THE MILLAU
VIADUCT
Cable-stayed bridge, @Millau,
France
PROJECT DATA
• Location: Millau, France
• Motorway bridge over the river Tarn in Millau and longest cable-
stayed bridge in the world
• construction period: 2001 - 2004
• construction: cable-stayed bridge
• construction method: bridge as a steel box superstructure using
an incremental launching method
• eight-section bridge with a length of 2,460 m
• highest piers: 343 m with steel structure
• seven reinforced concrete piers from approx. 78 m to 245 m
• cross-section change from single to double piers, 90 m below
the superstructure
PROJECT DATA
• Total width of span is 32.05m with 2 lanes on both the sides
• Longest span of bridge is 346m long
• Total cost of construction = 400 million euro
• Before construction of bridge ‘Fairy service’ took one & half hour
for crossing, but after construction of bridge this distance is passes
away in 5-10 minutes.
• It’s tallest pier is even taller than Eiffel Tower
• Tallest Pylons in the world
STRUCTURAL ELEMENTS
1. PYLONS & ABUTMENTS
~Each pylon is supported by four deep shafts, 15 m
(49 ft) deep and 5 m (16 ft) in diameter.
~The abutments are concrete structures that provide
anchorage for the deck to the ground at corners of
bridge
P1 P2 P3 P4 P5 P6 P7
94.50m 244.9m 221.0m 144.2m 136.4m 111.9m 77.56m
2. DECK
• The metallic deck, which appears very light despite its total
mass of around 36,000 tonnes (40,000 short tons), is 2,460 m
(8,070 ft) long and 32 m (105 ft) wide.
• These are composed of 173 central box beams, the spinal
column of the construction, onto which the lateral floors and
the lateral box beams were welded.
• The central box beams have a 4 m (13 ft) cross-section and a
length of 15–22 m (49–72 ft) for a total weight of 90 metric
tons (99 short tons). The deck has an inverse Airfoil shape,
providing negative lift in strong wind conditions.
3. MASTS
• The seven masts, each
87 m (285 ft) high and
weighing around 700
tonnes (690 long tons; 770
short tons), are set on top of
the pylons. Between each
of them, eleven stays
(metal cables) are
anchored, providing
support for the road deck.
4.STAYS
• Each mast of the viaduct is equipped with a monoaxial layer of
eleven pairs of stays laid face to face. Depending on their length, the
stays were made of 55 to 91 high tensile steel cables, or strands,
themselves formed of seven strands of steel (a central strand with six
intertwined strands).
• Each strand has triple protection against corrosion (galvanisation, a
coating of petroleum wax and an extruded polyethylene sheath).
The exterior envelope of the stays is itself coated along its entire
length with a double helical weatherstrip. The idea is to avoid running
water which, in high winds, could cause vibration in the stays and
compromise the stability of the viaduct.
• The stays were installed by the Freyssinet company.
5. SURFACE
• To allow for deformations of the metal deck under traffic, a special
surface of modified bitumen was installed by research teams
from Appia.
• The surface is somewhat flexible to adapt to deformations in the steel
deck without cracking, but it must nevertheless have sufficient strength
to withstand motorway conditions (fatigue, density, texture,
adherence, anti-rutting etc.).
• The "ideal formula" was found only after two years of research
6. ELECTRICAL
INSTALLATIONS
• The electrical installations of the
viaduct are large in proportion
to the size of the bridge.
• There are 30 km (19 mi) of high-
current cables, 20 km (12 mi)
of fibre optics, 10 km (6.2 mi) of
low-current cables and 357
telephone sockets allowing
maintenance teams to
communicate with each other
and with the command post.
• These are situated on the deck,
on the pylons and on the masts.
7. SAFETY MEASURES
• The pylons, deck, masts and stays are equipped with a multitude of sensors.
These are designed to detect the slightest movement in the viaduct and
measure its resistance to wear-and-tear over
time. Anemometers, accelerometers, inclinometers, temperature sensors are
all used for the instrumentation network.
• Twelve fibre optic extensometers were installed in the base of pylon P2. Being
the tallest of all, it is therefore under the most intense stress. These sensors
detect movements on the order of a micrometre. Other extensometers—
electrical this time—are distributed on top of P2 and P7. This apparatus is
capable of taking up to 100 readings per second. In high winds, they
continuously monitor the reactions of the viaduct to extreme conditions.
Accelerometers placed strategically on the deck monitor the oscillations that
can affect the metal structure. Displacements of the deck on the abutment
level are measured to the nearest millimetre. The stays are also instrumented,
and their ageing meticulously analysed. Additionally, two piezoelectric
sensors gather traffic data: weight of vehicles, average speed, density of the
flow of traffic, etc. This system can distinguish between fourteen different types
of vehicle.
• The data is transmitted by an Ethernet network to a computer in the IT room at
the management building situated near the toll plaza.
CONSTRUCTION OVERVIEW
• Temporary piers
used to help launch
and support the deck
as the the pylons
were constructed.
• The 2460m deck was
launched in two
pieces.
• Pylons and cables
were added on top
of the piers.
DECK LAUNCHING
• 7 temporary piers help
support the weight of the
deck.
• 2 deck segments are
launched from the each end
of te bhridge.
HYDRAULIC LAUNCHERS
• launchers push the pre-
fabricated deck
segments onto the
piers.
• cycle moves the deck
600mm. Total of 5000
cycles required.
NOSE RECOVERY
• Weight of steel
box-girder deck
sags as span is
completed.
• Nose recovery
system attached to
raise the deck to
the level of the
next pier.
COMPLETION
• Deck segments move towards each other at the
rate of 0.9 meter per hour.
• Two deck segments joined in May of 2004.
PHOTOES OF CONSTRUCTION
Hollow pier construction by moving
formwork with hydraulic crane
the millau viaduct
the millau viaduct
the millau viaduct

Contenu connexe

Tendances

Cable stayed ppt acp
Cable stayed ppt acpCable stayed ppt acp
Cable stayed ppt acp
Jigar Shah
 

Tendances (20)

Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methods
 
Metro Work
Metro WorkMetro Work
Metro Work
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
golden gate bridge
golden gate bridgegolden gate bridge
golden gate bridge
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 
Bundled Tube Structural System
 Bundled Tube Structural System Bundled Tube Structural System
Bundled Tube Structural System
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Presentation1
Presentation1Presentation1
Presentation1
 
The Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension BridgeThe Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension Bridge
 
Folded Plate structures
Folded Plate structures Folded Plate structures
Folded Plate structures
 
Jacketing
JacketingJacketing
Jacketing
 
Cable stayed ppt acp
Cable stayed ppt acpCable stayed ppt acp
Cable stayed ppt acp
 
Santiago calatrava
Santiago calatravaSantiago calatrava
Santiago calatrava
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Waffle or ribbed slab
Waffle or ribbed slabWaffle or ribbed slab
Waffle or ribbed slab
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
Arches and domes
Arches and domesArches and domes
Arches and domes
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
 

Similaire à the millau viaduct

Calculation Note Final
Calculation Note FinalCalculation Note Final
Calculation Note Final
Mohamed Elfike
 
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedInCalifornia Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
Alfred Mangus
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
Mohammed Abdelkawy
 
steelstructures-130906015820-.pdf
steelstructures-130906015820-.pdfsteelstructures-130906015820-.pdf
steelstructures-130906015820-.pdf
rubini32
 
Fib2010 article260 design & construction_rev_a
Fib2010 article260 design & construction_rev_aFib2010 article260 design & construction_rev_a
Fib2010 article260 design & construction_rev_a
gefyra-rion
 

Similaire à the millau viaduct (20)

Millau via duct presentation full analysis
Millau via duct presentation full analysisMillau via duct presentation full analysis
Millau via duct presentation full analysis
 
The Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldThe Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the world
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Case study on signature bridge ppt (1)
Case study on signature bridge ppt (1)Case study on signature bridge ppt (1)
Case study on signature bridge ppt (1)
 
Form Active system
Form Active systemForm Active system
Form Active system
 
Calculation Note Final
Calculation Note FinalCalculation Note Final
Calculation Note Final
 
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedInCalifornia Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
 
steelstructures-130906015820-.pdf
steelstructures-130906015820-.pdfsteelstructures-130906015820-.pdf
steelstructures-130906015820-.pdf
 
Steel structures
Steel structuresSteel structures
Steel structures
 
03 CONVEYER.pptx
03 CONVEYER.pptx03 CONVEYER.pptx
03 CONVEYER.pptx
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
A mini project on the transmission tower
A mini project on the transmission towerA mini project on the transmission tower
A mini project on the transmission tower
 
Fib2010 article260 design & construction_rev_a
Fib2010 article260 design & construction_rev_aFib2010 article260 design & construction_rev_a
Fib2010 article260 design & construction_rev_a
 
Cable-stayed Bridge final fig.pptx
Cable-stayed Bridge final     fig.pptxCable-stayed Bridge final     fig.pptx
Cable-stayed Bridge final fig.pptx
 

Dernier

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Dernier (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 

the millau viaduct

  • 2.
  • 3. PROJECT DATA • Location: Millau, France • Motorway bridge over the river Tarn in Millau and longest cable- stayed bridge in the world • construction period: 2001 - 2004 • construction: cable-stayed bridge • construction method: bridge as a steel box superstructure using an incremental launching method • eight-section bridge with a length of 2,460 m • highest piers: 343 m with steel structure • seven reinforced concrete piers from approx. 78 m to 245 m • cross-section change from single to double piers, 90 m below the superstructure
  • 4. PROJECT DATA • Total width of span is 32.05m with 2 lanes on both the sides • Longest span of bridge is 346m long • Total cost of construction = 400 million euro • Before construction of bridge ‘Fairy service’ took one & half hour for crossing, but after construction of bridge this distance is passes away in 5-10 minutes. • It’s tallest pier is even taller than Eiffel Tower • Tallest Pylons in the world
  • 5. STRUCTURAL ELEMENTS 1. PYLONS & ABUTMENTS ~Each pylon is supported by four deep shafts, 15 m (49 ft) deep and 5 m (16 ft) in diameter. ~The abutments are concrete structures that provide anchorage for the deck to the ground at corners of bridge P1 P2 P3 P4 P5 P6 P7 94.50m 244.9m 221.0m 144.2m 136.4m 111.9m 77.56m
  • 6.
  • 7. 2. DECK • The metallic deck, which appears very light despite its total mass of around 36,000 tonnes (40,000 short tons), is 2,460 m (8,070 ft) long and 32 m (105 ft) wide. • These are composed of 173 central box beams, the spinal column of the construction, onto which the lateral floors and the lateral box beams were welded. • The central box beams have a 4 m (13 ft) cross-section and a length of 15–22 m (49–72 ft) for a total weight of 90 metric tons (99 short tons). The deck has an inverse Airfoil shape, providing negative lift in strong wind conditions.
  • 8. 3. MASTS • The seven masts, each 87 m (285 ft) high and weighing around 700 tonnes (690 long tons; 770 short tons), are set on top of the pylons. Between each of them, eleven stays (metal cables) are anchored, providing support for the road deck.
  • 9. 4.STAYS • Each mast of the viaduct is equipped with a monoaxial layer of eleven pairs of stays laid face to face. Depending on their length, the stays were made of 55 to 91 high tensile steel cables, or strands, themselves formed of seven strands of steel (a central strand with six intertwined strands). • Each strand has triple protection against corrosion (galvanisation, a coating of petroleum wax and an extruded polyethylene sheath). The exterior envelope of the stays is itself coated along its entire length with a double helical weatherstrip. The idea is to avoid running water which, in high winds, could cause vibration in the stays and compromise the stability of the viaduct. • The stays were installed by the Freyssinet company.
  • 10. 5. SURFACE • To allow for deformations of the metal deck under traffic, a special surface of modified bitumen was installed by research teams from Appia. • The surface is somewhat flexible to adapt to deformations in the steel deck without cracking, but it must nevertheless have sufficient strength to withstand motorway conditions (fatigue, density, texture, adherence, anti-rutting etc.). • The "ideal formula" was found only after two years of research
  • 11. 6. ELECTRICAL INSTALLATIONS • The electrical installations of the viaduct are large in proportion to the size of the bridge. • There are 30 km (19 mi) of high- current cables, 20 km (12 mi) of fibre optics, 10 km (6.2 mi) of low-current cables and 357 telephone sockets allowing maintenance teams to communicate with each other and with the command post. • These are situated on the deck, on the pylons and on the masts.
  • 12. 7. SAFETY MEASURES • The pylons, deck, masts and stays are equipped with a multitude of sensors. These are designed to detect the slightest movement in the viaduct and measure its resistance to wear-and-tear over time. Anemometers, accelerometers, inclinometers, temperature sensors are all used for the instrumentation network. • Twelve fibre optic extensometers were installed in the base of pylon P2. Being the tallest of all, it is therefore under the most intense stress. These sensors detect movements on the order of a micrometre. Other extensometers— electrical this time—are distributed on top of P2 and P7. This apparatus is capable of taking up to 100 readings per second. In high winds, they continuously monitor the reactions of the viaduct to extreme conditions. Accelerometers placed strategically on the deck monitor the oscillations that can affect the metal structure. Displacements of the deck on the abutment level are measured to the nearest millimetre. The stays are also instrumented, and their ageing meticulously analysed. Additionally, two piezoelectric sensors gather traffic data: weight of vehicles, average speed, density of the flow of traffic, etc. This system can distinguish between fourteen different types of vehicle. • The data is transmitted by an Ethernet network to a computer in the IT room at the management building situated near the toll plaza.
  • 13. CONSTRUCTION OVERVIEW • Temporary piers used to help launch and support the deck as the the pylons were constructed. • The 2460m deck was launched in two pieces. • Pylons and cables were added on top of the piers.
  • 14. DECK LAUNCHING • 7 temporary piers help support the weight of the deck. • 2 deck segments are launched from the each end of te bhridge.
  • 15. HYDRAULIC LAUNCHERS • launchers push the pre- fabricated deck segments onto the piers. • cycle moves the deck 600mm. Total of 5000 cycles required.
  • 16. NOSE RECOVERY • Weight of steel box-girder deck sags as span is completed. • Nose recovery system attached to raise the deck to the level of the next pier.
  • 17. COMPLETION • Deck segments move towards each other at the rate of 0.9 meter per hour. • Two deck segments joined in May of 2004.
  • 18. PHOTOES OF CONSTRUCTION Hollow pier construction by moving formwork with hydraulic crane