SlideShare une entreprise Scribd logo
1  sur  7
Télécharger pour lire hors ligne
CURRICULUM VITAE
MUDASSIR NAZAR AFTAB DABILKAR.
Bach. Engg. (MECHANICAL ENGINEERING)
MEP MECHANICAL ENGINEER/DESIGNER
(DESIGN / ESTIMATION / EXECUTION / CADD-REVIT)
(UAE, Saudi & Qatar Experience)
Qatar N.O.C Available.
Mobile # (Qatar) 00974-66873791
E-Mail:- mdabilkar@gmail.com
CAREER OBJECTIVES
To seek a long term placement as a MEP Mechanical Engineer preferably with consultancy or contracting firm in
order to utilize my skills, expertise to the optimum level to further develop my carrier.
PROFILE SUMMARY
 Dynamic professional with 13 years’ vast experience in HVAC & FIRE PROTECTION Design and Estimation
Activities
 Currently associated with BOJAMHOOR MEP CO. QATAR as HVAC, PLUMBING & FIRE PROTECTION
Mechanical Engineer/ Estimator
 HVAC design duty parameters & calculation of heat loads to determine required capacity & type of AC required.
 HVAC ducting, piping, system & Fire protection system designing as per ASHRAE, SMACNA & NFPA standard.
 Preparing DBR (Design basic report) for client.
 Tendering and Estimation of Mechanical Works & Review tender documents, scope of work & specification
 Preparation of material take off’s and equipment /material requisitions related to systems.
 Preparation of cost sheets and BOQ.
 Preparation of technical proposal for tender submission.
 Responsible for procurement of HVAC & FIRE PROTECTION project related items.
 To lead and manage a team of professional engineers/draftsmen.
SKILL & CORE COMPETENCIES
►HVAC Designing Operations ► Heat Load Calculation ►HAP Calculation
►Tendering & Estimation/QS ► Project Execution & Vendor Management
►Techno-Commercial Operation ►Auto cad designing ►MEP Revit designing.
EXPERIENCE & ACHIEVEMENT (PROJECTS)
► AL BIDDA UNDER GROUND CAR PARK 5 & 6, 7A & 7B DOHA QATAR.
► ROYAL COMMISSION JUBAIL INDUSTRIAL CITY, SAUDI ARABIA
►AMERICAN UNIVERSITY OF SHARJAH- CAMPUS DEVELOPMENT, UAE
►ICC (INTERNATIONAL CRICKET COUNCIL) HEAD QUARTERS- DUBAI SPORT CITY.
►DUBAI MALL-GOAL- DUBAI, UAE. & G+24+R UNITED ARAB BANK TOWER SHARJAH
►EXPO CENTRE SHARJAH- SHARJAH UAE.
►RAK BANK-KALBA BRANCH- RAK UAE.
►3 B+GR+POD+11+ROOF PTL HOTEL- ABU DHABI UAE.
WORKING ABILITY IN DESIGN / ESTIMATION QS:-
► HVAC design duty parameters & calculation of heat loads to determine required capacity & type of AC
Required.
►Prepare concept designs & design basis report with recommendation of suitable AC system with analysis
of options including cost benefit analysis.
►To develop designs from project specifications as per ASHRAE, SMACNA & NFPA standard.
►Prepare BOQ, cost benefit analysis, tech specs & tender documents
►To check and evaluate design and material specifications for tender
►Assist clients or consultant in tender evaluation & vendor selection.
►Guide draughtsman/designer for detailed design work including preparation of working drawings.
►To lead and manage a team of professional draftsmen
►To allocate, prioritize and check work of a team of draftsmen
►Co-ordinate with utility, electrical design groups, project managers & clients for completion of co-
Ordinate services drawings.
►Timely completion of projects including testing & handing over of HVAC systems & AS-Built drawings.
► Tendering and Estimation of Mechanical Works.
► Review tender documents, scope of work & specification
► Preparation of basic design for building services such as HVAC.
► Preparation of material take off’s and equipment /material requisitions related to above systems.
► Preparation of “requests for Quotations” for equipment and materials and sending to suppliers
► Evaluation of vendor’s technical & commercial proposals and providing recommendation.
► Preparation of cost sheets and BOQ
► Preparation of technical proposal for tender submission
► Responsible for procurement of HVAC project related items
► Study and thoroughly understand project specifications and drawings
► Send enquires and obtain quotations from the vendors
► Evaluate vendor quotes, shortlist and negotiate with the vendors
► Arrange timely submittals to the finalized vendors as per project plan and scrutinize the submittals
► Follow-up with Consultants for necessary approvals and authority
► Ensure timely placement of purchase order and delivery of materials
► Responsible for day to day management of the project.
► Participate in project progress meeting.
► Ensure timely progress and implementation of the project quality plan.
► Assist project manager in identifying the resources required for the project and monitoring the performance and
progress of the woks.
► Ensure that work is carried out in line with the approved budged.
► Follow with consultants for necessary approval and authority.
► Review HVAC engineering designs for projects produce by design team and build contractors to ensure all
mechanical engineering elements comply with relevant ASHRAE codes and standards.
► Review equipment selection in line with building cooling load requirement.
► Review duct design, pipe work, pumps, heat exchanger, pressurization unit, fans, AHU’s and terminal units.
► Review material submittal and construction schedules to ensure construction quality and sustainability.
► Overseeing quality control and health and safety matters on site.
► Lead the project through all element of the project proposal and design stage, through to construction
documentation.
► Attended meeting with client, architects, other consultants, project manager and contractors.
EXPERIENCE AS AN MEP (HVAC, PLUMBING & FIRE FIGHTING) DESIGN /
ESTIMATOR & PROJECT ENGINEER:-
1. Working with BOJAMHOOR MEP CO. QATAR Company as a Mechanical/Estimation Engineer from
October, 2015 till date
With the following responsibilities:-
 To develop designs from project specifications
 To develop designs, Heat load calculations from project specifications
 To lead and manage a team of professional draftsmen
 To allocate, prioritize and check work of a team of draftsmen
 Co-ordinate with utility, electrical design groups, project managers & clients for completion of co-ordinate
services drawings.
 Timely completion of projects including testing & handing over of HVAC systems & AS-Built drawings
 Guide HVAC draughtsman for detailed design work including preparation of working drawings
 Tendering and Estimation of Mechanical Works
 Review tender documents, scope of work & specification
 Preparation of basic design for building services such as HVAC.
 Preparation of material take off’s and equipment /material requisitions related to above systems.
 Preparation of “requests for Quotations” for equipment and materials and sending to suppliers
 Evaluation of vendor’s technical & commercial proposals and providing recommendation.
 Preparation of cost sheets and BOQ
 Designing HVAC & Piping (shop drawing) layout for Consultant /Client approval.
 Co-ordinate with utility, electrical design groups, project managers & clients for completion of co-ordinate
services.
2. Working with DAR AL RIYADH CONSULTANT, SAUDI, Architect, Engineer &planning
Company as a Mep Mechanical Engineer (from December, 2012 to October 2015)
With the following responsibilities:-
 To develop designs, Heat load calculations from project specifications & Preparing DBR (Design basic report) for
client.
 To develop designs from project specifications as per ASHRAE, SMACNA & NFPA standard.
 Ducting & chilled water piping designing as per ASHRAE standard.
 To lead and manage a team of professional draftsmen
 To allocate, prioritize and check work of a team of draftsmen
 Co-ordinate with utility, electrical design groups, project managers & clients for completion of co-ordinate
services drawings.
 Guide Mechanical draughtsman for detailed design work including preparation of working drawings
 Lead the project through all element of the project proposal and design stage, through to construction
documentation.
 Attended meeting with client, architects, other consultants, project manager and contractors.
3. Working with M/s. AMBB-Al Mazrouei Bowyer Building L.L.C, Dubai, UAE, A British Chartered
Building Construction Company as an Mechanical Design/Estimation Engineer (from December, 2010
to December 2012)
With the following responsibilities:-
 To develop designs from project specifications
 To develop designs, Heat load calculations from project specifications
 To lead and manage a team of professional draftsmen
 To allocate, prioritize and check work of a team of draftsmen
 Co-ordinate with utility, electrical design groups, project managers & clients for completion of co-ordinate
services drawings.
 Timely completion of projects including testing & handing over of HVAC systems & AS-Built drawings
 Guide HVAC draughtsman for detailed design work including preparation of working drawings
 Tendering and Estimation of Mechanical Works
 Review tender documents, scope of work & specification
 Preparation of basic design for building services such as HVAC.
 Preparation of material take off’s and equipment /material requisitions related to above systems.
 Preparation of “requests for Quotations” for equipment and materials and sending to suppliers
 Evaluation of vendor’s technical & commercial proposals and providing recommendation.
 Preparation of cost sheets and BOQ
 Designing HVAC & Piping (shop drawing) layout for Consultant /Client approval.
 Co-ordinate with utility, electrical design groups, project managers & clients for completion of co-ordinate
services.
4. Working with M/s. AMBB-Al Mazrouei Bowyer Building L.L.C, Dubai,UAE, A British Chartered
Building Construction Company as an Mechanical Project Engineer (from March, 2008 to December
2010)
With the following responsibilities:-
 Responsible for day to day management of the project.
 Participate in project progress meeting.
 Ensure timely progress and implementation of the project quality plan.
 Assist project manager in identifying the resources required for the project and monitoring the performance and
progress of the woks.
 Ensure that work is carried out in line with the approved budged.
 Follow with consultants for necessary approval and authority.
 Review hvac engineering designs for projects produce by design team and build contractors to ensure all
mechanical engineering elements comply with relevant ASHRAE codes and standards.
 Review equipment selection in line with building cooling load requirement.
 Review duct design, pipe work, pumps, heat exchanger, pressurization unit, fans, AHU’s and terminal units.
 Review material submittal and construction schedules to ensure construction quality and sustainability.
 Overseeing quality control and health and safety matters on site.
 Lead the project through all element of the project proposal and design stage, through to construction
documentation.
 Attended meeting with client, architects, other consultants, project manager and contractors.
5. DESARCH DESIGN ASSOCIATION, Mumbai, India, PMC (PROJECT MANAGEMENT
CONSULTANT) company as an Mechanical Design Engineer (from Oct.’2007 to Feb’2008) for the
responsibilities were as follows.
 Meetings with Architect/Client for design requirement data.
 Side-survey/visit for design requirement data.
 Heat load calculation.
 Equipment selection (Chillers, Condenser, AHU, FCU, Compressor, Primary & Secondary Pumps, Valves etc. as
per the load requirement.
 Designing HVAC & Piping (single line, double line) layout for contractor.
 Checking shop drawing.
 Preparing material quantity for BOQ.
 Preparing empty BOQ for contractor’s estimation.
 Negotiation with contractors & preparing a comparatively BOQ for projects
6. NIKHIL COMFORTS (CARRIER DEALER) HVAC Contracting Company, Mumbai, India,
Worked as an HVAC Engineer (from Oct. 2006 to Oct. 2007) for the responsibilities were as follows:-
 Side-survey/visit for design requirement data.
 Designing HVAC & Piping (shop drawing) layout for Consultant /Client approval.
 Preparing schedule of layouts.
 Equipment selection (Chillers, Condenser, AHU, FCU, Compressor, Primary & Secondary Pumps, Valves etc. as
per the load requirement.)
 Preparing Ducting & Piping quantity for estimation.
 Prepare as-built layouts.
 Coordinate HVAC, Electrical &Plumbing services and making coordinated layout.
 Responsible for day to day management of the project.
 Participate in project progress meeting.
 Ensure timely progress and implementation of the project quality plan.
 Assist project manager in identifying the resources required for the project and monitoring the performance and
progress of the woks & Follow with consultants for necessary approval and authority.
 Ensure that work is carried out in line with the approved budged.
7. Ks P-MANS ENGINEERING CONSULTANT, MEP Consultant Company Mumbai, India, worked
As a Mechanical site Engineer (from Dec. 2004 to 2006) for the responsibilities were as follows:-
 Responsible for day to day management of the project.
 Participate in project progress meeting.
 Ensure timely progress and implementation of the project quality plan.
 Assist project manager in identifying the resources required for the project and monitoring the performance and
progress of the woks & Ensure that work is carried out in line with the approved budged
 Follow with consultants for necessary approval and authority.
8. Ks P-MANS ENGINEERING CONSULTANT, MEP Consultant Company Mumbai, India, worked
As an Mep Mechanical Designer (from Dec. 2002 to 2004) for the responsibilities were as follows:-
 Side-survey/visit for design requirement data.
 Designing a HVAC & Piping (shop drawing) layout for Consultant /Client approval.
 Heat load calculation on excel software
 Equipment selection (Chillers, Condenser, AHU, FCU, Compressor, Primary & Secondary Pumps, Valves etc. as
per the load requirement.)
 Checking shop drawing.
 Preparing material quantity for BOQ.
 Preparing empty BOQ for contractor’s estimation.
 Negotiation with contractors & preparing a comparatively BOQ for projects
Education qualifications:-
Academic College/University Division
Bachelor of Engineering Degree (Mechanical
Engineering) HRD & MEA Attested, Qatar
embassy & Mofa attested.
Dr. B.R. Ambedkar state
university,Agra, India
First Division
Diploma of Hvac National council Vocational
training.
Fr. Agnel polytechnic / Mumbai
university, Indian
First Division
Mechanical designing and draftman.. Industrial engineering institute. First Division
Certificate trade course (HVAC). Saboo siddiq polytechnic First Division
Certificate of Indian society of heating
refrigeration and air-conditioning engineers.
ISHRAE. First Division
HSC. Mumbai University Second Division
SSC. Mumbai University First Division
Computer Qualification:-
Academic College/University Division
Auto cad Industrial computer institute. First Division
MSCIT MSBTE First Division
Personal details:-
 Name - Mudassir Nazar Aftab Dabilkar.
 Father name - Aftab Yunus Dabilkar.
 Date of birth - 18th august 1984.
 Marital status - Married.
 Religion - Islam (Muslim).
 E mail - mdabilkar@gmail.com
 Nationality - Indian
 Permanent add. - AN. Residency C/302 Sector 36 Seawood(w)
Nerul, navi Mumbai, india.
 Language known - English, Hindi, Marathi & urdu.
Passport details:-
 Name in passport - MUDASSIR NAZAR AFTAB DABILKAR.
 Passport number - N2787809.
 Place of issue - Doha.
 Date of issue - 04/02/2016.
 Date of expiry - 03/02/2026.
D e c l a r a t i o n
I do hereby declare that the facts stated above are true and correct to the best of my knowledge.
______________________________
Mudassir Nazar Aftab Dabilkar.
Doha Qatar
00974-66873791.

Contenu connexe

Tendances

Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineer
imran ahmed
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
Arun Arun
 
Sr. Mechanical hvac engineer cv
Sr. Mechanical hvac engineer cvSr. Mechanical hvac engineer cv
Sr. Mechanical hvac engineer cv
Farhan zafar
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
Habeeb Omer
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
Sandip Karmakar
 
New C_V (ARMAN)
New C_V (ARMAN)New C_V (ARMAN)
New C_V (ARMAN)
ARMAN ALAM
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad
 

Tendances (20)

HVAC Engineer resume
HVAC Engineer resumeHVAC Engineer resume
HVAC Engineer resume
 
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineer
 
Resume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year expResume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year exp
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEER
 
Sr. Mechanical hvac engineer cv
Sr. Mechanical hvac engineer cvSr. Mechanical hvac engineer cv
Sr. Mechanical hvac engineer cv
 
Simab CV sup.
Simab CV sup.Simab CV sup.
Simab CV sup.
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
HVAC Engineer
HVAC EngineerHVAC Engineer
HVAC Engineer
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
New C_V (ARMAN)
New C_V (ARMAN)New C_V (ARMAN)
New C_V (ARMAN)
 
Resume
ResumeResume
Resume
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
 
HVAC DRAFTSMAN CV
HVAC DRAFTSMAN CVHVAC DRAFTSMAN CV
HVAC DRAFTSMAN CV
 

En vedette

anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021
Anthony Martini
 
2015-16 MEP Annual Report (FINAL)
2015-16 MEP Annual Report (FINAL)2015-16 MEP Annual Report (FINAL)
2015-16 MEP Annual Report (FINAL)
Min Hwangbo
 
anil jha final resume
anil jha final resumeanil jha final resume
anil jha final resume
Anil jha
 
Curriculum Vitae Rifqi
Curriculum Vitae RifqiCurriculum Vitae Rifqi
Curriculum Vitae Rifqi
Ahmad Rifqie
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit Certification
Vishnuprasad P
 
SHINJU CV LATEST 01
SHINJU CV LATEST 01SHINJU CV LATEST 01
SHINJU CV LATEST 01
AT SHINJU
 
Site report
Site reportSite report
Site report
Yunshi94
 
Top 8 piping engineer resume samples
Top 8 piping engineer resume samplesTop 8 piping engineer resume samples
Top 8 piping engineer resume samples
gedihutes
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
Nazrul Mokhtar
 

En vedette (20)

Jessy Fuller Resume
Jessy Fuller ResumeJessy Fuller Resume
Jessy Fuller Resume
 
anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021
 
2015-16 MEP Annual Report (FINAL)
2015-16 MEP Annual Report (FINAL)2015-16 MEP Annual Report (FINAL)
2015-16 MEP Annual Report (FINAL)
 
DANISH CV
DANISH CVDANISH CV
DANISH CV
 
Individual site report brief
Individual site report briefIndividual site report brief
Individual site report brief
 
anil jha final resume
anil jha final resumeanil jha final resume
anil jha final resume
 
Curriculum Vitae Rifqi
Curriculum Vitae RifqiCurriculum Vitae Rifqi
Curriculum Vitae Rifqi
 
Construction site
Construction siteConstruction site
Construction site
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit Certification
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
Assignment 1 - Site Visit Report
Assignment 1 - Site Visit ReportAssignment 1 - Site Visit Report
Assignment 1 - Site Visit Report
 
SHINJU CV LATEST 01
SHINJU CV LATEST 01SHINJU CV LATEST 01
SHINJU CV LATEST 01
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
Load estimation in Air Conditioning
Load estimation in Air ConditioningLoad estimation in Air Conditioning
Load estimation in Air Conditioning
 
Site report
Site reportSite report
Site report
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Top 8 piping engineer resume samples
Top 8 piping engineer resume samplesTop 8 piping engineer resume samples
Top 8 piping engineer resume samples
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
Visiting report
Visiting reportVisiting report
Visiting report
 
Revit mep draftman resume 000
Revit mep draftman resume 000Revit mep draftman resume 000
Revit mep draftman resume 000
 

Similaire à MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)

jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed Omer
Omer Mohammed
 
CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)
Puneet Dogra
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
CHETAN SHARMA
 
MEP Design Draughtsman Ducoment
MEP Design Draughtsman DucomentMEP Design Draughtsman Ducoment
MEP Design Draughtsman Ducoment
Hussain Sajid
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
Sidharth Sunny
 
Rehan Ahmed - Mechanical (Nov-2016)
Rehan Ahmed  - Mechanical (Nov-2016)Rehan Ahmed  - Mechanical (Nov-2016)
Rehan Ahmed - Mechanical (Nov-2016)
Rehan Ahmed
 

Similaire à MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) (20)

Syed javed hazari resume
Syed javed hazari resumeSyed javed hazari resume
Syed javed hazari resume
 
Syed javed hazari resume
Syed javed hazari resumeSyed javed hazari resume
Syed javed hazari resume
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
sounder
soundersounder
sounder
 
Resume Acc
Resume AccResume Acc
Resume Acc
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed Omer
 
CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)
 
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Nithin-CV
Nithin-CVNithin-CV
Nithin-CV
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 
Sr. Estimation engineer
Sr. Estimation engineerSr. Estimation engineer
Sr. Estimation engineer
 
MEP Design Draughtsman Ducoment
MEP Design Draughtsman DucomentMEP Design Draughtsman Ducoment
MEP Design Draughtsman Ducoment
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 
updated cv 2015
updated cv 2015updated cv 2015
updated cv 2015
 
Rehan Ahmed - Mechanical (Nov-2016)
Rehan Ahmed  - Mechanical (Nov-2016)Rehan Ahmed  - Mechanical (Nov-2016)
Rehan Ahmed - Mechanical (Nov-2016)
 

MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)

  • 1. CURRICULUM VITAE MUDASSIR NAZAR AFTAB DABILKAR. Bach. Engg. (MECHANICAL ENGINEERING) MEP MECHANICAL ENGINEER/DESIGNER (DESIGN / ESTIMATION / EXECUTION / CADD-REVIT) (UAE, Saudi & Qatar Experience) Qatar N.O.C Available. Mobile # (Qatar) 00974-66873791 E-Mail:- mdabilkar@gmail.com CAREER OBJECTIVES To seek a long term placement as a MEP Mechanical Engineer preferably with consultancy or contracting firm in order to utilize my skills, expertise to the optimum level to further develop my carrier. PROFILE SUMMARY  Dynamic professional with 13 years’ vast experience in HVAC & FIRE PROTECTION Design and Estimation Activities  Currently associated with BOJAMHOOR MEP CO. QATAR as HVAC, PLUMBING & FIRE PROTECTION Mechanical Engineer/ Estimator  HVAC design duty parameters & calculation of heat loads to determine required capacity & type of AC required.  HVAC ducting, piping, system & Fire protection system designing as per ASHRAE, SMACNA & NFPA standard.  Preparing DBR (Design basic report) for client.  Tendering and Estimation of Mechanical Works & Review tender documents, scope of work & specification  Preparation of material take off’s and equipment /material requisitions related to systems.  Preparation of cost sheets and BOQ.  Preparation of technical proposal for tender submission.  Responsible for procurement of HVAC & FIRE PROTECTION project related items.  To lead and manage a team of professional engineers/draftsmen. SKILL & CORE COMPETENCIES ►HVAC Designing Operations ► Heat Load Calculation ►HAP Calculation ►Tendering & Estimation/QS ► Project Execution & Vendor Management ►Techno-Commercial Operation ►Auto cad designing ►MEP Revit designing. EXPERIENCE & ACHIEVEMENT (PROJECTS) ► AL BIDDA UNDER GROUND CAR PARK 5 & 6, 7A & 7B DOHA QATAR. ► ROYAL COMMISSION JUBAIL INDUSTRIAL CITY, SAUDI ARABIA ►AMERICAN UNIVERSITY OF SHARJAH- CAMPUS DEVELOPMENT, UAE ►ICC (INTERNATIONAL CRICKET COUNCIL) HEAD QUARTERS- DUBAI SPORT CITY. ►DUBAI MALL-GOAL- DUBAI, UAE. & G+24+R UNITED ARAB BANK TOWER SHARJAH ►EXPO CENTRE SHARJAH- SHARJAH UAE.
  • 2. ►RAK BANK-KALBA BRANCH- RAK UAE. ►3 B+GR+POD+11+ROOF PTL HOTEL- ABU DHABI UAE. WORKING ABILITY IN DESIGN / ESTIMATION QS:- ► HVAC design duty parameters & calculation of heat loads to determine required capacity & type of AC Required. ►Prepare concept designs & design basis report with recommendation of suitable AC system with analysis of options including cost benefit analysis. ►To develop designs from project specifications as per ASHRAE, SMACNA & NFPA standard. ►Prepare BOQ, cost benefit analysis, tech specs & tender documents ►To check and evaluate design and material specifications for tender ►Assist clients or consultant in tender evaluation & vendor selection. ►Guide draughtsman/designer for detailed design work including preparation of working drawings. ►To lead and manage a team of professional draftsmen ►To allocate, prioritize and check work of a team of draftsmen ►Co-ordinate with utility, electrical design groups, project managers & clients for completion of co- Ordinate services drawings. ►Timely completion of projects including testing & handing over of HVAC systems & AS-Built drawings. ► Tendering and Estimation of Mechanical Works. ► Review tender documents, scope of work & specification ► Preparation of basic design for building services such as HVAC. ► Preparation of material take off’s and equipment /material requisitions related to above systems. ► Preparation of “requests for Quotations” for equipment and materials and sending to suppliers ► Evaluation of vendor’s technical & commercial proposals and providing recommendation. ► Preparation of cost sheets and BOQ ► Preparation of technical proposal for tender submission ► Responsible for procurement of HVAC project related items ► Study and thoroughly understand project specifications and drawings ► Send enquires and obtain quotations from the vendors ► Evaluate vendor quotes, shortlist and negotiate with the vendors ► Arrange timely submittals to the finalized vendors as per project plan and scrutinize the submittals ► Follow-up with Consultants for necessary approvals and authority ► Ensure timely placement of purchase order and delivery of materials ► Responsible for day to day management of the project. ► Participate in project progress meeting. ► Ensure timely progress and implementation of the project quality plan. ► Assist project manager in identifying the resources required for the project and monitoring the performance and progress of the woks. ► Ensure that work is carried out in line with the approved budged. ► Follow with consultants for necessary approval and authority. ► Review HVAC engineering designs for projects produce by design team and build contractors to ensure all mechanical engineering elements comply with relevant ASHRAE codes and standards. ► Review equipment selection in line with building cooling load requirement. ► Review duct design, pipe work, pumps, heat exchanger, pressurization unit, fans, AHU’s and terminal units. ► Review material submittal and construction schedules to ensure construction quality and sustainability. ► Overseeing quality control and health and safety matters on site. ► Lead the project through all element of the project proposal and design stage, through to construction documentation. ► Attended meeting with client, architects, other consultants, project manager and contractors.
  • 3. EXPERIENCE AS AN MEP (HVAC, PLUMBING & FIRE FIGHTING) DESIGN / ESTIMATOR & PROJECT ENGINEER:- 1. Working with BOJAMHOOR MEP CO. QATAR Company as a Mechanical/Estimation Engineer from October, 2015 till date With the following responsibilities:-  To develop designs from project specifications  To develop designs, Heat load calculations from project specifications  To lead and manage a team of professional draftsmen  To allocate, prioritize and check work of a team of draftsmen  Co-ordinate with utility, electrical design groups, project managers & clients for completion of co-ordinate services drawings.  Timely completion of projects including testing & handing over of HVAC systems & AS-Built drawings  Guide HVAC draughtsman for detailed design work including preparation of working drawings  Tendering and Estimation of Mechanical Works  Review tender documents, scope of work & specification  Preparation of basic design for building services such as HVAC.  Preparation of material take off’s and equipment /material requisitions related to above systems.  Preparation of “requests for Quotations” for equipment and materials and sending to suppliers  Evaluation of vendor’s technical & commercial proposals and providing recommendation.  Preparation of cost sheets and BOQ  Designing HVAC & Piping (shop drawing) layout for Consultant /Client approval.  Co-ordinate with utility, electrical design groups, project managers & clients for completion of co-ordinate services. 2. Working with DAR AL RIYADH CONSULTANT, SAUDI, Architect, Engineer &planning Company as a Mep Mechanical Engineer (from December, 2012 to October 2015) With the following responsibilities:-  To develop designs, Heat load calculations from project specifications & Preparing DBR (Design basic report) for client.  To develop designs from project specifications as per ASHRAE, SMACNA & NFPA standard.  Ducting & chilled water piping designing as per ASHRAE standard.  To lead and manage a team of professional draftsmen  To allocate, prioritize and check work of a team of draftsmen  Co-ordinate with utility, electrical design groups, project managers & clients for completion of co-ordinate services drawings.  Guide Mechanical draughtsman for detailed design work including preparation of working drawings  Lead the project through all element of the project proposal and design stage, through to construction documentation.  Attended meeting with client, architects, other consultants, project manager and contractors.
  • 4. 3. Working with M/s. AMBB-Al Mazrouei Bowyer Building L.L.C, Dubai, UAE, A British Chartered Building Construction Company as an Mechanical Design/Estimation Engineer (from December, 2010 to December 2012) With the following responsibilities:-  To develop designs from project specifications  To develop designs, Heat load calculations from project specifications  To lead and manage a team of professional draftsmen  To allocate, prioritize and check work of a team of draftsmen  Co-ordinate with utility, electrical design groups, project managers & clients for completion of co-ordinate services drawings.  Timely completion of projects including testing & handing over of HVAC systems & AS-Built drawings  Guide HVAC draughtsman for detailed design work including preparation of working drawings  Tendering and Estimation of Mechanical Works  Review tender documents, scope of work & specification  Preparation of basic design for building services such as HVAC.  Preparation of material take off’s and equipment /material requisitions related to above systems.  Preparation of “requests for Quotations” for equipment and materials and sending to suppliers  Evaluation of vendor’s technical & commercial proposals and providing recommendation.  Preparation of cost sheets and BOQ  Designing HVAC & Piping (shop drawing) layout for Consultant /Client approval.  Co-ordinate with utility, electrical design groups, project managers & clients for completion of co-ordinate services. 4. Working with M/s. AMBB-Al Mazrouei Bowyer Building L.L.C, Dubai,UAE, A British Chartered Building Construction Company as an Mechanical Project Engineer (from March, 2008 to December 2010) With the following responsibilities:-  Responsible for day to day management of the project.  Participate in project progress meeting.  Ensure timely progress and implementation of the project quality plan.  Assist project manager in identifying the resources required for the project and monitoring the performance and progress of the woks.  Ensure that work is carried out in line with the approved budged.  Follow with consultants for necessary approval and authority.  Review hvac engineering designs for projects produce by design team and build contractors to ensure all mechanical engineering elements comply with relevant ASHRAE codes and standards.  Review equipment selection in line with building cooling load requirement.  Review duct design, pipe work, pumps, heat exchanger, pressurization unit, fans, AHU’s and terminal units.  Review material submittal and construction schedules to ensure construction quality and sustainability.  Overseeing quality control and health and safety matters on site.  Lead the project through all element of the project proposal and design stage, through to construction documentation.  Attended meeting with client, architects, other consultants, project manager and contractors.
  • 5. 5. DESARCH DESIGN ASSOCIATION, Mumbai, India, PMC (PROJECT MANAGEMENT CONSULTANT) company as an Mechanical Design Engineer (from Oct.’2007 to Feb’2008) for the responsibilities were as follows.  Meetings with Architect/Client for design requirement data.  Side-survey/visit for design requirement data.  Heat load calculation.  Equipment selection (Chillers, Condenser, AHU, FCU, Compressor, Primary & Secondary Pumps, Valves etc. as per the load requirement.  Designing HVAC & Piping (single line, double line) layout for contractor.  Checking shop drawing.  Preparing material quantity for BOQ.  Preparing empty BOQ for contractor’s estimation.  Negotiation with contractors & preparing a comparatively BOQ for projects 6. NIKHIL COMFORTS (CARRIER DEALER) HVAC Contracting Company, Mumbai, India, Worked as an HVAC Engineer (from Oct. 2006 to Oct. 2007) for the responsibilities were as follows:-  Side-survey/visit for design requirement data.  Designing HVAC & Piping (shop drawing) layout for Consultant /Client approval.  Preparing schedule of layouts.  Equipment selection (Chillers, Condenser, AHU, FCU, Compressor, Primary & Secondary Pumps, Valves etc. as per the load requirement.)  Preparing Ducting & Piping quantity for estimation.  Prepare as-built layouts.  Coordinate HVAC, Electrical &Plumbing services and making coordinated layout.  Responsible for day to day management of the project.  Participate in project progress meeting.  Ensure timely progress and implementation of the project quality plan.  Assist project manager in identifying the resources required for the project and monitoring the performance and progress of the woks & Follow with consultants for necessary approval and authority.  Ensure that work is carried out in line with the approved budged. 7. Ks P-MANS ENGINEERING CONSULTANT, MEP Consultant Company Mumbai, India, worked As a Mechanical site Engineer (from Dec. 2004 to 2006) for the responsibilities were as follows:-  Responsible for day to day management of the project.  Participate in project progress meeting.  Ensure timely progress and implementation of the project quality plan.  Assist project manager in identifying the resources required for the project and monitoring the performance and progress of the woks & Ensure that work is carried out in line with the approved budged  Follow with consultants for necessary approval and authority.
  • 6. 8. Ks P-MANS ENGINEERING CONSULTANT, MEP Consultant Company Mumbai, India, worked As an Mep Mechanical Designer (from Dec. 2002 to 2004) for the responsibilities were as follows:-  Side-survey/visit for design requirement data.  Designing a HVAC & Piping (shop drawing) layout for Consultant /Client approval.  Heat load calculation on excel software  Equipment selection (Chillers, Condenser, AHU, FCU, Compressor, Primary & Secondary Pumps, Valves etc. as per the load requirement.)  Checking shop drawing.  Preparing material quantity for BOQ.  Preparing empty BOQ for contractor’s estimation.  Negotiation with contractors & preparing a comparatively BOQ for projects Education qualifications:- Academic College/University Division Bachelor of Engineering Degree (Mechanical Engineering) HRD & MEA Attested, Qatar embassy & Mofa attested. Dr. B.R. Ambedkar state university,Agra, India First Division Diploma of Hvac National council Vocational training. Fr. Agnel polytechnic / Mumbai university, Indian First Division Mechanical designing and draftman.. Industrial engineering institute. First Division Certificate trade course (HVAC). Saboo siddiq polytechnic First Division Certificate of Indian society of heating refrigeration and air-conditioning engineers. ISHRAE. First Division HSC. Mumbai University Second Division SSC. Mumbai University First Division Computer Qualification:- Academic College/University Division Auto cad Industrial computer institute. First Division MSCIT MSBTE First Division Personal details:-  Name - Mudassir Nazar Aftab Dabilkar.  Father name - Aftab Yunus Dabilkar.  Date of birth - 18th august 1984.  Marital status - Married.  Religion - Islam (Muslim).  E mail - mdabilkar@gmail.com  Nationality - Indian  Permanent add. - AN. Residency C/302 Sector 36 Seawood(w) Nerul, navi Mumbai, india.  Language known - English, Hindi, Marathi & urdu.
  • 7. Passport details:-  Name in passport - MUDASSIR NAZAR AFTAB DABILKAR.  Passport number - N2787809.  Place of issue - Doha.  Date of issue - 04/02/2016.  Date of expiry - 03/02/2026. D e c l a r a t i o n I do hereby declare that the facts stated above are true and correct to the best of my knowledge. ______________________________ Mudassir Nazar Aftab Dabilkar. Doha Qatar 00974-66873791.