NNTC is a specialist in cross-industry Virtual Reality projects: digital models of industrial objects and plants reproduced in every detail and powered by real-time visualization of analytics and processes, Health & Safety and emergency trainings, remote maintenance and collaboration tools, as well as new ways of communication with consumers through VR solutions.
Read more: https://bit.ly/3bRTtB0
2. ABOUT US
BAHRAIN
NNTC is a UAE-based IT
consultancy, software
development, and training
company. We focus on
innovations and digital
transformation projects.
NNTC’s strategic alliances
with the two international
systems integrators – NGN
and CROC – are aimed
at competence exchange, IT
solution portfolio expansion,
and implementation of joint
projects to reduce costs
of customers operating across
different regions of the Middle
East.
RUSSIA
002
3. 003
OUR EXPERTISE
Expert in technologically complex AR, VR, and 3D projects
VR emergency drills for personnel
VR simulators to train people in safe equipment operation at production enterprises
Enterprise digital models and technological process visualization for new employees
Mobile 3D apps as “always-at-hand” guides for enterprise training centers
Innovative training center design and outfitting
Unity 3D basic and advanced courses for customer’s IT specialists
15 full-time professionals, including UI/UX experts, CI/CD programmers, 3D modelers, product designers,
visual effect specialists, testers, AR/VR system engineers, and managers, all holding globally recognized
certificates
5-year track record, with projects completed for major oil and gas, chemical, defense, aerospace, pharma,
development and construction enterprises, cultural establishments, and robotized facilities
Full range of AR, VR, and 3D graphic services with focus on:
4. 004
SIMULATOR FOR GAGARIN RESEARCH & TEST COSMONAUT TRAINING CENTER
Description: A virtual simulator for practicing
100+ cosmonaut actions inside the
International Space Station
Source data: Space station module photos and
operation procedures
Project team: 5 people
Implementation time: 3 months
Outcome: R&D on leveraging VR technology in cosmonaut
training, and VR simulators included in Vostochny
Cosmodrome 2020 roadmap
WATCH VIDEO
5. 005
TRAINING FOR EMERGENCY RESPONSE ROBOT OPERATORS AT ROSATOM
STATE CORPORATION NUCLEAR POWER PLANTS
Description: A virtual emergency drill for robot
operators in case of a reactor cooling system failure
Source data: Emergency response robot photos and
operating manual, nuclear power plant photos and videos,
as well as specialist consultations
Project team: 5 people
Implementation time: 3 months
Outcome: Rosatom narrow specialists now leverage
emergency drills
WATCH VIDEO
6. 006
TRAINING FOR OPERATORS OF A GAS-DISTRIBUTING SUBSTATION OF
MOSOBLGAZ, A GAS COMPANY
Description: A mobile 3D app integrated with a learning
management system (LMS), designed for gas worker training, and
supporting the following scenarios: gas-distributing substation
switchover from main line to bypass line and back, as well as gas
pressure governor disassembly/assembly
Source data: Photos and videos of a gas-distributing substation,
equipment drawings, and specialist and trainer consultations
Project team: 5 people
Implementation time: 3.5 months
Outcome: During the first year, 500+ people were
trained. Task completion and the number of errors
are logged in the LMS
WATCH VIDEO
7. 007
TRAINING IN KOMPRESSOR DATA CENTER EMERGENCY SWITCHOVER
Description: A full data center digital twin with all
premises and technological systems for a VR
simulator. The model includes a scenario of an
emergency switchover to diesel generators and
supports 30+ actions
Source data: Space station module photos and
operation procedures
Project team: 7 people
Implementation time: 5 months
Outcome: The simulator is used to onboard new data
center operators (5-10 people per year)
WATCH VIDEO
8. 008
DIGITAL MODEL OF ZAPSIBNEFTEKHIM, A SIBUR COMPANY
Description: The model is the first step to a full-fledged digital
enterprise, including the elaboration of personnel training scenarios
(such as equipment maintenance and HSE) and integration with
production, security, and monitoring systems
Source data: Enterprise CAD models, photos and videos, laser
scanning results, site general layout, process flowcharts, and
consultations provided by involved technologists and specialists
Project team: 12 people
Implementation time: 5 months
Outcome: The enterprise model will be used to
train specialists in working at ZapSibNefteKhim
and other SIBUR subsidiaries, and will be
replicated at 31 SIBUR sites
WATCH VIDEO
9. 009
SMART RADIO LINK CONFIGURATOR FOR POPOV RADIO MANUFACTURING PLANT (RELERO)
Description: An app visualizes radio communication
patterns in different 20*40 km landscapes and
displays signal transmission, while supporting
unrestricted modeling of connection diagrams. The
app is designed for military training.
Source data: Military equipment performance
characteristics, mathematical models,
connection logics, and map
Project team: 8 people
Implementation time: 3 months
Outcome: The project was presented at ARMY 2017
forum and is regularly demonstrated to prospects
10. 0010
DEVELOPMENT OF AN AR/VR SOLUTION ARCHITECTURE FOR
GAZPROM NEFT PERSONNEL TRAINING
Description: The project includes a full-fledged analysis of
enterprise processes, identification of pains and needs of
functional departments (including HSE challenges), and
then AR/VR solution architecture development with
further integration into customer business processes.
Source data: Interviews with representatives of major
functional departments, and a seminar with HSE
responsible persons
Project team: 5 people
Implementation time: 3 months
Outcome: Main functional needs are identified, in
particular, those of HSE function, regarding the creation of
a corporate architecture and training courses, and AR/VR
solution architecture and implementation strategy are
developed
11. 0011
UNITY 3D TRAININGS FOR IT SPECIALISTS OF SIBUR / CENTRAL
INSTITUTE OF AVIATION MOTORS / ROSATOM
Description: Skilled trainers deliver one-week Unity 3D
courses to teach IT specialists how to maintain existing
VR projects, make changes, and create their own projects
Source data: Main programming language knowledge and
basic programming skills
Trainer team: 2 people
Implementation time: 5 days
Outcome: 10 IT specialists obtained required Unity 3D
programming knowledge and use it in their work at
enterprise competence centers every day
12. 0012
TECHNICAL TRAINING CENTER DESIGN, A SIBUR COMPANY
Description: To prepare operation personal for new built refinery
SAPSIBNEFTEKHIM SIBUR is establishing new technical training center. We
designed architecture, engineering and multimedia systems. Training center
includes VR classroom for collaborative staff trainings.
VR classroom is designed for collective briefings and VR sessions on
operation, HSE, maintenance and repair scenarios.
Project team: more than 20 people
Implementation time: 8 months
13. 0013
AR APP FOR HELIRUSSIA EXHIBITION
Description: An AR app to demonstrate unique performance
characteristics of helicopter internal components made with
the use of an additive technology. Helicopter virtual models
were laid over real-life objects in X-Ray mode, with new
component locations being shown and supported by related
infographics
Source data: Helicopter performance characteristics, CAD
models, and photogrammetry
Project team: 6 people
Implementation time: 2.5 months
Outcome: The project was showcased to 300+ exhibition
participants. The app got the maximum score in App Store
and Google Play
WATCH VIDEO
14. 0014
AR APP FOR PHENAZEPAMPRESENTATION BYVALENTA PHARM
Description: An AR app is developed for the integration with
another internal app used by pharmaceutical sales
representatives so that during visits to hospitals and industry
events they could demonstrate how the drug influences brain
neurons
Source data: Consultations provided by a product manager
and medical advisor
Project team: 6 people
Implementation time: 2.5 months
Outcome: The app logs start and exit times for each
scenario and integrates with a CRM system to collect
analytical data, thus enabling the customer to monitor the
performance of sales representatives
WATCH VIDEO
15. 0015
AR APP FOR SALES REPRESENTATIVES FOR TETRA PAK/
DELAVAL (SWEDEN)
Description: An AR app is developed to demonstrate large
robotic systems for innovative cow milking. It is an AR
catalog with animated technological processes to be used
as a sales support tool during visits to customers and
exhibitions
Source data: CAD models, photos, videos, and product
manager consultations
Project team: 4 people
Implementation time: 2 months
Outcome: Over 600 customers viewed the app at
exhibitions with further 3,000+ downloads from App Store
WATCH VIDEO
16. 0016
EXPERIENCE IN KSA. EVENT AR APP
Description: AR mobile application
Source data: CAD, photos, video
Project team: 3 people
Implementation time: 2 weeks
Outcome: Effective presentation of a museum
object for the opening event
17. 0017
AR APP FOR BAHRAIN INVESTMENT WHARF
Description: An AR app demonstrating an innovative cluster
model during an exhibition and leveraging photogrammetry
technology
Source data: Real-life photogrammetry of a mock-up of an
innovative cluster
Project team: 3 people
Implementation time: 2 weeks
Outcome: A stunning presentation of an innovative
cluster model to exhibition attendees
18. 0018
PROMO MATERIALS IN AUGMENTED REALITY FOR SHARJAH
DEPARTMENT OF PUBLIC WORKS
Description: AR Application to showcase
theatre and planetarium
Source data: CAD Data, Photos, Videos, floor
layouts
Project team: 4 people
Implementation time: 3 weeks
Outcome: Landmark was printed on DPW gifts on GITEX
2018, successful AR demo of objects by downloading
from AppStore, GooglePlay
19. 0019
A VIRTUAL TOUR ACROSS THE JUPITER HALL OF THE STATE HERMITAGE MUSEUM
Description: A social and cultural project on promoting
cultural heritage objects: a fully interactive digital copy of
the hall, audio guide for each exhibit, and teleportation
and levitation functions.
Source data: Real-life exhibits, which were processed with
the use of photogrammetry and laser scanning technologies.
Project team: 5 people
Implementation time: 3 months
Outcome: Project demonstration at exhibitions worldwide,
as well as for foster homes and disabled people as part of
charity initiatives. One more hall is going to be digitized.
WATCH VIDEOVIEW CUSTOMER FEEDBACK
20. 0020
A VIRTUAL TOUR: GALLERY OF THE HISTORY OF ANCIENT PAINTING
Task: Promote art and hold virtual museum tours in different regions.
Outcome: Using a special VR-powered data visualization technique, we digitized 60 art objects (paintings and sculptures)
in every detail, with one 3D model taking them 10 to 30 hours to create, depending on item size and complexity. Moreover,
some of the exhibits digitized by us have never been publicly displayed before.
The project was unveiled during Hermitage Days in Sakhalin and then toured through other Russian cities.
21. 0021
3D MODEL OF STAR OF BOSPHORUS DATA CENTER (TURKEY)
Description: The project was implemented right during the
facility construction and visualizes construction stages,
key functional capabilities, and technological processes
Source data: 3D (CAD) model of the building, 2D drawings,
equipment specification, and description of how it works
Project team: 6 people
Implementation time: 2 months
Outcome: The project was presented to prospects as
early as at the construction phase, and entire server
capacity was booked long before putting the data center
into commercial operation
WATCH VIDEO
22. 0022
3D MODEL OF TETRA PAK/DELAVAL FARM (SWEDEN)
Description: A 3D model of a 2,500 cow farm with milking
process visualization (7 scenarios)
Source data: 3D equipment models, 2D drawings, and
technological process descriptions
Project team: 5 people
Implementation time: 1.5 months
Outcome: Demonstration of complex robotic equipment
operation to prospects at industry events. 30+ events in
two years were covered
WATCH VIDEO
23. 0023
3D MODEL OF A ROOFED SKI RESORT IN UAE
Description: 3D model of a facility under
design, infographics visualization and internal
process animation
Source data: Drone-taken photos, CAD 3D
models, design, and internal process
description
Project team: 6 people
Implementation time: 3 weeks
Outcome: Holographic interactive model presentation to
Fujairah Municipality and corporate investors, and further
use at a sales office
24. 0024
3D MODEL OF BURJ KHALIFA HIGH-RISE BUILDING IN UAE
Description: A 3D model of a built facility with
adjacent territory, supporting floor layout
display in an interactive mode
Source data: Photos, floor layouts, and Google
Earth
Project team: 4 people
Implementation time: 3 weeks
Outcome: Interactive model demonstration at
international exhibitions
25. 0025
3D MODEL OF WATER BAY RESIDENTIAL CLUSTER IN BAHRAIN
Description: 3D model of the cluster under construction
Source data: Design, CAD, and floor layout
Project team: 4 people
Implementation time: 3 weeks
Outcome: Presentation of a residential cluster interactive
model at Bahrain International Property Exhibition 2017,
road shows, and sales office outfitting
26. Knowledge Park, Building 13, Office G16
Dubai, UAE PO BOX 503061
T: +971 444 66043, info@nntc.ae | nntc.digital THANK YOU