SlideShare une entreprise Scribd logo
1  sur  13
Télécharger pour lire hors ligne
International Forum
     Industry Perspectives on Commercial International
               Program/Project Collaboration




                                                     Gene Bounds
NASA PM Challenge                    Chairman, PMI Board of Directors
10 Feb. 2010               Senior Vice President, Booz Allen Hamilton
Space Industry ?


                                                       Satellite
          Monetized                                    Services



   $145 billion worldwide in 2008
   14.2% annual growth 2003-2008
                                                               Ground
   Mostly communications                                     Equipment
   Relatively mature (for current
    technology)
                                     Launch
                                     Services
                                                  Satellite
                                                    Mfg.



                                                                          2
Russian RD-180 Rocket Engine
                                                 for Atlas V Launch Vehicle




 NASA 2010 Program Managers Challenge
             Galveston, TX

   “Industry Perspectives on Commercial
International Program/Project Collaboration”

                                                                 Gregory J. Pech
              10 Feb 2010                          Director, Engines & Motors Product Delivery Team
                                                              United Launch Alliance (ULA)
   Copyright © United Launch Alliance, LLC

    NASA.PMC.2010                                                                                     1
RD-180 Background
• Russian Designed/Produced Engine
     – Liquid Oxygen-Kerosene Booster Engine
     – Derived from RD-170 ( Energya “Buran” Space Shuttle)
     – Fully Throttleable up to 860,000 Lbs of S.L. Thrust
     – Produced by NPO Energomash, Khimky Russia
• First Stage Engine for Atlas III and Atlas V
     – Commercial and Government satellite launches
     – 100% Mission Success: 25 Flights to Date
             • 13 Commercial + 12 US Government
             • NASA Launches:
                                                                 AC-201/Eutelsat W4
                    – Mars Reconnaissance Orbiter   Aug 2005          May 24, 2000
                                                                 1 st RD-180 Launch
                    – Pluto New Horizons            Jan 2006
                    – LRO/LCROSS                    Jun 2009


                 RD-180 is a Core Element of the Atlas V Launch Vehicle
                       for the USG’s Assured Access to Space
 NASA.PMC.2010                                                                        2
Contracting Relationships
                                                                                            Customer




• U.S. company est. 1997
• Contracting for production,
  sale, shipment and support
  services for RD-180 and
  derivative engines.              American/Russian Rocket Engine
                                            Joint Venture


                     50% Owner                                                  50% Owner

                 Pratt & Whitney                                                NPO
                   Rocketdyne                                                 Energomash

     •Premier U.S. liquid rocket engine developer/producer   •Premier Russian liquid rocket engine developer/producer
     •Premier turbopump developer/producer for SSME          •Developer/designer of RD-180 using RD-170 heritage
     •Funding source for RD-180 development                  •Produces RD-180 engines for Atlas launch vehicles
     •Provides RD-180 engine integration and launch          •Provides engine integration and launch support services
      support services                                       •Provides technology transfer for U.S. Co-production
     •Demonstrated U.S. Co-Production capability
Motivation for Cooperation
  • Technologies and Performance Capabilities
         – Currently not available in U.S.
  • US/Russia cooperative relations
  • Dramatic capability improvements:

                                Atlas IIAS   Atlas V
                 Reliability:     0.9876     0.9955


                 Payload:        8200 lb.    10900 lb.
                 (GTO)

  Atlas IIAS
                 Cost:           8 engines   2 engines    Atlas V
(US engines)                                             (RD-180)




 NASA.PMC.2010                                                      4
Integration
• Development (1996 - 1999)
      – Designed and developed by NPO Energomash under joint
        program with P&WR
      – System integration by Lockheed Martin
      – Tested in both U.S. and Russia
• Operations (1998 - Present)
      –    Manufacture & test by NPO Energomash in Khimky, Russia
      –    Reviews by P&WR and Lockheed Martin in Khimky & Denver    System testing at NASA’s
                                                                    Marshall Space Flight Center
      –    Air shipment by RD AMROSS to Denver, CO
      –    Integration into Atlas launch vehicle in Denver, CO
      –    Air shipment of Atlas V to U.S. launch sites
      –    Integration & Launch support from RD AMROSS using
           P&WR and NPO Energomash team in U.S.



                    RD-180 Engine Successfully Integrated
            into ULA’s Atlas V Launch Vehicles and Fully Operational

NASA.PMC.2010                                                                                      5
Interdependencies
                Stakeholders                             Interests
                                       BALANCE
                                       BALANCE
   – Governments                                 – Multinational Agreement
                                                     •   MTCR
           •    DoS              MOFA
                                                 – Policy
           •    DoD              MOD                 •   FSU Propulsion Systems
                                                     •   Nuclear Non-Proliferation
           •    DoC              MEDT                •   US Space Transportation
           •    USAF, Navy       FSA             – Fair International Trade
           •    NASA                             – Assured Access to Space
                                                 – Mission Success
                                                     •   Technical Integration
   – Industry                                        •   Data Access
                                                     •   IV&V
           •    United Launch Alliance
                                                 – Export Control
           •    RD AMROSS                            •   ITAR
           •    NPO Energomash                   – Intellectual Property
                                                     •   Protection / Patents
           •    Pratt & Whitney Rocketdyne
                                                 – Profitability
           •    Subcontractors


NASA.PMC.2010                                                                        6
Government Involvement
• Cooperation required by both Governments
     –    Participation at high levels at program startup (1994-1995)
     –    DoD FSU Policy extension granted in Oct 2002 by Under Secretary of Defense
     –    Licensing granted by both governments to allow technical integration
     –    Steady improvements in RD180 data access granted by GOR Export Control
• Active USG “One Team”
     –    Engine acceptance reviews
     –    Anomaly investigations
     –    Launch operations
     –    Risk reduction initiatives
     –    U.S. Co-Production monitoring
     –    Mission Assurance Team (MAT)
     –    Independent Readiness Reviews



                                           Boris Yeltsin and Norm Augustine discussing RD180 matters.




NASA.PMC.2010                                                                                           7
Government Participation
                                     RD-180 “One Team”
                               Integrated Team Management
                               (USAF, NASA, Aerospace, SCITOR)
                                                                                Program Management
                                                                                   & Engineering


  Independent             Systems                Hardware              Denver                 Launch
     Review               Analysis              Acceptance           Coordination            Operations

 •     “One Team” Charter
        – Provide objective, independent RD-180 launch verification
        – Monitor RD-180 production engine Program
 •     “One Team” Benefits
        – Consolidate USG technical talent
                • Maximize technical insight and information sharing while protecting data
                • Minimize organizational duplication and overlap of efforts
        – Minimize impact of existing barriers
                • Multiple contracts, contracting strategies



                  Process in Place for USG Participation
NASA.PMC.2010                                                                                             8
Challenges
 • Profitability in an export-controlled environment
        – TAA and MLA approval process can take up to 1 year from time of application
        – License restrictions make technical Integration more difficult
        – Anomaly resolutions and optimization take longer
 • Access to technical information
        – Protection of competition-sensitive or strategic data vs. over-protection
        – Must comply with both US and Russian export laws
 • Cultural differences
        –       Language / communications
        –       Contracting and business practices
        –       Trusting relationships
        –       Ethics




                      Challenging Business Environment


NASA.PMC.2010                                                                           9
Program Management
                  Recommendations
• Know and comply with Export Laws
     – Plan for a longer and more complex process of doing business
• Develop business relationships with mutual benefits
     – Understand and respect foreign supplier’s constraints
     – Recognize obligations to protect intellectual property
     – Fair economic exchange for products and technologies
     – Understand and recognize cultural differences
     – Employ facilitators who understand language and business practices
     – Communicate and adhere to our Ethics
     – Seek long-term opportunities for cooperative space exploration


      Great Potential for Mutual Benefits with International Partners



NASA.PMC.2010                                                               10
Summary
• RD-180 fully operational in the Atlas V launch vehicle
     – Atlas cost and launch capabilities greatly improved
     – 100% Mission Success

• Strong relationships established with Russian partners
     – Industry and Government

• Government support & participation critical to success



        International Cooperation Successfully Demonstrated
    by RD-180 Program: Foundation for Future Space Exploration



NASA.PMC.2010                                                    11

Contenu connexe

En vedette

Dillon.r.tinsley.c.rogers.e
Dillon.r.tinsley.c.rogers.eDillon.r.tinsley.c.rogers.e
Dillon.r.tinsley.c.rogers.e
NASAPMC
 
B ackroyd
B ackroydB ackroyd
B ackroyd
NASAPMC
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beene
NASAPMC
 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.k
NASAPMC
 
Neiberding
NeiberdingNeiberding
Neiberding
NASAPMC
 
Debbie.dusterwald
Debbie.dusterwaldDebbie.dusterwald
Debbie.dusterwald
NASAPMC
 
Brockhurst.lane
Brockhurst.laneBrockhurst.lane
Brockhurst.lane
NASAPMC
 
Kirsch.mike
Kirsch.mikeKirsch.mike
Kirsch.mike
NASAPMC
 
Mc nally
Mc nallyMc nally
Mc nally
NASAPMC
 
Barth simpkins
Barth simpkinsBarth simpkins
Barth simpkins
NASAPMC
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.update
NASAPMC
 
Backup norm.smith
Backup norm.smithBackup norm.smith
Backup norm.smith
NASAPMC
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
NASAPMC
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.update
NASAPMC
 
Grubbs teams and digital collaboration pmc2012
Grubbs teams and digital collaboration pmc2012Grubbs teams and digital collaboration pmc2012
Grubbs teams and digital collaboration pmc2012
NASAPMC
 
Battista barlowpmc conference 2012 rev. 2
Battista barlowpmc conference 2012 rev. 2Battista barlowpmc conference 2012 rev. 2
Battista barlowpmc conference 2012 rev. 2
NASAPMC
 
Coonce.tom
Coonce.tomCoonce.tom
Coonce.tom
NASAPMC
 
Stacy.cusack
Stacy.cusackStacy.cusack
Stacy.cusack
NASAPMC
 
Inter pech bounds
Inter pech boundsInter pech bounds
Inter pech bounds
NASAPMC
 

En vedette (20)

Dillon.r.tinsley.c.rogers.e
Dillon.r.tinsley.c.rogers.eDillon.r.tinsley.c.rogers.e
Dillon.r.tinsley.c.rogers.e
 
B ackroyd
B ackroydB ackroyd
B ackroyd
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beene
 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.k
 
Neiberding
NeiberdingNeiberding
Neiberding
 
Debbie.dusterwald
Debbie.dusterwaldDebbie.dusterwald
Debbie.dusterwald
 
Brockhurst.lane
Brockhurst.laneBrockhurst.lane
Brockhurst.lane
 
Kirsch.mike
Kirsch.mikeKirsch.mike
Kirsch.mike
 
Mc nally
Mc nallyMc nally
Mc nally
 
Barth simpkins
Barth simpkinsBarth simpkins
Barth simpkins
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.update
 
Backup norm.smith
Backup norm.smithBackup norm.smith
Backup norm.smith
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.update
 
Grubbs teams and digital collaboration pmc2012
Grubbs teams and digital collaboration pmc2012Grubbs teams and digital collaboration pmc2012
Grubbs teams and digital collaboration pmc2012
 
Hulett
HulettHulett
Hulett
 
Battista barlowpmc conference 2012 rev. 2
Battista barlowpmc conference 2012 rev. 2Battista barlowpmc conference 2012 rev. 2
Battista barlowpmc conference 2012 rev. 2
 
Coonce.tom
Coonce.tomCoonce.tom
Coonce.tom
 
Stacy.cusack
Stacy.cusackStacy.cusack
Stacy.cusack
 
Inter pech bounds
Inter pech boundsInter pech bounds
Inter pech bounds
 

Similaire à Inter pech bounds

Cooperation RD-180 _ 2001
Cooperation RD-180 _ 2001Cooperation RD-180 _ 2001
Cooperation RD-180 _ 2001
Dmitry Tseitlin
 
PacWest Upstream Oil/Gas Supply Chain Update - Eagle Ford
PacWest Upstream Oil/Gas Supply Chain Update - Eagle FordPacWest Upstream Oil/Gas Supply Chain Update - Eagle Ford
PacWest Upstream Oil/Gas Supply Chain Update - Eagle Ford
PacWest Consulting Partners
 
Fred.ouellette
Fred.ouelletteFred.ouellette
Fred.ouellette
NASAPMC
 
Fred.ouellette
Fred.ouelletteFred.ouellette
Fred.ouellette
NASAPMC
 

Similaire à Inter pech bounds (12)

Goddard 2015: Peter Marquez, Planetary Resources
Goddard 2015: Peter Marquez, Planetary ResourcesGoddard 2015: Peter Marquez, Planetary Resources
Goddard 2015: Peter Marquez, Planetary Resources
 
Westport 2012 AGM Presentation
Westport 2012 AGM PresentationWestport 2012 AGM Presentation
Westport 2012 AGM Presentation
 
Cooperation RD-180 _ 2001
Cooperation RD-180 _ 2001Cooperation RD-180 _ 2001
Cooperation RD-180 _ 2001
 
PacWest Upstream Oil/Gas Supply Chain Update - Eagle Ford
PacWest Upstream Oil/Gas Supply Chain Update - Eagle FordPacWest Upstream Oil/Gas Supply Chain Update - Eagle Ford
PacWest Upstream Oil/Gas Supply Chain Update - Eagle Ford
 
Accelerating Safety and Security Certification with FACE™ COTS Solutions
Accelerating Safety and Security Certification with FACE™ COTS SolutionsAccelerating Safety and Security Certification with FACE™ COTS Solutions
Accelerating Safety and Security Certification with FACE™ COTS Solutions
 
Fred.ouellette
Fred.ouelletteFred.ouellette
Fred.ouellette
 
Fred.ouellette
Fred.ouelletteFred.ouellette
Fred.ouellette
 
Ground Processing Affordability for Space Vehicles
Ground Processing Affordability for Space VehiclesGround Processing Affordability for Space Vehicles
Ground Processing Affordability for Space Vehicles
 
Rob Hoffman\'s Wind River Slides
Rob Hoffman\'s Wind River SlidesRob Hoffman\'s Wind River Slides
Rob Hoffman\'s Wind River Slides
 
Aerospace Professional
Aerospace ProfessionalAerospace Professional
Aerospace Professional
 
The ATAV Overview
The ATAV OverviewThe ATAV Overview
The ATAV Overview
 
2011 apr saewc_pres
2011 apr saewc_pres2011 apr saewc_pres
2011 apr saewc_pres
 

Plus de NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
NASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
NASAPMC
 
Yew manson
Yew mansonYew manson
Yew manson
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
NASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
NASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahm
NASAPMC
 
Snow lee
Snow leeSnow lee
Snow lee
NASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
NASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
NASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
NASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
NASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
NASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
NASAPMC
 
Paradis william
Paradis williamParadis william
Paradis william
NASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
NASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
NASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
NASAPMC
 

Plus de NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Dernier

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Dernier (20)

Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

Inter pech bounds

  • 1. International Forum Industry Perspectives on Commercial International Program/Project Collaboration Gene Bounds NASA PM Challenge Chairman, PMI Board of Directors 10 Feb. 2010 Senior Vice President, Booz Allen Hamilton
  • 2. Space Industry ? Satellite Monetized Services  $145 billion worldwide in 2008  14.2% annual growth 2003-2008 Ground  Mostly communications Equipment  Relatively mature (for current technology) Launch Services Satellite Mfg. 2
  • 3. Russian RD-180 Rocket Engine for Atlas V Launch Vehicle NASA 2010 Program Managers Challenge Galveston, TX “Industry Perspectives on Commercial International Program/Project Collaboration” Gregory J. Pech 10 Feb 2010 Director, Engines & Motors Product Delivery Team United Launch Alliance (ULA) Copyright © United Launch Alliance, LLC NASA.PMC.2010 1
  • 4. RD-180 Background • Russian Designed/Produced Engine – Liquid Oxygen-Kerosene Booster Engine – Derived from RD-170 ( Energya “Buran” Space Shuttle) – Fully Throttleable up to 860,000 Lbs of S.L. Thrust – Produced by NPO Energomash, Khimky Russia • First Stage Engine for Atlas III and Atlas V – Commercial and Government satellite launches – 100% Mission Success: 25 Flights to Date • 13 Commercial + 12 US Government • NASA Launches: AC-201/Eutelsat W4 – Mars Reconnaissance Orbiter Aug 2005 May 24, 2000 1 st RD-180 Launch – Pluto New Horizons Jan 2006 – LRO/LCROSS Jun 2009 RD-180 is a Core Element of the Atlas V Launch Vehicle for the USG’s Assured Access to Space NASA.PMC.2010 2
  • 5. Contracting Relationships Customer • U.S. company est. 1997 • Contracting for production, sale, shipment and support services for RD-180 and derivative engines. American/Russian Rocket Engine Joint Venture 50% Owner 50% Owner Pratt & Whitney NPO Rocketdyne Energomash •Premier U.S. liquid rocket engine developer/producer •Premier Russian liquid rocket engine developer/producer •Premier turbopump developer/producer for SSME •Developer/designer of RD-180 using RD-170 heritage •Funding source for RD-180 development •Produces RD-180 engines for Atlas launch vehicles •Provides RD-180 engine integration and launch •Provides engine integration and launch support services support services •Provides technology transfer for U.S. Co-production •Demonstrated U.S. Co-Production capability
  • 6. Motivation for Cooperation • Technologies and Performance Capabilities – Currently not available in U.S. • US/Russia cooperative relations • Dramatic capability improvements: Atlas IIAS Atlas V Reliability: 0.9876 0.9955 Payload: 8200 lb. 10900 lb. (GTO) Atlas IIAS Cost: 8 engines 2 engines Atlas V (US engines) (RD-180) NASA.PMC.2010 4
  • 7. Integration • Development (1996 - 1999) – Designed and developed by NPO Energomash under joint program with P&WR – System integration by Lockheed Martin – Tested in both U.S. and Russia • Operations (1998 - Present) – Manufacture & test by NPO Energomash in Khimky, Russia – Reviews by P&WR and Lockheed Martin in Khimky & Denver System testing at NASA’s Marshall Space Flight Center – Air shipment by RD AMROSS to Denver, CO – Integration into Atlas launch vehicle in Denver, CO – Air shipment of Atlas V to U.S. launch sites – Integration & Launch support from RD AMROSS using P&WR and NPO Energomash team in U.S. RD-180 Engine Successfully Integrated into ULA’s Atlas V Launch Vehicles and Fully Operational NASA.PMC.2010 5
  • 8. Interdependencies Stakeholders Interests BALANCE BALANCE – Governments – Multinational Agreement • MTCR • DoS MOFA – Policy • DoD MOD • FSU Propulsion Systems • Nuclear Non-Proliferation • DoC MEDT • US Space Transportation • USAF, Navy FSA – Fair International Trade • NASA – Assured Access to Space – Mission Success • Technical Integration – Industry • Data Access • IV&V • United Launch Alliance – Export Control • RD AMROSS • ITAR • NPO Energomash – Intellectual Property • Protection / Patents • Pratt & Whitney Rocketdyne – Profitability • Subcontractors NASA.PMC.2010 6
  • 9. Government Involvement • Cooperation required by both Governments – Participation at high levels at program startup (1994-1995) – DoD FSU Policy extension granted in Oct 2002 by Under Secretary of Defense – Licensing granted by both governments to allow technical integration – Steady improvements in RD180 data access granted by GOR Export Control • Active USG “One Team” – Engine acceptance reviews – Anomaly investigations – Launch operations – Risk reduction initiatives – U.S. Co-Production monitoring – Mission Assurance Team (MAT) – Independent Readiness Reviews Boris Yeltsin and Norm Augustine discussing RD180 matters. NASA.PMC.2010 7
  • 10. Government Participation RD-180 “One Team” Integrated Team Management (USAF, NASA, Aerospace, SCITOR) Program Management & Engineering Independent Systems Hardware Denver Launch Review Analysis Acceptance Coordination Operations • “One Team” Charter – Provide objective, independent RD-180 launch verification – Monitor RD-180 production engine Program • “One Team” Benefits – Consolidate USG technical talent • Maximize technical insight and information sharing while protecting data • Minimize organizational duplication and overlap of efforts – Minimize impact of existing barriers • Multiple contracts, contracting strategies Process in Place for USG Participation NASA.PMC.2010 8
  • 11. Challenges • Profitability in an export-controlled environment – TAA and MLA approval process can take up to 1 year from time of application – License restrictions make technical Integration more difficult – Anomaly resolutions and optimization take longer • Access to technical information – Protection of competition-sensitive or strategic data vs. over-protection – Must comply with both US and Russian export laws • Cultural differences – Language / communications – Contracting and business practices – Trusting relationships – Ethics Challenging Business Environment NASA.PMC.2010 9
  • 12. Program Management Recommendations • Know and comply with Export Laws – Plan for a longer and more complex process of doing business • Develop business relationships with mutual benefits – Understand and respect foreign supplier’s constraints – Recognize obligations to protect intellectual property – Fair economic exchange for products and technologies – Understand and recognize cultural differences – Employ facilitators who understand language and business practices – Communicate and adhere to our Ethics – Seek long-term opportunities for cooperative space exploration Great Potential for Mutual Benefits with International Partners NASA.PMC.2010 10
  • 13. Summary • RD-180 fully operational in the Atlas V launch vehicle – Atlas cost and launch capabilities greatly improved – 100% Mission Success • Strong relationships established with Russian partners – Industry and Government • Government support & participation critical to success International Cooperation Successfully Demonstrated by RD-180 Program: Foundation for Future Space Exploration NASA.PMC.2010 11