SlideShare une entreprise Scribd logo
1  sur  5
Télécharger pour lire hors ligne
Source: Productivity Engineering and Management by David J. Sumanth navanth31@yahoo.co.in
Unit – I Basic Concepts of Productivity
Basic definition of productivity:
Depending upon who is defining it-whether it is an economist, accountant, manager,
politician, union leader, or industrial engineer-you will get a slightly different definition of
he term productivity. How ever, if we closely examine the various definitions and
interpretations of this term, three basic types of productivity appear to be emerging. For the
purpose of this text, we shall refer to these basic forms as follows.
1) Partial Productivity: It is the ratio of output to one class of input. For example, labor
productivity (the ratio of output to labor input) is a partial productivity measure.
Similarly, capital productivity (the ratio of output to capital input) and material
productivity (the ratio of output to materials input) are examples of partial productivity.
2) Total-factor productivity: It is the ratio of net output to the sum of associated labor and
capital (factor) inputs. By ―net output,‖ we mean total output minus intermediate goods
and services purchased. Notice that the denominator of this ration is made up of only the
labor and capital input factors.
3) Total productivity: It is the ratio of total output to the sum of all input factors. Thus, a
total productivity measure reflects the joint impact of all the inputs in producing the
output.
In al of the above definitions, both the output and input (s) are expressed in
―real‖ or ―physical‖ terms by being reduced to constant dollars (or any other monetary
currency) of a reference period (often referred to as ―base period‖). This reducing to base
period is accomplished by dividing the values of output and input(s) by deflators or
inflators, depending upon whether the prices of outputs and inputs have gone up or down,
respectively. In other words, the effect of reducing the output and input(s) to a base period
is to eliminate the effects of price variations, so that only the ―physical‖ changes in output
and input(s) are considered in any of the productivity ratios.
We shall take a simple numerical example to illustrate these here basic definitions.
Example: Consider the ABC Company. The data for output produced and inputs consumed
for a particular time period are given below.
Output = $1000
Human input = 300
Material input = 200
Capital input = 300
Energy input = 100
Other expense input = 50
It is assumed that these values are in constant dollars with respect to a base period. Then the
partial, total-factor, and total productivity values are computed as follows:
Partial productivities:
Human productivity = output/human input = 1000/300 = 3.33
Material productivity = output/material input = 1000/200 = 5
Capital productivity = output/capital input = 1000/300 = 3.33
Energy productivity = output/energy input = 1000/100 = 10
Other expense productivity = output/other expense input = 1000/50 = 20
Total-factor productivity = net output/ (labor + capital) input
= total output — material and services purchased/ (labor + capital) input
Source: Productivity Engineering and Management by David J. Sumanth navanth31@yahoo.co.in
Unit – I Basic Concepts of Productivity
Assume that the company purchases all its materials and services, including the energy,
machinery and equipment (on lease), and other services, such as marketing, advertising,
information processing, consulting, etc.
Advantages and limitations of using the three basic types of productivity measures in
companies.
Advantages limitations
Partial productivity measures
1) Easy to understand. 1) If used alone, can be very misleading
and may lead to costly mistakes.
2) Easy to obtain the data. 2) Do not have the ability to explain
overall cost increases.
3) Easy to compute the productivity indices 3) Tend to shift the blame to the wrong
areas of management control.
4) Easy to sell to management 4) Profit control through partial
because of the above three advantages. productivity measures can be a hit-
and-miss approach.
5) Some partial productivity indicator data
is available industry wide.
6) Good diagnostic tools to pinpoint areas
for productivity improvement, if used
along with total productivity indicators.
Total factor productivity measure:
1. The data from company records are 1. Does not capture the impact of
relatively easy obtain. materials and energy inputs.
2. Usually appealing from a corporate 2. The value-added approach to defining
economist’s viewpoint. the output is not very appropriate in a
company setting because it is difficult
for operational managers to relate the
value-added output to production efficiency.
3. Not appropriate when material costs
from a sizable portion of total product
costs since the impact of material input
is not directly shown in this
productivity measure.
4. Only labor and capital inputs are
considered in the total factor input.
5. Data for comparison purposes are relatively
difficult to obtain, although for some specific
industries and specific time periods, the
indices have been published.
Total productivity measure:
1. Considers all the quantifiable output and 1. Data for computations are relatively
input factors: therefore, is a more accurate difficult to obtain at product and
representation of the real economic picture customer levels, unless data collection
of a company systems are designed for this purpose.
Source: Productivity Engineering and Management by David J. Sumanth navanth31@yahoo.co.in
Unit – I Basic Concepts of Productivity
2. Profit control through the use of total 2. As with the partial and total-factor
productivity indices is a tremendous measures, does not consider intangible
benefit to top management. factors of output and input in a direct
sense.
3. If used in conjunction with partial
measures, can direct management attention
in an effective manner.
4. Sensitivity analysis is easier to perform
5. Easily related to total costs.
1.1 Productivity vs. Inflation:
While increased inflation rates in an economy must be explained by the joint effect of
several factors, economists do agree that a lack of productivity growth contributes to the
increase. As expected, this is because price inflation of goods and services results from the
excessive increases in sales prices of products or services. Such increases are mostly due to
the management’s intention to meet their sales revenue targets, even if it means increasing
the selling price just to hold the profits margins. Also, since the path of least resistance is to
pass the increases in input costs on to the customer, many companies resorts to that strategy
rather than consistently increasing total productivity, a practice that can actually reduce, if
not hold, the total cost of manufacture.
Willard Butcher [1979] of the chase Manhattan Bank, in his remarks at the Town hall
of California on September 25, 1979, emphasizes.
The most compelling force we possess to improve our standard of living while at the same time fight
inflation may very well be – increased productivity.
The percent increases in prices and labor productivity are inversely correlated in fig 1.1 and
1.2, reinforcing the above statement.
.
Source: Productivity Engineering and Management by David J. Sumanth navanth31@yahoo.co.in
Unit – I Basic Concepts of Productivity
Fig 1.2 Relation between price increases and labor productivity in selected
industries, 1960 to 1978.
For an example of the relationship between productivity and price increases, consider
the case of the Eli Lilly Company, one of the better known pharmaceutical companies in the
world. During the period 1963-1974, by increasing its total factor productivity at a rate of
10.1% years on average. Lilly decreased its prices at an average annual rate of 0.4% [Virts
and Cocks, 1976].
John W. Kendrick, a well-known professor of economics at George Washington
University, is reported by the Chicago tribune (January 11, 1979) to have said that
―productivity could be a potent weapon in fighting inflation.‖
Geoffrey Moore [1973] (Vice President of Research at the National Bureau of
Economic Research, and Senior Research Fellow at The Hoover Institution, Stanford
University, in 1972) also points out in great detail the need for increasing productivity to
combat inflation over the next several years.
Fig 1.3, taken from a recent publication of United States Chamber of Commerce
[1979], points out that the money supply in the United States grew faster in the 1970s than
it did in the 1960s. Faster growth in the money supply and slower real growth in output have
produced higher inflation. In other words, the money supply grew faster in recent years than
did the national output of goods per unit of labor resource (labor productivity).
Gross Money Gross national product
National Supply
Money Product
Supply Inflation Portion
Real growth portion
Fig 1.3 Money supply growth faster than real growth in GNP, thereby causing inflation
Source: Productivity Engineering and Management by David J. Sumanth navanth31@yahoo.co.in
Unit – I Basic Concepts of Productivity
1.2 PRODUCTIVITY VS. THE STANDARD OF LIVING

Contenu connexe

Tendances

Overview -productivity management
Overview -productivity managementOverview -productivity management
Overview -productivity management
Bharat Parmar
 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction Productivity
Sunil Manjeri
 

Tendances (20)

Importance of Performance Management And Measurement of Productivity
Importance of Performance Management  And Measurement of ProductivityImportance of Performance Management  And Measurement of Productivity
Importance of Performance Management And Measurement of Productivity
 
Organisational Productivity
Organisational ProductivityOrganisational Productivity
Organisational Productivity
 
Ch02 p2 ppt
Ch02 p2 pptCh02 p2 ppt
Ch02 p2 ppt
 
094 Productivity Measurement
094 Productivity Measurement094 Productivity Measurement
094 Productivity Measurement
 
Productivity measurement approaches
Productivity measurement approachesProductivity measurement approaches
Productivity measurement approaches
 
Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivity
 
Productivity concepts
Productivity conceptsProductivity concepts
Productivity concepts
 
Overview -productivity management
Overview -productivity managementOverview -productivity management
Overview -productivity management
 
Productiivity vs production
Productiivity vs productionProductiivity vs production
Productiivity vs production
 
Productivity Measurement System
Productivity Measurement SystemProductivity Measurement System
Productivity Measurement System
 
Productivity
ProductivityProductivity
Productivity
 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction Productivity
 
Productivity
ProductivityProductivity
Productivity
 
Productivity management
Productivity management   Productivity management
Productivity management
 
Productivity management
Productivity management Productivity management
Productivity management
 
Importance of labor productivity and its measurement
Importance of labor productivity and its measurementImportance of labor productivity and its measurement
Importance of labor productivity and its measurement
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And Productivity
 
Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)
 
093 Productivity Measurement
093 Productivity Measurement093 Productivity Measurement
093 Productivity Measurement
 
435ch14
435ch14435ch14
435ch14
 

En vedette (8)

What is Productivity by Operational Excellence Consulting
What is Productivity by Operational Excellence ConsultingWhat is Productivity by Operational Excellence Consulting
What is Productivity by Operational Excellence Consulting
 
Work sample
Work sampleWork sample
Work sample
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
ISO 9000 AND 14000 PPT
ISO 9000 AND 14000 PPT ISO 9000 AND 14000 PPT
ISO 9000 AND 14000 PPT
 
what is Productivity
what is  Productivitywhat is  Productivity
what is Productivity
 
Construction productivity
Construction productivityConstruction productivity
Construction productivity
 
Productivity, Productivity, Productivity
Productivity, Productivity, ProductivityProductivity, Productivity, Productivity
Productivity, Productivity, Productivity
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 

Similaire à Basic concepts of_productivity

Cost n output relation
Cost n output relationCost n output relation
Cost n output relation
Tinku Kumar
 
Mb0042 managerial economics
Mb0042  managerial economicsMb0042  managerial economics
Mb0042 managerial economics
Study Stuff
 
Production function [ management ]
Production function [ management ] Production function [ management ]
Production function [ management ]
Dhairya Joshi
 

Similaire à Basic concepts of_productivity (20)

4th chapter
4th chapter4th chapter
4th chapter
 
Cost n output relation
Cost n output relationCost n output relation
Cost n output relation
 
Lecture 2
Lecture 2Lecture 2
Lecture 2
 
Production
ProductionProduction
Production
 
Reading materials producivity
Reading materials producivityReading materials producivity
Reading materials producivity
 
Managerial_economics (14).docx
Managerial_economics (14).docxManagerial_economics (14).docx
Managerial_economics (14).docx
 
Al 12 - chapter 3
Al   12 - chapter 3Al   12 - chapter 3
Al 12 - chapter 3
 
Presentation1 econo.pptx
Presentation1 econo.pptxPresentation1 econo.pptx
Presentation1 econo.pptx
 
Productivity management final part 1 m
Productivity management final part 1 mProductivity management final part 1 m
Productivity management final part 1 m
 
theory of production and cost
theory of production and costtheory of production and cost
theory of production and cost
 
Mb0042 managerial economics
Mb0042  managerial economicsMb0042  managerial economics
Mb0042 managerial economics
 
Production function [ management ]
Production function [ management ] Production function [ management ]
Production function [ management ]
 
Variance repoting
Variance repotingVariance repoting
Variance repoting
 
Business_Economics.ppt
Business_Economics.pptBusiness_Economics.ppt
Business_Economics.ppt
 
Exploring the Dynamics of Production Functions.pdf
Exploring the Dynamics of Production Functions.pdfExploring the Dynamics of Production Functions.pdf
Exploring the Dynamics of Production Functions.pdf
 
Law of variable proportion.pdf
Law of variable proportion.pdfLaw of variable proportion.pdf
Law of variable proportion.pdf
 
Managerial economics
Managerial economicsManagerial economics
Managerial economics
 
Accounting chapter-11
Accounting chapter-11Accounting chapter-11
Accounting chapter-11
 
Theoryofproduction
TheoryofproductionTheoryofproduction
Theoryofproduction
 
Production Function.ppt
Production Function.pptProduction Function.ppt
Production Function.ppt
 

Dernier

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Dernier (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Basic concepts of_productivity

  • 1. Source: Productivity Engineering and Management by David J. Sumanth navanth31@yahoo.co.in Unit – I Basic Concepts of Productivity Basic definition of productivity: Depending upon who is defining it-whether it is an economist, accountant, manager, politician, union leader, or industrial engineer-you will get a slightly different definition of he term productivity. How ever, if we closely examine the various definitions and interpretations of this term, three basic types of productivity appear to be emerging. For the purpose of this text, we shall refer to these basic forms as follows. 1) Partial Productivity: It is the ratio of output to one class of input. For example, labor productivity (the ratio of output to labor input) is a partial productivity measure. Similarly, capital productivity (the ratio of output to capital input) and material productivity (the ratio of output to materials input) are examples of partial productivity. 2) Total-factor productivity: It is the ratio of net output to the sum of associated labor and capital (factor) inputs. By ―net output,‖ we mean total output minus intermediate goods and services purchased. Notice that the denominator of this ration is made up of only the labor and capital input factors. 3) Total productivity: It is the ratio of total output to the sum of all input factors. Thus, a total productivity measure reflects the joint impact of all the inputs in producing the output. In al of the above definitions, both the output and input (s) are expressed in ―real‖ or ―physical‖ terms by being reduced to constant dollars (or any other monetary currency) of a reference period (often referred to as ―base period‖). This reducing to base period is accomplished by dividing the values of output and input(s) by deflators or inflators, depending upon whether the prices of outputs and inputs have gone up or down, respectively. In other words, the effect of reducing the output and input(s) to a base period is to eliminate the effects of price variations, so that only the ―physical‖ changes in output and input(s) are considered in any of the productivity ratios. We shall take a simple numerical example to illustrate these here basic definitions. Example: Consider the ABC Company. The data for output produced and inputs consumed for a particular time period are given below. Output = $1000 Human input = 300 Material input = 200 Capital input = 300 Energy input = 100 Other expense input = 50 It is assumed that these values are in constant dollars with respect to a base period. Then the partial, total-factor, and total productivity values are computed as follows: Partial productivities: Human productivity = output/human input = 1000/300 = 3.33 Material productivity = output/material input = 1000/200 = 5 Capital productivity = output/capital input = 1000/300 = 3.33 Energy productivity = output/energy input = 1000/100 = 10 Other expense productivity = output/other expense input = 1000/50 = 20 Total-factor productivity = net output/ (labor + capital) input = total output — material and services purchased/ (labor + capital) input
  • 2. Source: Productivity Engineering and Management by David J. Sumanth navanth31@yahoo.co.in Unit – I Basic Concepts of Productivity Assume that the company purchases all its materials and services, including the energy, machinery and equipment (on lease), and other services, such as marketing, advertising, information processing, consulting, etc. Advantages and limitations of using the three basic types of productivity measures in companies. Advantages limitations Partial productivity measures 1) Easy to understand. 1) If used alone, can be very misleading and may lead to costly mistakes. 2) Easy to obtain the data. 2) Do not have the ability to explain overall cost increases. 3) Easy to compute the productivity indices 3) Tend to shift the blame to the wrong areas of management control. 4) Easy to sell to management 4) Profit control through partial because of the above three advantages. productivity measures can be a hit- and-miss approach. 5) Some partial productivity indicator data is available industry wide. 6) Good diagnostic tools to pinpoint areas for productivity improvement, if used along with total productivity indicators. Total factor productivity measure: 1. The data from company records are 1. Does not capture the impact of relatively easy obtain. materials and energy inputs. 2. Usually appealing from a corporate 2. The value-added approach to defining economist’s viewpoint. the output is not very appropriate in a company setting because it is difficult for operational managers to relate the value-added output to production efficiency. 3. Not appropriate when material costs from a sizable portion of total product costs since the impact of material input is not directly shown in this productivity measure. 4. Only labor and capital inputs are considered in the total factor input. 5. Data for comparison purposes are relatively difficult to obtain, although for some specific industries and specific time periods, the indices have been published. Total productivity measure: 1. Considers all the quantifiable output and 1. Data for computations are relatively input factors: therefore, is a more accurate difficult to obtain at product and representation of the real economic picture customer levels, unless data collection of a company systems are designed for this purpose.
  • 3. Source: Productivity Engineering and Management by David J. Sumanth navanth31@yahoo.co.in Unit – I Basic Concepts of Productivity 2. Profit control through the use of total 2. As with the partial and total-factor productivity indices is a tremendous measures, does not consider intangible benefit to top management. factors of output and input in a direct sense. 3. If used in conjunction with partial measures, can direct management attention in an effective manner. 4. Sensitivity analysis is easier to perform 5. Easily related to total costs. 1.1 Productivity vs. Inflation: While increased inflation rates in an economy must be explained by the joint effect of several factors, economists do agree that a lack of productivity growth contributes to the increase. As expected, this is because price inflation of goods and services results from the excessive increases in sales prices of products or services. Such increases are mostly due to the management’s intention to meet their sales revenue targets, even if it means increasing the selling price just to hold the profits margins. Also, since the path of least resistance is to pass the increases in input costs on to the customer, many companies resorts to that strategy rather than consistently increasing total productivity, a practice that can actually reduce, if not hold, the total cost of manufacture. Willard Butcher [1979] of the chase Manhattan Bank, in his remarks at the Town hall of California on September 25, 1979, emphasizes. The most compelling force we possess to improve our standard of living while at the same time fight inflation may very well be – increased productivity. The percent increases in prices and labor productivity are inversely correlated in fig 1.1 and 1.2, reinforcing the above statement. .
  • 4. Source: Productivity Engineering and Management by David J. Sumanth navanth31@yahoo.co.in Unit – I Basic Concepts of Productivity Fig 1.2 Relation between price increases and labor productivity in selected industries, 1960 to 1978. For an example of the relationship between productivity and price increases, consider the case of the Eli Lilly Company, one of the better known pharmaceutical companies in the world. During the period 1963-1974, by increasing its total factor productivity at a rate of 10.1% years on average. Lilly decreased its prices at an average annual rate of 0.4% [Virts and Cocks, 1976]. John W. Kendrick, a well-known professor of economics at George Washington University, is reported by the Chicago tribune (January 11, 1979) to have said that ―productivity could be a potent weapon in fighting inflation.‖ Geoffrey Moore [1973] (Vice President of Research at the National Bureau of Economic Research, and Senior Research Fellow at The Hoover Institution, Stanford University, in 1972) also points out in great detail the need for increasing productivity to combat inflation over the next several years. Fig 1.3, taken from a recent publication of United States Chamber of Commerce [1979], points out that the money supply in the United States grew faster in the 1970s than it did in the 1960s. Faster growth in the money supply and slower real growth in output have produced higher inflation. In other words, the money supply grew faster in recent years than did the national output of goods per unit of labor resource (labor productivity). Gross Money Gross national product National Supply Money Product Supply Inflation Portion Real growth portion Fig 1.3 Money supply growth faster than real growth in GNP, thereby causing inflation
  • 5. Source: Productivity Engineering and Management by David J. Sumanth navanth31@yahoo.co.in Unit – I Basic Concepts of Productivity 1.2 PRODUCTIVITY VS. THE STANDARD OF LIVING