The total capacity of IDU should be minimum 34TR with multiple units of minimum 03 units of various capacities as per OEM standards b No of indoor units c Indoor unit make and model d Remote Controls for the indoor units 4 a Variable Refrigerant Flow Outdoor unit consists of inverter driven compressor (combination of constant speed + variable speed or all variable speed, Scroll/DC twin rotary), air cooled condenser, fan motor, stands for outdoor units, vibration isolation pads etc. b The total Output capacity of oudoor unit shall be minimum 42 HP. The Outdoor unit shall have multiple compressors of minimum 03 nos of various capacities (minimum of 10HP & maximum of 24HP) as per OEM standards. c Outdoor Unit make and model 5 Central Monitoring Unit shall monitor and control all indoor/outdoor units of the VRF AC system and set the desired temperature, speed of fan etc. 6 a The refrigerant piping shall be hard drawn heavy duty copper of various sizes with necessary supports, fittings between condensing unit & indoor units along with suitable insulation. b Necessary drain piping with supports/clamps from indoor unit to the ground level is in the scope of the supplier. CENTRAL MONITORING UNIT: PIPING DETAILS: Annexure - C to Tender BAP/CAP/2013-14/OT-01 TECHNICAL SPECIFICATION FOR VRF AC IN MDP HALL BILL OF QUANTITIES VRF SYSTEM DESCRIPTION REFRIGERANT: INDOOR UNIT: OUTDOOR UNIT: Page 1 of 2
  • 2. 7 All control/communication cables between IDUs and ODUs shall be in the scope of supplier. All power cables for the IDUs and ODUs shall be in the scope of BHEL. 8 The vendor has to connect each outlet of IDU to the common duct of the existing Air distribution system. The necessary dampers, flexible joints required for connection with the existing duct is in the scope of the supplier. The existing distribution system drawing is enclosed in the annexure. 9 Dismantling of existing Package AC units at AHU room consist of following equipments. ( 10TR x 3 Nos and 5TR x 1 No = 35 TR ) a Indoor compressor units b Cooling tower with connected pipings 10 Guarantee period should be for a period of 24 months from the date of commissioning. 11 DOCUMENTATION (To be furnished along with supply): Three sets of Operating & Maintenance Manuals (Hard copies) in English language should be supplied along with the VRF unit 12 a Supplier shall be responsible for carrying out dismantling of the existing Package AC units, erection, testing and commissioning of the VRF AC system. b Indoor units are to be mounted/fixed in the AHU room in the appropriate location as instructed by Engineer-in-charge. c Outdoor units shall be mounted/fixed in pedestal on the roof of the building as instructed by Engineer-in-charge. Necessary civil works shall be carried out by BHEL. d Wall opening for drain water pipes, refrigerant pipes entry and cable entry shall be done by supplier and shall be closed and finished with white cement after installation work is completed. e The indoor units and outdoor units shall be factory assembled, tested and filled with first charge of refrigerant before delivering at site. Final acceptance will be given after the equipment is installed and tested at site to give satisfactory performance. 13 The erection and commissioning time period shall be 30 days from the date of handing over of site by BHEL. CABLING: AIR DISTRIBUTION SYSTEM: DISMANTLING OF THE EXISTING PAC UNITS: ERECTION & COMMISSIONING: TIME PERIOD FOR ERECTION & COMMISSIONING: GUARANTEE PERIOD: Page 2 of 2