SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
1
2
3
3.1
3.1.1
3.1.2 6
3.2 4
3.2.1 44
3.2.2 350
3.3
3.3.1 34
3.3.2 6
3.4 4
4 44
4.1 350
4.2 NEAR MISS
5
1
AREA OF CONCERN
0
TIS- PLANT SERVICES - TURNAROUND PLANNING DEPARTMENT
0 0
LOST TIME INJURY
THIS WEEK
1584
0
TO DATE
3828
0
ENGINEERING:
1- APPROVED GA DWG SUBMITTED TO SEPCO-III, FOR IFC (ISSUED FOR CONSTRUCTION STAMP). SEPCO RESPONSE IS AWAITED.
2- FABRICATION DETAIL DRAWINGS WERE RE-SUBMITTED TO SEPCO-III ON DEC 22, 2021 POST DOCUMENT NUMBERING CORRECTION.SEPCO RESPONSE IS
AWAITED.
QA/QC:
1- ITP AND RELAETD WPS APPROVED HAVE BEEN APPROVED BY SEPCO.
2- PROCEDURE FOR VACCUM BOX TESTING AND PRCEDURE FOR SAND BLASTING / PAINTING SUBMITTED TO SEPCO-III FOR ARPPROVAL ON DEC 22, 2021.
RESPONSE IS AWAITED FROM SEPCO-III.
PROCUREMENT:
1- DIRECT MATERIAL PO HAS ALREADY BEEN ISSUED WHEREAS MATERIAL DELIVERY IS AWAITED TO START THE FABRICAITON ACTIVITY.
2- PAINTING AND NDT RENTAL SERVICES PO HAS BEEN ISSUED.
ENGNEERING:
1- GA DRAWING WITH IFC STAMP TO BE ISSUED BY SEPCO.
2- DETAIL ENGINEERING DRAWINGS TO BE ISSUED FOR CONSTRUCTION POST SEPCO APPROVAL.
QA/QC:
1- TIS QC TO RAISE THE FIRST (RFI) OF RECEVIED MATERIAL FOR SEPCO-III WITNESS AS PER ITP.
2- INSPECTION OF DELIVERED MATERIAL TO BE CARRIED OUT IN TAMIMI WORKSHOP/PAINTING YARD.
PROCUREMENT:
1- PLATE MATERIAL FOR TANK FABRICAITON IS EXPECTED TO BE DELIVERD IN WORKSHOP.
2- PIPING, FLNAGES AND PIPE FITTINGS MATERIAL IS EXPECTED TO BE DELIVRED IN WORKSHOP.
SHOP FABRICAITON OF TANKS:
1- POST QC APPROVAL, FABRICATION OF TANK BOTTOM PLATES TO BE STARTED IN PAINTYARD/DESIGNATED AREA IN TIS WORKSHOP.
1- TO DAT OVERALL PLAN PROGRESS REACHED (46.3%) WHEREAS ACHIEVED PROGRESS ONLY 17.0% AND TOTAL (- 29.3%) PROGRESS BEHIND THE SCHEDULE.
2- DELIVERY OF PLATE MATERIAL HAS BEEN BADLY DELAYED FOR OVER 30 DAYS AND ALL PROJECT FABRICATION ACTIVITIES ARE HALTED.
TOTAL PROJECT PROGRESS 100.00% 5.0% 1.2% 51.3% 18.3%
AGREEMENT/PO REF# : SA007-SS-058-01
6 ROLLER MACHINE 1
THIS WEEK
CUMM.
SITE INSTALLATION OF TANK NO. 2 9.00% 0.0% 0.0% 0.0% 0.0%
PROJECT HANDOVER 2.00% 0.00% 0.00% 0.00% 0.00%
SITE WORK
SITE WORK 18.00% 0.0% 0.0% 0.0% 0.0%
SITE INSTALLATION OF TANK NO. 1 9.00%
PLAN 24 - 24.00
4.99%
51.32%
1.22%
18.25%
-3.77%
-33.07% 0 - -
ACTUAL
12
DESCR. PLAN ACTUAL VARIANCE
WEEKLY WEATHER REPORT
BOOM TRUCK 1 8
5 DOUBLE CABIN 1 11
4 TRAILER 1 10
ACTIVITIES CARRIED OUT THIS WEEK ACTIVITIES PLANNED FOR NEXT WEEK MAJOR EQUIPMENT/VEHICLE STATUS
SR.# DESCRIPTION QTY SR.# DESCRIPTION QTY
1 DIESEL WELDING M/C 2 7 POWER GENERATOR (100 KVA) 1
3 DIESEL TANKER 1 9
2
0 0
DIRECT MANHRS
ACTUAL
INSTALLATION OF TANK NO.1
INSTALLATION OF TANK NO.2
EA
EA
1 - -
- -
0.0% 0.0% 0.0% 0.0%
0
OBSERVATION
0
0
TRANSPORTATION TO SITE 3.00% 0.0% 0.0% 0.0% 0.0%
PLAN
SAND BLASTING AND PAINTING SEQ.MTR 0 FIRST AID 0 0
THIS WEEK TILL DATE
TANK ASSEMBLY TON 0
SB. PAINTING OF TANK NO. 2 2.50% 0.0% 0.0% 0.0% 0.0%
WEEKLY DIRECT MANHOURS STATUS
HSE STATISTICS
SB. PAINTING OF TANK NO. 1 2.50% 0.0% 0.0% 0.0% 0.0%
DESCRIPTION
FABRICATION OF TANK STRUCTURE (STAIRCASE)
FABRICATION OF BOTTOM AND SHELL PLATES TON
FABRICATION OF TANK NOZZLES AND MANWAYS TON
0
0
TON 0
0.0% 0.0%
HYDROTESTING OF TANK NO.2 2.00% 0.0% 0.0% 0.0% 0.0%
SAND BLASTING AND PAINTING 5.00% 0.0% 0.0% TANK NO. 2
SAND BLASTING AND PAINTING
HYDROTESTING OF TANK NO.1 2.00% 0.0% 0.0% 0.0% 0.0% TANK ASSEMBLY
FABRICATION OF TANK STRUCTURE (STAIRCASE, HANDRAIL,
STIFFNER TINGS)
0.0%
HYDROTESTING 4.00% 0.0% 0.0% 0.0% 0.0%
FABRICATION OF TANK NO. 2 14.00% 19.4% 0.0% 40.7%
28.00% 17.9% 0.0% 40.5% 0.0%
SHOP EXECUTION 40.00% 12.5% 0.0% 28.3% 0.0%
FABRICATION OF TANK NO. 1 14.00% 16.3% 0.0% 40.2% 0.0%
FABRICATION OF TANK NOZZLES AND MANWAYS
PROCUREMENT 30.00% 0.0% 0.0% 100.0% 36.7%
SHOP PHASE
DOCUMENTS SUBMITTALS
FABRICATION
10.00% 0.0% 12.2% 100.0% 72.5%
THIS WEEK TO-DATE
DESCR. DAY SHIFT NIGHT SHIFT TOTAL
DESCRIPTION
PROJECT
WEIGHTAGE
WEEKLY-PLAN
WEEKLY-
ACTUAL
CUMM. PLAN CUMM. ACTUAL DESCRIPTION UOM
TOTAL
QUANTITY
WEEKLY STAGE WISE PROJECT PROGRESS STATUS QUANTITY WISE PROGRESS PERCENTAGE OVERALL PROGRESS PERCENTAGE OVERALL PROGRESS
DIRECT MANPOWER (LABOUR) STATUS
WEEKLY PROGRESS REPORT
578-29- SEPCO-III-EPC SULFURIC ACID STORAGE TANKS (02 NOS.) FOR SWRO-2, JUBAIL
TOOL BOX TALK TOPICS : WPR # 02 Date 1-Jan-22
TANK NO. 1
FABRICATION OF BOTTOM AND SHELL PLATES
S-CURVE OVERALL
34 0
TON
SEQ.MTR
TON 0
TON 0
0
0
TON
18.3%
81.7%
COMPLETED
BALANCE
23-Oct-21 30-Oct-21 6-Nov-21 13-Nov-21 20-Nov-21 27-Nov-21 4-Dec-21 11-Dec-21 18-Dec-21 25-Dec-21 1-Jan-22 8-Jan-22 15-Jan-22 22-Jan-22 29-Jan-22 5-Feb-22 12-Feb-22 19-Feb-22 26-Feb-22 5-Mar-22 12-Mar-22 19-Mar-22 26-Mar-22 2-Apr-22 9-Apr-22 16-Apr-22
Planned For The Week 0.0% 0.8% 1.3% 1.4% 1.4% 5.8% 6.1% 12.1% 12.8% 4.7% 5.0% 4.2% 3.1% 3.7% 1.9% 0.8% 1.7% 1.4% 7.0% 6.9% 13.7% 4.3%
Actual For the Week 0.0% 0.6% 1.3% 1.3% 1.3% 2.7% 2.0% 2.4% 2.9% 2.5%
Cummulative Planned 0.0% 0.77% 2.11% 3.49% 4.86% 10.64% 16.74% 28.80% 41.61% 46.33% 51.32% 55.48% 58.55% 62.29% 64.16% 65.01% 66.74% 68.10% 75.12% 81.99% 95.69% 100.00%
Cummulative Actual 0.0% 0.6% 1.9% 3.2% 4.5% 7.2% 9.2% 11.7% 14.5% 17.0%
Latest Forecast -LF 0.0% 0.0% 0.0% 0.0% 0.5% 1.7% 5.0% 9.1% 13.2% 17.7% 30.2% 37.9% 48.0% 54.5% 57.9% 62.6% 64.3% 65.0% 66.6% 67.9% 71.7% 77.0% 80.6% 88.2% 97.0% 100.0%
-10.0%
10.0%
30.0%
50.0%
70.0%
90.0%
110.0%
-1%
1%
3%
5%
7%
9%
11%
13%
15%
Weekly
%
PLAN
ACTUAL
LATEST FORECAST
# Sensitivity: Internal

Contenu connexe

Similaire à 578-29-SEPCO-III- WPR 1-1-2022.pdf

Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report마 이환
 
Weekly Progress.521-67
Weekly Progress.521-67Weekly Progress.521-67
Weekly Progress.521-67Usama Athar
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxnoelmanroe1
 
Checklist for Cost Control Dept in Contracting Company
Checklist for Cost Control Dept in Contracting CompanyChecklist for Cost Control Dept in Contracting Company
Checklist for Cost Control Dept in Contracting Companykashif khawja
 
Monthly report march, 2020(word)
Monthly report march, 2020(word)Monthly report march, 2020(word)
Monthly report march, 2020(word)thomas victor
 
Construction plan 29.08. 14
Construction plan 29.08. 14Construction plan 29.08. 14
Construction plan 29.08. 14Winter Sonata
 
2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docxMohammedSalah424258
 
C&I July-2022.pptx
C&I July-2022.pptxC&I July-2022.pptx
C&I July-2022.pptxPowerMurugan
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpmKinshook Chaturvedi
 
Documento base definitivo
Documento base definitivoDocumento base definitivo
Documento base definitivoFranciscoMeza55
 
Method statement of temporary office and fa
Method statement of temporary office and faMethod statement of temporary office and fa
Method statement of temporary office and faAl-Amin Ahmed Nabin
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportNatalie Reid
 

Similaire à 578-29-SEPCO-III- WPR 1-1-2022.pdf (20)

Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report
 
Procedures
ProceduresProcedures
Procedures
 
Weekly Progress.521-67
Weekly Progress.521-67Weekly Progress.521-67
Weekly Progress.521-67
 
Cash Flow Portfolio
Cash Flow PortfolioCash Flow Portfolio
Cash Flow Portfolio
 
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
 
Checklist for Cost Control Dept in Contracting Company
Checklist for Cost Control Dept in Contracting CompanyChecklist for Cost Control Dept in Contracting Company
Checklist for Cost Control Dept in Contracting Company
 
CV Piping Designer & Supervisor
CV Piping Designer & SupervisorCV Piping Designer & Supervisor
CV Piping Designer & Supervisor
 
Design notes5
Design notes5Design notes5
Design notes5
 
Design notes5
Design notes5Design notes5
Design notes5
 
Monthly report march, 2020(word)
Monthly report march, 2020(word)Monthly report march, 2020(word)
Monthly report march, 2020(word)
 
Construction plan 29.08. 14
Construction plan 29.08. 14Construction plan 29.08. 14
Construction plan 29.08. 14
 
Mikazuki Slide.pptx
Mikazuki Slide.pptxMikazuki Slide.pptx
Mikazuki Slide.pptx
 
2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx
 
EIA-Final-Report (1)
EIA-Final-Report (1)EIA-Final-Report (1)
EIA-Final-Report (1)
 
C&I July-2022.pptx
C&I July-2022.pptxC&I July-2022.pptx
C&I July-2022.pptx
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpm
 
Documento base definitivo
Documento base definitivoDocumento base definitivo
Documento base definitivo
 
Project assign 2
Project assign 2Project assign 2
Project assign 2
 
Method statement of temporary office and fa
Method statement of temporary office and faMethod statement of temporary office and fa
Method statement of temporary office and fa
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary Report
 

Dernier

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 

Dernier (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

578-29-SEPCO-III- WPR 1-1-2022.pdf

  • 1. 1 2 3 3.1 3.1.1 3.1.2 6 3.2 4 3.2.1 44 3.2.2 350 3.3 3.3.1 34 3.3.2 6 3.4 4 4 44 4.1 350 4.2 NEAR MISS 5 1 AREA OF CONCERN 0 TIS- PLANT SERVICES - TURNAROUND PLANNING DEPARTMENT 0 0 LOST TIME INJURY THIS WEEK 1584 0 TO DATE 3828 0 ENGINEERING: 1- APPROVED GA DWG SUBMITTED TO SEPCO-III, FOR IFC (ISSUED FOR CONSTRUCTION STAMP). SEPCO RESPONSE IS AWAITED. 2- FABRICATION DETAIL DRAWINGS WERE RE-SUBMITTED TO SEPCO-III ON DEC 22, 2021 POST DOCUMENT NUMBERING CORRECTION.SEPCO RESPONSE IS AWAITED. QA/QC: 1- ITP AND RELAETD WPS APPROVED HAVE BEEN APPROVED BY SEPCO. 2- PROCEDURE FOR VACCUM BOX TESTING AND PRCEDURE FOR SAND BLASTING / PAINTING SUBMITTED TO SEPCO-III FOR ARPPROVAL ON DEC 22, 2021. RESPONSE IS AWAITED FROM SEPCO-III. PROCUREMENT: 1- DIRECT MATERIAL PO HAS ALREADY BEEN ISSUED WHEREAS MATERIAL DELIVERY IS AWAITED TO START THE FABRICAITON ACTIVITY. 2- PAINTING AND NDT RENTAL SERVICES PO HAS BEEN ISSUED. ENGNEERING: 1- GA DRAWING WITH IFC STAMP TO BE ISSUED BY SEPCO. 2- DETAIL ENGINEERING DRAWINGS TO BE ISSUED FOR CONSTRUCTION POST SEPCO APPROVAL. QA/QC: 1- TIS QC TO RAISE THE FIRST (RFI) OF RECEVIED MATERIAL FOR SEPCO-III WITNESS AS PER ITP. 2- INSPECTION OF DELIVERED MATERIAL TO BE CARRIED OUT IN TAMIMI WORKSHOP/PAINTING YARD. PROCUREMENT: 1- PLATE MATERIAL FOR TANK FABRICAITON IS EXPECTED TO BE DELIVERD IN WORKSHOP. 2- PIPING, FLNAGES AND PIPE FITTINGS MATERIAL IS EXPECTED TO BE DELIVRED IN WORKSHOP. SHOP FABRICAITON OF TANKS: 1- POST QC APPROVAL, FABRICATION OF TANK BOTTOM PLATES TO BE STARTED IN PAINTYARD/DESIGNATED AREA IN TIS WORKSHOP. 1- TO DAT OVERALL PLAN PROGRESS REACHED (46.3%) WHEREAS ACHIEVED PROGRESS ONLY 17.0% AND TOTAL (- 29.3%) PROGRESS BEHIND THE SCHEDULE. 2- DELIVERY OF PLATE MATERIAL HAS BEEN BADLY DELAYED FOR OVER 30 DAYS AND ALL PROJECT FABRICATION ACTIVITIES ARE HALTED. TOTAL PROJECT PROGRESS 100.00% 5.0% 1.2% 51.3% 18.3% AGREEMENT/PO REF# : SA007-SS-058-01 6 ROLLER MACHINE 1 THIS WEEK CUMM. SITE INSTALLATION OF TANK NO. 2 9.00% 0.0% 0.0% 0.0% 0.0% PROJECT HANDOVER 2.00% 0.00% 0.00% 0.00% 0.00% SITE WORK SITE WORK 18.00% 0.0% 0.0% 0.0% 0.0% SITE INSTALLATION OF TANK NO. 1 9.00% PLAN 24 - 24.00 4.99% 51.32% 1.22% 18.25% -3.77% -33.07% 0 - - ACTUAL 12 DESCR. PLAN ACTUAL VARIANCE WEEKLY WEATHER REPORT BOOM TRUCK 1 8 5 DOUBLE CABIN 1 11 4 TRAILER 1 10 ACTIVITIES CARRIED OUT THIS WEEK ACTIVITIES PLANNED FOR NEXT WEEK MAJOR EQUIPMENT/VEHICLE STATUS SR.# DESCRIPTION QTY SR.# DESCRIPTION QTY 1 DIESEL WELDING M/C 2 7 POWER GENERATOR (100 KVA) 1 3 DIESEL TANKER 1 9 2 0 0 DIRECT MANHRS ACTUAL INSTALLATION OF TANK NO.1 INSTALLATION OF TANK NO.2 EA EA 1 - - - - 0.0% 0.0% 0.0% 0.0% 0 OBSERVATION 0 0 TRANSPORTATION TO SITE 3.00% 0.0% 0.0% 0.0% 0.0% PLAN SAND BLASTING AND PAINTING SEQ.MTR 0 FIRST AID 0 0 THIS WEEK TILL DATE TANK ASSEMBLY TON 0 SB. PAINTING OF TANK NO. 2 2.50% 0.0% 0.0% 0.0% 0.0% WEEKLY DIRECT MANHOURS STATUS HSE STATISTICS SB. PAINTING OF TANK NO. 1 2.50% 0.0% 0.0% 0.0% 0.0% DESCRIPTION FABRICATION OF TANK STRUCTURE (STAIRCASE) FABRICATION OF BOTTOM AND SHELL PLATES TON FABRICATION OF TANK NOZZLES AND MANWAYS TON 0 0 TON 0 0.0% 0.0% HYDROTESTING OF TANK NO.2 2.00% 0.0% 0.0% 0.0% 0.0% SAND BLASTING AND PAINTING 5.00% 0.0% 0.0% TANK NO. 2 SAND BLASTING AND PAINTING HYDROTESTING OF TANK NO.1 2.00% 0.0% 0.0% 0.0% 0.0% TANK ASSEMBLY FABRICATION OF TANK STRUCTURE (STAIRCASE, HANDRAIL, STIFFNER TINGS) 0.0% HYDROTESTING 4.00% 0.0% 0.0% 0.0% 0.0% FABRICATION OF TANK NO. 2 14.00% 19.4% 0.0% 40.7% 28.00% 17.9% 0.0% 40.5% 0.0% SHOP EXECUTION 40.00% 12.5% 0.0% 28.3% 0.0% FABRICATION OF TANK NO. 1 14.00% 16.3% 0.0% 40.2% 0.0% FABRICATION OF TANK NOZZLES AND MANWAYS PROCUREMENT 30.00% 0.0% 0.0% 100.0% 36.7% SHOP PHASE DOCUMENTS SUBMITTALS FABRICATION 10.00% 0.0% 12.2% 100.0% 72.5% THIS WEEK TO-DATE DESCR. DAY SHIFT NIGHT SHIFT TOTAL DESCRIPTION PROJECT WEIGHTAGE WEEKLY-PLAN WEEKLY- ACTUAL CUMM. PLAN CUMM. ACTUAL DESCRIPTION UOM TOTAL QUANTITY WEEKLY STAGE WISE PROJECT PROGRESS STATUS QUANTITY WISE PROGRESS PERCENTAGE OVERALL PROGRESS PERCENTAGE OVERALL PROGRESS DIRECT MANPOWER (LABOUR) STATUS WEEKLY PROGRESS REPORT 578-29- SEPCO-III-EPC SULFURIC ACID STORAGE TANKS (02 NOS.) FOR SWRO-2, JUBAIL TOOL BOX TALK TOPICS : WPR # 02 Date 1-Jan-22 TANK NO. 1 FABRICATION OF BOTTOM AND SHELL PLATES S-CURVE OVERALL 34 0 TON SEQ.MTR TON 0 TON 0 0 0 TON 18.3% 81.7% COMPLETED BALANCE 23-Oct-21 30-Oct-21 6-Nov-21 13-Nov-21 20-Nov-21 27-Nov-21 4-Dec-21 11-Dec-21 18-Dec-21 25-Dec-21 1-Jan-22 8-Jan-22 15-Jan-22 22-Jan-22 29-Jan-22 5-Feb-22 12-Feb-22 19-Feb-22 26-Feb-22 5-Mar-22 12-Mar-22 19-Mar-22 26-Mar-22 2-Apr-22 9-Apr-22 16-Apr-22 Planned For The Week 0.0% 0.8% 1.3% 1.4% 1.4% 5.8% 6.1% 12.1% 12.8% 4.7% 5.0% 4.2% 3.1% 3.7% 1.9% 0.8% 1.7% 1.4% 7.0% 6.9% 13.7% 4.3% Actual For the Week 0.0% 0.6% 1.3% 1.3% 1.3% 2.7% 2.0% 2.4% 2.9% 2.5% Cummulative Planned 0.0% 0.77% 2.11% 3.49% 4.86% 10.64% 16.74% 28.80% 41.61% 46.33% 51.32% 55.48% 58.55% 62.29% 64.16% 65.01% 66.74% 68.10% 75.12% 81.99% 95.69% 100.00% Cummulative Actual 0.0% 0.6% 1.9% 3.2% 4.5% 7.2% 9.2% 11.7% 14.5% 17.0% Latest Forecast -LF 0.0% 0.0% 0.0% 0.0% 0.5% 1.7% 5.0% 9.1% 13.2% 17.7% 30.2% 37.9% 48.0% 54.5% 57.9% 62.6% 64.3% 65.0% 66.6% 67.9% 71.7% 77.0% 80.6% 88.2% 97.0% 100.0% -10.0% 10.0% 30.0% 50.0% 70.0% 90.0% 110.0% -1% 1% 3% 5% 7% 9% 11% 13% 15% Weekly % PLAN ACTUAL LATEST FORECAST # Sensitivity: Internal