Introduction to Estimation
▪ Estimating is argued to be one of the most difficult tasks in Project
Scheduling
▪ This is due to the lack of available specific data regarding product
resources i.e. how much a product will cost, how long it will take etc.
▪ The lack of this data means that project managers can only provide
estimates
▪ These estimates are usually wide ranging
▪ Wide ranging estimates are better than specific estimates which are
likely to be wrong
Estimating Project costs with Duration
and Effort
Before the start of a project three things must be estimated:
1.

Duration: time the project will take

1.

Effort: the amount of work

2.

Cost: how much the project will cost financially
Estimating Project Costs with Duration
and Effort
▪ Effort must be estimated first

▪ Duration can be estimated from the amount of effort required and
the resources which are available
▪ Once effort and duration have been establish project costs can be
estimated using labour and non-labour items
Techniques for Estimating
▪ Quantitatively based or Parametric Estimating

▪ Analogous Estimating or As-buts
▪ Bottom-up Estimating
▪ Using Learning Curve Effects
▪ Wishful thinking
▪ Expert judgement
Parametric Estimating
▪ Works best when there is existing experience of similar projects
▪ Project is broken down into units which can then be estimated using
independent variables

▪ These variables are often standard or previously known variables
▪ Costs can be estimated from knowledge of what work is being undertaken
▪ Relies on repetition in previous projects

▪ Similar to Analogous estimating but follows a more statistical approach
▪ The accuracy of the data/known variables effects the accuracy of this approach
Analogues Estimating or As….Buts
▪ Useful for early project estimates
▪ The organisation uses previous experience which is similar to make an estimate
▪ Use costs from previous experience as a guideline for estimation
▪ If previous projects are not reviewed then the accuracy of previous estimates is
unknown
▪ Therefore previous costs etc. might not provide valuable valid estimates
▪ This may cause mistakes to be repeated as no learning has occurred
▪ Previous estimates can be used if they are reviewed and augmented
Bottom-up Estimating
▪ The project is broken down into estimated components

▪ Each component is broken down further to allow for greater
understanding
▪ The costs of each work component is summed from the bottom up to
provide an estimation for the whole project.
Learning Curve Effects
▪ There will be areas of repetition in projects, repetition decreases the time
required for tasks as they are known and learning has already occurred
▪ Subsequent improvements in speed are seen to become smaller over time
▪ This can be quantified using the following formula:

Yx = Kxn
X

The number of times the task has been carried out

Yx

Time taken to carry out the task the xth time

K

Time taken to carry out the task the first time

n

Log b/log 2 where b = learning rate
Wishful Thinking
Some causes of wishful thinking occurring are:

▪ Optimism Bias: being over-optimistic regarding timeframes and
costs
▪ Politics: for examples when objectives are regarded as being more
important than costs
▪ Failure to be systematic about planning: i.e. people making
estimates can be complacent and/or unqualified
Expert Judgement
▪ Estimation requires a degree of expert judgement
▪ There is a degree of expert judgement required in the project and of
the business area.
▪ The project manager is assumed to have expert judgement
Problems with Estimates
▪ Inappropriate use of estimates: i.e. rough estimates may be used as
definitive estimates.
▪ Inappropriate data used to generate estimates: such as irrelevant
past experience
▪ Estimates are taken out of context: for example initial estimates are
used when changes have been made to the project
Nature, Role and Accuracy of Estimate
Types
Name

Nature

Role

Accuracy

Rough/Ballpark

Much uncertainty as to
what is involved

Early check on feasibility Very low
of brief

As-buts

As was carried out
previously but with
some amendments

With an appropriate
contingency factor, can
be used for proposals

Detailed Estimates

Some initial work is
Proposals
carried out to determine
what the likely problems
are going to be

To Finish

Much of the Project is
completed and
additional funding is
needed to complete the
tasks

Moderate

Moderate

Additional fund requests High

Source: Maylor. 2010. Project Management
Parkinson’s Law
▪ An activity will expand to fill the time available
▪ A critical review of Parkinson’s Law and it’s implications can be found
in the article below
Genaro J. Gutierrez and Panagiotis Kouvelis, Parkinson's Law and Its
Implications for Project Management. Management Science. Vol. 37,
No. 8 (Aug., 1991), pp. 990-1001
Techniques for Accuracy
1. Clarify the project priorities, understand the scope of the project

2. Incorporate time to generate estimates in the project plan
3. Break the project down into detailed tasks
4. Use learning from previous projects

5. Avoid making estimates to please management
6. Refine the project scope throughout the duration of the project to improve
accuracy

7. Use multiple estimating techniques
Techniques for Accuracy
▪ Bottom up estimating and Parametric estimating offer the highest
levels of accuracy
▪ Bottom up estimating: provides the highest level of accuracy when
there is suitable detail regarding the components
▪ Parametric Estimating: provides high levels of accuracy when the
data is of good quality and due to the statistical nature of the
approach
Further Reading
▪ Maylor: Project Management, 4th ed, Chapter 6 & 8

▪ Chapman., and Ward. 2003. Constructively Simple Estimating: a
Project Management Example. Journal of the Operation Research
Society. 54. 1050-1058.
References
▪ Maylor, H., 2010. Project Management. 4th ed. Chester: Pearson

▪ Tom Mochal, 2006. Estimate project costs after you have estimated effort and
duration. [Online] Available at: http://www.techrepublic.com/article/estimate/project-costs-after-you-have-estimated-effort-and-duration/ [Accessed: 07/11/13]
▪ CHRIS O'HALLORAN, 2013. Project Estimation Techniques and Templates. [Online]
Available at: http://strikingprojectmanagement.com/project-estimation/ [Accessed
07/11/13]
▪ Adele Sommers, 2013. 12 Tips for Accurate Project Estimating. [Online] Availbale at:
http://www.projectsmart.co.uk/12-tips-for-accurate-project-estimating.html
[Accessed 07/11/13]
▪ MindTools, 2013. Estimating Time Accurately. [Online] Available at:
http://www.mindtools.com/pages/article/newPPM_01.htm [Accessed 07/11/13]

Contenu connexe

Tendances

Project Planning
Project PlanningProject Planning
Project Planning
lew
 

Tendances (20)

Project Estimating Process
Project Estimating Process Project Estimating Process
Project Estimating Process
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and cons
 
The art of project estimation
The art of project estimationThe art of project estimation
The art of project estimation
 
Free CAPM® Exam Sample Question
Free CAPM® Exam Sample QuestionFree CAPM® Exam Sample Question
Free CAPM® Exam Sample Question
 
Bottom-up time estimations techiques
Bottom-up time estimations techiquesBottom-up time estimations techiques
Bottom-up time estimations techiques
 
Project Estimating
Project EstimatingProject Estimating
Project Estimating
 
Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...
Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...
Estimating & Control - Reliable Estimates for Realistic Projects - PMI NL cha...
 
Project Estimation
Project EstimationProject Estimation
Project Estimation
 
Project Estimation
Project EstimationProject Estimation
Project Estimation
 
Software engineering 11 project scheduling
Software engineering 11 project schedulingSoftware engineering 11 project scheduling
Software engineering 11 project scheduling
 
The estimating process
The estimating processThe estimating process
The estimating process
 
Estimating
EstimatingEstimating
Estimating
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project Scheduling
Project Scheduling Project Scheduling
Project Scheduling
 
Project Cost.pdf
Project Cost.pdfProject Cost.pdf
Project Cost.pdf
 
Project Schedule Management - Estimate Activity Durations - PMP Workgroup
Project Schedule Management - Estimate Activity Durations - PMP WorkgroupProject Schedule Management - Estimate Activity Durations - PMP Workgroup
Project Schedule Management - Estimate Activity Durations - PMP Workgroup
 
Ch03
Ch03Ch03
Ch03
 
Day 3 Analogous, estimates and semantics for process
Day 3   Analogous, estimates and semantics for process Day 3   Analogous, estimates and semantics for process
Day 3 Analogous, estimates and semantics for process
 
Project management
Project managementProject management
Project management
 
Scheduling
SchedulingScheduling
Scheduling
 

Similaire à Estimating

Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - Presentation
Hassan Rizwan
 
8 project planning
8 project planning8 project planning
8 project planning
randhirlpu
 

Similaire à Estimating (20)

Project-Time-Line.pdf
Project-Time-Line.pdfProject-Time-Line.pdf
Project-Time-Line.pdf
 
Project Management and Organization
Project Management and OrganizationProject Management and Organization
Project Management and Organization
 
Ppt.pptx
Ppt.pptxPpt.pptx
Ppt.pptx
 
Excellent Estimating – the key to Happy Clients
Excellent Estimating – the key to Happy ClientsExcellent Estimating – the key to Happy Clients
Excellent Estimating – the key to Happy Clients
 
5. PMP Training - Time management
5. PMP Training - Time management5. PMP Training - Time management
5. PMP Training - Time management
 
Topic 11 - Project Schedule Management.pdf
Topic 11 - Project Schedule Management.pdfTopic 11 - Project Schedule Management.pdf
Topic 11 - Project Schedule Management.pdf
 
Project Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksProject Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & Tricks
 
4-ProjectPlanning.ppt
4-ProjectPlanning.ppt4-ProjectPlanning.ppt
4-ProjectPlanning.ppt
 
Mba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management a
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
7 Project planning for software engineering.pptx
7 Project planning for software engineering.pptx7 Project planning for software engineering.pptx
7 Project planning for software engineering.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
Planning can we do with out it?
Planning can we do with out it?Planning can we do with out it?
Planning can we do with out it?
 
PMI-ACP Domain V: Adaptive Planning v1.0
PMI-ACP Domain V: Adaptive Planning v1.0PMI-ACP Domain V: Adaptive Planning v1.0
PMI-ACP Domain V: Adaptive Planning v1.0
 
Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - Presentation
 
WRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptxWRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptx
 
Chap005
Chap005Chap005
Chap005
 
06 projecttimemanagement
06 projecttimemanagement06 projecttimemanagement
06 projecttimemanagement
 
1587310189-week6.pptx
1587310189-week6.pptx1587310189-week6.pptx
1587310189-week6.pptx
 
8 project planning
8 project planning8 project planning
8 project planning
 

Plus de Nicola2903

Network diagrams
Network diagramsNetwork diagrams
Network diagrams
Nicola2903
 
Critical path method
Critical path methodCritical path method
Critical path method
Nicola2903
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown Structure
Nicola2903
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart
Nicola2903
 
Resource Scheduling
Resource Scheduling  Resource Scheduling
Resource Scheduling
Nicola2903
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
Nicola2903
 
Network Diagrams
Network DiagramsNetwork Diagrams
Network Diagrams
Nicola2903
 
The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path Method
Nicola2903
 
The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path Method
Nicola2903
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource Scheduling
Nicola2903
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt Chart
Nicola2903
 

Plus de Nicola2903 (11)

Network diagrams
Network diagramsNetwork diagrams
Network diagrams
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown Structure
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart
 
Resource Scheduling
Resource Scheduling  Resource Scheduling
Resource Scheduling
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Network Diagrams
Network DiagramsNetwork Diagrams
Network Diagrams
 
The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path Method
 
The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path Method
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource Scheduling
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt Chart
 

Dernier

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Dernier (20)

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 

Estimating

  • 2. Introduction to Estimation ▪ Estimating is argued to be one of the most difficult tasks in Project Scheduling ▪ This is due to the lack of available specific data regarding product resources i.e. how much a product will cost, how long it will take etc. ▪ The lack of this data means that project managers can only provide estimates ▪ These estimates are usually wide ranging ▪ Wide ranging estimates are better than specific estimates which are likely to be wrong
  • 3. Estimating Project costs with Duration and Effort Before the start of a project three things must be estimated: 1. Duration: time the project will take 1. Effort: the amount of work 2. Cost: how much the project will cost financially
  • 4. Estimating Project Costs with Duration and Effort ▪ Effort must be estimated first ▪ Duration can be estimated from the amount of effort required and the resources which are available ▪ Once effort and duration have been establish project costs can be estimated using labour and non-labour items
  • 5. Techniques for Estimating ▪ Quantitatively based or Parametric Estimating ▪ Analogous Estimating or As-buts ▪ Bottom-up Estimating ▪ Using Learning Curve Effects ▪ Wishful thinking ▪ Expert judgement
  • 6. Parametric Estimating ▪ Works best when there is existing experience of similar projects ▪ Project is broken down into units which can then be estimated using independent variables ▪ These variables are often standard or previously known variables ▪ Costs can be estimated from knowledge of what work is being undertaken ▪ Relies on repetition in previous projects ▪ Similar to Analogous estimating but follows a more statistical approach ▪ The accuracy of the data/known variables effects the accuracy of this approach
  • 7. Analogues Estimating or As….Buts ▪ Useful for early project estimates ▪ The organisation uses previous experience which is similar to make an estimate ▪ Use costs from previous experience as a guideline for estimation ▪ If previous projects are not reviewed then the accuracy of previous estimates is unknown ▪ Therefore previous costs etc. might not provide valuable valid estimates ▪ This may cause mistakes to be repeated as no learning has occurred ▪ Previous estimates can be used if they are reviewed and augmented
  • 8. Bottom-up Estimating ▪ The project is broken down into estimated components ▪ Each component is broken down further to allow for greater understanding ▪ The costs of each work component is summed from the bottom up to provide an estimation for the whole project.
  • 9. Learning Curve Effects ▪ There will be areas of repetition in projects, repetition decreases the time required for tasks as they are known and learning has already occurred ▪ Subsequent improvements in speed are seen to become smaller over time ▪ This can be quantified using the following formula: Yx = Kxn X The number of times the task has been carried out Yx Time taken to carry out the task the xth time K Time taken to carry out the task the first time n Log b/log 2 where b = learning rate
  • 10. Wishful Thinking Some causes of wishful thinking occurring are: ▪ Optimism Bias: being over-optimistic regarding timeframes and costs ▪ Politics: for examples when objectives are regarded as being more important than costs ▪ Failure to be systematic about planning: i.e. people making estimates can be complacent and/or unqualified
  • 11. Expert Judgement ▪ Estimation requires a degree of expert judgement ▪ There is a degree of expert judgement required in the project and of the business area. ▪ The project manager is assumed to have expert judgement
  • 12. Problems with Estimates ▪ Inappropriate use of estimates: i.e. rough estimates may be used as definitive estimates. ▪ Inappropriate data used to generate estimates: such as irrelevant past experience ▪ Estimates are taken out of context: for example initial estimates are used when changes have been made to the project
  • 13. Nature, Role and Accuracy of Estimate Types Name Nature Role Accuracy Rough/Ballpark Much uncertainty as to what is involved Early check on feasibility Very low of brief As-buts As was carried out previously but with some amendments With an appropriate contingency factor, can be used for proposals Detailed Estimates Some initial work is Proposals carried out to determine what the likely problems are going to be To Finish Much of the Project is completed and additional funding is needed to complete the tasks Moderate Moderate Additional fund requests High Source: Maylor. 2010. Project Management
  • 14. Parkinson’s Law ▪ An activity will expand to fill the time available ▪ A critical review of Parkinson’s Law and it’s implications can be found in the article below Genaro J. Gutierrez and Panagiotis Kouvelis, Parkinson's Law and Its Implications for Project Management. Management Science. Vol. 37, No. 8 (Aug., 1991), pp. 990-1001
  • 15. Techniques for Accuracy 1. Clarify the project priorities, understand the scope of the project 2. Incorporate time to generate estimates in the project plan 3. Break the project down into detailed tasks 4. Use learning from previous projects 5. Avoid making estimates to please management 6. Refine the project scope throughout the duration of the project to improve accuracy 7. Use multiple estimating techniques
  • 16. Techniques for Accuracy ▪ Bottom up estimating and Parametric estimating offer the highest levels of accuracy ▪ Bottom up estimating: provides the highest level of accuracy when there is suitable detail regarding the components ▪ Parametric Estimating: provides high levels of accuracy when the data is of good quality and due to the statistical nature of the approach
  • 17. Further Reading ▪ Maylor: Project Management, 4th ed, Chapter 6 & 8 ▪ Chapman., and Ward. 2003. Constructively Simple Estimating: a Project Management Example. Journal of the Operation Research Society. 54. 1050-1058.
  • 18. References ▪ Maylor, H., 2010. Project Management. 4th ed. Chester: Pearson ▪ Tom Mochal, 2006. Estimate project costs after you have estimated effort and duration. [Online] Available at: http://www.techrepublic.com/article/estimate/project-costs-after-you-have-estimated-effort-and-duration/ [Accessed: 07/11/13] ▪ CHRIS O'HALLORAN, 2013. Project Estimation Techniques and Templates. [Online] Available at: http://strikingprojectmanagement.com/project-estimation/ [Accessed 07/11/13] ▪ Adele Sommers, 2013. 12 Tips for Accurate Project Estimating. [Online] Availbale at: http://www.projectsmart.co.uk/12-tips-for-accurate-project-estimating.html [Accessed 07/11/13] ▪ MindTools, 2013. Estimating Time Accurately. [Online] Available at: http://www.mindtools.com/pages/article/newPPM_01.htm [Accessed 07/11/13]