Soumettre la recherche
Mettre en ligne
Majerowicz
•
Télécharger en tant que PPTX, PDF
•
1 j'aime
•
18,552 vues
N
NASAPMC
Suivre
Technologie
Formation
Signaler
Partager
Signaler
Partager
1 sur 29
Télécharger maintenant
Recommandé
Brantley.wayne
Brantley.wayne
NASAPMC
Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1
NASAPMC
Lau.cheevon
Lau.cheevon
NASAPMC
Daisy.mueller
Daisy.mueller
NASAPMC
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinal
NASAPMC
Ortiz
Ortiz
NASAPMC
Thomas.a.greathouse.r
Thomas.a.greathouse.r
NASAPMC
Louis.cioletti
Louis.cioletti
NASAPMC
Recommandé
Brantley.wayne
Brantley.wayne
NASAPMC
Woods.edwards.pm challenge bpr presentation 2012 v1
Woods.edwards.pm challenge bpr presentation 2012 v1
NASAPMC
Lau.cheevon
Lau.cheevon
NASAPMC
Daisy.mueller
Daisy.mueller
NASAPMC
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinal
NASAPMC
Ortiz
Ortiz
NASAPMC
Thomas.a.greathouse.r
Thomas.a.greathouse.r
NASAPMC
Louis.cioletti
Louis.cioletti
NASAPMC
Bauer.frank
Bauer.frank
NASAPMC
Gary.humphreys
Gary.humphreys
NASAPMC
Healy edward
Healy edward
NASAPMC
Vonnie simonsen
Vonnie simonsen
NASAPMC
Borchardt.poole.majerowicz
Borchardt.poole.majerowicz
NASAPMC
Thomas.coonce
Thomas.coonce
NASAPMC
Ortiz.james
Ortiz.james
NASAPMC
Phillip.hall
Phillip.hall
NASAPMC
Eggert.joe
Eggert.joe
NASAPMC
Solomon.paul
Solomon.paul
NASAPMC
Backup darren elliott
Backup darren elliott
NASAPMC
Humphreys.gary
Humphreys.gary
NASAPMC
Bilardo.vince
Bilardo.vince
NASAPMC
Dickerson mark
Dickerson mark
NASAPMC
Smalley stigberg petze
Smalley stigberg petze
NASAPMC
R simpson elee
R simpson elee
NASAPMC
Ingoldsby.k.lee.y
Ingoldsby.k.lee.y
NASAPMC
Murphy.dar jean.jean
Murphy.dar jean.jean
NASAPMC
Charles.leising
Charles.leising
NASAPMC
Symons
Symons
NASAPMC
Kelly.elliott
Kelly.elliott
NASAPMC
Fuller.david
Fuller.david
NASAPMC
Contenu connexe
Tendances
Bauer.frank
Bauer.frank
NASAPMC
Gary.humphreys
Gary.humphreys
NASAPMC
Healy edward
Healy edward
NASAPMC
Vonnie simonsen
Vonnie simonsen
NASAPMC
Borchardt.poole.majerowicz
Borchardt.poole.majerowicz
NASAPMC
Thomas.coonce
Thomas.coonce
NASAPMC
Ortiz.james
Ortiz.james
NASAPMC
Phillip.hall
Phillip.hall
NASAPMC
Eggert.joe
Eggert.joe
NASAPMC
Solomon.paul
Solomon.paul
NASAPMC
Backup darren elliott
Backup darren elliott
NASAPMC
Humphreys.gary
Humphreys.gary
NASAPMC
Bilardo.vince
Bilardo.vince
NASAPMC
Dickerson mark
Dickerson mark
NASAPMC
Smalley stigberg petze
Smalley stigberg petze
NASAPMC
R simpson elee
R simpson elee
NASAPMC
Ingoldsby.k.lee.y
Ingoldsby.k.lee.y
NASAPMC
Murphy.dar jean.jean
Murphy.dar jean.jean
NASAPMC
Charles.leising
Charles.leising
NASAPMC
Symons
Symons
NASAPMC
Tendances
(20)
Bauer.frank
Bauer.frank
Gary.humphreys
Gary.humphreys
Healy edward
Healy edward
Vonnie simonsen
Vonnie simonsen
Borchardt.poole.majerowicz
Borchardt.poole.majerowicz
Thomas.coonce
Thomas.coonce
Ortiz.james
Ortiz.james
Phillip.hall
Phillip.hall
Eggert.joe
Eggert.joe
Solomon.paul
Solomon.paul
Backup darren elliott
Backup darren elliott
Humphreys.gary
Humphreys.gary
Bilardo.vince
Bilardo.vince
Dickerson mark
Dickerson mark
Smalley stigberg petze
Smalley stigberg petze
R simpson elee
R simpson elee
Ingoldsby.k.lee.y
Ingoldsby.k.lee.y
Murphy.dar jean.jean
Murphy.dar jean.jean
Charles.leising
Charles.leising
Symons
Symons
En vedette
Kelly.elliott
Kelly.elliott
NASAPMC
Fuller.david
Fuller.david
NASAPMC
Glavich
Glavich
NASAPMC
Garg.sanjay
Garg.sanjay
NASAPMC
Zimmerman
Zimmerman
NASAPMC
White.charles
White.charles
NASAPMC
Tim.honeycutt
Tim.honeycutt
NASAPMC
Claunch.cathy
Claunch.cathy
NASAPMC
Vince.bilardo
Vince.bilardo
NASAPMC
Inter mitchell
Inter mitchell
NASAPMC
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_case
NASAPMC
Newman.steve
Newman.steve
NASAPMC
Miller.charles
Miller.charles
NASAPMC
Paradis william
Paradis william
NASAPMC
Black.j.smith.g
Black.j.smith.g
NASAPMC
Sharyl butler
Sharyl butler
NASAPMC
Dean.david
Dean.david
NASAPMC
Inter fellous freilich
Inter fellous freilich
NASAPMC
K ingoldsby
K ingoldsby
NASAPMC
Cook.richard
Cook.richard
NASAPMC
En vedette
(20)
Kelly.elliott
Kelly.elliott
Fuller.david
Fuller.david
Glavich
Glavich
Garg.sanjay
Garg.sanjay
Zimmerman
Zimmerman
White.charles
White.charles
Tim.honeycutt
Tim.honeycutt
Claunch.cathy
Claunch.cathy
Vince.bilardo
Vince.bilardo
Inter mitchell
Inter mitchell
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_case
Newman.steve
Newman.steve
Miller.charles
Miller.charles
Paradis william
Paradis william
Black.j.smith.g
Black.j.smith.g
Sharyl butler
Sharyl butler
Dean.david
Dean.david
Inter fellous freilich
Inter fellous freilich
K ingoldsby
K ingoldsby
Cook.richard
Cook.richard
Similaire à Majerowicz
Vonnie simonsen
Vonnie simonsen
NASAPMC
Charles.leising
Charles.leising
NASAPMC
Ortiz.james
Ortiz.james
NASAPMC
Walley.tina
Walley.tina
NASAPMC
Skibsmotorer reducerer brændselsforbruget (IBM Rational)
Skibsmotorer reducerer brændselsforbruget (IBM Rational)
IBM Danmark
Humphreys.gary
Humphreys.gary
NASAPMC
Keer.beth
Keer.beth
NASAPMC
Keer.beth
Keer.beth
NASAPMC
Geyer.m.sasaki.c
Geyer.m.sasaki.c
NASAPMC
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
Alithya
Risk Management
Risk Management
Paco Ibáñez
C armstrong tbyers
C armstrong tbyers
NASAPMC
D.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrum
Ramkumar Sundarakalatharan
Primavera _ Jawad Shakeel _ Portfolio Comparison ad resource analysis using P...
Primavera _ Jawad Shakeel _ Portfolio Comparison ad resource analysis using P...
InSync2011
Togaf9 Refcard2
Togaf9 Refcard2
jucaab
57086 02 starting_upa_project
57086 02 starting_upa_project
Engineering Department
12 19-12 ggu-year_review
12 19-12 ggu-year_review
MKThink Strategy
Achieving Successful Alliances With Effective Project Management Office (PMO)...
Achieving Successful Alliances With Effective Project Management Office (PMO)...
jshakeel
James.ortiz
James.ortiz
NASAPMC
Project management fundamentals
Project management fundamentals
Rajasekar M
Similaire à Majerowicz
(20)
Vonnie simonsen
Vonnie simonsen
Charles.leising
Charles.leising
Ortiz.james
Ortiz.james
Walley.tina
Walley.tina
Skibsmotorer reducerer brændselsforbruget (IBM Rational)
Skibsmotorer reducerer brændselsforbruget (IBM Rational)
Humphreys.gary
Humphreys.gary
Keer.beth
Keer.beth
Keer.beth
Keer.beth
Geyer.m.sasaki.c
Geyer.m.sasaki.c
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
Risk Management
Risk Management
C armstrong tbyers
C armstrong tbyers
D.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrum
Primavera _ Jawad Shakeel _ Portfolio Comparison ad resource analysis using P...
Primavera _ Jawad Shakeel _ Portfolio Comparison ad resource analysis using P...
Togaf9 Refcard2
Togaf9 Refcard2
57086 02 starting_upa_project
57086 02 starting_upa_project
12 19-12 ggu-year_review
12 19-12 ggu-year_review
Achieving Successful Alliances With Effective Project Management Office (PMO)...
Achieving Successful Alliances With Effective Project Management Office (PMO)...
James.ortiz
James.ortiz
Project management fundamentals
Project management fundamentals
Plus de NASAPMC
Bejmuk bo
Bejmuk bo
NASAPMC
Baniszewski john
Baniszewski john
NASAPMC
Yew manson
Yew manson
NASAPMC
Wood frank
Wood frank
NASAPMC
Wood frank
Wood frank
NASAPMC
Wessen randi (cd)
Wessen randi (cd)
NASAPMC
Vellinga joe
Vellinga joe
NASAPMC
Trahan stuart
Trahan stuart
NASAPMC
Stock gahm
Stock gahm
NASAPMC
Snow lee
Snow lee
NASAPMC
Smalley sandra
Smalley sandra
NASAPMC
Seftas krage
Seftas krage
NASAPMC
Sampietro marco
Sampietro marco
NASAPMC
Rudolphi mike
Rudolphi mike
NASAPMC
Roberts karlene
Roberts karlene
NASAPMC
Rackley mike
Rackley mike
NASAPMC
Osterkamp jeff
Osterkamp jeff
NASAPMC
O'keefe william
O'keefe william
NASAPMC
Muller ralf
Muller ralf
NASAPMC
Mulenburg jerry
Mulenburg jerry
NASAPMC
Plus de NASAPMC
(20)
Bejmuk bo
Bejmuk bo
Baniszewski john
Baniszewski john
Yew manson
Yew manson
Wood frank
Wood frank
Wood frank
Wood frank
Wessen randi (cd)
Wessen randi (cd)
Vellinga joe
Vellinga joe
Trahan stuart
Trahan stuart
Stock gahm
Stock gahm
Snow lee
Snow lee
Smalley sandra
Smalley sandra
Seftas krage
Seftas krage
Sampietro marco
Sampietro marco
Rudolphi mike
Rudolphi mike
Roberts karlene
Roberts karlene
Rackley mike
Rackley mike
Osterkamp jeff
Osterkamp jeff
O'keefe william
O'keefe william
Muller ralf
Muller ralf
Mulenburg jerry
Mulenburg jerry
Dernier
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
charlottematthew16
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
Fwdays
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
Enterprise Knowledge
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
RankYa
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
Rizwan Syed
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Zilliz
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
BookNet Canada
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
Memoori
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
Stephanie Beckett
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
Ridwan Fadjar
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
Manik S Magar
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
Commit University
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Safe Software
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
carlostorres15106
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
Alex Barbosa Coqueiro
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
charlottematthew16
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
2toLead Limited
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
Fwdays
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
NavinnSomaal
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
Mattias Andersson
Dernier
(20)
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
Majerowicz
1.
National Aeronautics and
Space Administration Introduction to Project Scheduling NASA PM Challenge 2011 Long Beach California February 9-10, 2011 Walt Majerowicz, MBA, PMP ASRC Aerospace Corporation Used with permission
2.
Purpose of Today’s
Presentation The purpose to today’s session is to provide a basic overview of project scheduling. © Copyright by Walter Majerowicz 2010 2
3.
Agenda
• NASA Project Scheduling Perspectives • Project Scheduling Processes • Additional Project Scheduling Resources © Copyright by Walter Majerowicz 2010 3
4.
NASA Project Scheduling
Perspectives © Copyright by Walter Majerowicz 2010 4
5.
NASA Projects Are
Large, Expensive and Complex NASA spends approximately 85 percent of its budget on procurements, while other project work is performed “in-house” at NASA facilities © Copyright by Walter Majerowicz 2010 5
6.
NASA Project Life
Cycle Simplified FORMULATION IMPLEMENTATION Project Pre-A A B C D E F Concept Concept & Preliminary Final Sys. Ops. & Closeout Technology Phases Studies Development Design & Design & Assembly, Sustainment Tech. Comp. Fabrication Test, & Launch A B C D E F Key Decision Points Mission Concept Review Systems Requirements Review Major Mission Definition Review (or System Definition Review) Reviews Preliminary Design Review Critical Design Review Systems Integration Review Operational Readiness Review Flight Readiness Review Post Launch Assessment Review Decommissioning © Copyright by Walter Majerowicz 2010 Review 6
7.
NPR 7120.5 Project
Schedule Requirements Project Phase Schedule Requirement Pre-Phase A Draft Management Baseline that includes “a schedule” Phase A Preliminary Project Plan that includes the “schedule baseline” / Integrated Master Schedule Phase B Approved Project Plan that includes schedule baseline / Integrated Master Schedule Phase C/D - Maintain a schedule baseline based on an approved joint cost and schedule confidence level - Notice and recovery plan if C/D phase life cycle milestone is estimated to be delayed 6 months or more Formulation / Implementation Schedule margin . . . based on assessments of risks SOURCE: NM 7120-81: NID for 7120.5D © Copyright by Walter Majerowicz 2010 7
8.
Integrated Master Schedule
Integrated Master Schedule “An integrated set of schedule data that reflects the total project scope of work as discrete and measurable tasks/milestones that are time-phased through the use of task durations, interdependencies, and date constraints and is traceable to the WBS.” SOURCE: NM 7120-81: NID for 7120.5D © Copyright by Walter Majerowicz 2010 8
9.
Project Scheduling Processes ©
Copyright by Walter Majerowicz 2010 9
10.
Project Scheduling Processes
Process Primary Output Activity Definition Task listing of project work scope Activity Sequencing Project logic / activity dependencies Activity Duration Estimating Approximation of working time (e.g. days) to accomplish each activity Schedule Margin Planning Funded schedule allowance to account for risk and uncertainty Schedule Development Schedule baseline / Integrated Master Schedule Schedule Status Accounting, Data Current schedule (actual progress + Maintenance & Updating forecast to complete) Schedule Analysis & Assessment Insight and understanding Schedule Performance Reporting Results, metrics and trends Schedule Control Revisions, replans/rebaselines, management decisions © Copyright by Walter Majerowicz 2010 10
11.
Activity Definition
Activity Description KDP-C Approval Spacecraft Development (NASA In-House) Instrument A Development (Contractor) Instrument B Development (International Activity Definition is the Partner) process of identifying the A-B Compatibility Test (at Partner 1) tasks which must be System I&T (NASA In-House) performed in order to Integrate Instrument A produce the project’s Integrate Instrument B deliverables and meet it’s objectives. Environmental Testing Launch Site Operations Ground System Development (NASA Center "B") Launch Vehicle Launch © Copyright by Walter Majerowicz 2010 11
12.
Activity Sequencing
KDP-C Approval Start: 2/10/11 ID: 1 Spacecraft Development (NASA In-House) Start: 2/10/11 ID: 2 Activity Finish: 2/10/11 Dur: 0 d Res: Finish: 2/10/11 Dur: 0 d Res: Sequencing is the process of Instrument A Development (Contractor) A-B Compatibility Test (at Partner 1) characterizing Start: 2/10/11 ID: 3 Start: 2/10/11 ID: 5 project logic by Finish: 2/10/11 Dur: 0 d Finish: 2/10/11 Dur: 0 d Res: Res: identifying and documenting the Instrument B Development (International Partner) interdependencies between project Start: 2/10/11 ID: 4 Finish: 2/10/11 Dur: 0 d Res: activities Launch Vehicle Start: 2/10/11 ID: 14 Finish: 2/10/11 Dur: 0 d Res: System I&T (NASA In-House) Schedule Margin Integrate Instrument A Start: 2/10/11 ID: 6 Start: 2/10/11 ID: 7 Start: 2/10/11 ID: 8 Finish: 2/10/11 Dur: 0 d Finish: 2/10/11 Dur: 0 d Finish: 2/10/11 Dur: 0 d Comp: 0% Res: Res: © Copyright by Walter Majerowicz 2010 12
13.
Activity Duration Estimating
Activity Description Duration Estimate KDP-C Approval 0d Spacecraft Development (NASA In- House) 600 d Instrument A Development (Contractor) 450 d Activity Duration Instrument B Development Estimating is the (International Partner) 400 d process of determining A-B Compatibility Test (at Partner 1) 60 d the realistic number of System I&T (NASA In-House) 930 d work periods required Integrate Instrument A 25 d to accomplish each Integrate Instrument B 15 d activity. Environmental Testing 100 d Launch Site Operations 60 d Ground System Development (NASA Center "B") 500 d Launch Vehicle 764 d Launch 0d © Copyright by Walter Majerowicz 2010 13
14.
Activity Duration Estimating
Methods Estimating Method Approach Reliability Expert Judgment Estimate is based on the expertise, knowledge or experience of Moderate someone familiar with the activity Analogous Actual duration from a similar activity used as the basis for the Moderate new activity duration Bottoms-Up / Grassroots Decomposition of activities into lower level tasks which are High estimated and then aggregated at higher levels Parametric Duration derived from a arithmetical relationship among variables Moderate-to-High Brainstorming Project team guesses durations based on a combination of Low factors (gut feel, prior experience, historic actuals) Expected Value / Average of activity's most likely, optimistic and pessimistic High 3-Point duration estimates Standards Application Well-established, historically validated durations for routine or High procedurally-based activities or operations © Copyright by Walter Majerowicz 2010 14
15.
Schedule Margin Planning ©
Copyright by Walter Majerowicz 2010 15
16.
Schedule Margin Planning
Methods Planning Method Approach % of activity or overall project duration deducted OR added and established as Applied Percentage the schedule reserve Rule-of-thumb based on historic norms (e.g. one month of reserve for each year Fixed Standard between time-now and launch readiness date) Risk-Based Expected Value Calculation of expected value of project risks (probability x impact) 3-Point Duration Estimate Evaluation of tradeoffs among most likely, optimistic, pessimistic and expected Derivation value activity durations Determine reserve based on calculation of expected value of decision alternatives Decision Tree Analysis Difference between project completion date from the Critical Path Method Monte Carlo Analysis calculation and the completion date associated with the desired confidence level based on the Monte Carlo analysis Recommendation from those with expertise or experience appropriate for the Expert Judgment application, discipline or effort © Copyright by Walter Majerowicz 2010 16
17.
Schedule Development
Schedule Development is the process of determining the planned start and finish dates for the project’s activities in order to establish the baseline schedule © Copyright by Walter Majerowicz 2010 17
18.
Schedule Status Accounting,
Data Maintenance & Updating • Factors to consider for activities include – Status date – Actual start date – Actual finish date – Remaining duration – Physical percentage complete – Estimated completion date of activities underway – Actual duration – Earned Value – Resource updates – Forecast start date, finish date or planned duration for activities that have not started © Copyright by Walter Majerowicz 2010 18
19.
What Has Changed
Since We Baselined the Schedule? © Copyright by Walter Majerowicz 2010 19
20.
Schedule Analysis and
Assessment 0 - Total Project : Finish Date 100% 18 Oct 10 SCHEDULE ASSESSMENT CHECKLIST 50.0 95% 01 Oct 10 90% 28 Sep 10 85% 26 Sep 10 80% 24 Sep 10 Yes No Criterion Description 40.0 75% 22 Sep 10 70% 20 Sep 10 1. ___ ___ Does the IMS reflect the total scope of work? Cumulative Frequency 65% 19 Sep 10 30.0 60% 18 Sep 10 2. ___ ___ Is the correct WBS element identified for each task 55% 17 Sep 10 and milestone in the IMS? Hits 50% 15 Sep 10 45% 14 Sep 10 40% 12 Sep 10 3. ___ ___ Is the IMS used by all levels of management for 20.0 35% 11 Sep 10 project implementation and control? 30% 09 Sep 10 25% 08 Sep 10 4. ___ ___ Do all tasks/milestones have interdependencies 10.0 20% 06 Sep 10 15% 04 Sep 10 identified to reflect a credible logical sequence? 10% 03 Sep 10 5% 31 Aug 10 5. ___ ___ Are task durations reasonable, measureable, and at 0.0 0% 24 Aug 10 appropriate level of detail for effective management? 24 Aug 10 13 Sep 10 03 Oct 10 Distribution (start of interval) 6. ___ ___ Does the IMS include all contract and/or designated NEW Overall Rating management control milestones? Project Name: Project XYZ 1.4 R Contractor: ACME Engineering 7. ___ ___ Does IMS reflect accurate current status & credible File Type: MS Project Current start/finish forecasts for all to-go tasks and milestones? Schedule Status Current Start (earliest activity Early Start date) 1/1/2005 8. ___ ___ Has the IMS been resource loaded and are assigned Current Finish (latest activity Early Finish date) 3/16/2008 Approximate Remaining Work Days 722 resources reasonable and available? Is schedule externally linked to other schedules? N Status Date 6/15/2005 9. ___ ___ Is the critical path identifiable and determined by the Task & Milestone Count (excl. Summary Tasks) Count % of Total calculated IMS logic network? Total Tasks & Milestones 192 Completed Tasks & Milestones 13 7% 10. ___ ___ Is the critical path credible? To Go Tasks & Milestones 179 93% Logic (excl. Summary & Started/Completed Tasks) 11. ___ ___ Has a Schedule Risk Assessment (SRA) been Tasks & Milestones Without Predecessors 75 42% R Tasks & Milestones Without Successors 73 41% R conducted on the IMS within the last three months? Constraints (other than ASAP) and Deadlines 102 57% R Summaries with Logic Ties ** 1 1% G 12. ___ ___ Has adequate schedule margin been included and Tasks & Milestones Needing Updates 21 12% R clearly defined within the IMS? Actuals after Status Date 2 1% Y Tasks marked as Milestones (have Duration > 0) 0 0% G 13. ___ ___ Has the IMS content been baselined and is it Additional Schedule Information Tasks with No Finish Ties 20 11% adequately controlled? Recurring Tasks 0 0% Tasks & Milestones with Estimated Durations 15 8% 14. ___ ___ Is there an excessive & invalid use of task constraints Schedule traceable to WBS (Y/N) Yes and relationship leads/lags? Realistic Critical Path(s) (Y/N) No Schedule Baselined (Y/N) No Resource Loaded (Y/N) No 15. ___ ___ Are right task & resource calendars used in the IMS? Tasks & Milestones with 10 days or less TF 1 1% Tasks with Total Float > 25% of Rem Dur 148 83% Source: NASA Schedule Management Handbook © Copyright by Walter Majerowicz 2010 20
21.
Schedule Performance Reporting
Spacecraft Cumulative Activties 1200 1000 Cumulative Activities 800 600 400 200 0 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 B/L Plan 105 141 197 258 325 416 274 431 515 601 682 758 881 975 1063 1133 Actuals 102 137 161 198 217 238 274 352 387 Late Finish 274 320 359 398 460 541 634 709 774 842 Month/Year © Copyright by Walter Majerowicz 2010 21
22.
Schedule Control
Schedule Control is the process of managing the schedule baseline and current IMS in a timely, disciplined manner in response to: a) new work scope b) the need for a new baseline schedule c) recovery from actual or potential schedule problems Schedule control includes taking the appropriate action to get things done and stay on track. Schedule Control Baseline Workaround Management Replanning Revisions Planning Decision-Making New Scope New Baseline Recovery Plan Action © Copyright by Walter Majerowicz 2010 22
23.
Let’s Recap Some
Key Points From Today’s Session Free Slack: amount of time an activity can be delayed before impacting the start date of it‟s successor Total Slack: amount of time an activity can be delayed before impacting the project „s completion date Schedule Margin: pre-planned amount of funded schedule reserve to protect against risks/problems Critical Path: path through network with least amount of total slack © Copyright by Walter Majerowicz 2010 23
24.
Additional Project Scheduling
Resources © Copyright by Walter Majerowicz 2010 24
25.
NASA Schedule Management
Handbook Chapters 1. Introduction 2. Schedule Management Overview 3. Schedule Management Tool Considerations 4. Pre-schedule Development 5. Integrated Master Schedule Development 6. Status Updates & Schedule Maintenance 7. Schedule Assessments and Analysis 8. Schedule Control 9. Schedule Reporting 10. Schedule Data Archival & Lessons Learned Download the NASA Schedule Management Handbook at: http://evm.nasa.gov/handbooks.html © Copyright by Walter Majerowicz 2010 25
26.
NASA Planning &
Scheduling Community of Practice © Copyright by Walter Majerowicz 2010 26
27.
NASA Planning &
Scheduling Community of Practice • Instructions for joining the P&S CoP are at: – http://pmknowledge.gsfc.nasa.gov/docs/PSCoP_Instructions.pdf • For P&S CoP technical assistance contact: – Jennifer Poston – Jennifer.L.Poston@nasa.gov – (301) 286-7492 © Copyright by Walter Majerowicz 2010 27
28.
Schedule Training from
the NASA Academy of Program, Project and Engineering Leadership • Understanding Project Scheduling (1 day) • Beyond Scheduling Basics: Analysis, Control & Margin Planning (1 day) • Advanced Earned Value Management Topics: Recognizing EVM and Scheduling Gaming, Abuse and Data Manipulation (1 day) • Assessing Project Performance (2 days) • Training schedule http://pmknowledge.gsfc.nasa.gov/scheduletrain.htm © Copyright by Walter Majerowicz 2010 28
29.
Thank you !
Walt Majerowicz, MBA, PMP Management Consultant ASRC Aerospace Corporation walt.majerowicz@nasa.gov walt.majerowicz@gmail.com 301-286-5622 © Copyright by Walter Majerowicz 2010 29