Managing IT Personnel and
Projects
Pramit Kumar Sah
BPH, MPH
Overview
 Managing information technology (IT) personnel and projects is a
challenging undertaking.
 A public health manager charged with developing and
implementing a new information system must identify and recruit
technical staff and consultants possessing the right kinds of
educational qualifications and experience.
 In addition, the project manager must organize the technical team
and use effective strategies for communication with every
stakeholder, including company management, users of the
proposed new system, and IT personnel assigned to the project.
 Along the way, the project manager must secure appropriate
funding, analyze current processes, identify user needs, manage
the expectations of every stakeholder, address the inevitable
political opposition, analyze processes to be affected by the new
system, determine the appropriate technology to be employed,
and educate management about the costs of the proposed new
system.
 Although IT projects have a history of very high failure
rates, there are strategies that a project manager can use
to help insure project success.
 Through use of such tools as rapid prototyping, a
project manager can identify user needs and involve
users from the beginning in the project.
 Through a careful review of business processes, a
project manager can define the appropriate technology
to be applied.
 Finally, through knowing and recognizing the
characteristics of successful and unsuccessful IT
projects, a project manager can minimize the
probability that the IT project will fail.
Introduction
Managing IT personnel and projects is a challenging
undertaking
A public health manager charged with developing and
implementing a new information system must:
 identify and recruit technical staff and consultants with
right kinds of qualification and experiences
 organize the technical team and use effective strategies
for communication with every stakeholder, including
company management, users of the new system and IT
personnel
Contd…
 Secure appropriate funding, analyze
current processes and identify user needs
 mange the expectation of every
stakeholders and address the inevitable
political opposition
 analyze processes to be affected by the new
system
 determine the appropriate technology to be
employed, and educate management about
the costs of the proposed new system
Managing IT Personnel
Successful IT projects depend greatly on a
project head’s ability to:
1. Identify computer expertise
2. Recruit right people
3. Communicate with technical personnel
4. Hire consultants appropriately
5. Organize technical team
1. Identifying computer expertise
Requires the identification and selection
of the right people to perform the work
Requires a manager to determine
whether candidates for project team
position have the right computer
expertise
Key factors to look for identifying computer
expertise
Factor Relevant characteristics
Education in
computer sciences
Bachelors level: possession of programming skills, knowledge of
database design, experience with project tools
Masters level: all skills of bachelors level plus completion of at
least one major IT project
Doctoral level: all skills of masters level plus development of a
significant new approach to solving a computer science problem;
primary emphasis is on research
Certification: indicate possession of expertise with regard to
specific products and systems
Experience Should be related to current task
Should be relevant to role the candidate will perform on the project
team
Should indicate cooperative service on a project team
References Should be multiple
Should include inquiry about the success of projects on which the
candidate has worked
2.Recruiting
• Offering competitive compensation levels is
important in attracting high quality personnel, but
it is not the only tool to attract them
• Tools related to a candidate’s career development
and lifestyle are also extremely important
• Offering a candidate a desirable work environment
such as nice office space, good equipment can
attract good people
3. Communication with technical
personnel
Manager should communicate effectively with
technical personnel
Manager should be familiar with the basic
terminology of information systems
Manager must insist on clear explanations of
technical terms from technical personnel
Technical personnel should be able to explain what
they are doing in plain English
4. Hiring consultants
If a manager does not understand what he/she is being told and cannot get
clear explanation, it is time to hire a consultant
When there is a very specific issue or question that is beyond the expertise of
an in-house staff, it is time to bring in a consultant.
Important to interview potential consulting candidates same like as potential
full- time staff hire.
The references provided should be checked carefully
Task to be performed must be well defined and clear to consultants
5.OrganizingTechnical Teams
Small interdisciplinary teams are most effective for handling IT projects
Technical team should include users, program staff, managers, and technical
personnel
A team manger should consider the input of all team members, and specially of
potential users of the system to be developed
Communication strategies such as holding regular meetings, making frequent
e-mail contact, issuing progress reports regularly, and locating team members
in close proximity to facilitate informal contact should be utilized
Managing IT Projects
A basic concept in IT projects is the “triangle”
relationship of the three key elements of time, features,
and budget.
The relationship of time, features and budget is
interdependent.
Not one of the elements of time, features, and budget of
IT projects can be changed without affecting another
element.
Interrelations of IT project time, features
and budget
Project component Impact of component increase or decrease
time If increased, will increase budget and may allow increase in system
features
If decreased, will reduce budget but also reduce system features
features If increased, will increase both project time and budget
If decreased, will reduce both project time and budget
budget If increased, may increase features and reduce project time
if decreased, will increase project time and reduce system features
Managing IT projects includes:
1. Managing expectation
2. Involving users
3. Communicating project benefits
4. Rapid prototyping
5. Managing political challenges
6. Securing funding for an IT project
7. Managing change created by a new system
8. Using technology appropriately
1. Managing Expectations
IT project manager must:
Promise only what can be delivered and deliver what is promised on
time
be very cautious about making commitments
Educate higher management in the process of system development
Estimate – time and budget
Understand what can be done and how fast it can be accomplished
Estimate better future progress and therefore do a better job of
managing expectations
2. Involving users
Give the users meaningful involvement from the inception
of the project to its completion
Involvement of users not only serves to solve real user
problems, but also fosters a sense of ownership of the
system
Involve users rather than supervisors of the system
Establish steering committee composed of users, managers
and the system developers
3.Communicating project benefits
Deliver real benefits to higher levels of
management and the real users
The benefits of new system should include
improvement of the work flow of users
Providing small benefits to the intended
users early in the project development cycle
is extremely helpful in securing user
participation
4.Rapid prototyping
Quick development of a nonfunctional test
version of the ultimate system for discussion and
review by users
Aids in the requirements specification process by
presenting users with a framework that captures
the current level of understanding of their needs
Minimizes risk by making very incremental
investments in system developments to refine the
requirements
5.Managing political challenges
Overcome the inertia – the desire to maintain the status
quo- that is inherent in organizations
Understand who will benefit from the failure of a new
system development and to work to minimize those
benefits of failure
To gain acceptance of a new system, ensure job
placement for any person whose position will be
adversely affected by the new system
6.Securring funding for an IT
project
Recognize inadequate funding usually is a
manifestation of political opposition within the
organization
Project manager should understand if decision
makers are not willing to pay for new system,
they do not really want it
It is also important for a manager to educate
senior management about the true costs of
information systems
7.Managing change created by a new
system
A key element is changing employee behavior
The more rapid the change, the more the discomfort
increases
Behavior modification is a key part of system
development
Intermittent positive reinforcement is one of the
most powerful tools for behavior modification
Respect the affinity that users have with the old
system
8.Using technology appropriately
Recognize that technology does not solve all
problems
A careful review of business processes helps to
define where technology can best be applied
Merely automating inefficient process is not a good
business strategy
Simply reengineering processes may eliminate the
need for automation and reveal new and different
information system needs
Reasons Projects Succeed
User involvement
Management support
Skilled, experienced project managers
Clear requirements statement
Comprehensive work plan
Sound development methodology
Prototyping
Extensive Testing
Paradigm for Success
Behavior Modification
– management
– users
Minimize increments of change
Use intermittent positive reinforcement
– provide real benefits to users
– what they want, NOT what you want
Managing IT - Summary
Know what you are doing
Use competent personnel
Use rapid prototyping to ensure user
involvement
Assess and respond to political
challenges
Know when to avoid technology
REFERENCE
1. http://rgw.arizona.edu/administration/man
aging-projects
2. http://funnel.sfsu.edu/creep/ProjectPersonn
el.htm
3. https://link.springer.com/chapter/10.1007
%2F0-387-22745-8_8
Managing IT Personnel and projects

Contenu connexe

Tendances

Sources of Demographic data_NFHS.pptx
Sources of Demographic data_NFHS.pptxSources of Demographic data_NFHS.pptx
Sources of Demographic data_NFHS.pptxTR Dilip
 
Global burden of disease & International Health Regulation
Global burden of disease & International Health RegulationGlobal burden of disease & International Health Regulation
Global burden of disease & International Health RegulationSujata Mohapatra
 
Universal Health Coverage
Universal Health Coverage Universal Health Coverage
Universal Health Coverage sourav goswami
 
Geographic information system in public health
Geographic information system in public healthGeographic information system in public health
Geographic information system in public healthBPKIHS
 
Child mortality indicators in India
Child mortality indicators in IndiaChild mortality indicators in India
Child mortality indicators in IndiaRizwan S A
 
Determinants of under five children morbidity and mortality
Determinants of under five children morbidity and mortalityDeterminants of under five children morbidity and mortality
Determinants of under five children morbidity and mortalityRam Chandra
 
Global and Indian plan to End TB
Global and Indian plan to End TBGlobal and Indian plan to End TB
Global and Indian plan to End TBRama shankar
 
National leprosy eradication program
National leprosy eradication programNational leprosy eradication program
National leprosy eradication programMadhushree Acharya
 
International Health Regulations
International Health RegulationsInternational Health Regulations
International Health RegulationsTanveerRehman4
 
Integrated concurrent field practice iii report draft2
Integrated concurrent field practice iii report draft2 Integrated concurrent field practice iii report draft2
Integrated concurrent field practice iii report draft2 BikashDangaura
 
International health
International healthInternational health
International healthAshok Pandey
 
Basic measurements in epidemiology
Basic measurements in epidemiologyBasic measurements in epidemiology
Basic measurements in epidemiologyAntony Gorbachave
 
Universal health coverage concept and vision for india
Universal health coverage   concept and vision for indiaUniversal health coverage   concept and vision for india
Universal health coverage concept and vision for indiaVikash Keshri
 
National digital health mission- Dr. Gurmeet
National digital health mission- Dr. GurmeetNational digital health mission- Dr. Gurmeet
National digital health mission- Dr. GurmeetYogesh Arora
 
National digital health mission new
National digital health mission newNational digital health mission new
National digital health mission newKumarjitDutta2
 
Universal Health Coverage
Universal Health CoverageUniversal Health Coverage
Universal Health CoverageNursing Path
 

Tendances (20)

Sources of Demographic data_NFHS.pptx
Sources of Demographic data_NFHS.pptxSources of Demographic data_NFHS.pptx
Sources of Demographic data_NFHS.pptx
 
END TB 2015 strategy
END TB 2015 strategyEND TB 2015 strategy
END TB 2015 strategy
 
Global burden of disease & International Health Regulation
Global burden of disease & International Health RegulationGlobal burden of disease & International Health Regulation
Global burden of disease & International Health Regulation
 
Universal Health Coverage
Universal Health Coverage Universal Health Coverage
Universal Health Coverage
 
Geographic information system in public health
Geographic information system in public healthGeographic information system in public health
Geographic information system in public health
 
Child mortality indicators in India
Child mortality indicators in IndiaChild mortality indicators in India
Child mortality indicators in India
 
Determinants of under five children morbidity and mortality
Determinants of under five children morbidity and mortalityDeterminants of under five children morbidity and mortality
Determinants of under five children morbidity and mortality
 
Global and Indian plan to End TB
Global and Indian plan to End TBGlobal and Indian plan to End TB
Global and Indian plan to End TB
 
National leprosy eradication program
National leprosy eradication programNational leprosy eradication program
National leprosy eradication program
 
Global Burden of Disease (GBD) 2017 study findings
Global Burden of Disease (GBD) 2017 study findingsGlobal Burden of Disease (GBD) 2017 study findings
Global Burden of Disease (GBD) 2017 study findings
 
International Health Regulations
International Health RegulationsInternational Health Regulations
International Health Regulations
 
Integrated concurrent field practice iii report draft2
Integrated concurrent field practice iii report draft2 Integrated concurrent field practice iii report draft2
Integrated concurrent field practice iii report draft2
 
International health
International healthInternational health
International health
 
Basic measurements in epidemiology
Basic measurements in epidemiologyBasic measurements in epidemiology
Basic measurements in epidemiology
 
Universal health coverage concept and vision for india
Universal health coverage   concept and vision for indiaUniversal health coverage   concept and vision for india
Universal health coverage concept and vision for india
 
National digital health mission- Dr. Gurmeet
National digital health mission- Dr. GurmeetNational digital health mission- Dr. Gurmeet
National digital health mission- Dr. Gurmeet
 
National digital health mission new
National digital health mission newNational digital health mission new
National digital health mission new
 
Universal Health Coverage
Universal Health CoverageUniversal Health Coverage
Universal Health Coverage
 
37 viswash khattri-journal-club-presentation
37 viswash khattri-journal-club-presentation37 viswash khattri-journal-club-presentation
37 viswash khattri-journal-club-presentation
 
Public Health Leadership
Public Health LeadershipPublic Health Leadership
Public Health Leadership
 

Similaire à Managing IT Personnel and projects

Managing it personnel and projects
Managing it personnel and projectsManaging it personnel and projects
Managing it personnel and projectsMr. Pramit Kumar Sah
 
Feasible
FeasibleFeasible
Feasiblelearnt
 
Running Header 1SYSTEM ARCHITECTURE24Gr.docx
Running Header  1SYSTEM ARCHITECTURE24Gr.docxRunning Header  1SYSTEM ARCHITECTURE24Gr.docx
Running Header 1SYSTEM ARCHITECTURE24Gr.docxrtodd599
 
Running Header 1SYSTEM ARCHITECTURE2Unit .docx
Running Header  1SYSTEM ARCHITECTURE2Unit .docxRunning Header  1SYSTEM ARCHITECTURE2Unit .docx
Running Header 1SYSTEM ARCHITECTURE2Unit .docxrtodd599
 
Technology Implementation Paper
Technology Implementation PaperTechnology Implementation Paper
Technology Implementation PaperDeb Birch
 
Running Header 1APPLICATION DEVELOPMENT METHODS2.docx
Running Header  1APPLICATION DEVELOPMENT METHODS2.docxRunning Header  1APPLICATION DEVELOPMENT METHODS2.docx
Running Header 1APPLICATION DEVELOPMENT METHODS2.docxrtodd599
 
Dynamic Curriculum & Its Implementation In Agora@Merit
Dynamic Curriculum & Its Implementation In Agora@MeritDynamic Curriculum & Its Implementation In Agora@Merit
Dynamic Curriculum & Its Implementation In Agora@MeritRenata Aquino
 
Project Report on Employee Management System.docx
Project Report on Employee Management System.docxProject Report on Employee Management System.docx
Project Report on Employee Management System.docxDhineshkumarPrakasam
 
Innovation and System Design
Innovation and System DesignInnovation and System Design
Innovation and System DesignIJOAEM Editor
 
Hsc project management 2018pptx
Hsc project management 2018pptxHsc project management 2018pptx
Hsc project management 2018pptxgreg robertson
 
Assignment Of Property Asset Management.Pdf
Assignment Of Property Asset Management.PdfAssignment Of Property Asset Management.Pdf
Assignment Of Property Asset Management.PdfDustin Pytko
 
computer science.docx. Mohit Class 12 follow for more
computer science.docx. Mohit Class 12 follow for morecomputer science.docx. Mohit Class 12 follow for more
computer science.docx. Mohit Class 12 follow for morekimchibhendalbhai070
 
Presentation by dakshinamoorthi g
Presentation by dakshinamoorthi  gPresentation by dakshinamoorthi  g
Presentation by dakshinamoorthi gPMI_IREP_TP
 
The Role Of Analytics in Healthcare.
The Role Of Analytics in Healthcare.The Role Of Analytics in Healthcare.
The Role Of Analytics in Healthcare.Techugo
 
Feasibility of a project
Feasibility of a projectFeasibility of a project
Feasibility of a projectBikramjit Singh
 
Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises Moutasm Tamimi
 
Information resources, mis, csvtu
Information resources, mis, csvtuInformation resources, mis, csvtu
Information resources, mis, csvtuNarender Chintada
 
Information systems strategy formulation
Information systems strategy formulationInformation systems strategy formulation
Information systems strategy formulationAssignment Studio
 

Similaire à Managing IT Personnel and projects (20)

Managing it personnel and projects
Managing it personnel and projectsManaging it personnel and projects
Managing it personnel and projects
 
Feasible
FeasibleFeasible
Feasible
 
Running Header 1SYSTEM ARCHITECTURE24Gr.docx
Running Header  1SYSTEM ARCHITECTURE24Gr.docxRunning Header  1SYSTEM ARCHITECTURE24Gr.docx
Running Header 1SYSTEM ARCHITECTURE24Gr.docx
 
Running Header 1SYSTEM ARCHITECTURE2Unit .docx
Running Header  1SYSTEM ARCHITECTURE2Unit .docxRunning Header  1SYSTEM ARCHITECTURE2Unit .docx
Running Header 1SYSTEM ARCHITECTURE2Unit .docx
 
Technology Implementation Paper
Technology Implementation PaperTechnology Implementation Paper
Technology Implementation Paper
 
Running Header 1APPLICATION DEVELOPMENT METHODS2.docx
Running Header  1APPLICATION DEVELOPMENT METHODS2.docxRunning Header  1APPLICATION DEVELOPMENT METHODS2.docx
Running Header 1APPLICATION DEVELOPMENT METHODS2.docx
 
Dynamic Curriculum & Its Implementation In Agora@Merit
Dynamic Curriculum & Its Implementation In Agora@MeritDynamic Curriculum & Its Implementation In Agora@Merit
Dynamic Curriculum & Its Implementation In Agora@Merit
 
Report
ReportReport
Report
 
Project Report on Employee Management System.docx
Project Report on Employee Management System.docxProject Report on Employee Management System.docx
Project Report on Employee Management System.docx
 
Innovation and System Design
Innovation and System DesignInnovation and System Design
Innovation and System Design
 
Hsc project management 2018pptx
Hsc project management 2018pptxHsc project management 2018pptx
Hsc project management 2018pptx
 
Assignment Of Property Asset Management.Pdf
Assignment Of Property Asset Management.PdfAssignment Of Property Asset Management.Pdf
Assignment Of Property Asset Management.Pdf
 
Atitude
AtitudeAtitude
Atitude
 
computer science.docx. Mohit Class 12 follow for more
computer science.docx. Mohit Class 12 follow for morecomputer science.docx. Mohit Class 12 follow for more
computer science.docx. Mohit Class 12 follow for more
 
Presentation by dakshinamoorthi g
Presentation by dakshinamoorthi  gPresentation by dakshinamoorthi  g
Presentation by dakshinamoorthi g
 
The Role Of Analytics in Healthcare.
The Role Of Analytics in Healthcare.The Role Of Analytics in Healthcare.
The Role Of Analytics in Healthcare.
 
Feasibility of a project
Feasibility of a projectFeasibility of a project
Feasibility of a project
 
Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises
 
Information resources, mis, csvtu
Information resources, mis, csvtuInformation resources, mis, csvtu
Information resources, mis, csvtu
 
Information systems strategy formulation
Information systems strategy formulationInformation systems strategy formulation
Information systems strategy formulation
 

Plus de Mr. Pramit Kumar Sah

Plus de Mr. Pramit Kumar Sah (7)

Managing IT Personnel and Projects
Managing IT Personnel and Projects Managing IT Personnel and Projects
Managing IT Personnel and Projects
 
Meningococal menengitis presentation
Meningococal menengitis presentationMeningococal menengitis presentation
Meningococal menengitis presentation
 
Pramit diptheria presentation
Pramit diptheria presentationPramit diptheria presentation
Pramit diptheria presentation
 
Stroke presentation
Stroke presentationStroke presentation
Stroke presentation
 
Pramit dengue presentation
Pramit dengue presentationPramit dengue presentation
Pramit dengue presentation
 
Core competencies for public health informatics
Core competencies for public health informaticsCore competencies for public health informatics
Core competencies for public health informatics
 
Leadership
LeadershipLeadership
Leadership
 

Dernier

Premium Call Girls Bangalore {9955608600} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {9955608600} ❤️VVIP POOJA Call Girls in Bangalor...Premium Call Girls Bangalore {9955608600} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {9955608600} ❤️VVIP POOJA Call Girls in Bangalor...Sheetaleventcompany
 
palanpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
palanpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetpalanpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
palanpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Service
 
Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.
Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.
Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.ktanvi103
 
Patna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Patna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetPatna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Patna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Service
 
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetHubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Service
 
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in Lahore
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in LahoreBest Lahore Escorts 😮‍💨03250114445 || VIP escorts in Lahore
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in LahoreDeny Daniel
 
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...mahaiklolahd
 
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapur
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in AnantapurCall Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapur
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapurgragmanisha42
 
Mathura Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mathura Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMathura Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mathura Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Service
 
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetNanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Service
 
Krishnagiri call girls Tamil aunty 7877702510
Krishnagiri call girls Tamil aunty 7877702510Krishnagiri call girls Tamil aunty 7877702510
Krishnagiri call girls Tamil aunty 7877702510Vipesco
 
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Service
 
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance Payments
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance PaymentsEscorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance Payments
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance PaymentsAhmedabad Call Girls
 
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real Meet
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real MeetVip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real Meet
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real MeetAhmedabad Call Girls
 
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetraisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Service
 
Thoothukudi Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Thoothukudi Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetThoothukudi Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Thoothukudi Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Service
 
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetbhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Service
 
neemuch Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
neemuch Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetneemuch Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
neemuch Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Service
 
Rajkot Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Rajkot Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetRajkot Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Rajkot Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Service
 

Dernier (20)

Premium Call Girls Bangalore {9955608600} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {9955608600} ❤️VVIP POOJA Call Girls in Bangalor...Premium Call Girls Bangalore {9955608600} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {9955608600} ❤️VVIP POOJA Call Girls in Bangalor...
 
9316020077📞Goa Call Girls Numbers, Call Girls Whatsapp Numbers Goa
9316020077📞Goa  Call Girls  Numbers, Call Girls  Whatsapp Numbers Goa9316020077📞Goa  Call Girls  Numbers, Call Girls  Whatsapp Numbers Goa
9316020077📞Goa Call Girls Numbers, Call Girls Whatsapp Numbers Goa
 
palanpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
palanpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetpalanpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
palanpur Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.
Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.
Call Now ☎ 9999965857 !! Call Girls in Hauz Khas Escort Service Delhi N.C.R.
 
Patna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Patna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetPatna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Patna Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetHubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Hubli Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in Lahore
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in LahoreBest Lahore Escorts 😮‍💨03250114445 || VIP escorts in Lahore
Best Lahore Escorts 😮‍💨03250114445 || VIP escorts in Lahore
 
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...
Call Girl in Bangalore 9632137771 {LowPrice} ❤️ (Navya) Bangalore Call Girls ...
 
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapur
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in AnantapurCall Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapur
Call Girls Service Anantapur 📲 6297143586 Book Now VIP Call Girls in Anantapur
 
Mathura Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mathura Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMathura Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mathura Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetNanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Nanded Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Krishnagiri call girls Tamil aunty 7877702510
Krishnagiri call girls Tamil aunty 7877702510Krishnagiri call girls Tamil aunty 7877702510
Krishnagiri call girls Tamil aunty 7877702510
 
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetMangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Mangalore Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance Payments
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance PaymentsEscorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance Payments
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance Payments
 
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real Meet
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real MeetVip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real Meet
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real Meet
 
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetraisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
raisen Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Thoothukudi Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Thoothukudi Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetThoothukudi Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Thoothukudi Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetbhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
bhubaneswar Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
neemuch Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
neemuch Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetneemuch Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
neemuch Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Rajkot Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Rajkot Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetRajkot Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
Rajkot Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 

Managing IT Personnel and projects

  • 1. Managing IT Personnel and Projects Pramit Kumar Sah BPH, MPH
  • 2. Overview  Managing information technology (IT) personnel and projects is a challenging undertaking.  A public health manager charged with developing and implementing a new information system must identify and recruit technical staff and consultants possessing the right kinds of educational qualifications and experience.  In addition, the project manager must organize the technical team and use effective strategies for communication with every stakeholder, including company management, users of the proposed new system, and IT personnel assigned to the project.  Along the way, the project manager must secure appropriate funding, analyze current processes, identify user needs, manage the expectations of every stakeholder, address the inevitable political opposition, analyze processes to be affected by the new system, determine the appropriate technology to be employed, and educate management about the costs of the proposed new system.
  • 3.  Although IT projects have a history of very high failure rates, there are strategies that a project manager can use to help insure project success.  Through use of such tools as rapid prototyping, a project manager can identify user needs and involve users from the beginning in the project.  Through a careful review of business processes, a project manager can define the appropriate technology to be applied.  Finally, through knowing and recognizing the characteristics of successful and unsuccessful IT projects, a project manager can minimize the probability that the IT project will fail.
  • 4. Introduction Managing IT personnel and projects is a challenging undertaking A public health manager charged with developing and implementing a new information system must:  identify and recruit technical staff and consultants with right kinds of qualification and experiences  organize the technical team and use effective strategies for communication with every stakeholder, including company management, users of the new system and IT personnel
  • 5. Contd…  Secure appropriate funding, analyze current processes and identify user needs  mange the expectation of every stakeholders and address the inevitable political opposition  analyze processes to be affected by the new system  determine the appropriate technology to be employed, and educate management about the costs of the proposed new system
  • 6. Managing IT Personnel Successful IT projects depend greatly on a project head’s ability to: 1. Identify computer expertise 2. Recruit right people 3. Communicate with technical personnel 4. Hire consultants appropriately 5. Organize technical team
  • 7. 1. Identifying computer expertise Requires the identification and selection of the right people to perform the work Requires a manager to determine whether candidates for project team position have the right computer expertise
  • 8. Key factors to look for identifying computer expertise Factor Relevant characteristics Education in computer sciences Bachelors level: possession of programming skills, knowledge of database design, experience with project tools Masters level: all skills of bachelors level plus completion of at least one major IT project Doctoral level: all skills of masters level plus development of a significant new approach to solving a computer science problem; primary emphasis is on research Certification: indicate possession of expertise with regard to specific products and systems Experience Should be related to current task Should be relevant to role the candidate will perform on the project team Should indicate cooperative service on a project team References Should be multiple Should include inquiry about the success of projects on which the candidate has worked
  • 9. 2.Recruiting • Offering competitive compensation levels is important in attracting high quality personnel, but it is not the only tool to attract them • Tools related to a candidate’s career development and lifestyle are also extremely important • Offering a candidate a desirable work environment such as nice office space, good equipment can attract good people
  • 10. 3. Communication with technical personnel Manager should communicate effectively with technical personnel Manager should be familiar with the basic terminology of information systems Manager must insist on clear explanations of technical terms from technical personnel Technical personnel should be able to explain what they are doing in plain English
  • 11. 4. Hiring consultants If a manager does not understand what he/she is being told and cannot get clear explanation, it is time to hire a consultant When there is a very specific issue or question that is beyond the expertise of an in-house staff, it is time to bring in a consultant. Important to interview potential consulting candidates same like as potential full- time staff hire. The references provided should be checked carefully Task to be performed must be well defined and clear to consultants
  • 12. 5.OrganizingTechnical Teams Small interdisciplinary teams are most effective for handling IT projects Technical team should include users, program staff, managers, and technical personnel A team manger should consider the input of all team members, and specially of potential users of the system to be developed Communication strategies such as holding regular meetings, making frequent e-mail contact, issuing progress reports regularly, and locating team members in close proximity to facilitate informal contact should be utilized
  • 13. Managing IT Projects A basic concept in IT projects is the “triangle” relationship of the three key elements of time, features, and budget. The relationship of time, features and budget is interdependent. Not one of the elements of time, features, and budget of IT projects can be changed without affecting another element.
  • 14. Interrelations of IT project time, features and budget Project component Impact of component increase or decrease time If increased, will increase budget and may allow increase in system features If decreased, will reduce budget but also reduce system features features If increased, will increase both project time and budget If decreased, will reduce both project time and budget budget If increased, may increase features and reduce project time if decreased, will increase project time and reduce system features
  • 15. Managing IT projects includes: 1. Managing expectation 2. Involving users 3. Communicating project benefits 4. Rapid prototyping 5. Managing political challenges 6. Securing funding for an IT project 7. Managing change created by a new system 8. Using technology appropriately
  • 16. 1. Managing Expectations IT project manager must: Promise only what can be delivered and deliver what is promised on time be very cautious about making commitments Educate higher management in the process of system development Estimate – time and budget Understand what can be done and how fast it can be accomplished Estimate better future progress and therefore do a better job of managing expectations
  • 17. 2. Involving users Give the users meaningful involvement from the inception of the project to its completion Involvement of users not only serves to solve real user problems, but also fosters a sense of ownership of the system Involve users rather than supervisors of the system Establish steering committee composed of users, managers and the system developers
  • 18. 3.Communicating project benefits Deliver real benefits to higher levels of management and the real users The benefits of new system should include improvement of the work flow of users Providing small benefits to the intended users early in the project development cycle is extremely helpful in securing user participation
  • 19. 4.Rapid prototyping Quick development of a nonfunctional test version of the ultimate system for discussion and review by users Aids in the requirements specification process by presenting users with a framework that captures the current level of understanding of their needs Minimizes risk by making very incremental investments in system developments to refine the requirements
  • 20. 5.Managing political challenges Overcome the inertia – the desire to maintain the status quo- that is inherent in organizations Understand who will benefit from the failure of a new system development and to work to minimize those benefits of failure To gain acceptance of a new system, ensure job placement for any person whose position will be adversely affected by the new system
  • 21. 6.Securring funding for an IT project Recognize inadequate funding usually is a manifestation of political opposition within the organization Project manager should understand if decision makers are not willing to pay for new system, they do not really want it It is also important for a manager to educate senior management about the true costs of information systems
  • 22. 7.Managing change created by a new system A key element is changing employee behavior The more rapid the change, the more the discomfort increases Behavior modification is a key part of system development Intermittent positive reinforcement is one of the most powerful tools for behavior modification Respect the affinity that users have with the old system
  • 23. 8.Using technology appropriately Recognize that technology does not solve all problems A careful review of business processes helps to define where technology can best be applied Merely automating inefficient process is not a good business strategy Simply reengineering processes may eliminate the need for automation and reveal new and different information system needs
  • 24. Reasons Projects Succeed User involvement Management support Skilled, experienced project managers Clear requirements statement Comprehensive work plan Sound development methodology Prototyping Extensive Testing
  • 25. Paradigm for Success Behavior Modification – management – users Minimize increments of change Use intermittent positive reinforcement – provide real benefits to users – what they want, NOT what you want
  • 26. Managing IT - Summary Know what you are doing Use competent personnel Use rapid prototyping to ensure user involvement Assess and respond to political challenges Know when to avoid technology