SlideShare une entreprise Scribd logo
1  sur  35
Télécharger pour lire hors ligne
1
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
OECD WGI workshop
on advanced participation
for water governance
Nils Ferrand & Patrice Garin, Emeline Hassenforder,
Benjamin Noury, Sylvie Morardet, Sophie Richard,
Delphine L’Aot, Bruno Bonté
UMR/JRU G-EAU Managing Water, Stakeholders & Uses
IRSTEA : French National Institute for Research and Technology
on Environment and Agriculture - Montpellier, FRANCE
2
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Context of this session
• Session held on demand by the WGI board, in response to
members’ request during the last internal survey
– Organized by the Joint Research Unit « UMR G-EAU » (Gestion
Eau Acteurs Usages / Management of Water, Stakeholders & Uses)
a French public laboratory, expert in Water Governance and
Management, member of the WGI (with N. Ferrand, S. Richard, L.
Guerin-Schneider)  intervention on IRSTEA budget
– Facilitators for this session :
• Dr. Nils Ferrand, decision sciences, coordinator
• Delphine L’Aot, international development
• Dr. Emeline Hassenforder, participatory water governance
• Benjamin Noury, participatory water governance
• Dr. Sophie Richard, political scientist
• Dr. Patrice Garin, senior water scientist
• Dr. Sylvie Morardet, water economist
• Dr. Bruno Bonté, modeller
3
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Aims of the session
• Consider new perspectives on participatory water
governance, including multi-level stakeholders
(together) & the general public
• Introduce some original and useful participation
methods, relevant for the water governance cycle.
Discover some of them in practical sessions
– Participatory modeling, simulation & planning
– Pre-participation  « participating about
governance processes »
• Discuss needs and perspectives
(NOT an overview, a course or an expert group)
4
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
OECD principles from a participatory perspective
Participatory !?
Participatory !?
Participatory !?
5
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Workshop Schedule & Organization
• 14:30-14:50 Welcome and workshop introduction
• 14:50-15:45 Practical approach of participatory methods
• 15:45-16:40 Self-design of a participatory governance
process
• 16:40-16:50 Individual feedback questionaire
• 16:50-17:30 General discussion
Working in small groups (6) with guidelines & material on your
table and with our assistance.
6
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Decision & Action Cycle
Identification of
a social-environmental issue
Situation assessment & modelling, stakeholder
analysis, preferences elicitation, data collection…
Solution development
Operational planning, decision making
process, strategy, solution testing,
monitoring & evaluation design
Solution implementation
Engineering implementation, monitoring
Expansion
Final evaluation, scaling up,
dissemination, sustainability of the
implemented activities
DECISION &
ACTION CYCLE
Source: http://www.oecd.org/gov/regional-policy/OECD-
Principles-on-Water-Governance-brochure.pdf
7
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
an
Many rationales for
participation
Create ownership
Build trust
Empower communities
Educate and raise awareness Collect local data and knowledge
Develop appropriate activities
Gather various options and ideas
Establish new cooperation
Strengthen the effectiveness of the intervention
OECD report on Stakeholder Engagement for
Inclusive Water Governance: “there are many
economic, environmental and social benefits to
be gained from effectively engaging
stakeholders in water policies and projects”.
…
Resolve conflicts
Support engagement and institutional emergence
8
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
IDENTIFICATION
Engage the relevant stakeholders?
Reveal and share representations?
Collect local data and information?
Frame and structure objectives?
How can we strengthen participation throughout the cycle?
DEVELOPMENT
Prepare a decision making protocol ?
Elaborate participatory planning?
Explore and test various scenarios?
Develop a shared Monitoring and
Evaluation (M&E) strategy?
IMPLEMENTATION
Engage stakeholders in autonomous
transformation and its M&E?
EXPANSION
Transfer the responsibilities ?
Autonomise the duplication
of the intervention?
Support policy makers to
lead the scaling out?
Resolve the use of Internet?
HOW CAN
WE?
9
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
UN - Non-Governmental Liaison
Service (sept. 2013) recommendations
“f). Recognize civil society as a key
partner in identifying issues, informing
policies and achieving goals; and in
monitoring and evaluating
implementation, by mainstreaming
participatory processes at various
levels of policy-making, including the provision of access to
information; <…>
h) Adopt mechanisms and allocate resources to ensure that
civil society, including associations of vulnerable and
marginalized people, have the capacity to engage meaningfully
in decision-making processes”
10
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
P.W.G. : a wide range of actions, investigations & results
Several methods / tools
• Generic / procedural
 Focus groups, citizen jury, deliberative polling,
open forum, world café, forum theater, e-fora,
PPGIS, town meeting, e-voting, …
• Targeted at Participatory…
 Political framing, Establishing principles or aims
 Setting of Decision Agenda, Rules and Arbitration
 Sensing / Mapping / Surveillance / Data collection
 Modeling / Diagnosis / Assessment
 Foresight / Future visioning
 Simulation: role playing games,
 Planning: proposing, integrating, selecting
 Monitoring & Evaluation
 Budgeting
 Funding
 Guarantee / Certification / Auditing
 Building / Construction / « Making » / Maintenance
 Policing / Control / Vigilance
 Constitution / Institutionalization
R&D Projects (e.g.)
• European Research:
HarmoniCOP, CatchMod,
Aquastress, Newater, SLIM,
GOVERN, WeSenseIt,
Gover-Nat, G-FORS, I-
FIVE, CADWAGO…
• International: CGIAR
CPWF, WLE, …
Various Aims / contexts
Integrated Water Management,
Restoration, Planning, Public
Utility Management (WASH),
Climate Change Adaptation,
Irrigation, Conflict resolution…
11
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
An innovative participation strategy and toolbox from Irstea : CoOPLAaGE
E.g., in a catchment, a group of water users would like to act to improve their situation and the
socio-environmental viability. Guided by a process manager, they cycle with various tools.
1
Preparing a governance protocol
Decide the principles and rules of the
emerging participation process.
2
Exploring Justice
Discuss the social justice
principles for sharing land
and water.
3
Creating a playable model
Prepare a local model for
participatory simulations of local
situation and new options.
4
Elaborating an integrated action plan
Propose and structure actions, and
then assess their coherency, feasibility
and efficiency
5
Testing and discussing plans
Experiment the plan with the
role playing game and validate a
joint adaptation strategy.
6
Monitoring and evaluation
Learn about the changes in
knowledge, preferences,
actions and relations
12
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Example of Ugandan process in the AfroMaison project (2011-2014)
1 2
3
4
6
7
Procedural agreement Focal issue
Implementation plan
Modeling & plan testing
through game
Planning
Actions identification
5 Resource allocation
Monitoring & Evaluation
13
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
M&E: a vital principle for P.W.G. ?
OUTPUTS / OUTCOMES / IMPACTS
Normative (e.g. rules)
Cognitive (e.g. Views, perceptions)
Operational (e.g. practices)
Relational (e.g. trust)
...
CONTEXT
“INTERVENTION”
• Participatory Planning Process
• Implementation of Water
Governance Principles
• …
KNOW WHAT WE DO KNOW WHAT WE GET
Expectations
Questionnaires
Participatory observation
Interviews
Debriefing
14
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Participatory modeling: the backbone for P.W.G. ?
Participatory modeling : when ALL actors design together the
relevant models (i.e. actionable representations) of their situation,
options, responses, plans, which they can use to explore, formalize
and engage in adaptation
– Yes, « they » can…
• Model their own complex hydro-social system
• Model their own decision values, procedure & rules
• Model their integrated multi-*** action plan & its impact
• Use the modeling (& simulation) process to support co-
engagement toward a shared future
&… No, we don’t need computers
 Simple transferable modeling
kit (e.g. INIWAG)
15
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
An innovative participation strategy and toolbox from Irstea : CoOPLAaGE
E.g., in a catchment, a group of water users would like to act to improve their situation and the
socio-environmental viability. Guided by a process manager, they cycle with various tools.
1
Preparing a governance protocol
Decide the principles and rules of the
emerging participation process.
2
Exploring Justice
Discuss the social justice
principles for sharing land
and water.
3
Creating a playable model
Prepare a local model for
participatory simulations of local
situation and new options.
4
Elaborating an integrated action plan
Propose and structure actions, and
then assess their coherency, feasibility
and efficiency
5
Testing and discussing plans
Experiment / simulate the plan
with the role playing game and
validate a joint adaptation
strategy.
6
Monitoring and evaluation
Learn about the changes in
knowledge, preferences,
actions and relations
This workshop focus :
16
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
What we’ll do next :
Act « as if » you were real actors of a Water Catchment, to
explore some participatory methods
1. Discover this common (abstract) case study
2. Model it with a simple (but integrative) tool
3. Simulate 2 scenarios
4. Design an action plan
5. Consider participatory actions & integrate them in the
design of a decision procedure –hopefully participatory- for
water management
On the way, please comment, question on your individual
feedback form.
17
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Let’s consider a generic (abstract) case study
« We live in a coastal region, in the Erhno catchment. Features :
• A large city (500.000 px), high demographic growth (immigration),
• Mixed agriculture with family farming, commercial orchards & wine
(developing irrigation), vegetables and corn,
• Intense & seasonal touristic activity near the coast,
• Petrochemical (seaside) and food industry,
• Brackish laguna with RAMSAR bird area downstream
• Mountains & forests upstream in the natural park,
• Large multi-purpose dam, hydroelectricity, tourism .
• Shallow aquifer downstream between the city and the coast
Issues:
Summer scarcity, mid-season floods, pollution peaks
18
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Map
SEA
Erhno
Dam
Laguna
PetroChem
Wine
Wine
Orchards
Irrigation
Corn
Aquifer Food
Processing
unit
19
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
This catchment challenges
• For the last 15 years, recharge of the dam and the river
flow have clearly diminished, with impact on aquifer and
wetlands
• Family farming made difficult by low surface water access
• Water utilities in city should be expanded to match growth
• Irrigation demand grows (commercial) but limited network
• The two factories play a key economic role, but the
PetroChem plant is challenged after a pollution spillover
in the river and the protected laguna.
• Overarching regulations ask for ecosystems protection
 A new strategy for water and land management has
to be decided and implemented
20
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Participate to explore participatory modeling
Please pick a role among:
1. Director of the Catchment & Water Agency
2. Mayor of the Heliopol city
3. Representative of the Environmental NGO
4. Delegate of the SmallHolders Farmers Association
5. Chair of the Commerce & Industry Chamber
6. « The People of Erhno » delegate (citizens’ group)
In the next steps, please try to react as you think this actor
would do in « real operations ».
21
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Creating a playable model
Prepare a local model for
participatory simulations of
local situation and new
options.
This Step :
22
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Action 1 Participatory Modeling (15’)
Step 1.1
Map
Hydrosyst
Select and organize elements from the *catchment
mapping kit* to represent on your table your common
vision (map, model) of the water system. Fill the dam
bucket –if any- with 10 drops, mixed colors.
Step 1.2
Create
Create & add 1 or 2 new mapping elements if they
are missing (Use Post-It to draw or name them)
Step 1.3
Model
Land-use
Discuss, choose and install ~12~ *action cards* for
your model. Only one *action card* goes on one land
plot card.
Step 1.4
Audit
On the set situation, audit current operation cost for
each actor, as well as population, jobs and satisfaction.
 Get participants to build and share a common dynamic model of the
situation, including biophysical, social, economic & policy issues
 NOTA !!! This simplified version does not include management /
governance actions  please feel free to invent them
23
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Reading / using an action card
Name
Pollution sensitivity
indicator
Operation cost
Water needs
Dry
Normal
Population Jobs
Returned water
Dry year
Normal year
Income
« Smiley »
« Angry »
24
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
This Step :
5 Testing and discussing plans
Experiment / simulate the plan with the
role playing game and validate a joint
adaptation strategy.
25
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Action 2 Participatory Simulation (20’)
Step 2.1
Fill
river
Fill the *river bucket* with 15 water drops (blue). Put
it upstream your river system.
Step 2.2
Flow, use,
return…
Flow the *river bucket* step by step. Each user collects
water from it (no filter = no sorting !), « consumes »
it (for action), and returns directly *used water* (red
drops) to the bucket.
Step 2.3
Issues…
Not enough water ? Or water too polluted for your
activity ( max 50%, 0% !) ?  Failed activity !!
Step 2.4
Impacts
Monitor final economic situation (if successful) and
monitor the river and dam status (quantity, quality),
as well as other indicators. Anything else to observe ?
Step 2.5
Climate
change
Repeat a second similar round with only 10 drops.
Assess and discuss changing activities.
 Get participants to explore together the dynamics of the socio-hydro
system, to react and organize management & governance.
Normal
Climate
Drought
26
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Monitoring results
Round 1 Round 2 Round 3 Round 4
Climate Normal Dry
Operation costs Urban
Agriculture
Nature
Industry
Population
Labor
Input water
Outlet water Clean
Used
Income Urban
Agriculture
Nature
Industry
# Activ. Failed
Smileys #
Angrys #
Immeubles #
Maisons #
Friche urbaine #
Forêts #
Lande #
Fruits et Legumes #
Elevage industriel #
27
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
((( More Options if you wish and have time )))
Option 1
Add
Resources
Socio-hydrosystems do not run *only* on land, water,
labor and money  you can specify other resources:
e.g. food, energy, biodiversity, social willingness...
Actions « use » or « produce » them. And they evolve
in the natural or social environment. How ? Propose
processes & rules if required.
Option 2
Add
Actions
Many other actions can be proposed and used. Edit
*blank action cards* to specify you own. Agree on
values and specific rules.
Option 3
Add
Events
Scenarii ? External Drivers ? Add events which can
happen in time, as steps in the process or as random
events.
Many extensions are possible in the modeling process, considering needs,
participants, etc.
28
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Action 3 Integrative Planning CooPLAN (15’)
Step 3.1
Aim
Formulate aim(s) for your future catchment
management plan. Write on your *COOPLAN* banner.
Step 3.2
Propose
Every participant can propose up to 2 new options
(proposed interventions) using the *option model* card
Step 3.3
Integrate
Discuss to select some, and organize the sequence of
options in your *COOPLAN*.
Step 3.4
Assess
Discuss coherency, feasibility and efficiency, looking at
the *Requirements* (left) and *Impact* (right) sides
Option
Test
How would you test this strategy with the simulation?
 Get participants to build and discuss suitable actions, and integrate them
in coherent actions plans.
29
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Filling a CooPLAN Option Strip
CooPLAN Option Card ©Irstea, 2015 Resources Requirements (Qualitative) Individual Local Regional > Nat
COOPLAN
Investment
Operation
cost
LandUse
Water
Quantity
Water
Quality
Legal
Licenses
Social
support
Nature
Biodiversity
Political
willing
Other
Low + + + + + + + + + + +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +
Med ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +
High +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +
Anticipated impact / outcomes
Detail
Ecosystem
s
Water
Quantity
Water
quality
Flood
Protection
Citizens
Well-Being
Community
Life
Regional
Economy
Governance
Institutions
NAME
RainWater
Infiltration
Open area for
infiltrating water
to the aquifer
1. Naming the option proposal
& specify details
2. Specifying implementation level
3. Specifying the estimated levels /
intensity of resources (material or
immaterial) required for this option.
4 levels : 0 / + / ++ / ++++
Darken boxes with a marker
4. Describing the anticipated /
expected impacts for each criteria
 can be positive or negative
30
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
CooPLAN Integration matrix
SCALEIndividual Local Regional > Nat Time Short
Mediu
m
Long Term
CooPLAN Option Card ©Irstea, 2015 Resources Requirements (Qualitative) Individual Local Regional > Nat
Equity
Justice
Anticipated impact / outcomes
Ecosystem
s
Water
Quantity
Water
quality
Flood
Protection
CooPLAN matrix
Aim :
Detail
Citizens
Well-Being
Community
Life
Regional
Economy
Governance
Institutions
COOPLAN
Investment
Operation
cost
LandUse
Water
Quantity
Water
Quality
Legal
Licenses
Social
support
Nature
Biodiversity
Political
willing
Other
Equity
Justice
NAME
Ecosystem
s
Water
Quantity
Water
quality
Flood
Protection
Detail
Citizens
Well-Being
Community
Life
Regional
Economy
Governance
Institutions
Low + + + + + + + + + + +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1
Med ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2
High +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3
CooPLAN Option Card ©Irstea, 2015 Resources Requirements (Qualitative) Individual Local Regional > Nat
COOPLAN
Investment
Operation
cost
LandUse
Water
Quantity
Water
Quality
Legal
Licenses
Social
support
Nature
Biodiversity
Political
willing
Other
Low + + + + + + + + + + +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1
Med ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2
High +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3
CooPLAN Option Card ©Irstea, 2015 Resources Requirements (Qualitative) Individual Local Regional > Nat
COOPLAN
Investment
Operation
cost
LandUse
Water
Quantity
Water
Quality
Legal
Licenses
Social
support
Nature
Biodiversity
Political
willing
Other
Low + + + + + + + + + + +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1
Med ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2
High +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3
CooPLAN Option Card ©Irstea, 2015 Resources Requirements (Qualitative) Individual Local Regional > Nat
COOPLAN
Investment
Operation
cost
LandUse
Water
Quantity
Water
Quality
Legal
Licenses
Social
support
Nature
Biodiversity
Political
willing
Other
Low + + + + + + + + + + +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1
Med ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2
High +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3
Community
Life
Regional
Economy
Governance
Institutions
Equity
Justice
NAMEDetail
Ecosystem
s
Water
Quantity
Water
quality
Flood
Protection
Citizens
Well-Being
Community
Life
Regional
Economy
Governance
Institutions
Equity
Justice
NAME
Anticipated impact / outcomes
Detail
Ecosystem
s
Water
Quantity
Water
quality
Flood
Protection
Citizens
Well-Being
Community
Life
Regional
Economy
Governance
Institutions
Equity
Justice
NAME Anticipated impact / outcomesNAME
Anticipated impact / outcomes
Detail
Ecosystem
s
Water
Quantity
Water
quality
Flood
Protection
Citizens
Well-Being
31
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Action 4: Get Ready for PrePar (10’)
Step 4.1
Consider the *Participatory Actions* and the
*Participatory Roles* cards. Discuss them.
Option
4.2
Propose
Use the *Participatory Action* template to add other
method(s) you want to propose. Explain them.
Option
4.3
Evaluate
Organize all of them on the feasibility / efficiency
matrix. Discuss.
 Get participants to understand possible participatory methods / tools
In the next phase (PrePar), you’ll have to decide how the
participatory process should be organized, with / by / for
whom, with which method, in order to get your water
management plan designed, agreed and implemented.
32
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Action 5 Prepare Participation: PrePar (40’)
Step 5.1
Look at the multi-level *PRE-PAR chart*.
Understand: lines = scales, actors // columns = phases.
Step 5.2
For each phase, you can specify up to 2 sub-steps (or
not). Write captions on the headline with post-its.
Step 5.3
For each step, WRITE *participatory actions* and/or
*participatory role* (ref. cards) at their main
implementation scales. If multi-level, specify WHO is
engaged by *drawing* vertical lines or dots. Write
Outcomes on the bottom line.
Option
5.4
Add *Alert Stars* where you consider there is a risk /
contingency in the plan. Discuss solutions.
What happens in case of conflict during the process ?
 Get participants to build and agree on a plan and rules for decision and
participation, at different levels
33
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Action 6 Individual feedback (10’)
Please fill the individual feedback
form on paper or online at :
http://pwg.watagame.info
34
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
Action 7 Global Discussion (40’)
In your address, please specify topic:
1. Pros & Cons of Fostering Wider
Participation for Water Governance
2. Value of new methods (please ref. to
*Participatory Action* cards)
3. Participation to design participation 
PrePar vs. usual engineering
4. Emerging needs and expectations
35
http://watagame.info
© Nils.Ferrand@IRSTEA.fr , 2015
OECD
WGI
2015
Pleasedonotreproduce,photoortakeaway
THANK YOU !!!
All results will be shared through the OECD WGI coordination.

Contenu connexe

Similaire à Nils Ferrand (IRSTEA) - 6th WGI Meeting (2-3 November 2015, Paris)

Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Iwl Pcu
 
Csr fact sheet apr2014
Csr fact sheet apr2014Csr fact sheet apr2014
Csr fact sheet apr2014ict4dev
 
TCI 2014 Fostering competitiveness through transnational clusters networks
TCI 2014 Fostering competitiveness through transnational clusters networks TCI 2014 Fostering competitiveness through transnational clusters networks
TCI 2014 Fostering competitiveness through transnational clusters networks TCI Network
 
Toby Roxburgh (WWF) - "Pisces Project: Partnerships involving Stakeholders i...
Toby Roxburgh (WWF)  - "Pisces Project: Partnerships involving Stakeholders i...Toby Roxburgh (WWF)  - "Pisces Project: Partnerships involving Stakeholders i...
Toby Roxburgh (WWF) - "Pisces Project: Partnerships involving Stakeholders i...Shellfish Association
 
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHG
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHG
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGvj8pcsccj9
 
Measuring policy influence: like measuring thin air?
Measuring policy influence: like measuring thin air?Measuring policy influence: like measuring thin air?
Measuring policy influence: like measuring thin air?Arnaldo Pellini
 
Responsible propertyinvestmenttoolkit
Responsible propertyinvestmenttoolkitResponsible propertyinvestmenttoolkit
Responsible propertyinvestmenttoolkitDr Lendy Spires
 
Responsible propertyinvestmenttoolkit
Responsible propertyinvestmenttoolkitResponsible propertyinvestmenttoolkit
Responsible propertyinvestmenttoolkitDr Lendy Spires
 
IFAD´s Online project mgmt tools-ifad asia and lfad global
IFAD´s Online project mgmt tools-ifad asia and lfad globalIFAD´s Online project mgmt tools-ifad asia and lfad global
IFAD´s Online project mgmt tools-ifad asia and lfad globalPROCASUR Corporation
 
Project Sustainability workshop session: YouthMetre Project
Project Sustainability workshop session: YouthMetre ProjectProject Sustainability workshop session: YouthMetre Project
Project Sustainability workshop session: YouthMetre ProjectKarl Donert
 
Session 5 - UNEP Finance Initiative - Private Sector Finance.pdf
Session 5 - UNEP Finance Initiative - Private Sector Finance.pdfSession 5 - UNEP Finance Initiative - Private Sector Finance.pdf
Session 5 - UNEP Finance Initiative - Private Sector Finance.pdfOECD Environment
 
Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...Iwl Pcu
 
Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...Iwl Pcu
 
Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...Iwl Pcu
 
A flexible, multi-purpose monitoring, evaluation, and learning system to supp...
A flexible, multi-purpose monitoring, evaluation, and learning system to supp...A flexible, multi-purpose monitoring, evaluation, and learning system to supp...
A flexible, multi-purpose monitoring, evaluation, and learning system to supp...Food_Systems_Innovation
 

Similaire à Nils Ferrand (IRSTEA) - 6th WGI Meeting (2-3 November 2015, Paris) (20)

IRA Tunisia: Integrated Research for Development
IRA Tunisia: Integrated Research for DevelopmentIRA Tunisia: Integrated Research for Development
IRA Tunisia: Integrated Research for Development
 
Urbanizing Deltas of the World: Research Uptake
Urbanizing Deltas of the World: Research UptakeUrbanizing Deltas of the World: Research Uptake
Urbanizing Deltas of the World: Research Uptake
 
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
 
EGI Strategy
EGI StrategyEGI Strategy
EGI Strategy
 
Innovation Platforms for Value Chain Development: Experiences from Ghana and ...
Innovation Platforms for Value Chain Development: Experiences from Ghana and ...Innovation Platforms for Value Chain Development: Experiences from Ghana and ...
Innovation Platforms for Value Chain Development: Experiences from Ghana and ...
 
Csr fact sheet apr2014
Csr fact sheet apr2014Csr fact sheet apr2014
Csr fact sheet apr2014
 
TCI 2014 Fostering competitiveness through transnational clusters networks
TCI 2014 Fostering competitiveness through transnational clusters networks TCI 2014 Fostering competitiveness through transnational clusters networks
TCI 2014 Fostering competitiveness through transnational clusters networks
 
Toby Roxburgh (WWF) - "Pisces Project: Partnerships involving Stakeholders i...
Toby Roxburgh (WWF)  - "Pisces Project: Partnerships involving Stakeholders i...Toby Roxburgh (WWF)  - "Pisces Project: Partnerships involving Stakeholders i...
Toby Roxburgh (WWF) - "Pisces Project: Partnerships involving Stakeholders i...
 
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHG
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHG
URBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHGURBREATH WP7 Kickoff FHG
 
Measuring policy influence: like measuring thin air?
Measuring policy influence: like measuring thin air?Measuring policy influence: like measuring thin air?
Measuring policy influence: like measuring thin air?
 
Responsible propertyinvestmenttoolkit
Responsible propertyinvestmenttoolkitResponsible propertyinvestmenttoolkit
Responsible propertyinvestmenttoolkit
 
Responsible propertyinvestmenttoolkit
Responsible propertyinvestmenttoolkitResponsible propertyinvestmenttoolkit
Responsible propertyinvestmenttoolkit
 
IFAD´s Online project mgmt tools-ifad asia and lfad global
IFAD´s Online project mgmt tools-ifad asia and lfad globalIFAD´s Online project mgmt tools-ifad asia and lfad global
IFAD´s Online project mgmt tools-ifad asia and lfad global
 
Support for Research Data Management, by Esther Dzalé Yeumo Kaboré
Support for Research Data Management, by Esther Dzalé Yeumo KaboréSupport for Research Data Management, by Esther Dzalé Yeumo Kaboré
Support for Research Data Management, by Esther Dzalé Yeumo Kaboré
 
Project Sustainability workshop session: YouthMetre Project
Project Sustainability workshop session: YouthMetre ProjectProject Sustainability workshop session: YouthMetre Project
Project Sustainability workshop session: YouthMetre Project
 
Session 5 - UNEP Finance Initiative - Private Sector Finance.pdf
Session 5 - UNEP Finance Initiative - Private Sector Finance.pdfSession 5 - UNEP Finance Initiative - Private Sector Finance.pdf
Session 5 - UNEP Finance Initiative - Private Sector Finance.pdf
 
Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...
 
Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...
 
Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...Use of Information Management and Public Participation by GEF IW Projects (Da...
Use of Information Management and Public Participation by GEF IW Projects (Da...
 
A flexible, multi-purpose monitoring, evaluation, and learning system to supp...
A flexible, multi-purpose monitoring, evaluation, and learning system to supp...A flexible, multi-purpose monitoring, evaluation, and learning system to supp...
A flexible, multi-purpose monitoring, evaluation, and learning system to supp...
 

Plus de OECD Governance

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators SlidesOECD Governance
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...OECD Governance
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)OECD Governance
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...OECD Governance
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...OECD Governance
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...OECD Governance
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmOECD Governance
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...OECD Governance
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...OECD Governance
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...OECD Governance
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023OECD Governance
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...OECD Governance
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsOECD Governance
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfOECD Governance
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxOECD Governance
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxOECD Governance
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxOECD Governance
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxOECD Governance
 

Plus de OECD Governance (20)

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators Slides
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and Recommendations
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdf
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptx
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptx
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
 

Dernier

BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...tanu pandey
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...Amil baba
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 

Dernier (20)

E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
Green Banking
Green Banking Green Banking
Green Banking
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 

Nils Ferrand (IRSTEA) - 6th WGI Meeting (2-3 November 2015, Paris)

  • 1. 1 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway OECD WGI workshop on advanced participation for water governance Nils Ferrand & Patrice Garin, Emeline Hassenforder, Benjamin Noury, Sylvie Morardet, Sophie Richard, Delphine L’Aot, Bruno Bonté UMR/JRU G-EAU Managing Water, Stakeholders & Uses IRSTEA : French National Institute for Research and Technology on Environment and Agriculture - Montpellier, FRANCE
  • 2. 2 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Context of this session • Session held on demand by the WGI board, in response to members’ request during the last internal survey – Organized by the Joint Research Unit « UMR G-EAU » (Gestion Eau Acteurs Usages / Management of Water, Stakeholders & Uses) a French public laboratory, expert in Water Governance and Management, member of the WGI (with N. Ferrand, S. Richard, L. Guerin-Schneider)  intervention on IRSTEA budget – Facilitators for this session : • Dr. Nils Ferrand, decision sciences, coordinator • Delphine L’Aot, international development • Dr. Emeline Hassenforder, participatory water governance • Benjamin Noury, participatory water governance • Dr. Sophie Richard, political scientist • Dr. Patrice Garin, senior water scientist • Dr. Sylvie Morardet, water economist • Dr. Bruno Bonté, modeller
  • 3. 3 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Aims of the session • Consider new perspectives on participatory water governance, including multi-level stakeholders (together) & the general public • Introduce some original and useful participation methods, relevant for the water governance cycle. Discover some of them in practical sessions – Participatory modeling, simulation & planning – Pre-participation  « participating about governance processes » • Discuss needs and perspectives (NOT an overview, a course or an expert group)
  • 4. 4 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway OECD principles from a participatory perspective Participatory !? Participatory !? Participatory !?
  • 5. 5 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Workshop Schedule & Organization • 14:30-14:50 Welcome and workshop introduction • 14:50-15:45 Practical approach of participatory methods • 15:45-16:40 Self-design of a participatory governance process • 16:40-16:50 Individual feedback questionaire • 16:50-17:30 General discussion Working in small groups (6) with guidelines & material on your table and with our assistance.
  • 6. 6 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Decision & Action Cycle Identification of a social-environmental issue Situation assessment & modelling, stakeholder analysis, preferences elicitation, data collection… Solution development Operational planning, decision making process, strategy, solution testing, monitoring & evaluation design Solution implementation Engineering implementation, monitoring Expansion Final evaluation, scaling up, dissemination, sustainability of the implemented activities DECISION & ACTION CYCLE Source: http://www.oecd.org/gov/regional-policy/OECD- Principles-on-Water-Governance-brochure.pdf
  • 7. 7 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway an Many rationales for participation Create ownership Build trust Empower communities Educate and raise awareness Collect local data and knowledge Develop appropriate activities Gather various options and ideas Establish new cooperation Strengthen the effectiveness of the intervention OECD report on Stakeholder Engagement for Inclusive Water Governance: “there are many economic, environmental and social benefits to be gained from effectively engaging stakeholders in water policies and projects”. … Resolve conflicts Support engagement and institutional emergence
  • 8. 8 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway IDENTIFICATION Engage the relevant stakeholders? Reveal and share representations? Collect local data and information? Frame and structure objectives? How can we strengthen participation throughout the cycle? DEVELOPMENT Prepare a decision making protocol ? Elaborate participatory planning? Explore and test various scenarios? Develop a shared Monitoring and Evaluation (M&E) strategy? IMPLEMENTATION Engage stakeholders in autonomous transformation and its M&E? EXPANSION Transfer the responsibilities ? Autonomise the duplication of the intervention? Support policy makers to lead the scaling out? Resolve the use of Internet? HOW CAN WE?
  • 9. 9 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway UN - Non-Governmental Liaison Service (sept. 2013) recommendations “f). Recognize civil society as a key partner in identifying issues, informing policies and achieving goals; and in monitoring and evaluating implementation, by mainstreaming participatory processes at various levels of policy-making, including the provision of access to information; <…> h) Adopt mechanisms and allocate resources to ensure that civil society, including associations of vulnerable and marginalized people, have the capacity to engage meaningfully in decision-making processes”
  • 10. 10 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway P.W.G. : a wide range of actions, investigations & results Several methods / tools • Generic / procedural  Focus groups, citizen jury, deliberative polling, open forum, world café, forum theater, e-fora, PPGIS, town meeting, e-voting, … • Targeted at Participatory…  Political framing, Establishing principles or aims  Setting of Decision Agenda, Rules and Arbitration  Sensing / Mapping / Surveillance / Data collection  Modeling / Diagnosis / Assessment  Foresight / Future visioning  Simulation: role playing games,  Planning: proposing, integrating, selecting  Monitoring & Evaluation  Budgeting  Funding  Guarantee / Certification / Auditing  Building / Construction / « Making » / Maintenance  Policing / Control / Vigilance  Constitution / Institutionalization R&D Projects (e.g.) • European Research: HarmoniCOP, CatchMod, Aquastress, Newater, SLIM, GOVERN, WeSenseIt, Gover-Nat, G-FORS, I- FIVE, CADWAGO… • International: CGIAR CPWF, WLE, … Various Aims / contexts Integrated Water Management, Restoration, Planning, Public Utility Management (WASH), Climate Change Adaptation, Irrigation, Conflict resolution…
  • 11. 11 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway An innovative participation strategy and toolbox from Irstea : CoOPLAaGE E.g., in a catchment, a group of water users would like to act to improve their situation and the socio-environmental viability. Guided by a process manager, they cycle with various tools. 1 Preparing a governance protocol Decide the principles and rules of the emerging participation process. 2 Exploring Justice Discuss the social justice principles for sharing land and water. 3 Creating a playable model Prepare a local model for participatory simulations of local situation and new options. 4 Elaborating an integrated action plan Propose and structure actions, and then assess their coherency, feasibility and efficiency 5 Testing and discussing plans Experiment the plan with the role playing game and validate a joint adaptation strategy. 6 Monitoring and evaluation Learn about the changes in knowledge, preferences, actions and relations
  • 12. 12 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Example of Ugandan process in the AfroMaison project (2011-2014) 1 2 3 4 6 7 Procedural agreement Focal issue Implementation plan Modeling & plan testing through game Planning Actions identification 5 Resource allocation Monitoring & Evaluation
  • 13. 13 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway M&E: a vital principle for P.W.G. ? OUTPUTS / OUTCOMES / IMPACTS Normative (e.g. rules) Cognitive (e.g. Views, perceptions) Operational (e.g. practices) Relational (e.g. trust) ... CONTEXT “INTERVENTION” • Participatory Planning Process • Implementation of Water Governance Principles • … KNOW WHAT WE DO KNOW WHAT WE GET Expectations Questionnaires Participatory observation Interviews Debriefing
  • 14. 14 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Participatory modeling: the backbone for P.W.G. ? Participatory modeling : when ALL actors design together the relevant models (i.e. actionable representations) of their situation, options, responses, plans, which they can use to explore, formalize and engage in adaptation – Yes, « they » can… • Model their own complex hydro-social system • Model their own decision values, procedure & rules • Model their integrated multi-*** action plan & its impact • Use the modeling (& simulation) process to support co- engagement toward a shared future &… No, we don’t need computers  Simple transferable modeling kit (e.g. INIWAG)
  • 15. 15 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway An innovative participation strategy and toolbox from Irstea : CoOPLAaGE E.g., in a catchment, a group of water users would like to act to improve their situation and the socio-environmental viability. Guided by a process manager, they cycle with various tools. 1 Preparing a governance protocol Decide the principles and rules of the emerging participation process. 2 Exploring Justice Discuss the social justice principles for sharing land and water. 3 Creating a playable model Prepare a local model for participatory simulations of local situation and new options. 4 Elaborating an integrated action plan Propose and structure actions, and then assess their coherency, feasibility and efficiency 5 Testing and discussing plans Experiment / simulate the plan with the role playing game and validate a joint adaptation strategy. 6 Monitoring and evaluation Learn about the changes in knowledge, preferences, actions and relations This workshop focus :
  • 16. 16 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway What we’ll do next : Act « as if » you were real actors of a Water Catchment, to explore some participatory methods 1. Discover this common (abstract) case study 2. Model it with a simple (but integrative) tool 3. Simulate 2 scenarios 4. Design an action plan 5. Consider participatory actions & integrate them in the design of a decision procedure –hopefully participatory- for water management On the way, please comment, question on your individual feedback form.
  • 17. 17 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Let’s consider a generic (abstract) case study « We live in a coastal region, in the Erhno catchment. Features : • A large city (500.000 px), high demographic growth (immigration), • Mixed agriculture with family farming, commercial orchards & wine (developing irrigation), vegetables and corn, • Intense & seasonal touristic activity near the coast, • Petrochemical (seaside) and food industry, • Brackish laguna with RAMSAR bird area downstream • Mountains & forests upstream in the natural park, • Large multi-purpose dam, hydroelectricity, tourism . • Shallow aquifer downstream between the city and the coast Issues: Summer scarcity, mid-season floods, pollution peaks
  • 18. 18 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Map SEA Erhno Dam Laguna PetroChem Wine Wine Orchards Irrigation Corn Aquifer Food Processing unit
  • 19. 19 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway This catchment challenges • For the last 15 years, recharge of the dam and the river flow have clearly diminished, with impact on aquifer and wetlands • Family farming made difficult by low surface water access • Water utilities in city should be expanded to match growth • Irrigation demand grows (commercial) but limited network • The two factories play a key economic role, but the PetroChem plant is challenged after a pollution spillover in the river and the protected laguna. • Overarching regulations ask for ecosystems protection  A new strategy for water and land management has to be decided and implemented
  • 20. 20 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Participate to explore participatory modeling Please pick a role among: 1. Director of the Catchment & Water Agency 2. Mayor of the Heliopol city 3. Representative of the Environmental NGO 4. Delegate of the SmallHolders Farmers Association 5. Chair of the Commerce & Industry Chamber 6. « The People of Erhno » delegate (citizens’ group) In the next steps, please try to react as you think this actor would do in « real operations ».
  • 21. 21 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Creating a playable model Prepare a local model for participatory simulations of local situation and new options. This Step :
  • 22. 22 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Action 1 Participatory Modeling (15’) Step 1.1 Map Hydrosyst Select and organize elements from the *catchment mapping kit* to represent on your table your common vision (map, model) of the water system. Fill the dam bucket –if any- with 10 drops, mixed colors. Step 1.2 Create Create & add 1 or 2 new mapping elements if they are missing (Use Post-It to draw or name them) Step 1.3 Model Land-use Discuss, choose and install ~12~ *action cards* for your model. Only one *action card* goes on one land plot card. Step 1.4 Audit On the set situation, audit current operation cost for each actor, as well as population, jobs and satisfaction.  Get participants to build and share a common dynamic model of the situation, including biophysical, social, economic & policy issues  NOTA !!! This simplified version does not include management / governance actions  please feel free to invent them
  • 23. 23 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Reading / using an action card Name Pollution sensitivity indicator Operation cost Water needs Dry Normal Population Jobs Returned water Dry year Normal year Income « Smiley » « Angry »
  • 24. 24 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway This Step : 5 Testing and discussing plans Experiment / simulate the plan with the role playing game and validate a joint adaptation strategy.
  • 25. 25 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Action 2 Participatory Simulation (20’) Step 2.1 Fill river Fill the *river bucket* with 15 water drops (blue). Put it upstream your river system. Step 2.2 Flow, use, return… Flow the *river bucket* step by step. Each user collects water from it (no filter = no sorting !), « consumes » it (for action), and returns directly *used water* (red drops) to the bucket. Step 2.3 Issues… Not enough water ? Or water too polluted for your activity ( max 50%, 0% !) ?  Failed activity !! Step 2.4 Impacts Monitor final economic situation (if successful) and monitor the river and dam status (quantity, quality), as well as other indicators. Anything else to observe ? Step 2.5 Climate change Repeat a second similar round with only 10 drops. Assess and discuss changing activities.  Get participants to explore together the dynamics of the socio-hydro system, to react and organize management & governance. Normal Climate Drought
  • 26. 26 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Monitoring results Round 1 Round 2 Round 3 Round 4 Climate Normal Dry Operation costs Urban Agriculture Nature Industry Population Labor Input water Outlet water Clean Used Income Urban Agriculture Nature Industry # Activ. Failed Smileys # Angrys # Immeubles # Maisons # Friche urbaine # Forêts # Lande # Fruits et Legumes # Elevage industriel #
  • 27. 27 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway ((( More Options if you wish and have time ))) Option 1 Add Resources Socio-hydrosystems do not run *only* on land, water, labor and money  you can specify other resources: e.g. food, energy, biodiversity, social willingness... Actions « use » or « produce » them. And they evolve in the natural or social environment. How ? Propose processes & rules if required. Option 2 Add Actions Many other actions can be proposed and used. Edit *blank action cards* to specify you own. Agree on values and specific rules. Option 3 Add Events Scenarii ? External Drivers ? Add events which can happen in time, as steps in the process or as random events. Many extensions are possible in the modeling process, considering needs, participants, etc.
  • 28. 28 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Action 3 Integrative Planning CooPLAN (15’) Step 3.1 Aim Formulate aim(s) for your future catchment management plan. Write on your *COOPLAN* banner. Step 3.2 Propose Every participant can propose up to 2 new options (proposed interventions) using the *option model* card Step 3.3 Integrate Discuss to select some, and organize the sequence of options in your *COOPLAN*. Step 3.4 Assess Discuss coherency, feasibility and efficiency, looking at the *Requirements* (left) and *Impact* (right) sides Option Test How would you test this strategy with the simulation?  Get participants to build and discuss suitable actions, and integrate them in coherent actions plans.
  • 29. 29 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Filling a CooPLAN Option Strip CooPLAN Option Card ©Irstea, 2015 Resources Requirements (Qualitative) Individual Local Regional > Nat COOPLAN Investment Operation cost LandUse Water Quantity Water Quality Legal Licenses Social support Nature Biodiversity Political willing Other Low + + + + + + + + + + +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 + Med ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 + High +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 + Anticipated impact / outcomes Detail Ecosystem s Water Quantity Water quality Flood Protection Citizens Well-Being Community Life Regional Economy Governance Institutions NAME RainWater Infiltration Open area for infiltrating water to the aquifer 1. Naming the option proposal & specify details 2. Specifying implementation level 3. Specifying the estimated levels / intensity of resources (material or immaterial) required for this option. 4 levels : 0 / + / ++ / ++++ Darken boxes with a marker 4. Describing the anticipated / expected impacts for each criteria  can be positive or negative
  • 30. 30 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway CooPLAN Integration matrix SCALEIndividual Local Regional > Nat Time Short Mediu m Long Term CooPLAN Option Card ©Irstea, 2015 Resources Requirements (Qualitative) Individual Local Regional > Nat Equity Justice Anticipated impact / outcomes Ecosystem s Water Quantity Water quality Flood Protection CooPLAN matrix Aim : Detail Citizens Well-Being Community Life Regional Economy Governance Institutions COOPLAN Investment Operation cost LandUse Water Quantity Water Quality Legal Licenses Social support Nature Biodiversity Political willing Other Equity Justice NAME Ecosystem s Water Quantity Water quality Flood Protection Detail Citizens Well-Being Community Life Regional Economy Governance Institutions Low + + + + + + + + + + +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 Med ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 High +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 CooPLAN Option Card ©Irstea, 2015 Resources Requirements (Qualitative) Individual Local Regional > Nat COOPLAN Investment Operation cost LandUse Water Quantity Water Quality Legal Licenses Social support Nature Biodiversity Political willing Other Low + + + + + + + + + + +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 Med ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 High +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 CooPLAN Option Card ©Irstea, 2015 Resources Requirements (Qualitative) Individual Local Regional > Nat COOPLAN Investment Operation cost LandUse Water Quantity Water Quality Legal Licenses Social support Nature Biodiversity Political willing Other Low + + + + + + + + + + +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 Med ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 High +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 CooPLAN Option Card ©Irstea, 2015 Resources Requirements (Qualitative) Individual Local Regional > Nat COOPLAN Investment Operation cost LandUse Water Quantity Water Quality Legal Licenses Social support Nature Biodiversity Political willing Other Low + + + + + + + + + + +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 +1 -1 Med ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 +2 -2 High +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 +3 -3 Community Life Regional Economy Governance Institutions Equity Justice NAMEDetail Ecosystem s Water Quantity Water quality Flood Protection Citizens Well-Being Community Life Regional Economy Governance Institutions Equity Justice NAME Anticipated impact / outcomes Detail Ecosystem s Water Quantity Water quality Flood Protection Citizens Well-Being Community Life Regional Economy Governance Institutions Equity Justice NAME Anticipated impact / outcomesNAME Anticipated impact / outcomes Detail Ecosystem s Water Quantity Water quality Flood Protection Citizens Well-Being
  • 31. 31 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Action 4: Get Ready for PrePar (10’) Step 4.1 Consider the *Participatory Actions* and the *Participatory Roles* cards. Discuss them. Option 4.2 Propose Use the *Participatory Action* template to add other method(s) you want to propose. Explain them. Option 4.3 Evaluate Organize all of them on the feasibility / efficiency matrix. Discuss.  Get participants to understand possible participatory methods / tools In the next phase (PrePar), you’ll have to decide how the participatory process should be organized, with / by / for whom, with which method, in order to get your water management plan designed, agreed and implemented.
  • 32. 32 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Action 5 Prepare Participation: PrePar (40’) Step 5.1 Look at the multi-level *PRE-PAR chart*. Understand: lines = scales, actors // columns = phases. Step 5.2 For each phase, you can specify up to 2 sub-steps (or not). Write captions on the headline with post-its. Step 5.3 For each step, WRITE *participatory actions* and/or *participatory role* (ref. cards) at their main implementation scales. If multi-level, specify WHO is engaged by *drawing* vertical lines or dots. Write Outcomes on the bottom line. Option 5.4 Add *Alert Stars* where you consider there is a risk / contingency in the plan. Discuss solutions. What happens in case of conflict during the process ?  Get participants to build and agree on a plan and rules for decision and participation, at different levels
  • 33. 33 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Action 6 Individual feedback (10’) Please fill the individual feedback form on paper or online at : http://pwg.watagame.info
  • 34. 34 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway Action 7 Global Discussion (40’) In your address, please specify topic: 1. Pros & Cons of Fostering Wider Participation for Water Governance 2. Value of new methods (please ref. to *Participatory Action* cards) 3. Participation to design participation  PrePar vs. usual engineering 4. Emerging needs and expectations
  • 35. 35 http://watagame.info © Nils.Ferrand@IRSTEA.fr , 2015 OECD WGI 2015 Pleasedonotreproduce,photoortakeaway THANK YOU !!! All results will be shared through the OECD WGI coordination.