SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
Doc: TEC-PT-01 Issue #: 01/Rev #:04 Issue Date: 21.11.2022
Industrial Analytical Center-H.E.J. Research Institute of Chemistry Page 1 of 2
General Instructions
For
Laboratory Proficiency Testing Program
Receiving Samples
1. General Instructions, Letter of Code, Immediate Response Form and Proficiency Test Report
Card are enclosed along with the samples.
2. Review the sample description, quantity, storage condition and Laboratory Code from
enclosed letter (Letter of Code).
3. Send enclosed “Immediate Response Form” for sample receipt. Inform immediately, in case
of damage/broken or not in good condition.
Sample Analysis and Reporting
1. Recommended methods are defined in “Proficiency Test Report Card”. Laboratory can use
their routine methods for analysis.
2. Results can be reported through email or by courier. Round off the results as required on
reporting card.
3. Mention Laboratory code, method, technique/equipment, units as required in “Proficiency
Test Report Card”.
4. Correct results are essential. Results reported incorrectly will not be changed.
5. Do not use greater than (>) or less than (<) symbols when reporting data.
Returning Results
1. Sample results must be received at IAC by or before due dates.
2. Results received after the deadline will not be added to the database and will be treated as
missing data.
3. Delay results only accepted, if a written explanation and justification is submitted to the PT
Coordinator. These requests must be received within one week of due date of results.
Otherwise there will be no exceptions considered.
4. Any type of correction will not be accepted after the results have been posted. Also no
correction will be accepted for typographical errors.
Proficiency Test Report
1. Final Report to participants will be issue within four weeks of the result due date and send
through courier or email.
2. The Final report will identify the following:
Date of issue, Report Title, Introduction, Features of the Program, Preparation of Test
Materials, Analysis Requested, Confidentiality Statement, Statistical Evaluation, Results for
Proficiency Testing Program, Summary and any other details if required.
3. Statistical Method follows ISO 13528:2015.
Doc: TEC-PT-01 Issue #: 01/Rev #:04 Issue Date: 21.11.2022
Industrial Analytical Center-H.E.J. Research Institute of Chemistry Page 2 of 2
4. Assigned value for Quantitative Scheme: Derived from the mean or median of the results
reported by the participants after the elimination of extreme outliers. Incase mean or median
not possible to calculate, acceptance value or reference method specification will be consider
as Assigned value.
5. Assigned value for Qualitative Scheme: The assigned value for each analyte will be derived
from the Mode (the most common or repeated result) is used as the True Value (assigned
value) for results due to Categorical data i.e. Absence/Presence, Detected/Not Detected.
6. Standard Deviation: Deviation of data from the results reported by the participants after the
elimination of extreme outliers.
7. Z-scores are calculated to assess the testing performance of laboratories in a program by
dividing the difference between the assigned value and the reported value by the standard
deviation. Z-score plots are according to analyst number. (Note: Z-scores are not calculated
for less than 3 participants).
8. Assessment Criteria (Quantitative Scheme):
|Z| < 2.0 indicates a "Satisfactory" performance;
2.0 ≤ |Z| < 3.0 indicates a "Questionable" performance;
|Z| ≥ 3.0 indicates an "Unsatisfactory" performance
9. Assessment Criteria (Qualitative Scheme): Represented in tabulated form in the report and are
expressed as „Satisfactory‟ and „Unsatisfactory‟ after comparison of the result with the True
Value (assigned value).
 Unsatisfactory results are represented with Red color in Bar Chart (graphical representation)
 Satisfactory results are represented with Green color in Bar Chart (graphical representation)
10. Unsatisfactory results (Outlier) are noted on data entry reports with an asterisk (*). The
laboratories having Unsatisfactory results are encouraged to commence investigate/corrective
action for their results.
Report Appeal
1. Interim report will be issue before final reports through e-mail to participants.
2. Interim report contains date of issue, program details, results, evaluation and assessment.
3. Participants can appeal against any decision of PT provider and/or PT activities, within one
week (7 working days) after receiving the interim report of a PT scheme are taking in account
to investigate its problem and resolution if possible.
4. The appeal should be submitted to Director (PT Scheme Chairman) on ____________ (email)
through email/courier.
Contact Detail
_______________________ (Name)
PT Coordinator
Industrial Analytical Center-H.E.J. Research Institute of Chemistry,
ICCBS, University of Karachi, Karachi-75270
Ph: _______________________
Email: ____________________

Contenu connexe

Similaire à (TEC-PT-01) General Instructions Rev.04.pdf

Measurement system analysis
Measurement system analysisMeasurement system analysis
Measurement system analysisTina Arora
 
Btpsec Sample Penetration Test Report
Btpsec Sample Penetration Test ReportBtpsec Sample Penetration Test Report
Btpsec Sample Penetration Test Reportbtpsec
 
Understanding statistics in laboratory quality control
Understanding statistics in laboratory quality controlUnderstanding statistics in laboratory quality control
Understanding statistics in laboratory quality controlRandox
 
IRJET- Cost of Quality Analysis and its Calculation
IRJET- Cost of Quality Analysis and its CalculationIRJET- Cost of Quality Analysis and its Calculation
IRJET- Cost of Quality Analysis and its CalculationIRJET Journal
 
Validation of lab instruments and quantitative test methods
Validation of lab instruments and quantitative test methods Validation of lab instruments and quantitative test methods
Validation of lab instruments and quantitative test methods Mostafa Mahmoud
 
Post analytical variables in Laboratory
Post analytical variables in LaboratoryPost analytical variables in Laboratory
Post analytical variables in Laboratorywww.jaailab.com
 
Post analytical variables dr kamlesh patel
Post analytical variables dr kamlesh patelPost analytical variables dr kamlesh patel
Post analytical variables dr kamlesh patelwww.jaailab.com
 
Managing Quality
Managing QualityManaging Quality
Managing QualityAli BARAN
 
REDCap Guide for GlobalSurg 2 Validation Study
REDCap Guide for GlobalSurg 2 Validation StudyREDCap Guide for GlobalSurg 2 Validation Study
REDCap Guide for GlobalSurg 2 Validation StudyGlobal Surg
 
1 ACC 307 Final Project Part I Guidelines and Rubric
1 ACC 307 Final Project Part I Guidelines and Rubric  1 ACC 307 Final Project Part I Guidelines and Rubric
1 ACC 307 Final Project Part I Guidelines and Rubric AbbyWhyte974
 
1 ACC 307 Final Project Part I Guidelines and Rubric
1 ACC 307 Final Project Part I Guidelines and Rubric  1 ACC 307 Final Project Part I Guidelines and Rubric
1 ACC 307 Final Project Part I Guidelines and Rubric MartineMccracken314
 
Course Project Hospital Data Analysis and ReportingObjectiveThe
Course Project Hospital Data Analysis and ReportingObjectiveTheCourse Project Hospital Data Analysis and ReportingObjectiveThe
Course Project Hospital Data Analysis and ReportingObjectiveTheCruzIbarra161
 
Assessment 2 descriptor
Assessment 2  descriptorAssessment 2  descriptor
Assessment 2 descriptorPraneel Chand
 
eCTD in Australia and Experience in the Pilot Programme
eCTD in Australia and Experience in the Pilot ProgrammeeCTD in Australia and Experience in the Pilot Programme
eCTD in Australia and Experience in the Pilot ProgrammeTGA Australia
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505densongco
 
Quality assurance part_2
Quality assurance part_2Quality assurance part_2
Quality assurance part_2ThorikulHuda2
 
QCP user manual EN.pdf
QCP user manual EN.pdfQCP user manual EN.pdf
QCP user manual EN.pdfEmerson Ceras
 

Similaire à (TEC-PT-01) General Instructions Rev.04.pdf (20)

Measurement system analysis
Measurement system analysisMeasurement system analysis
Measurement system analysis
 
Btpsec Sample Penetration Test Report
Btpsec Sample Penetration Test ReportBtpsec Sample Penetration Test Report
Btpsec Sample Penetration Test Report
 
Understanding statistics in laboratory quality control
Understanding statistics in laboratory quality controlUnderstanding statistics in laboratory quality control
Understanding statistics in laboratory quality control
 
IRJET- Cost of Quality Analysis and its Calculation
IRJET- Cost of Quality Analysis and its CalculationIRJET- Cost of Quality Analysis and its Calculation
IRJET- Cost of Quality Analysis and its Calculation
 
Validation of lab instruments and quantitative test methods
Validation of lab instruments and quantitative test methods Validation of lab instruments and quantitative test methods
Validation of lab instruments and quantitative test methods
 
Post analytical variables in Laboratory
Post analytical variables in LaboratoryPost analytical variables in Laboratory
Post analytical variables in Laboratory
 
Testing Metrics
Testing MetricsTesting Metrics
Testing Metrics
 
Post analytical variables dr kamlesh patel
Post analytical variables dr kamlesh patelPost analytical variables dr kamlesh patel
Post analytical variables dr kamlesh patel
 
Managing Quality
Managing QualityManaging Quality
Managing Quality
 
REDCap Guide for GlobalSurg 2 Validation Study
REDCap Guide for GlobalSurg 2 Validation StudyREDCap Guide for GlobalSurg 2 Validation Study
REDCap Guide for GlobalSurg 2 Validation Study
 
1 ACC 307 Final Project Part I Guidelines and Rubric
1 ACC 307 Final Project Part I Guidelines and Rubric  1 ACC 307 Final Project Part I Guidelines and Rubric
1 ACC 307 Final Project Part I Guidelines and Rubric
 
1 ACC 307 Final Project Part I Guidelines and Rubric
1 ACC 307 Final Project Part I Guidelines and Rubric  1 ACC 307 Final Project Part I Guidelines and Rubric
1 ACC 307 Final Project Part I Guidelines and Rubric
 
Course Project Hospital Data Analysis and ReportingObjectiveThe
Course Project Hospital Data Analysis and ReportingObjectiveTheCourse Project Hospital Data Analysis and ReportingObjectiveThe
Course Project Hospital Data Analysis and ReportingObjectiveThe
 
Assessment 2 descriptor
Assessment 2  descriptorAssessment 2  descriptor
Assessment 2 descriptor
 
eCTD in Australia and Experience in the Pilot Programme
eCTD in Australia and Experience in the Pilot ProgrammeeCTD in Australia and Experience in the Pilot Programme
eCTD in Australia and Experience in the Pilot Programme
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505
 
Quality assurance part_2
Quality assurance part_2Quality assurance part_2
Quality assurance part_2
 
Six sigma
Six sigmaSix sigma
Six sigma
 
QCP user manual EN.pdf
QCP user manual EN.pdfQCP user manual EN.pdf
QCP user manual EN.pdf
 
Attribute measurement analysis
Attribute measurement analysis Attribute measurement analysis
Attribute measurement analysis
 

Dernier

Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfOverkill Security
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKJago de Vreede
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 

Dernier (20)

Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdf
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 

(TEC-PT-01) General Instructions Rev.04.pdf

  • 1. Doc: TEC-PT-01 Issue #: 01/Rev #:04 Issue Date: 21.11.2022 Industrial Analytical Center-H.E.J. Research Institute of Chemistry Page 1 of 2 General Instructions For Laboratory Proficiency Testing Program Receiving Samples 1. General Instructions, Letter of Code, Immediate Response Form and Proficiency Test Report Card are enclosed along with the samples. 2. Review the sample description, quantity, storage condition and Laboratory Code from enclosed letter (Letter of Code). 3. Send enclosed “Immediate Response Form” for sample receipt. Inform immediately, in case of damage/broken or not in good condition. Sample Analysis and Reporting 1. Recommended methods are defined in “Proficiency Test Report Card”. Laboratory can use their routine methods for analysis. 2. Results can be reported through email or by courier. Round off the results as required on reporting card. 3. Mention Laboratory code, method, technique/equipment, units as required in “Proficiency Test Report Card”. 4. Correct results are essential. Results reported incorrectly will not be changed. 5. Do not use greater than (>) or less than (<) symbols when reporting data. Returning Results 1. Sample results must be received at IAC by or before due dates. 2. Results received after the deadline will not be added to the database and will be treated as missing data. 3. Delay results only accepted, if a written explanation and justification is submitted to the PT Coordinator. These requests must be received within one week of due date of results. Otherwise there will be no exceptions considered. 4. Any type of correction will not be accepted after the results have been posted. Also no correction will be accepted for typographical errors. Proficiency Test Report 1. Final Report to participants will be issue within four weeks of the result due date and send through courier or email. 2. The Final report will identify the following: Date of issue, Report Title, Introduction, Features of the Program, Preparation of Test Materials, Analysis Requested, Confidentiality Statement, Statistical Evaluation, Results for Proficiency Testing Program, Summary and any other details if required. 3. Statistical Method follows ISO 13528:2015.
  • 2. Doc: TEC-PT-01 Issue #: 01/Rev #:04 Issue Date: 21.11.2022 Industrial Analytical Center-H.E.J. Research Institute of Chemistry Page 2 of 2 4. Assigned value for Quantitative Scheme: Derived from the mean or median of the results reported by the participants after the elimination of extreme outliers. Incase mean or median not possible to calculate, acceptance value or reference method specification will be consider as Assigned value. 5. Assigned value for Qualitative Scheme: The assigned value for each analyte will be derived from the Mode (the most common or repeated result) is used as the True Value (assigned value) for results due to Categorical data i.e. Absence/Presence, Detected/Not Detected. 6. Standard Deviation: Deviation of data from the results reported by the participants after the elimination of extreme outliers. 7. Z-scores are calculated to assess the testing performance of laboratories in a program by dividing the difference between the assigned value and the reported value by the standard deviation. Z-score plots are according to analyst number. (Note: Z-scores are not calculated for less than 3 participants). 8. Assessment Criteria (Quantitative Scheme): |Z| < 2.0 indicates a "Satisfactory" performance; 2.0 ≤ |Z| < 3.0 indicates a "Questionable" performance; |Z| ≥ 3.0 indicates an "Unsatisfactory" performance 9. Assessment Criteria (Qualitative Scheme): Represented in tabulated form in the report and are expressed as „Satisfactory‟ and „Unsatisfactory‟ after comparison of the result with the True Value (assigned value).  Unsatisfactory results are represented with Red color in Bar Chart (graphical representation)  Satisfactory results are represented with Green color in Bar Chart (graphical representation) 10. Unsatisfactory results (Outlier) are noted on data entry reports with an asterisk (*). The laboratories having Unsatisfactory results are encouraged to commence investigate/corrective action for their results. Report Appeal 1. Interim report will be issue before final reports through e-mail to participants. 2. Interim report contains date of issue, program details, results, evaluation and assessment. 3. Participants can appeal against any decision of PT provider and/or PT activities, within one week (7 working days) after receiving the interim report of a PT scheme are taking in account to investigate its problem and resolution if possible. 4. The appeal should be submitted to Director (PT Scheme Chairman) on ____________ (email) through email/courier. Contact Detail _______________________ (Name) PT Coordinator Industrial Analytical Center-H.E.J. Research Institute of Chemistry, ICCBS, University of Karachi, Karachi-75270 Ph: _______________________ Email: ____________________