PREPARED BY
NIHAL SHIROYA
Why "Testing of Circuit Breaker" is Necessary?
A Circuit Breaker should be capable of carrying, making, and
breaking under normal and abnormal conditions. In any power
system circuit breaker has to withstand power frequency over
voltages and transient over voltages due to switching and
lightning.
The performance of a circuit breaker under normal and abnormal
conditions can be verified by performing different type of tests
on circuit breakers. The main purpose of testing of circuit
breakers is to confirm if circuit breaker is able to work on
particular voltage and current ratings or not.
There are mainly two tests classified:
1) Type test
2) Routine Test
1) Type Tests:
The purpose of type tests is to prove design
features and the quality of circuit breaker. Type tests
are not conducted on each circuit breaker. This is
done to prove the capabilities and to confirm the
rated characteristics of the circuit breakers.
2)Routine Tests:
Routine test is performed before circuit
breaker dispatch to ensure the product.
This gives result about defects in
materials and construction of circuit
breaker. We can check quality of material
of circuit breaker by performing Routine
Test.
 Mechanical endurance tests
 Thermal tests
 Dielectric tests
 Measurement of resistance of the main circuits
 Short Circuit tests
In this test, the C.B.. is open and closed 500 times or
other value as agreed to between the purchaser and the
supplier.the test are carried out without current through
the main circuit of the C.B.Out of the total number of
tests, 10% should be closed-open operation,that is with
the tripping,mechanism energized by the closing of
main contacts.During the tests,occasional
lubrication,but no mechanical adjustments are
permissible.after the tests,all parts including contacts
should be in good condition and there should be no
permanent distortion and undue wear of the parts.
This test determines the maximum normal current that the
circuit breaker can carry without exceeding the maximum
allowable temperature rise.In this test the rated normal
current of normal frequency is passed through the current
carrying parts of circuit breaker.
Method are recognized by Indian standards for measuring
temperature rise of parts:-
1) Thermometer method
2) Thermocouple method
3) Self resistance method
1) Breaking capacity Test:-
• Sequence of performing this tests is as follows:-
 First of all,the master circuit breaker (MB)and the breaker under test
(TB)are closed.
 The s.c.current is passed by closing the make switch.
 The circuit breaker under test(TB) is opened to interrupt the s.c.current at
desired moment.
• The following measurements related to the breaking capacity
performance are taken from the oscillogram during the test:-
 Symmetrical breaking current
 Asymmetrical breaking current
 Amplitude factor
 Natural frequency of oscillations and RRRV(RATE OF RISE OF
RISTRIKING VOLTAGE)
Sequence of Performing this test :-
First of all,the master circuit breaker (MB)and the
make switch(MS) are closed.
Then,the short circuit current is initiated by closing
the test breaker (TB).
The rated short circuit making current i.e.the peak
value of the first major loop of the short circuit current
envelope is measured from the oscillorgram.
3(Short Time Withstand Current Capacity
In this test,the rated short-time withstand current is
applied to the circuit breaker
under test for the specified duration of the time.
The rated short time withstand current is equal to be
rated short circuit breaking current and standarad
value of rated duration of short circuit current is 1
second or 3 seconds.
The current is measured by taking an oscillograph of
the short circuit current wave.
After the test,there should be no mechanical or
insulation damage and any contact welding.
Routine Test Listed Below:-
1(Mechanical Operational test
2(One-Minute power frequency
voltage dry withstand test
3(Measurement of resistance of main
circuits
 This test should be made before temperature rise
test.The measurement of resistance is made by
measuring dc voltage drop or resistance across the
terminals of each pole of circuit breaker.The current
during the test shall have any convenient value
between 100 A and the rated current of the circuit
breaker.The d.c. resistance of main contact of each
pole of a circuit breaker is of the order of a few tens
of micro-ohms.
 Operational tests are made to ensure that the circuit breakers
comply with prescribed operating conditions within the specified
voltage and supply pressure limits of their opening and closing
devices.
 During routine test five opening and five closing operations should
carry out at
a. Minimum supply voltage and pressure
b. Maximum supply voltage and pressure
After the test,all parts should be in good condition and should not
undue wear.
 
The preliminary preparations of circuit breaker testing include
the following:
 Connect the equipment.
 Adjust the correct values of resistance and reactors to set
the required magnitude of short circuit.
 Connect and set the transformer to get desired test voltage.
 The contacts on sequence switch are adjusted to get
desired timings.
 Oscillographs are adjusted and calibrated.
• 1) Short Circuit generator:-
It is a specially designed generator having very low
leakage reactance to provide short power for testing c.b.
It is driven by 3-phse induction motor.A flywheel is
provided on shaft of generator to supply kinetic energy
during short circuit and helps in spped regulation.
• 2)Short Circuit Transformer:-
 It is connected between TB and power source.It is used
to allow for flexibility to test at different voltage levels and
also provide isolation between the power source and test
breaker.
It is designed to have low leakage reactance and to
withstand repeated short circuit.
It is used as a back up c.b. to interrupt the short circuit
current in event of c.b.under test(TB) fails to operate.It
has higher capacity than the circuit breaker under
test.After every test,it is also isolates the test circuit
breaker(TB) from the supply source.It is set to operate at
a predetermined time after the initiation of short circuit
4) Make Switch(MS):-
It is very high speed switch used for initiation of short
circuit test current at desired moment.Recently,SF6 gas
make switch are used in short circuit testing station.
5) Reactors(L):-
It is connected in series.It is used to limit or control the
magnitude of the short circuit or test current to its
required value.
6) Resistors and Capacitors (R and C):-
TRV shaping circuit(R and C) is connected across the
circuit breaker under test(TB).This circuit is used to control
transient recovery voltage(TRV).Capacitors are also used
for voltage measurement.
7) Measuring Equipments:-
 For the measurements of voltage,voltage
dividers are used and for cureent measurements
shunts or CTs are used in the short circuit testing
stations.
Photo Of Testing Of Circuit Breaker
Testing of c.b.(hk & hr) nihal

Contenu connexe

Tendances

HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 
Transformer testing
Transformer testingTransformer testing
Transformer testingajayknows
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protectionRishi Tandon
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protectionRakesh Joshi
 
Power System Protection course - Part I
Power System Protection course - Part IPower System Protection course - Part I
Power System Protection course - Part ISlides Hub
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformervikasgupta1965
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION moiz89
 
Power system protection
Power system protectionPower system protection
Power system protectionAnu Priya
 
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERDIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERRitesh Kumawat
 
Digital testing of high voltage circuit breaker
Digital testing of high voltage circuit breakerDigital testing of high voltage circuit breaker
Digital testing of high voltage circuit breakerneeraj prasad
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sightDHAVALKUMAR JULASANA
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNageswar Rao
 
RW - Thermal Overload Relay
RW - Thermal Overload RelayRW - Thermal Overload Relay
RW - Thermal Overload RelayAllan Bernardino
 
LV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxLV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxshivendra68
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer ProtectionAng Sovann
 

Tendances (20)

HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
Transformer testing
Transformer testingTransformer testing
Transformer testing
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Relay
RelayRelay
Relay
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
Power System Protection course - Part I
Power System Protection course - Part IPower System Protection course - Part I
Power System Protection course - Part I
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
 
Power System Protection
Power System ProtectionPower System Protection
Power System Protection
 
MV Switchgear from IEEE
MV Switchgear from IEEEMV Switchgear from IEEE
MV Switchgear from IEEE
 
Power system protection
Power system protectionPower system protection
Power system protection
 
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERDIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
 
Digital testing of high voltage circuit breaker
Digital testing of high voltage circuit breakerDigital testing of high voltage circuit breaker
Digital testing of high voltage circuit breaker
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sight
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Buchholz relay
Buchholz relayBuchholz relay
Buchholz relay
 
RW - Thermal Overload Relay
RW - Thermal Overload RelayRW - Thermal Overload Relay
RW - Thermal Overload Relay
 
LV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxLV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptx
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 

En vedette

Er. rahul sharma circuit breaker
Er. rahul sharma circuit breakerEr. rahul sharma circuit breaker
Er. rahul sharma circuit breakerRahul Ruddra
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerRenuka Verma
 
2.components in a substation breaker
2.components in a substation   breaker2.components in a substation   breaker
2.components in a substation breakerayyadurai SHANMUGAM
 
Circuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument TestingCircuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument Testinginfoweb12
 
Schering bridge
Schering bridge Schering bridge
Schering bridge mihir jain
 
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...Shivakumar Shivu
 
High voltage engineering
High voltage engineeringHigh voltage engineering
High voltage engineeringHari Kumar
 
Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Rohini Haridas
 
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...Prannay Kumar Giri
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-enSuresh Patil
 
Circuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software TechnologyCircuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software Technologysiddhartha muduli
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNadir Baloch
 

En vedette (20)

Testing of cb
Testing of cbTesting of cb
Testing of cb
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
HV Circuit Breaker Testing
HV Circuit Breaker TestingHV Circuit Breaker Testing
HV Circuit Breaker Testing
 
Er. rahul sharma circuit breaker
Er. rahul sharma circuit breakerEr. rahul sharma circuit breaker
Er. rahul sharma circuit breaker
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breaker
 
2.components in a substation breaker
2.components in a substation   breaker2.components in a substation   breaker
2.components in a substation breaker
 
final yr project-1
final yr project-1final yr project-1
final yr project-1
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
1+1 venky
1+1 venky1+1 venky
1+1 venky
 
Circuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument TestingCircuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument Testing
 
Schering bridge
Schering bridge Schering bridge
Schering bridge
 
Akt tl design01
Akt tl design01Akt tl design01
Akt tl design01
 
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...
 
High voltage engineering
High voltage engineeringHigh voltage engineering
High voltage engineering
 
Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)
 
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-en
 
Circuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software TechnologyCircuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software Technology
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 

Similaire à Testing of c.b.(hk & hr) nihal

Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushingNovia Putri
 
Testing of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTesting of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTafhim Bin Nasir
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...Ali Sepehri
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxRAJKIRANR3
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100Ali Sepehri
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxDrNiveditaSingh3
 
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...Ali Sepehri
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSatish Pydimarla
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................hiiarindam
 
Electrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptxElectrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptxPritishPachhapure1
 

Similaire à Testing of c.b.(hk & hr) nihal (20)

Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
Testing of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTesting of Circuit Breakers.pptx
Testing of Circuit Breakers.pptx
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
 
ET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptxET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptx
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptx
 
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
Relay testing.............................
Relay testing.............................Relay testing.............................
Relay testing.............................
 
16950
1695016950
16950
 
Test Switch Operation, Specifications & Accesories
Test Switch Operation, Specifications & Accesories Test Switch Operation, Specifications & Accesories
Test Switch Operation, Specifications & Accesories
 
Test Switch Operation, Specification & Accessories
Test Switch Operation, Specification & AccessoriesTest Switch Operation, Specification & Accessories
Test Switch Operation, Specification & Accessories
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
Electrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptxElectrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptx
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
 
SEMA 2016 - Introduction to Transformer Rated Metering
SEMA 2016 -  Introduction to Transformer Rated MeteringSEMA 2016 -  Introduction to Transformer Rated Metering
SEMA 2016 - Introduction to Transformer Rated Metering
 
Meduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptxMeduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptx
 

Dernier

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 

Dernier (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 

Testing of c.b.(hk & hr) nihal

  • 2. Why "Testing of Circuit Breaker" is Necessary? A Circuit Breaker should be capable of carrying, making, and breaking under normal and abnormal conditions. In any power system circuit breaker has to withstand power frequency over voltages and transient over voltages due to switching and lightning. The performance of a circuit breaker under normal and abnormal conditions can be verified by performing different type of tests on circuit breakers. The main purpose of testing of circuit breakers is to confirm if circuit breaker is able to work on particular voltage and current ratings or not.
  • 3. There are mainly two tests classified: 1) Type test 2) Routine Test 1) Type Tests: The purpose of type tests is to prove design features and the quality of circuit breaker. Type tests are not conducted on each circuit breaker. This is done to prove the capabilities and to confirm the rated characteristics of the circuit breakers.
  • 4. 2)Routine Tests: Routine test is performed before circuit breaker dispatch to ensure the product. This gives result about defects in materials and construction of circuit breaker. We can check quality of material of circuit breaker by performing Routine Test.
  • 5.  Mechanical endurance tests  Thermal tests  Dielectric tests  Measurement of resistance of the main circuits  Short Circuit tests
  • 6. In this test, the C.B.. is open and closed 500 times or other value as agreed to between the purchaser and the supplier.the test are carried out without current through the main circuit of the C.B.Out of the total number of tests, 10% should be closed-open operation,that is with the tripping,mechanism energized by the closing of main contacts.During the tests,occasional lubrication,but no mechanical adjustments are permissible.after the tests,all parts including contacts should be in good condition and there should be no permanent distortion and undue wear of the parts.
  • 7. This test determines the maximum normal current that the circuit breaker can carry without exceeding the maximum allowable temperature rise.In this test the rated normal current of normal frequency is passed through the current carrying parts of circuit breaker. Method are recognized by Indian standards for measuring temperature rise of parts:- 1) Thermometer method 2) Thermocouple method 3) Self resistance method
  • 8. 1) Breaking capacity Test:- • Sequence of performing this tests is as follows:-  First of all,the master circuit breaker (MB)and the breaker under test (TB)are closed.  The s.c.current is passed by closing the make switch.  The circuit breaker under test(TB) is opened to interrupt the s.c.current at desired moment. • The following measurements related to the breaking capacity performance are taken from the oscillogram during the test:-  Symmetrical breaking current  Asymmetrical breaking current  Amplitude factor  Natural frequency of oscillations and RRRV(RATE OF RISE OF RISTRIKING VOLTAGE)
  • 9. Sequence of Performing this test :- First of all,the master circuit breaker (MB)and the make switch(MS) are closed. Then,the short circuit current is initiated by closing the test breaker (TB). The rated short circuit making current i.e.the peak value of the first major loop of the short circuit current envelope is measured from the oscillorgram.
  • 10. 3(Short Time Withstand Current Capacity In this test,the rated short-time withstand current is applied to the circuit breaker under test for the specified duration of the time. The rated short time withstand current is equal to be rated short circuit breaking current and standarad value of rated duration of short circuit current is 1 second or 3 seconds. The current is measured by taking an oscillograph of the short circuit current wave. After the test,there should be no mechanical or insulation damage and any contact welding.
  • 11. Routine Test Listed Below:- 1(Mechanical Operational test 2(One-Minute power frequency voltage dry withstand test 3(Measurement of resistance of main circuits
  • 12.  This test should be made before temperature rise test.The measurement of resistance is made by measuring dc voltage drop or resistance across the terminals of each pole of circuit breaker.The current during the test shall have any convenient value between 100 A and the rated current of the circuit breaker.The d.c. resistance of main contact of each pole of a circuit breaker is of the order of a few tens of micro-ohms.
  • 13.  Operational tests are made to ensure that the circuit breakers comply with prescribed operating conditions within the specified voltage and supply pressure limits of their opening and closing devices.  During routine test five opening and five closing operations should carry out at a. Minimum supply voltage and pressure b. Maximum supply voltage and pressure After the test,all parts should be in good condition and should not undue wear.
  • 14.   The preliminary preparations of circuit breaker testing include the following:  Connect the equipment.  Adjust the correct values of resistance and reactors to set the required magnitude of short circuit.  Connect and set the transformer to get desired test voltage.  The contacts on sequence switch are adjusted to get desired timings.  Oscillographs are adjusted and calibrated.
  • 15. • 1) Short Circuit generator:- It is a specially designed generator having very low leakage reactance to provide short power for testing c.b. It is driven by 3-phse induction motor.A flywheel is provided on shaft of generator to supply kinetic energy during short circuit and helps in spped regulation. • 2)Short Circuit Transformer:-  It is connected between TB and power source.It is used to allow for flexibility to test at different voltage levels and also provide isolation between the power source and test breaker. It is designed to have low leakage reactance and to withstand repeated short circuit.
  • 16. It is used as a back up c.b. to interrupt the short circuit current in event of c.b.under test(TB) fails to operate.It has higher capacity than the circuit breaker under test.After every test,it is also isolates the test circuit breaker(TB) from the supply source.It is set to operate at a predetermined time after the initiation of short circuit 4) Make Switch(MS):- It is very high speed switch used for initiation of short circuit test current at desired moment.Recently,SF6 gas make switch are used in short circuit testing station. 5) Reactors(L):- It is connected in series.It is used to limit or control the magnitude of the short circuit or test current to its required value.
  • 17. 6) Resistors and Capacitors (R and C):- TRV shaping circuit(R and C) is connected across the circuit breaker under test(TB).This circuit is used to control transient recovery voltage(TRV).Capacitors are also used for voltage measurement. 7) Measuring Equipments:-  For the measurements of voltage,voltage dividers are used and for cureent measurements shunts or CTs are used in the short circuit testing stations.
  • 18. Photo Of Testing Of Circuit Breaker