Palmal Group of Industries
AZMERI Monthly Knowledge Sharing Meeting-KSM
Organized by:
Central-IE (Audit)
Manufacturing Audit & Central Costing
1-1
Objectives of the Meeting:
1-2
To review factory last months performance
To understand our present position against
management expectation
To know about the scope of improvement
To set next month performance target
Key Discussion points:
1-3
1. Planning, Production & IE KPI:
Monthly Target Vs. achievement status
Monthly Efficiency %
Monthly PCD Hit rate status
Monthly NPT Analysis
Monthly Revenue status
Monthly Profit/Loss status
Monthly Machine utilization %
Operators Skill Matrix Analysis
Monthly Short/excess shipment status
2. Quality Assurance Department KPI:
 Monthly Final inspection pass status
 Monthly OQL% status
Monthly DHU% status
Monthly Top 5 Defects analysis
Fail report analysis against Top 5 Defect
3. Human Resource Department KPI:
 Monthly worker absenteeism status
4. Set next month performance target
1. Planning, Production & IE KPI:
1-4
Month wise target Vs. achievement status:
1-5
Month wise efficiency %:
1-6
Month wise facts analysis :
1-7
Month wise profit/Loss status (Excluding Abnormal Loss) :
1-8
Month wise NPT status :
1-9
Month
No of
Working
days
Non
Productive
Minute
NPT Value in
Tk.
NPT% NPT (Pcs)
NPT (Man-
Hour)
NPT
MC/Day
Total Earning
(Including NPT
Value)
Revenue/M
C (Without
NPT)
November-20 26 152758 Min. 887,524৳ 7.16% 19461 Pcs 2546 10.7 MC 175,574.66
$ BDT 57739
December-20 23 208675 Min. 1,212,402৳ 10.16% 21813 Pcs 3478 17.7 MC 188,820.82
$ BDT 72404
January-21 26 171499 Min. 996,409৳ 5.68% 24122 Pcs 2858 11.8 MC 273,029.37
$ BDT 83997
G. Total 25 532932 Min. 3,096,335৳ 7.39% 65395 Pcs 8882 13.4 MC 637424.846 BDT 71628
NPT status (November-2020):
1-10
NPT status (December-2020):
1-11
NPT status (January-2021):
1-12
Month wise per Machine Plan Vs. Achieve Revenue status:
1-13
Month wise Plan Vs. Achievement status:
1-14
Month wise Machine utilization % :
1-15
Operators Skill Matrix Analysis :
1-16
Grade wise
OP
Number of
Operator
OP %
Grade wise
OP
Number of
Operator
U-1,OP %
Grade wise
OP
Number of
Operator
U-2,OP %
Grade wise
OP
Number of
Operator
U-3,OP %
A+ 3 1.01% A+ 1 0.34% A+ 1 0.34% A+ 1 0.34%
A 8 2.68% A 5 1.68% A 1 0.34% A 2 0.67%
B+ 31 10.40% B+ 6 2.01% B+ 6 2.01% B+ 19 6.38%
B 112 37.58% B 38 12.75% B 36 12.08% B 38 12.75%
C+ 0 0.00% C+ 0 0.00% C+ 0 0.00% C+ 0 0.00%
C 144 48.32% C 56 18.79% C 36 12.08% C 52 17.45%
Total Op 298 Total Op 106 Total Op 80 Total Op 112
U-1
All Unit U-2 U-3
Unit wise Operator Grading Summary Month
Number of
New operator
Jan-21 49
Dec-20 0
Nov-20 0
Oct-20 12
Sep-20 15
Aug-20 8
Jul-20 7
Jun-20 3
May-20 7
Apr-20 0
Mar-20 9
Feb-20 8
Jan-20 11
Total 129
Line balance Analysis based on skill matrix:
1-17
Red Tape 246 Grade- A 0 0% Date:
WTK-10,23,37 202 Grade- B+ 1 5%
82% Grade- B 13 62%
202 Grade- C 7 33%
Total 21
1 2 3 4 5
1 OP2538 C Shoulder join, Cut & Arrange 26 24 23 26 25 24.8 0.41 145 150 -12 -8%
2 OP2538 C Shoulder join, Cut & Arrange 27 25 28 25 27 26.4 0.44 136 150 -11 -8%
3 OP2515 B Neck join 14 13 16 14 15 14.4 0.24 250 220 1 250 -21 -8%
4 OP2585 C Neck rib tack 15 14 13 15 13 14.0 0.23 257 300 1 257 -21 -8%
5 OP3294 B Neck Rib servicing & t/c 16 15 17 15 14 15.4 0.26 234 260 1 234 -19 -8%
6 OP2119 B Back neck piping & cut 15 14 15 16 13 14.6 0.24 247 273 1 247 -21 -8%
7 OP2453 B Piping end tack & cut 15 14 16 15 16 15.2 0.25 237 300 1 237 -20 -8%
8 OP2594 B Back top stitch with loop & t/c 27 25 24 26 27 25.8 0.43 140 158 -12 -8%
9 OP2581 B Back top stitch with loop 25 26 28 25 26 26.0 0.43 138 158 -12 -8%
10 OP2556 B Slv join 31 29 32 29 28 29.8 0.50 121 125 -10 -8%
11 OP284 B Slv join 32 30 29 33 32 31.2 0.52 115 125 -10 -8%
12 OP3457 B Side join 45 47 46 49 46 46.6 0.78 77 86 -6 -8%
13 OP3494 C Side join 43 45 47 45 43 44.6 0.74 81 86 -7 -8%
14 OP163 B Side join 46 44 43 46 47 45.2 0.75 80 86 -7 -8%
15 OP1641 C Care label attach & fold tack & t/c 27 25 29 27 29 27.4 0.46 131 158 -11 -8%
16 OP2439 C Care label attach & fold tack & t/c 25 28 25 27 28 26.6 0.44 135 158 -11 -8%
17 OP2395 B+ Bottom Hem 15 17 16 14 13 15.0 0.25 240 250 1 240 -20 -8%
18 OP2576 B Slv hem 32 34 32 31 33 32.4 0.54 111 150 -9 -8%
19 OP3524 B Slv hem 32 31 29 31 30 30.6 0.51 118 150 -10 -8%
20 OP3462 B Front Neck top stitch 16 14 15 16 14 15.0 0.25 240 333 1 240 -20 -8%
21 OP2354 C Heat seal 18 17 19 18 17 17.8 0.30 202 250 1 202 -17 -8%
21
3 238
FS
Target/Hr
.
2 282
2 236
2 278
Total
2 267
2 229
Capacity Study
Minimum Target
220
Capacity
Gap
Gap %
SL
Oparator Name
or IDNO
Operation
Cycle time
2nd floor
C
Floor:
Line
Name of Supv.
Prepaired By (IE)
Average
Input date:
Order Qty:
Style:
Buyer:
Combine
capacity
Allocated
Manpowe
r
Capacity/
Hr.
Cap SMV
Operator
Grade as per
Skill Matrix
SPT
BPTTarget
Line Balance
BNT
Month wise On Time Delivery status:
1-18
Month wise short/excess shipment status :
1-19
2. Quality Assurance Department KPI:
1-20
1-21
Month wise final inspection status
1-22
Month wise Final inspection status :
Total
Inspection
Pass Fail Pass%
Total Self
Inspection
Pass Fail Pass%
Total QC/3rd
Party
Inspection
Pass Fail Pass%
Nov-20 56 56 0 100.00% 46 46 0 100.00% 10 10 0 100.00%
Dec-20 21 21 0 100.00% 14 14 0 100.00% 7 7 0 100.00%
Jan-21 64 64 0 100.00% 15 15 0 100.00% 49 49 0 100.00%
Total 141 141 0 100.00% 75 75 0 100.00% 66 66 0 100.00%
Buying QC/ 3rd Party Inspection Status
Self Inspection Status
Total Inspection Status
Month
1-23
Buyer wise Monthly final inspection comparison
Self
Inspetion
Self
Inspection
Pass
Self
Inspection
Pass%
QC/3rd
Party
Inspection
QC/3rd
Party
Inspection
Pass
QC/3rd
Party
Inspection
Pass%
Nov-20 Carrefour 56 46 46 100.0% 10 10 100.0%
Dec-20 Carrefour 17 14 14 100.0% 3 3 100.0%
Jan-21 Carrefour 16 15 15 100.0% 1 1 100.0%
89 75 75 100.0% 14 14 100.0%
Month Buyer
Total
Inspection
QC/3rdPartyInspectionStatus
Remarks
Total
SelfInspectionStatus
Self
Inspetion
Self
Inspection
Pass
Self
Inspection
Pass%
QC/3rd
Party
Inspection
QC/3rd
Party
Inspection
Pass
QC/3rd
Party
Inspection
Pass%
Nov-20 Redtape 0 0 0 0 0
Dec-20 Redtape 4 0 0 4 4 100.0%
Jan-21 Redtape 48 0 0 48 48 100.0%
52 0 0 52 52 100.0%
Remarks
Total
Month Buyer
Total
Inspection
SelfInspectionStatus QC/3rdPartyInspectionStatus
1-24
Month wise Final inspection OQL status :
1-25
Month wise Sewing DHU status :
1-26
DHU% for the month of November 2020
1-27
Month of November-2020
Total Check 262456
QC Pass 245997
Alter 16459
AVG DHU % 6.27%
Up down 13.67%
Broken Stitch 13.03%
Uncut thread 10.9%
Skip Stitch 10.46%
Pleat 7.21%
Up down 2251 pcs
Broken Stitch 2145 pcs
Uncut thread 1722 pcs
Skip stitch 1662 pcs
Pleat 1188 pcs
1-28
DHU% for the month of December 2020
1-29
Month of December-2020
Total Check 217983
QC Pass 205006
Alter 12977
AVG DHU % 5.95%
Uncut Thread 35.05%
Broken Stitch 12.62%
Point Up-Down 10.13%
Skip Stitch 7.92%
Raw Edge 6.93%
Uncut thread 12389 pcs
Broken stitch 4461 pcs
Point up-down 3581 pcs
Skip stitch 2800 pcs
Raw edge 2451 pcs
1-30
DHU% for the month of JANUARY 2021
1-31
Month of January-2021
1-32
TOP 5 DEFECTS OF LAST 3 MONTHS
1-33
Root cause & Action plan of Uncut thread
1-34
Root cause & Action plan of Broken stitch
1-35
Root cause & Action plan of Skip stitch
1-36
Root cause & Action plan of Raw-edge
1-37
Root cause & Action plan of Point up-down
1-38
Root cause & Action plan of Pleat
1-39
Finishing DHU Monthly Trends Analysis:
Month Checked Qty QC Pass Qty Defective Qty Defective % Top 5Defects status
Nov-20 277181 260444 16737 6.04% 1. Spot 2. Poor Neck Shap 3. Up-down 4. Uncut thread 5. Raw edge
Dec-20 196213 183561 12652 6.45% 1. Spot 2. Uncut Thread 3. Slanted 4. Broken 5. Up-down
Jan-21 356094 336534 19560 5.49% 1. Poor Neck Shape 2. Slanted 3. Spot 4. Contamenation 5. Uncut Thread
Total 829488 780539 48949 5.90%
AZMERI Finishing DHU Status
1-40
Monthly Finishing DHU status (Nov-20) :
Date Day Inspection Qty Qc Pass Qty Alter Qty Avg. DHU% Remarks
1-Nov-20 Sunday 11137 10530 607 5.45% 1. Spot 2. Poor Neck Shap.3. Broken. 4. Rawedge 5.Open Stitch
2-Nov-20 Monday 11000 10350 650 5.91% 1. Broken. 2. Poor Neck Shap.. 3. Rawedge. 4. Uneven. 5. Skip.
3-Nov-20 Tuesday 12000 11258 742 6.18% 1. Up Doun. 2. Poor Neck Shap. 3. Skip. 4. Uncut thread. 5. Rawedge
4-Nov-20 Wednesday 10056 9235 821 8.16% 1. Spot 2. Slanted 3. 3. Broken. 4. Rawedge 5.Open Stitch
5-Nov-20 Thursday 10096 9607 489 4.84% 1. Spot 2. Slanted 3.Poor Neck Shap. 4. Rawedge 5. Up Down
6-Nov-20 Friday
7-Nov-20 Saturday 12061 11572 489 4.05% 1. Spot 2. Slanted 3. Rawedge 4. Down Stitch 5. Pleat
8-Nov-20 Sunday 12060 11520 540 4.48% 1. Uncut Thread 2. Up Down 3.Pleat. 4. Broken 5. Skip
9-Nov-20 Monday 12828 11357 1471 11.47% 1. Spot.2. Broken. 3. Rawedge. 4. Uncut Thread. 5. Open Stitch.
10-Nov-20 Tuesday 12341 11478 863 6.99% 1. Skip. 2.Poor Neck Shap. 3. Up Down. 4. Uncut Thread. 5. Open Stitch
11-Nov-20 Wednesday 12471 11947 524 4.20% 1. Spot. 2. Skip. 3.Poor Neck Shap.4. Rawedge 5.Open Stitch
12-Nov-20 Thursday 13078 12458 620 4.74% 1. Spot 2. Poor Neck Shap 3. Up Down. 4. Uncut Thread. 5. Open Stitch
13-Nov-20 Friday
14-Nov-20 Saturday 10098 9378 720 7.13% 1. Spot. 2. Poor Neck Shap.3. Broken. 4. Rawedge 5. Up Down
15-Nov-20 Sunday 11300 10613 687 6.08% 1. Spot. 2. Skip. 3. Pleat. 4. Rawedge. 5. Up Down.
16-Nov-20 Monday 13070 12474 596 4.56% 1. Spot. Uncut Thread. 3.Poor Neck Shap. 4. Uneven. 5. Skip.
17-Nov-20 Tuesday 13142 12330 812 6.18% 1Spot. 2. Poor Neck Shap 3. Open Seam. 4. Pleat. 5. Uneven.
18-Nov-20 Wednesday 13000 12250 750 5.77% 1.Spot. 2. Skip. 3. Open Stitch. 4. Rawedge 5. Rawedge.
19-Nov-20 Thursday 13025 12244 781 6.00% 1. Spot 2. Uncut Thread. 3. Rawedge. 4. Uneven. 5. Skip.
20-Nov-20 Friday
21-Nov-20 Saturday 13000 12332 668 5.14% 1. Uncut Thread. 2. Skip. 3. Open Stitch. 4. Rawedge 5. Rawedge.
22-Nov-20 Sunday 9190 8490 700 7.62% 1. Uncut Thread. 2.Poor Neck Shap. 3. Broken. 4. Rawedge 5.Open Stitch
23-Nov-20 Monday 9100 8446 654 7.19% 1. Spot 2. Slanted 3.Poor Neck Shap.. 4. Rawedge 5.Open Stitch
24-Nov-20 Tuesday 9000 8523 477 5.30% 1. Rawedge. 2. Uncut thread. 3. Broken. 4. Skip. 5. Up Down
25-Nov-20 Wednesday 7558 7000 558 7.38% 1. Spot. 2. Brokrn Stitch 3.Down Stitch 4. Skip Stitch 5. Rawedge.
26-Nov-20 Thursday 7000 6420 580 8.29% 1. Spot 2. Slanted 3.Poor Neck Shap.. 4. Rawedge 5. Up Down
27-Nov-20 Friday
28-Nov-20 Saturday 7000 6587 413 5.90% 1. Spot 2. Slanted 3. Poor Neck Shap.. 4. Rawedge 5.Open Stitch
29-Nov-20 Sunday 5562 5321 241 4.33% 1. Rawedge. 2. Uncut thread. 3. Broken. 4. Skip. 5. Rawedge.
30-Nov-20 Monday 7008 6724 284 4.05% 1. Uncut Thread. 2. Poor Neck Shap 3. Broken. 4. Rawedge 5. Up Down
277181 260444 16737 6.04% 1. Spot. 2. Poor Neck Shap. 3. Up Down. 4. Uncut thread. 5. Rawedge.
Azmeri composite knit Ltd.
Finishing DHU Status (Month of November-2020)
SUMMARY
Grand total
1-41
Monthly Finishing DHU status (Dec-20) :
Date Day Inspection Qty QC Pass Qty Alter Qty Avg. DHU% Remarks
1-Dec-20 Tuesday 8150 7577 573 7.03% 1. Spot.. 2. Uncut thread. 3.Slanted4. Open Seam. 5.Rawedge.
2-Dec-20 Wednesday 7600 7071 529 6.96% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch
3-Dec-20 Thursday 7350 6828 522 7.10% 1. Up Down 2. Skip. 3. Broken. 4. Pleat. 5. Down Stitch
4-Dec-20 Friday 559
5-Dec-20 Saturday 11200 10700 500 4.46% 1 Pleat 2. Up Down 3. Uncut Thread 4. Broken 5. Skip
6-Dec-20 Sunday 8150 7679 471 5.78% 1. Up Down 2. Uncut Thread 3. Broken 4. Slanted 5. Skip
7-Dec-20 Monday 11235 10358 877 7.81% 1. Pleat 2. Broken 3. Uncut Thread 4. Skip Stitch 5. Up Down
8-Dec-20 Tuesday 8500 8210 290 3.41% 1.Slanted 2. Broken 3. Uncut Thread 4. Skip Stitch 5. Up Down
9-Dec-20 Wednesday 8100 7533 567 7.00% 1. broken 2. uncut thread 3. Slanted 4. skip stitch 5. up down
10-Dec-20 Thursday 8000 7409 591 7.39% 1. Up Down 2. Uncut Thread 3. Broken 4. Rawedge 5. Skip
11-Dec-20 Friday
12-Dec-20 Saturday 8350 7724 626 7.50% 1. Cutting Sticker. 2. Up Down. 3. Uncut Thread.4. Open Seam. 5.Unevwn
13-Dec-20 Sunday 7600 7063 537 7.07% 1. Open Stitch 2. Brokrn Stitch 3. Uncut thread 4. Skip Stitch 5. Slantead
14-Dec-20 Monday 8213 7689 524 6.38% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch
15-Dec-20 Tuesday 6900 6652 248 3.59% 1. Poor shape. 2. Slanted 3. Skip. 4. Uncut thread. 5. Up Down
16-Dec-20 Wednesday
17-Dec-20 Thursday
18-Dec-20 Friday
19-Dec-20 Saturday
20-Dec-20 Sunday
21-Dec-20 Monday 8000 7520 480 6.00% 1. Uncut Thread. 2. Skip. 3. Broken. 4. Rawedge 5.Open Stitch
22-Dec-20 Tuesday 5250 4872 378 7.20% 1. Spot.2. Skip. 3.Open Seam. 4. Up Down. 5. Uncut Thread
23-Dec-20 Wednesday 9563 9148 415 4.34% 1. Open Stitch 2. Brokrn Stitch 3. Uncut thread 4. Skip Stitch 5. Slantead
24-Dec-20 Thursday 15400 14258 1142 7.42% 1. Spot 2. Slanted 3. 3. Broken. 4. Rawedge 5.Open Stitch
25-Dec-20 Friday
26-Dec-20 Saturday 8550 7913 637 7.45% 1. Spot. 2. Uncut Thread. 3. Rawedge. 4. Uneven. 5. Skip.
27-Dec-20 Sunday 9000 8579 421 4.68% 1. Rawedge. 2. Uncut thread. 3. Broken. 4. Skip. 5. Open Seam.
28-Dec-20 Monday 6500 5984 516 7.94% 1. Spot. 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch
29-Dec-20 Tuesday 7500 6781 719 9.59% 1. Uncut Thread. 2. Skip. 3. Broken. 4. Rawedge 5.Open Stitch
30-Dec-20 Wednesday 8650 8120 530 6.13% 1. Spot. 2. Uncut Thread 3. Up Down 4. Rawedge 5. Skip
31-Dec-20 Thursday 8452 7957 495 5.86% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch
196213 183625 12652 6.45% 1. Spot. 2. Uncut Thread. 3. Slanted. 4. Broken. 5. Up Down.
Grand total
Azmeri composite knit Ltd.
Finishing DHU Status (Month of December-2020)
SUMMARY
1-42
Monthly Finishing DHU status (Jan-21) :
Date Day Inspection Qty Qc Pass Qty Alter Qty Avg. DHU% Remarks
1-Jan-21 Friday
2-Jan-21 Saturday 4800 4620 180 3.75% 1. Spot 2. Slanted 3. Broken. 4. Contamenation. 5.Open Stitch
3-Jan-21 Sunday 10032 9365 667 6.65% 1. Up Down 2. Skip. 3. Broken. 4. Contamenation 5. Uncut Thread
4-Jan-21 Monday 13000 11982 559 4.30% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch
5-Jan-21 Tuesday 15028 14523 505 3.36% 1. Spot 2. Poor Neck Shape. 3. Broken. 4.Contamenation.5.Open Stitch
6-Jan-21 Wednesday 13000 12400 600 4.62% 1. Up Down 2. Poor Neck Shape 3. Broken 4. Rawedge 5. Skip
7-Jan-21 Thursday 12500 11857 643 5.14% 1. Pleat 2. Broken 3. Uncut Thread 4. Contamenation. 5. Up Down
8-Jan-21 Friday
9-Jan-21 Saturday 12400 11685 715 5.77% 1. broken 2. uncut thread 3. rawedge 4. skip stitch 5. up down
10-Jan-21 Sunday 13000 12459 541 4.16% 1. Up Down 2. Poor Neck Shape 3. Broken 4. Contamenation. 5. Uncut Thread
11-Jan-21 Monday 12300 11200 1100 8.94% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch
12-Jan-21 Tuesday 16000 15100 900 5.63% 1. Cutting Sticker. 2. Up Down. 3. Uncut Thread.4. Open Seam. 5.Unevwn
13-Jan-21 Wednesday 14000 13400 600 4.29% 1. Open Stitch 2. Contamenation. 3. Uncut thread 4. Skip Stitch 5. Slantead
14-Jan-21 Thursday 11500 10679 821 7.14% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch
15-Jan-21 Friday
16-Jan-21 Saturday 11450 10847 603 5.27% 1. Rawedge. 2. Uncut thread. 3. Broken. 4. Skip. 5. Open Seam.
17-Jan-21 Sunday 14538 13957 581 4.00% 1. Broken 2. Uncut Thread 3. Up Down 4. Contamenation. 5. Skip
18-Jan-21 Monday 13524 12568 956 7.07% 1. Spot 2. Slanted 3. Broken. 4. Poor Neck Shape.5. Uncut Thread
19-Jan-21 Tuesday 11550 10540 1010 8.74% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch
20-Jan-21 Wednesday 12250 11174 1076 8.78% 1. Uncut Thread. 2. Skip. 3. Broken. 4. Rawedge 5.Open Stitch
21-Jan-21 Thursday 11700 10633 1067 9.12% 1. Uncut Thread. 2. Skip. 3. Broken. 4. Poor Neck Shape. 5.Open Stitch
22-Jan-21 Friday
23-Jan-21 Saturday 14560 13489 1071 7.36% 1. Open Stitch 2. Poor Neck Shape. 3. Uncut thread 4. Skip Stitch 5. Slantead
24-Jan-21 Sunday 14000 13400 600 4.29% 1. Spot 2. Slanted 3. Broken. 4. Contamenation.5.Open Stitch
25-Jan-21 Monday 14650 13387 1263 8.62% 1. Spot 2. Slanted 3. Broken. 4. Contamenation. 5.Open Stitch
26-Jan-21 Tuesday 18623 17820 803 4.31% 1. Broken. 2. Uncut Thread. 3. Rawedge. 4. Uneven. 5. Skip.
27-Jan-21 Wednesday 17600 16830 770 4.38% 1. Spot 2. Slanted 3. Broken. 4. Contamenation. 5.Open Stitch
28-Jan-21 Thursday 18000 17002 998 5.54% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch
29-Jan-21 Friday
30-Jan-21 Saturday 18589 17658 931 5.01% 1. Broken 2. Uncut Thread 3. Up Down 4. Contamenation. 5. Slanted.
31-Jan-21 Sunday 17500 16524 976 5.58% 1. Spot 2. Slanted . 3. Broken. 4. Contamenation. 5.Open Stitch
356094 335099 19560 5.49% 1. Poor Neck Shape. 2.Slanted. 3. Spot. 4. Contamenation. 5. Uncut Thread .
Azmeri composite knit Ltd.
Finishing DHU Status (Month of January-2021)
SUMMARY
Grand total
1-43
Monthly Finishing DHU status :
Root causes & corrective action plan has to be
showed.
1-44
QUALITY ORGANOGRAM OF AZMERI KNIT PVT LIMITED
1-45
CHO QA ORGANOGRAM
1-46
Fabric GPQ Activities:
• Receiving Fabric booking sheet from the fabric audit/merchant team.
• Fabric quality follow-up at fabric mills (dyeing/finishing).
• From each color /combo (1st lot fabric/rib/collar/cuff) approval will be
provided by the concern merchandiser. Rest of the lots approval will be
done by fabric GPQ.
• GSM record (100% rolls) should be made by the fabric mill in front of fabric
GPQ.
• Fabric test report should be carried out from the fabric mill’s lab for each
lot.
• 4.0 Fabric inspection report should be carried out 20% rolls from each lot.
• Fabric check and test related all docs should be submitted to the cutting
units through the mail.
3. Human Resource Department KPI:
1-47
Month wise worker absenteeism status :
1-48
Proposal for Month factory overall house keeping
status :
1-49
Color Meaning
Green Maintain
Yellow Need to improve
Red Alarming
Discredit marks %
If marks is >20%
If marks is 10% to 20%
If marks is <10%
SL FOCUS POINTS
NO OF
CHECKED
ITEMS
NO OF
DEFECTS
DISCREDIT
POINTS
REMARKS
1 The work area and all tables are clean 10 2 20%
2 The Idle machine is covered by machine cover 20 5 25%
3 All tools and scissors are attached to the equipment (avoiding touching the floor) or attached workers wrist 10 1 10%
4 All fabrics rolls are poly bagged and identified & All trims are stored properly and identified 5 0 0%
5 Aisle are free from any object 10 1 10%
6 Fabrics and Trims in Quanrantine areas must be placed on pallets 20 3 15%
7 Empty Basket / Trolley are stationed in designated area 5 1 20%
8 Sewing Machines and Tables are in right place and position 10 2 20%
9 Alter Materials are kept in Rework, Rejected ,spot clean boxes 10 3 30%
10 Iron shoe & palet are being used during ironning 15 1 7%
11 Fire fighting tools are kept in right place 10 1 10%
12 All cartoon, boxes and unusable goods are kept in designated area 5 1 20%
13 Finished carton areas are kept as well organized 10 1 10%
14 Rejection garments management system is well organized 5 1 20%
145 23 16%
Factory HR KPI Dash Board.
Total
4. Set next month target:
1-51
Final Inspection Pass % 100.00%
DHU% <5.00%
OQL % <3.50%
Quality
Expected Plan Actual Plan
Planned Machine 270 270
Working days 26 26
Avg. Working Hour 10.00 10.00
Avg. SMV 9.39 9.39
Target Efficiency % 65.00% 58.76%
Target Hour 59319 53627
Target Qty 379053 342680
Target Achievement % 100.00% 100.00%
Machine utilization % 98.00% 98.00%
Excess shipment % 0.50% 0.50%
AZMERI
PPC, IE &
Production
Criteria
Dept.
Thank You

Contenu connexe

Similaire à Factory Monthly KSM- AZMERI.ppt

Monthly report march, 2020(word)
Monthly report march, 2020(word)Monthly report march, 2020(word)
Monthly report march, 2020(word)
thomas victor
 
Picking – Productivity - A location Kaizen 16
Picking – Productivity - A location Kaizen 16Picking – Productivity - A location Kaizen 16
Picking – Productivity - A location Kaizen 16
Vasu devan.R
 
SUPPLY CHAIN AND SOURCING_PROCUREMENT RAISING rev 2
SUPPLY CHAIN AND SOURCING_PROCUREMENT RAISING rev 2SUPPLY CHAIN AND SOURCING_PROCUREMENT RAISING rev 2
SUPPLY CHAIN AND SOURCING_PROCUREMENT RAISING rev 2
Reinaldo Leopoldo
 
Final Project Presentation on Internship Report 2015, BUFT
Final Project Presentation on Internship Report 2015, BUFT Final Project Presentation on Internship Report 2015, BUFT
Final Project Presentation on Internship Report 2015, BUFT
Md. Sayeed Hossain
 

Similaire à Factory Monthly KSM- AZMERI.ppt (20)

Factory Monthly KPI of Lizfashion.ppt
Factory Monthly KPI of Lizfashion.pptFactory Monthly KPI of Lizfashion.ppt
Factory Monthly KPI of Lizfashion.ppt
 
Factory Monthly KPI of DLPL .ppt
Factory Monthly KPI of DLPL .pptFactory Monthly KPI of DLPL .ppt
Factory Monthly KPI of DLPL .ppt
 
Factory Monthly Marina.ppt
Factory Monthly Marina.pptFactory Monthly Marina.ppt
Factory Monthly Marina.ppt
 
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).pptFactory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
 
Monthly KPI Presentation Admin & HR Team(August)
Monthly KPI Presentation Admin & HR Team(August)Monthly KPI Presentation Admin & HR Team(August)
Monthly KPI Presentation Admin & HR Team(August)
 
Factory Monthly Silvar.ppt
Factory Monthly Silvar.pptFactory Monthly Silvar.ppt
Factory Monthly Silvar.ppt
 
Factory Monthly ACCL-1.ppt
Factory Monthly ACCL-1.pptFactory Monthly ACCL-1.ppt
Factory Monthly ACCL-1.ppt
 
Factory Monthly KPI.ppt
Factory Monthly KPI.pptFactory Monthly KPI.ppt
Factory Monthly KPI.ppt
 
Weekly KPI meeting of FHRO.ppt
Weekly KPI meeting of FHRO.pptWeekly KPI meeting of FHRO.ppt
Weekly KPI meeting of FHRO.ppt
 
ABC analysis
ABC analysisABC analysis
ABC analysis
 
Monthly report march, 2020(word)
Monthly report march, 2020(word)Monthly report march, 2020(word)
Monthly report march, 2020(word)
 
Factory Monthly ALP.ppt
Factory Monthly ALP.pptFactory Monthly ALP.ppt
Factory Monthly ALP.ppt
 
Picking – Productivity - A location Kaizen 16
Picking – Productivity - A location Kaizen 16Picking – Productivity - A location Kaizen 16
Picking – Productivity - A location Kaizen 16
 
Monthly Review April-2023.pptx
Monthly Review April-2023.pptxMonthly Review April-2023.pptx
Monthly Review April-2023.pptx
 
SUPPLY CHAIN AND SOURCING_PROCUREMENT RAISING rev 2
SUPPLY CHAIN AND SOURCING_PROCUREMENT RAISING rev 2SUPPLY CHAIN AND SOURCING_PROCUREMENT RAISING rev 2
SUPPLY CHAIN AND SOURCING_PROCUREMENT RAISING rev 2
 
Weekly KPI meeting of PPC team.ppt
Weekly KPI meeting of PPC team.pptWeekly KPI meeting of PPC team.ppt
Weekly KPI meeting of PPC team.ppt
 
Monthly-MIS.ppt
Monthly-MIS.pptMonthly-MIS.ppt
Monthly-MIS.ppt
 
JTP - EV Presentation
JTP - EV PresentationJTP - EV Presentation
JTP - EV Presentation
 
Weekly KPI meeting of IE.ppt
Weekly KPI meeting of IE.pptWeekly KPI meeting of IE.ppt
Weekly KPI meeting of IE.ppt
 
Final Project Presentation on Internship Report 2015, BUFT
Final Project Presentation on Internship Report 2015, BUFT Final Project Presentation on Internship Report 2015, BUFT
Final Project Presentation on Internship Report 2015, BUFT
 

Plus de Nittamallik216 (14)

Factory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptFactory Monthly KSM- New.ppt
Factory Monthly KSM- New.ppt
 
Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.ppt
 
160_16SCCFT4_2020051906270858.pptx
160_16SCCFT4_2020051906270858.pptx160_16SCCFT4_2020051906270858.pptx
160_16SCCFT4_2020051906270858.pptx
 
Factory Monthly KPI OF LDC.ppt
Factory Monthly KPI OF LDC.pptFactory Monthly KPI OF LDC.ppt
Factory Monthly KPI OF LDC.ppt
 
Weekly KPI meeting of Production team .ppt
Weekly KPI meeting of Production team .pptWeekly KPI meeting of Production team .ppt
Weekly KPI meeting of Production team .ppt
 
Factory Monthly HAMZA.ppt
Factory Monthly HAMZA.pptFactory Monthly HAMZA.ppt
Factory Monthly HAMZA.ppt
 
Factory Monthly SAFA-1.ppt
Factory Monthly SAFA-1.pptFactory Monthly SAFA-1.ppt
Factory Monthly SAFA-1.ppt
 
TP MAX SWEATPANT SB.pdf
TP MAX SWEATPANT SB.pdfTP MAX SWEATPANT SB.pdf
TP MAX SWEATPANT SB.pdf
 
SILAS PJ SET .pdf
SILAS PJ SET .pdfSILAS PJ SET .pdf
SILAS PJ SET .pdf
 
SANDY SS TVP.pdf
SANDY SS TVP.pdfSANDY SS TVP.pdf
SANDY SS TVP.pdf
 
ROMY BODY.pdf
ROMY BODY.pdfROMY BODY.pdf
ROMY BODY.pdf
 
Factory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptFactory Monthly KSM- New.ppt
Factory Monthly KSM- New.ppt
 
9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf
 
inventory-management.pptx
inventory-management.pptxinventory-management.pptx
inventory-management.pptx
 

Dernier

Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
amitlee9823
 
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts ServiceCall Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
amitlee9823
 
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in  KishangarhDelhi 99530 vip 56974 Genuine Escort Service Call Girls in  Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Dernier (20)

Cheap Rate Call girls Sarita Vihar Delhi 9205541914 shot 1500 night
Cheap Rate Call girls Sarita Vihar Delhi 9205541914 shot 1500 nightCheap Rate Call girls Sarita Vihar Delhi 9205541914 shot 1500 night
Cheap Rate Call girls Sarita Vihar Delhi 9205541914 shot 1500 night
 
CebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptxCebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptx
 
BabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxBabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptx
 
Introduction-to-Machine-Learning (1).pptx
Introduction-to-Machine-Learning (1).pptxIntroduction-to-Machine-Learning (1).pptx
Introduction-to-Machine-Learning (1).pptx
 
Carero dropshipping via API with DroFx.pptx
Carero dropshipping via API with DroFx.pptxCarero dropshipping via API with DroFx.pptx
Carero dropshipping via API with DroFx.pptx
 
Best VIP Call Girls Noida Sector 22 Call Me: 8448380779
Best VIP Call Girls Noida Sector 22 Call Me: 8448380779Best VIP Call Girls Noida Sector 22 Call Me: 8448380779
Best VIP Call Girls Noida Sector 22 Call Me: 8448380779
 
April 2024 - Crypto Market Report's Analysis
April 2024 - Crypto Market Report's AnalysisApril 2024 - Crypto Market Report's Analysis
April 2024 - Crypto Market Report's Analysis
 
Zuja dropshipping via API with DroFx.pptx
Zuja dropshipping via API with DroFx.pptxZuja dropshipping via API with DroFx.pptx
Zuja dropshipping via API with DroFx.pptx
 
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Indiranagar Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
 
(NEHA) Call Girls Katra Call Now 8617697112 Katra Escorts 24x7
(NEHA) Call Girls Katra Call Now 8617697112 Katra Escorts 24x7(NEHA) Call Girls Katra Call Now 8617697112 Katra Escorts 24x7
(NEHA) Call Girls Katra Call Now 8617697112 Katra Escorts 24x7
 
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Mandawali Delhi >༒8448380779 Escort Service
 
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
 
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts ServiceCall Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
 
Best VIP Call Girls Noida Sector 39 Call Me: 8448380779
Best VIP Call Girls Noida Sector 39 Call Me: 8448380779Best VIP Call Girls Noida Sector 39 Call Me: 8448380779
Best VIP Call Girls Noida Sector 39 Call Me: 8448380779
 
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
Chintamani Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore ...
 
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in  KishangarhDelhi 99530 vip 56974 Genuine Escort Service Call Girls in  Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
 
Data-Analysis for Chicago Crime Data 2023
Data-Analysis for Chicago Crime Data  2023Data-Analysis for Chicago Crime Data  2023
Data-Analysis for Chicago Crime Data 2023
 
BigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptxBigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptx
 
Accredited-Transport-Cooperatives-Jan-2021-Web.pdf
Accredited-Transport-Cooperatives-Jan-2021-Web.pdfAccredited-Transport-Cooperatives-Jan-2021-Web.pdf
Accredited-Transport-Cooperatives-Jan-2021-Web.pdf
 
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
 

Factory Monthly KSM- AZMERI.ppt

  • 1. 1-0
  • 2. Palmal Group of Industries AZMERI Monthly Knowledge Sharing Meeting-KSM Organized by: Central-IE (Audit) Manufacturing Audit & Central Costing 1-1
  • 3. Objectives of the Meeting: 1-2 To review factory last months performance To understand our present position against management expectation To know about the scope of improvement To set next month performance target
  • 4. Key Discussion points: 1-3 1. Planning, Production & IE KPI: Monthly Target Vs. achievement status Monthly Efficiency % Monthly PCD Hit rate status Monthly NPT Analysis Monthly Revenue status Monthly Profit/Loss status Monthly Machine utilization % Operators Skill Matrix Analysis Monthly Short/excess shipment status 2. Quality Assurance Department KPI:  Monthly Final inspection pass status  Monthly OQL% status Monthly DHU% status Monthly Top 5 Defects analysis Fail report analysis against Top 5 Defect 3. Human Resource Department KPI:  Monthly worker absenteeism status 4. Set next month performance target
  • 5. 1. Planning, Production & IE KPI: 1-4
  • 6. Month wise target Vs. achievement status: 1-5
  • 8. Month wise facts analysis : 1-7
  • 9. Month wise profit/Loss status (Excluding Abnormal Loss) : 1-8
  • 10. Month wise NPT status : 1-9 Month No of Working days Non Productive Minute NPT Value in Tk. NPT% NPT (Pcs) NPT (Man- Hour) NPT MC/Day Total Earning (Including NPT Value) Revenue/M C (Without NPT) November-20 26 152758 Min. 887,524৳ 7.16% 19461 Pcs 2546 10.7 MC 175,574.66 $ BDT 57739 December-20 23 208675 Min. 1,212,402৳ 10.16% 21813 Pcs 3478 17.7 MC 188,820.82 $ BDT 72404 January-21 26 171499 Min. 996,409৳ 5.68% 24122 Pcs 2858 11.8 MC 273,029.37 $ BDT 83997 G. Total 25 532932 Min. 3,096,335৳ 7.39% 65395 Pcs 8882 13.4 MC 637424.846 BDT 71628
  • 14. Month wise per Machine Plan Vs. Achieve Revenue status: 1-13
  • 15. Month wise Plan Vs. Achievement status: 1-14
  • 16. Month wise Machine utilization % : 1-15
  • 17. Operators Skill Matrix Analysis : 1-16 Grade wise OP Number of Operator OP % Grade wise OP Number of Operator U-1,OP % Grade wise OP Number of Operator U-2,OP % Grade wise OP Number of Operator U-3,OP % A+ 3 1.01% A+ 1 0.34% A+ 1 0.34% A+ 1 0.34% A 8 2.68% A 5 1.68% A 1 0.34% A 2 0.67% B+ 31 10.40% B+ 6 2.01% B+ 6 2.01% B+ 19 6.38% B 112 37.58% B 38 12.75% B 36 12.08% B 38 12.75% C+ 0 0.00% C+ 0 0.00% C+ 0 0.00% C+ 0 0.00% C 144 48.32% C 56 18.79% C 36 12.08% C 52 17.45% Total Op 298 Total Op 106 Total Op 80 Total Op 112 U-1 All Unit U-2 U-3 Unit wise Operator Grading Summary Month Number of New operator Jan-21 49 Dec-20 0 Nov-20 0 Oct-20 12 Sep-20 15 Aug-20 8 Jul-20 7 Jun-20 3 May-20 7 Apr-20 0 Mar-20 9 Feb-20 8 Jan-20 11 Total 129
  • 18. Line balance Analysis based on skill matrix: 1-17 Red Tape 246 Grade- A 0 0% Date: WTK-10,23,37 202 Grade- B+ 1 5% 82% Grade- B 13 62% 202 Grade- C 7 33% Total 21 1 2 3 4 5 1 OP2538 C Shoulder join, Cut & Arrange 26 24 23 26 25 24.8 0.41 145 150 -12 -8% 2 OP2538 C Shoulder join, Cut & Arrange 27 25 28 25 27 26.4 0.44 136 150 -11 -8% 3 OP2515 B Neck join 14 13 16 14 15 14.4 0.24 250 220 1 250 -21 -8% 4 OP2585 C Neck rib tack 15 14 13 15 13 14.0 0.23 257 300 1 257 -21 -8% 5 OP3294 B Neck Rib servicing & t/c 16 15 17 15 14 15.4 0.26 234 260 1 234 -19 -8% 6 OP2119 B Back neck piping & cut 15 14 15 16 13 14.6 0.24 247 273 1 247 -21 -8% 7 OP2453 B Piping end tack & cut 15 14 16 15 16 15.2 0.25 237 300 1 237 -20 -8% 8 OP2594 B Back top stitch with loop & t/c 27 25 24 26 27 25.8 0.43 140 158 -12 -8% 9 OP2581 B Back top stitch with loop 25 26 28 25 26 26.0 0.43 138 158 -12 -8% 10 OP2556 B Slv join 31 29 32 29 28 29.8 0.50 121 125 -10 -8% 11 OP284 B Slv join 32 30 29 33 32 31.2 0.52 115 125 -10 -8% 12 OP3457 B Side join 45 47 46 49 46 46.6 0.78 77 86 -6 -8% 13 OP3494 C Side join 43 45 47 45 43 44.6 0.74 81 86 -7 -8% 14 OP163 B Side join 46 44 43 46 47 45.2 0.75 80 86 -7 -8% 15 OP1641 C Care label attach & fold tack & t/c 27 25 29 27 29 27.4 0.46 131 158 -11 -8% 16 OP2439 C Care label attach & fold tack & t/c 25 28 25 27 28 26.6 0.44 135 158 -11 -8% 17 OP2395 B+ Bottom Hem 15 17 16 14 13 15.0 0.25 240 250 1 240 -20 -8% 18 OP2576 B Slv hem 32 34 32 31 33 32.4 0.54 111 150 -9 -8% 19 OP3524 B Slv hem 32 31 29 31 30 30.6 0.51 118 150 -10 -8% 20 OP3462 B Front Neck top stitch 16 14 15 16 14 15.0 0.25 240 333 1 240 -20 -8% 21 OP2354 C Heat seal 18 17 19 18 17 17.8 0.30 202 250 1 202 -17 -8% 21 3 238 FS Target/Hr . 2 282 2 236 2 278 Total 2 267 2 229 Capacity Study Minimum Target 220 Capacity Gap Gap % SL Oparator Name or IDNO Operation Cycle time 2nd floor C Floor: Line Name of Supv. Prepaired By (IE) Average Input date: Order Qty: Style: Buyer: Combine capacity Allocated Manpowe r Capacity/ Hr. Cap SMV Operator Grade as per Skill Matrix SPT BPTTarget Line Balance BNT
  • 19. Month wise On Time Delivery status: 1-18
  • 20. Month wise short/excess shipment status : 1-19
  • 21. 2. Quality Assurance Department KPI: 1-20
  • 22. 1-21 Month wise final inspection status
  • 23. 1-22 Month wise Final inspection status : Total Inspection Pass Fail Pass% Total Self Inspection Pass Fail Pass% Total QC/3rd Party Inspection Pass Fail Pass% Nov-20 56 56 0 100.00% 46 46 0 100.00% 10 10 0 100.00% Dec-20 21 21 0 100.00% 14 14 0 100.00% 7 7 0 100.00% Jan-21 64 64 0 100.00% 15 15 0 100.00% 49 49 0 100.00% Total 141 141 0 100.00% 75 75 0 100.00% 66 66 0 100.00% Buying QC/ 3rd Party Inspection Status Self Inspection Status Total Inspection Status Month
  • 24. 1-23 Buyer wise Monthly final inspection comparison Self Inspetion Self Inspection Pass Self Inspection Pass% QC/3rd Party Inspection QC/3rd Party Inspection Pass QC/3rd Party Inspection Pass% Nov-20 Carrefour 56 46 46 100.0% 10 10 100.0% Dec-20 Carrefour 17 14 14 100.0% 3 3 100.0% Jan-21 Carrefour 16 15 15 100.0% 1 1 100.0% 89 75 75 100.0% 14 14 100.0% Month Buyer Total Inspection QC/3rdPartyInspectionStatus Remarks Total SelfInspectionStatus Self Inspetion Self Inspection Pass Self Inspection Pass% QC/3rd Party Inspection QC/3rd Party Inspection Pass QC/3rd Party Inspection Pass% Nov-20 Redtape 0 0 0 0 0 Dec-20 Redtape 4 0 0 4 4 100.0% Jan-21 Redtape 48 0 0 48 48 100.0% 52 0 0 52 52 100.0% Remarks Total Month Buyer Total Inspection SelfInspectionStatus QC/3rdPartyInspectionStatus
  • 25. 1-24 Month wise Final inspection OQL status :
  • 26. 1-25 Month wise Sewing DHU status :
  • 27. 1-26 DHU% for the month of November 2020
  • 28. 1-27 Month of November-2020 Total Check 262456 QC Pass 245997 Alter 16459 AVG DHU % 6.27% Up down 13.67% Broken Stitch 13.03% Uncut thread 10.9% Skip Stitch 10.46% Pleat 7.21% Up down 2251 pcs Broken Stitch 2145 pcs Uncut thread 1722 pcs Skip stitch 1662 pcs Pleat 1188 pcs
  • 29. 1-28 DHU% for the month of December 2020
  • 30. 1-29 Month of December-2020 Total Check 217983 QC Pass 205006 Alter 12977 AVG DHU % 5.95% Uncut Thread 35.05% Broken Stitch 12.62% Point Up-Down 10.13% Skip Stitch 7.92% Raw Edge 6.93% Uncut thread 12389 pcs Broken stitch 4461 pcs Point up-down 3581 pcs Skip stitch 2800 pcs Raw edge 2451 pcs
  • 31. 1-30 DHU% for the month of JANUARY 2021
  • 33. 1-32 TOP 5 DEFECTS OF LAST 3 MONTHS
  • 34. 1-33 Root cause & Action plan of Uncut thread
  • 35. 1-34 Root cause & Action plan of Broken stitch
  • 36. 1-35 Root cause & Action plan of Skip stitch
  • 37. 1-36 Root cause & Action plan of Raw-edge
  • 38. 1-37 Root cause & Action plan of Point up-down
  • 39. 1-38 Root cause & Action plan of Pleat
  • 40. 1-39 Finishing DHU Monthly Trends Analysis: Month Checked Qty QC Pass Qty Defective Qty Defective % Top 5Defects status Nov-20 277181 260444 16737 6.04% 1. Spot 2. Poor Neck Shap 3. Up-down 4. Uncut thread 5. Raw edge Dec-20 196213 183561 12652 6.45% 1. Spot 2. Uncut Thread 3. Slanted 4. Broken 5. Up-down Jan-21 356094 336534 19560 5.49% 1. Poor Neck Shape 2. Slanted 3. Spot 4. Contamenation 5. Uncut Thread Total 829488 780539 48949 5.90% AZMERI Finishing DHU Status
  • 41. 1-40 Monthly Finishing DHU status (Nov-20) : Date Day Inspection Qty Qc Pass Qty Alter Qty Avg. DHU% Remarks 1-Nov-20 Sunday 11137 10530 607 5.45% 1. Spot 2. Poor Neck Shap.3. Broken. 4. Rawedge 5.Open Stitch 2-Nov-20 Monday 11000 10350 650 5.91% 1. Broken. 2. Poor Neck Shap.. 3. Rawedge. 4. Uneven. 5. Skip. 3-Nov-20 Tuesday 12000 11258 742 6.18% 1. Up Doun. 2. Poor Neck Shap. 3. Skip. 4. Uncut thread. 5. Rawedge 4-Nov-20 Wednesday 10056 9235 821 8.16% 1. Spot 2. Slanted 3. 3. Broken. 4. Rawedge 5.Open Stitch 5-Nov-20 Thursday 10096 9607 489 4.84% 1. Spot 2. Slanted 3.Poor Neck Shap. 4. Rawedge 5. Up Down 6-Nov-20 Friday 7-Nov-20 Saturday 12061 11572 489 4.05% 1. Spot 2. Slanted 3. Rawedge 4. Down Stitch 5. Pleat 8-Nov-20 Sunday 12060 11520 540 4.48% 1. Uncut Thread 2. Up Down 3.Pleat. 4. Broken 5. Skip 9-Nov-20 Monday 12828 11357 1471 11.47% 1. Spot.2. Broken. 3. Rawedge. 4. Uncut Thread. 5. Open Stitch. 10-Nov-20 Tuesday 12341 11478 863 6.99% 1. Skip. 2.Poor Neck Shap. 3. Up Down. 4. Uncut Thread. 5. Open Stitch 11-Nov-20 Wednesday 12471 11947 524 4.20% 1. Spot. 2. Skip. 3.Poor Neck Shap.4. Rawedge 5.Open Stitch 12-Nov-20 Thursday 13078 12458 620 4.74% 1. Spot 2. Poor Neck Shap 3. Up Down. 4. Uncut Thread. 5. Open Stitch 13-Nov-20 Friday 14-Nov-20 Saturday 10098 9378 720 7.13% 1. Spot. 2. Poor Neck Shap.3. Broken. 4. Rawedge 5. Up Down 15-Nov-20 Sunday 11300 10613 687 6.08% 1. Spot. 2. Skip. 3. Pleat. 4. Rawedge. 5. Up Down. 16-Nov-20 Monday 13070 12474 596 4.56% 1. Spot. Uncut Thread. 3.Poor Neck Shap. 4. Uneven. 5. Skip. 17-Nov-20 Tuesday 13142 12330 812 6.18% 1Spot. 2. Poor Neck Shap 3. Open Seam. 4. Pleat. 5. Uneven. 18-Nov-20 Wednesday 13000 12250 750 5.77% 1.Spot. 2. Skip. 3. Open Stitch. 4. Rawedge 5. Rawedge. 19-Nov-20 Thursday 13025 12244 781 6.00% 1. Spot 2. Uncut Thread. 3. Rawedge. 4. Uneven. 5. Skip. 20-Nov-20 Friday 21-Nov-20 Saturday 13000 12332 668 5.14% 1. Uncut Thread. 2. Skip. 3. Open Stitch. 4. Rawedge 5. Rawedge. 22-Nov-20 Sunday 9190 8490 700 7.62% 1. Uncut Thread. 2.Poor Neck Shap. 3. Broken. 4. Rawedge 5.Open Stitch 23-Nov-20 Monday 9100 8446 654 7.19% 1. Spot 2. Slanted 3.Poor Neck Shap.. 4. Rawedge 5.Open Stitch 24-Nov-20 Tuesday 9000 8523 477 5.30% 1. Rawedge. 2. Uncut thread. 3. Broken. 4. Skip. 5. Up Down 25-Nov-20 Wednesday 7558 7000 558 7.38% 1. Spot. 2. Brokrn Stitch 3.Down Stitch 4. Skip Stitch 5. Rawedge. 26-Nov-20 Thursday 7000 6420 580 8.29% 1. Spot 2. Slanted 3.Poor Neck Shap.. 4. Rawedge 5. Up Down 27-Nov-20 Friday 28-Nov-20 Saturday 7000 6587 413 5.90% 1. Spot 2. Slanted 3. Poor Neck Shap.. 4. Rawedge 5.Open Stitch 29-Nov-20 Sunday 5562 5321 241 4.33% 1. Rawedge. 2. Uncut thread. 3. Broken. 4. Skip. 5. Rawedge. 30-Nov-20 Monday 7008 6724 284 4.05% 1. Uncut Thread. 2. Poor Neck Shap 3. Broken. 4. Rawedge 5. Up Down 277181 260444 16737 6.04% 1. Spot. 2. Poor Neck Shap. 3. Up Down. 4. Uncut thread. 5. Rawedge. Azmeri composite knit Ltd. Finishing DHU Status (Month of November-2020) SUMMARY Grand total
  • 42. 1-41 Monthly Finishing DHU status (Dec-20) : Date Day Inspection Qty QC Pass Qty Alter Qty Avg. DHU% Remarks 1-Dec-20 Tuesday 8150 7577 573 7.03% 1. Spot.. 2. Uncut thread. 3.Slanted4. Open Seam. 5.Rawedge. 2-Dec-20 Wednesday 7600 7071 529 6.96% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch 3-Dec-20 Thursday 7350 6828 522 7.10% 1. Up Down 2. Skip. 3. Broken. 4. Pleat. 5. Down Stitch 4-Dec-20 Friday 559 5-Dec-20 Saturday 11200 10700 500 4.46% 1 Pleat 2. Up Down 3. Uncut Thread 4. Broken 5. Skip 6-Dec-20 Sunday 8150 7679 471 5.78% 1. Up Down 2. Uncut Thread 3. Broken 4. Slanted 5. Skip 7-Dec-20 Monday 11235 10358 877 7.81% 1. Pleat 2. Broken 3. Uncut Thread 4. Skip Stitch 5. Up Down 8-Dec-20 Tuesday 8500 8210 290 3.41% 1.Slanted 2. Broken 3. Uncut Thread 4. Skip Stitch 5. Up Down 9-Dec-20 Wednesday 8100 7533 567 7.00% 1. broken 2. uncut thread 3. Slanted 4. skip stitch 5. up down 10-Dec-20 Thursday 8000 7409 591 7.39% 1. Up Down 2. Uncut Thread 3. Broken 4. Rawedge 5. Skip 11-Dec-20 Friday 12-Dec-20 Saturday 8350 7724 626 7.50% 1. Cutting Sticker. 2. Up Down. 3. Uncut Thread.4. Open Seam. 5.Unevwn 13-Dec-20 Sunday 7600 7063 537 7.07% 1. Open Stitch 2. Brokrn Stitch 3. Uncut thread 4. Skip Stitch 5. Slantead 14-Dec-20 Monday 8213 7689 524 6.38% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch 15-Dec-20 Tuesday 6900 6652 248 3.59% 1. Poor shape. 2. Slanted 3. Skip. 4. Uncut thread. 5. Up Down 16-Dec-20 Wednesday 17-Dec-20 Thursday 18-Dec-20 Friday 19-Dec-20 Saturday 20-Dec-20 Sunday 21-Dec-20 Monday 8000 7520 480 6.00% 1. Uncut Thread. 2. Skip. 3. Broken. 4. Rawedge 5.Open Stitch 22-Dec-20 Tuesday 5250 4872 378 7.20% 1. Spot.2. Skip. 3.Open Seam. 4. Up Down. 5. Uncut Thread 23-Dec-20 Wednesday 9563 9148 415 4.34% 1. Open Stitch 2. Brokrn Stitch 3. Uncut thread 4. Skip Stitch 5. Slantead 24-Dec-20 Thursday 15400 14258 1142 7.42% 1. Spot 2. Slanted 3. 3. Broken. 4. Rawedge 5.Open Stitch 25-Dec-20 Friday 26-Dec-20 Saturday 8550 7913 637 7.45% 1. Spot. 2. Uncut Thread. 3. Rawedge. 4. Uneven. 5. Skip. 27-Dec-20 Sunday 9000 8579 421 4.68% 1. Rawedge. 2. Uncut thread. 3. Broken. 4. Skip. 5. Open Seam. 28-Dec-20 Monday 6500 5984 516 7.94% 1. Spot. 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch 29-Dec-20 Tuesday 7500 6781 719 9.59% 1. Uncut Thread. 2. Skip. 3. Broken. 4. Rawedge 5.Open Stitch 30-Dec-20 Wednesday 8650 8120 530 6.13% 1. Spot. 2. Uncut Thread 3. Up Down 4. Rawedge 5. Skip 31-Dec-20 Thursday 8452 7957 495 5.86% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch 196213 183625 12652 6.45% 1. Spot. 2. Uncut Thread. 3. Slanted. 4. Broken. 5. Up Down. Grand total Azmeri composite knit Ltd. Finishing DHU Status (Month of December-2020) SUMMARY
  • 43. 1-42 Monthly Finishing DHU status (Jan-21) : Date Day Inspection Qty Qc Pass Qty Alter Qty Avg. DHU% Remarks 1-Jan-21 Friday 2-Jan-21 Saturday 4800 4620 180 3.75% 1. Spot 2. Slanted 3. Broken. 4. Contamenation. 5.Open Stitch 3-Jan-21 Sunday 10032 9365 667 6.65% 1. Up Down 2. Skip. 3. Broken. 4. Contamenation 5. Uncut Thread 4-Jan-21 Monday 13000 11982 559 4.30% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch 5-Jan-21 Tuesday 15028 14523 505 3.36% 1. Spot 2. Poor Neck Shape. 3. Broken. 4.Contamenation.5.Open Stitch 6-Jan-21 Wednesday 13000 12400 600 4.62% 1. Up Down 2. Poor Neck Shape 3. Broken 4. Rawedge 5. Skip 7-Jan-21 Thursday 12500 11857 643 5.14% 1. Pleat 2. Broken 3. Uncut Thread 4. Contamenation. 5. Up Down 8-Jan-21 Friday 9-Jan-21 Saturday 12400 11685 715 5.77% 1. broken 2. uncut thread 3. rawedge 4. skip stitch 5. up down 10-Jan-21 Sunday 13000 12459 541 4.16% 1. Up Down 2. Poor Neck Shape 3. Broken 4. Contamenation. 5. Uncut Thread 11-Jan-21 Monday 12300 11200 1100 8.94% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch 12-Jan-21 Tuesday 16000 15100 900 5.63% 1. Cutting Sticker. 2. Up Down. 3. Uncut Thread.4. Open Seam. 5.Unevwn 13-Jan-21 Wednesday 14000 13400 600 4.29% 1. Open Stitch 2. Contamenation. 3. Uncut thread 4. Skip Stitch 5. Slantead 14-Jan-21 Thursday 11500 10679 821 7.14% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch 15-Jan-21 Friday 16-Jan-21 Saturday 11450 10847 603 5.27% 1. Rawedge. 2. Uncut thread. 3. Broken. 4. Skip. 5. Open Seam. 17-Jan-21 Sunday 14538 13957 581 4.00% 1. Broken 2. Uncut Thread 3. Up Down 4. Contamenation. 5. Skip 18-Jan-21 Monday 13524 12568 956 7.07% 1. Spot 2. Slanted 3. Broken. 4. Poor Neck Shape.5. Uncut Thread 19-Jan-21 Tuesday 11550 10540 1010 8.74% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch 20-Jan-21 Wednesday 12250 11174 1076 8.78% 1. Uncut Thread. 2. Skip. 3. Broken. 4. Rawedge 5.Open Stitch 21-Jan-21 Thursday 11700 10633 1067 9.12% 1. Uncut Thread. 2. Skip. 3. Broken. 4. Poor Neck Shape. 5.Open Stitch 22-Jan-21 Friday 23-Jan-21 Saturday 14560 13489 1071 7.36% 1. Open Stitch 2. Poor Neck Shape. 3. Uncut thread 4. Skip Stitch 5. Slantead 24-Jan-21 Sunday 14000 13400 600 4.29% 1. Spot 2. Slanted 3. Broken. 4. Contamenation.5.Open Stitch 25-Jan-21 Monday 14650 13387 1263 8.62% 1. Spot 2. Slanted 3. Broken. 4. Contamenation. 5.Open Stitch 26-Jan-21 Tuesday 18623 17820 803 4.31% 1. Broken. 2. Uncut Thread. 3. Rawedge. 4. Uneven. 5. Skip. 27-Jan-21 Wednesday 17600 16830 770 4.38% 1. Spot 2. Slanted 3. Broken. 4. Contamenation. 5.Open Stitch 28-Jan-21 Thursday 18000 17002 998 5.54% 1. Spot 2. Slanted 3. Broken. 4. Rawedge 5.Open Stitch 29-Jan-21 Friday 30-Jan-21 Saturday 18589 17658 931 5.01% 1. Broken 2. Uncut Thread 3. Up Down 4. Contamenation. 5. Slanted. 31-Jan-21 Sunday 17500 16524 976 5.58% 1. Spot 2. Slanted . 3. Broken. 4. Contamenation. 5.Open Stitch 356094 335099 19560 5.49% 1. Poor Neck Shape. 2.Slanted. 3. Spot. 4. Contamenation. 5. Uncut Thread . Azmeri composite knit Ltd. Finishing DHU Status (Month of January-2021) SUMMARY Grand total
  • 44. 1-43 Monthly Finishing DHU status : Root causes & corrective action plan has to be showed.
  • 45. 1-44 QUALITY ORGANOGRAM OF AZMERI KNIT PVT LIMITED
  • 47. 1-46 Fabric GPQ Activities: • Receiving Fabric booking sheet from the fabric audit/merchant team. • Fabric quality follow-up at fabric mills (dyeing/finishing). • From each color /combo (1st lot fabric/rib/collar/cuff) approval will be provided by the concern merchandiser. Rest of the lots approval will be done by fabric GPQ. • GSM record (100% rolls) should be made by the fabric mill in front of fabric GPQ. • Fabric test report should be carried out from the fabric mill’s lab for each lot. • 4.0 Fabric inspection report should be carried out 20% rolls from each lot. • Fabric check and test related all docs should be submitted to the cutting units through the mail.
  • 48. 3. Human Resource Department KPI: 1-47
  • 49. Month wise worker absenteeism status : 1-48
  • 50. Proposal for Month factory overall house keeping status : 1-49 Color Meaning Green Maintain Yellow Need to improve Red Alarming Discredit marks % If marks is >20% If marks is 10% to 20% If marks is <10% SL FOCUS POINTS NO OF CHECKED ITEMS NO OF DEFECTS DISCREDIT POINTS REMARKS 1 The work area and all tables are clean 10 2 20% 2 The Idle machine is covered by machine cover 20 5 25% 3 All tools and scissors are attached to the equipment (avoiding touching the floor) or attached workers wrist 10 1 10% 4 All fabrics rolls are poly bagged and identified & All trims are stored properly and identified 5 0 0% 5 Aisle are free from any object 10 1 10% 6 Fabrics and Trims in Quanrantine areas must be placed on pallets 20 3 15% 7 Empty Basket / Trolley are stationed in designated area 5 1 20% 8 Sewing Machines and Tables are in right place and position 10 2 20% 9 Alter Materials are kept in Rework, Rejected ,spot clean boxes 10 3 30% 10 Iron shoe & palet are being used during ironning 15 1 7% 11 Fire fighting tools are kept in right place 10 1 10% 12 All cartoon, boxes and unusable goods are kept in designated area 5 1 20% 13 Finished carton areas are kept as well organized 10 1 10% 14 Rejection garments management system is well organized 5 1 20% 145 23 16% Factory HR KPI Dash Board. Total
  • 51.
  • 52. 4. Set next month target: 1-51 Final Inspection Pass % 100.00% DHU% <5.00% OQL % <3.50% Quality Expected Plan Actual Plan Planned Machine 270 270 Working days 26 26 Avg. Working Hour 10.00 10.00 Avg. SMV 9.39 9.39 Target Efficiency % 65.00% 58.76% Target Hour 59319 53627 Target Qty 379053 342680 Target Achievement % 100.00% 100.00% Machine utilization % 98.00% 98.00% Excess shipment % 0.50% 0.50% AZMERI PPC, IE & Production Criteria Dept.