Column
 RCC (Reinforced Cement Concrete) column is a
structural member of RCC frame structured
building. It's a vertical member which transfers
loads from slab and beam directly to subsequent
soil.
 Material used in columns
 Cement
 Coarse aggregate
 Fine aggregate
 Steel bar
 Water
 Shuttering
Column Construction process
 Constructing RCC (Reinforced Cement Concrete)
Column involves following four stages of works.
1. Column layout work.
2. Column reinforcement work.
3. Column formwork.
4. Pouring concrete into column.
1. Column layout work
In this stage of works the location of columns are
determined practically in field. It is done by laying
rope according to grids shown in the drawing and
then mark the location of columns related to rope.
2. Column reinforcement work.
After marking the column locations, we then
start to place reinforcement as instructed in the
structural drawing.
This is normally described in the drawing like -
(C1-12#16 mm⌀ and stirrup-10 mm⌀ @ 4" c/c)
3. Column formwork
Column formwork is a term used for structures that
are used to support forms or molds for poured
concrete columns. It can be as simple as a
reinforced cardboard tube for small cylindrical
columns or very complex forms constructed from
many pieces of wood and metal
4. Pouring concrete into column
For small quantity of concrete volume we normally
depend on machine-mix concrete and for large
concrete quantity we order ready-mix concrete.
Because, if you use moving pump with ready-mix
concrete and if you want not to exceed 5 feet height
range for dropping concrete that would be difficult
Curing
Concrete which is moist cured for 7 days is about
50% stronger than uncured concrete
Slab
 In building construction the roof or slab for roof
is very important constituents.
 Material used in slab.
 Cement.
 Coarse aggregate.
 Fine aggregate.
 Steel bar.
 Binding wire.
 Water .
 Shuttering materials (wooden Planks, and Iron
Plates).
Slab laying process
 According to work arrangement laying of RCC slab
can be done in 4 stages such as formwork or
centering and shuttering, bending and binding MS
steel bars and laying of concrete
1. Formwork
2. Bending And Binding Steel bars
3. Spacing of steel bars
4. Laying of Cement Concrete
1. Form work
 The formwork should be as per ( I S : 14687-1999).
To retain concrete, formwork or centering and
shuttering is required, which provides the support
to the wet concrete until it has gained sufficient
strength to be self supporting.
2. Bending And Binding Steel bars
 At the time of designing the slab, it is consider that
concrete is strong in compressive strength but weak
in tensile strength, so make the structure safe against
the tensile stress, steel bars are .provided.
3. Spacing of steel bars
 Steel bars diameter and its spacing in the RCC slab is
calculated by designing the slab according to load and span
of the slab. In general 12mm, 10mm and 8mm diameter
steel bars are used in RCC slab according to the length of
span of the slab and similarly spacing is from 4.5’’ to 6’’ in
the main bars and 6’’ to 8’’ in distribution bars.
4. Laying of Cement Concrete
 Make walking way on steel bars by placing wooden
plates to avoid disturbance in steel bars. Now start
to lay the cement concrete mix as per design but
not below the 1; 2; 4 ratio. The mix should be
mechanically mixed and vibrated after laying on
the slab.
Curing
 After laying the RCC slab it should be cure for 28
days for getting full strength.
Beam
 A beam is a structural element that is capable of
withstanding load primarily by resisting against
bending. The bending force induced into the
material of the beam as a result of the external
loads, own weight, span and external reactions to
these loads is called a bending moment.
Beam construction process
 According to work arrangement laying of RCC Beam
can be done in 4 stages
1. Formwork.
2. Bending And Binding Steel bars.
3. Laying of Cement Concrete.
4. Curing .
Form work
The formwork should be
To retain concrete, formwork or centering and
shuttering is required
Bending And Binding Steel bars.
 At the time of designing the slab, it is consider that
concrete is strong in compressive strength but weak
in tensile strength, so make the structure safe against
the tensile stress, steel bars are .provided.
Laying of Cement Concrete.
 For small quantity of concrete volume we normally
depend on machine-mix concrete and filling the
beam.

Contenu connexe

Tendances

Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship reportMd Mohsin Mohsin
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measuressabnisajit
 
Construction site report
Construction site reportConstruction site report
Construction site reportRavi Kant Sahu
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSShourya Puri
 
Design of multistorey building
Design of multistorey buildingDesign of multistorey building
Design of multistorey buildingSivaji Djpk
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONRising Sher
 
Construction of Brick Wall
Construction of Brick WallConstruction of Brick Wall
Construction of Brick WallI'mMiss Lily
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction pptBeing Deepak
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Simran Aggarwal
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1Nabeel Joomun
 
Site visit report
Site visit reportSite visit report
Site visit reportJıa Yıı
 

Tendances (20)

Building Construction
Building ConstructionBuilding Construction
Building Construction
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship report
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measures
 
Construction site report
Construction site reportConstruction site report
Construction site report
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
 
Design of multistorey building
Design of multistorey buildingDesign of multistorey building
Design of multistorey building
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Design of beams
Design of beamsDesign of beams
Design of beams
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
 
Formwork
FormworkFormwork
Formwork
 
Construction of Brick Wall
Construction of Brick WallConstruction of Brick Wall
Construction of Brick Wall
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction ppt
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
Staircase design
Staircase designStaircase design
Staircase design
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 

En vedette

Rcc slab design guidelines
Rcc slab design guidelinesRcc slab design guidelines
Rcc slab design guidelinesMain Uddin
 
Lecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importanceLecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importanceDr. H.M.A. Mahzuz
 
Insert some activities into primavera p6
Insert some activities into primavera p6Insert some activities into primavera p6
Insert some activities into primavera p6firdaus Muhammad Adnan
 
Two way slab
Two way slabTwo way slab
Two way slabillpa
 
Columns lecture#1
Columns lecture#1Columns lecture#1
Columns lecture#1Irfan Malik
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Columnমু সা
 

En vedette (8)

Rcc slab design guidelines
Rcc slab design guidelinesRcc slab design guidelines
Rcc slab design guidelines
 
Lecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importanceLecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importance
 
Insert some activities into primavera p6
Insert some activities into primavera p6Insert some activities into primavera p6
Insert some activities into primavera p6
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 
Two way slab
Two way slabTwo way slab
Two way slab
 
Columns lecture#1
Columns lecture#1Columns lecture#1
Columns lecture#1
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
 
Reinforced column design
Reinforced column design Reinforced column design
Reinforced column design
 

Similaire à Construction process''column,beam,slab''

RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.Puneet Chhonker
 
REINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETEREINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETEBrijesh Alig
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
RCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdfRCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdfUMESHVerma100
 
Reinforced Concrete
Reinforced ConcreteReinforced Concrete
Reinforced ConcreteCivil Manage
 
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURES
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURESCOMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURES
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURESMohammed Tajammul Ahmed
 
04. superstructure
04. superstructure04. superstructure
04. superstructureThien Hee
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxanik7nziza
 
Steelplacementhandbook
SteelplacementhandbookSteelplacementhandbook
Steelplacementhandbookdefrimk
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
Mechanism of load transfored...PRC-I
Mechanism of load transfored...PRC-IMechanism of load transfored...PRC-I
Mechanism of load transfored...PRC-IIrfan Malik
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs632k18BilalAhmad
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Buildingppt_master
 
Design of Retaining Wall
Design of Retaining WallDesign of Retaining Wall
Design of Retaining WallAnanthakumar75
 
Lectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptxLectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptx2020CEB005POTNURUSAI
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdfPrakashM970621
 

Similaire à Construction process''column,beam,slab'' (20)

BEAM.pptx
BEAM.pptxBEAM.pptx
BEAM.pptx
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
REINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETEREINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETE
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
RCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdfRCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdf
 
Reinforced Concrete
Reinforced ConcreteReinforced Concrete
Reinforced Concrete
 
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURES
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURESCOMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURES
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURES
 
RCC Floor
RCC FloorRCC Floor
RCC Floor
 
KUY Limeng,e20190482(I4GCI-B)_4.pdf
KUY Limeng,e20190482(I4GCI-B)_4.pdfKUY Limeng,e20190482(I4GCI-B)_4.pdf
KUY Limeng,e20190482(I4GCI-B)_4.pdf
 
04. superstructure
04. superstructure04. superstructure
04. superstructure
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptx
 
Steelplacementhandbook
SteelplacementhandbookSteelplacementhandbook
Steelplacementhandbook
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Mechanism of load transfored...PRC-I
Mechanism of load transfored...PRC-IMechanism of load transfored...PRC-I
Mechanism of load transfored...PRC-I
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Building
 
Jacketing (RR&S)
Jacketing (RR&S)Jacketing (RR&S)
Jacketing (RR&S)
 
Design of Retaining Wall
Design of Retaining WallDesign of Retaining Wall
Design of Retaining Wall
 
Lectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptxLectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptx
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdf
 

Dernier

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Dernier (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 

Construction process''column,beam,slab''

  • 2. Column  RCC (Reinforced Cement Concrete) column is a structural member of RCC frame structured building. It's a vertical member which transfers loads from slab and beam directly to subsequent soil.  Material used in columns  Cement  Coarse aggregate  Fine aggregate  Steel bar  Water  Shuttering
  • 3. Column Construction process  Constructing RCC (Reinforced Cement Concrete) Column involves following four stages of works. 1. Column layout work. 2. Column reinforcement work. 3. Column formwork. 4. Pouring concrete into column.
  • 4. 1. Column layout work In this stage of works the location of columns are determined practically in field. It is done by laying rope according to grids shown in the drawing and then mark the location of columns related to rope.
  • 5. 2. Column reinforcement work. After marking the column locations, we then start to place reinforcement as instructed in the structural drawing. This is normally described in the drawing like - (C1-12#16 mm⌀ and stirrup-10 mm⌀ @ 4" c/c)
  • 6. 3. Column formwork Column formwork is a term used for structures that are used to support forms or molds for poured concrete columns. It can be as simple as a reinforced cardboard tube for small cylindrical columns or very complex forms constructed from many pieces of wood and metal
  • 7. 4. Pouring concrete into column For small quantity of concrete volume we normally depend on machine-mix concrete and for large concrete quantity we order ready-mix concrete. Because, if you use moving pump with ready-mix concrete and if you want not to exceed 5 feet height range for dropping concrete that would be difficult
  • 8. Curing Concrete which is moist cured for 7 days is about 50% stronger than uncured concrete
  • 9. Slab  In building construction the roof or slab for roof is very important constituents.  Material used in slab.  Cement.  Coarse aggregate.  Fine aggregate.  Steel bar.  Binding wire.  Water .  Shuttering materials (wooden Planks, and Iron Plates).
  • 10. Slab laying process  According to work arrangement laying of RCC slab can be done in 4 stages such as formwork or centering and shuttering, bending and binding MS steel bars and laying of concrete 1. Formwork 2. Bending And Binding Steel bars 3. Spacing of steel bars 4. Laying of Cement Concrete
  • 11. 1. Form work  The formwork should be as per ( I S : 14687-1999). To retain concrete, formwork or centering and shuttering is required, which provides the support to the wet concrete until it has gained sufficient strength to be self supporting.
  • 12. 2. Bending And Binding Steel bars  At the time of designing the slab, it is consider that concrete is strong in compressive strength but weak in tensile strength, so make the structure safe against the tensile stress, steel bars are .provided.
  • 13. 3. Spacing of steel bars  Steel bars diameter and its spacing in the RCC slab is calculated by designing the slab according to load and span of the slab. In general 12mm, 10mm and 8mm diameter steel bars are used in RCC slab according to the length of span of the slab and similarly spacing is from 4.5’’ to 6’’ in the main bars and 6’’ to 8’’ in distribution bars.
  • 14. 4. Laying of Cement Concrete  Make walking way on steel bars by placing wooden plates to avoid disturbance in steel bars. Now start to lay the cement concrete mix as per design but not below the 1; 2; 4 ratio. The mix should be mechanically mixed and vibrated after laying on the slab.
  • 15. Curing  After laying the RCC slab it should be cure for 28 days for getting full strength.
  • 16. Beam  A beam is a structural element that is capable of withstanding load primarily by resisting against bending. The bending force induced into the material of the beam as a result of the external loads, own weight, span and external reactions to these loads is called a bending moment.
  • 17. Beam construction process  According to work arrangement laying of RCC Beam can be done in 4 stages 1. Formwork. 2. Bending And Binding Steel bars. 3. Laying of Cement Concrete. 4. Curing .
  • 18. Form work The formwork should be To retain concrete, formwork or centering and shuttering is required
  • 19. Bending And Binding Steel bars.  At the time of designing the slab, it is consider that concrete is strong in compressive strength but weak in tensile strength, so make the structure safe against the tensile stress, steel bars are .provided.
  • 20. Laying of Cement Concrete.  For small quantity of concrete volume we normally depend on machine-mix concrete and filling the beam.