SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
Mojtaba Rezakhah
1909 Digger Drive #95 303-885-0427
Golden, CO 80401 mrezakha@mines.edu
EDUCATION
Colorado School of Mines, Golden, Colorado
 PhD, Operations Research with Engineering Expected Dec 2016
 M.Sc. in Mineral and Energy Economics May 2015
Tarbiat Modarres University, Tehran, Iran 2006
 M.Sc. in Mining Engineering
Isfahan University of Technology, Isfahan, Iran 2003
 B.Sc. in Mining Engineering
Academic Achievements
Publications
 Moerno E., Rezakhah, M., Newman, A., Ferreria, F., 2016, Linear Models for Stockpiling in Open-pit Mine
Prodoction Scheduling Problems. European Journal of Operational Research. Working Paper
 Rezakhah, M., Moerno E., Newman, A., 2016, An Improvement on Stockpiling Strategies in Commercial Software,
International Journal of Mining, Reclamation and Environment. Working Paper.
 M. Monjezi (2007), K. Goshtasbi, M. Rezakhah and T.N. Singh, “Design of stable slopes for Songun copper mine,”
Mining Technology, Vol 116 No 3, Money Publishing, Australia.
Teaching Assistant and Grader Nov 2012 - Present
Colorado School of Mines
 Mining Engineering Department: Statics.
 Petroleum Engineering Department: Petroleum Design.
 Economics & Business: Industrial System Simulations, Stochastic Modeling, Deterministic Optimizations, Supply
Chain Management.
 Mechanical Engineering Department: Nonlinear Optimization, Integer Optimization.
COMPUTER SKILLS
 C++, Python, MineSight, 3DEC, FLAC and FLAC 3D, AMPL, CPLEX, Matlab, R.
Work Experience
Senior Mine Engineer Sept 2010 - May 2012
Fars & Khuzestan Cement Company, Iran
 Generated and implemented long-range planning procedures.
 Designed the "Optimized Blending Ratio of Raw Materials” to reduce energy consumption in the kiln.
 Optimized the transportation system of raw materials from the mine to cement factory.
 Conducted all mining engineering work on multiple pre-feasibility and feasibility including pit optimization, pit
designs, haulage system design, equipment sizing, and economic analysis.
 Trained long- and short-range planning engineers.
Director May 2008 - July 2010
Kelardasht Quarry Mine, Iran
 Increased the revenue of the company by 30% in 2 years, based on selling more products.
 Provided pre-feasibility- and feasibility-level studies for replacing explosives with wire cut.
Mine Operations Engineer May 2006 - May 2008
Tamin Cement Investment Company, Iran
 Increased the production capacity at Limestone mine.
International Experience
Board of Director Appointments
 Kelardasht Quarry Mine Company, Iran July 2010 - June 2012
 Farsit Ahwaz Company, Iran April 2011 - June 2012
Visiting Scholar:
 Universidad Adolfo Ibáñez, Santiago, Chile December 2015 - February 2016

Contenu connexe

Similaire à Rezakhah-CV (20)

Touraj Vitae-last
Touraj Vitae-lastTouraj Vitae-last
Touraj Vitae-last
 
Resume-9-11-2015
Resume-9-11-2015Resume-9-11-2015
Resume-9-11-2015
 
Mahdi Massahi_CV_V18
Mahdi Massahi_CV_V18Mahdi Massahi_CV_V18
Mahdi Massahi_CV_V18
 
CV _D_
CV _D_CV _D_
CV _D_
 
shahbaz make
shahbaz makeshahbaz make
shahbaz make
 
1. Simon Yazdan-Geot Pro
1. Simon Yazdan-Geot Pro1. Simon Yazdan-Geot Pro
1. Simon Yazdan-Geot Pro
 
Curriculum Vitae khani
Curriculum Vitae khaniCurriculum Vitae khani
Curriculum Vitae khani
 
Cv 5-15-2016
Cv 5-15-2016Cv 5-15-2016
Cv 5-15-2016
 
AlekseyVolodchenkovResume
AlekseyVolodchenkovResumeAlekseyVolodchenkovResume
AlekseyVolodchenkovResume
 
My CV
My CVMy CV
My CV
 
CV. KHOSRO SHIRZADI -کاری
CV. KHOSRO SHIRZADI -کاریCV. KHOSRO SHIRZADI -کاری
CV. KHOSRO SHIRZADI -کاری
 
cv-updated2015
cv-updated2015cv-updated2015
cv-updated2015
 
QAISAR ALI ENGINEER
QAISAR ALI  ENGINEERQAISAR ALI  ENGINEER
QAISAR ALI ENGINEER
 
Resume_JK
Resume_JKResume_JK
Resume_JK
 
Muhammad imtiaz azam. Cv
Muhammad imtiaz azam. CvMuhammad imtiaz azam. Cv
Muhammad imtiaz azam. Cv
 
Aleksandar Jankovic CV 16
Aleksandar Jankovic CV 16Aleksandar Jankovic CV 16
Aleksandar Jankovic CV 16
 
Fahad seemab Research Curriculum Vitae
Fahad seemab Research Curriculum VitaeFahad seemab Research Curriculum Vitae
Fahad seemab Research Curriculum Vitae
 
Akash CV 12_16
Akash CV 12_16Akash CV 12_16
Akash CV 12_16
 
Ardeshiri_94-2
Ardeshiri_94-2Ardeshiri_94-2
Ardeshiri_94-2
 
Engr Kashif Cv
Engr Kashif CvEngr Kashif Cv
Engr Kashif Cv
 

Rezakhah-CV

  • 1. Mojtaba Rezakhah 1909 Digger Drive #95 303-885-0427 Golden, CO 80401 mrezakha@mines.edu EDUCATION Colorado School of Mines, Golden, Colorado  PhD, Operations Research with Engineering Expected Dec 2016  M.Sc. in Mineral and Energy Economics May 2015 Tarbiat Modarres University, Tehran, Iran 2006  M.Sc. in Mining Engineering Isfahan University of Technology, Isfahan, Iran 2003  B.Sc. in Mining Engineering Academic Achievements Publications  Moerno E., Rezakhah, M., Newman, A., Ferreria, F., 2016, Linear Models for Stockpiling in Open-pit Mine Prodoction Scheduling Problems. European Journal of Operational Research. Working Paper  Rezakhah, M., Moerno E., Newman, A., 2016, An Improvement on Stockpiling Strategies in Commercial Software, International Journal of Mining, Reclamation and Environment. Working Paper.  M. Monjezi (2007), K. Goshtasbi, M. Rezakhah and T.N. Singh, “Design of stable slopes for Songun copper mine,” Mining Technology, Vol 116 No 3, Money Publishing, Australia. Teaching Assistant and Grader Nov 2012 - Present Colorado School of Mines  Mining Engineering Department: Statics.  Petroleum Engineering Department: Petroleum Design.  Economics & Business: Industrial System Simulations, Stochastic Modeling, Deterministic Optimizations, Supply Chain Management.  Mechanical Engineering Department: Nonlinear Optimization, Integer Optimization. COMPUTER SKILLS  C++, Python, MineSight, 3DEC, FLAC and FLAC 3D, AMPL, CPLEX, Matlab, R. Work Experience Senior Mine Engineer Sept 2010 - May 2012 Fars & Khuzestan Cement Company, Iran  Generated and implemented long-range planning procedures.  Designed the "Optimized Blending Ratio of Raw Materials” to reduce energy consumption in the kiln.  Optimized the transportation system of raw materials from the mine to cement factory.  Conducted all mining engineering work on multiple pre-feasibility and feasibility including pit optimization, pit designs, haulage system design, equipment sizing, and economic analysis.  Trained long- and short-range planning engineers. Director May 2008 - July 2010 Kelardasht Quarry Mine, Iran  Increased the revenue of the company by 30% in 2 years, based on selling more products.  Provided pre-feasibility- and feasibility-level studies for replacing explosives with wire cut. Mine Operations Engineer May 2006 - May 2008 Tamin Cement Investment Company, Iran  Increased the production capacity at Limestone mine. International Experience Board of Director Appointments  Kelardasht Quarry Mine Company, Iran July 2010 - June 2012  Farsit Ahwaz Company, Iran April 2011 - June 2012 Visiting Scholar:  Universidad Adolfo Ibáñez, Santiago, Chile December 2015 - February 2016