SlideShare une entreprise Scribd logo
1  sur  21
Télécharger pour lire hors ligne
Public Engagement in Estonia –
lessons learnt and way forward
18.06.2015
1. Overview of the Public Engagement System in Estonia
2. Achievements and drawbacks in Public Engagement Practice
Road to systematic public engagement
in Estonia
4
2001
2012
2011
2007
2000 Public Information Act
Today I Decide
e-Participation Webpage osale.ee
Information System for
Draft Acts
Adoption of:
- Renewed rules of the Government of the Republic;
- Renewed rules of legislative drafting;
- Impact Assessment Guidelines;
- New Version of Code of Good Engagement Practices
2001 Strategy on Estonian Third Sector Development (STSD)
2005Code of Good Engagement Practices
Action Plan 2004-2006 for
implementatino of STSD
2004
Estonia joins the
Open Government Partnership
2015
2012
2007 Estonian Better Regulation Programme
2011 Guidelines for Development of Legislative Policy until 2018
Coalition Agreement 2015-2019 2015
(autumn)
Renewed Better Regulation Programme
2002eRT – official publication portal
of Estonian regulations
Areas of application of public engagement rules
• Legislative intents;
• Drafts of laws and their amendments;
• Drafts of secondary regulations;
• Drafts of development plans, strategies of the state;
• EU draft legislation and other strategic documents;
• Conventions and international agreements, as well as the documents
that are worked out within their framework, and that influence the
society;
• Ex-post evaluations (no practical examples yet)
Main focus of the
presentation
PREPARATION OF
LEGISLATIVE INTENT
(since 2012)
• PROBLEM  OBJECTIVE  PREFERRED POLICY CHOICE
• PRELIMINARY IMPACT ASSESSMENT - IMPACTS AND THEIR
SIGNIFICANCE
• PUBLIC ENGAGEMENT
CONSULTATION AND
COORDINATION OF
LEGISLATIVE INTENT
• min 4 WEEKS OF CONSULTATION
• ALL RELEVANT MINISTRIES MUST CHECK ENGAGEMENT
PLANS AND ESTIMATED IMPACTS IN THEIR FIELD OF
COMPETENCE
• MINISTRY OF JUSTICE CHECKS THE OVERALL QUALITY
•ALL COMMENTS BY MINISTRIES ARE PUBLIC
PREPARATION OF
LEGISLATIVE DRAFT
• IN-DEPTH IMPACT ASSESSMENT OF SIGNIFICANT CHANGES
• PUBLIC ENGAGEMENT
• PLAN OF EX-POST RIA
CONSULTATION
• min 4 WEEKS OF CONSULTATION
• FEEDBACK TO CONSULTATION
All formal
stages of
policy cycle
PUBLIC ENGAGEMENT IN LEGISLATIVE PROCESS
INTER-MINISTERIAL
COORDINATION
• ALL MINISTRIES MUST CHECK
ENGAGEMENT AND IMPACTS IN THEIR
FIELD OF COMPETENCE
• MINISTRY OF JUSTICE CHECKS THE
OVERALL QUALITY
•ALL COMMENTS BY MINISTRIES ARE
PUBLIC
GOVERNMENT ENDORSES
PARLIAMENT
RIIGIKOGU DECIDES
EX-POST RIA
(since 2012)
•PRESENTED TO THE PARLIAMENT, THE
STAKEHOLDERS AND THE MINISTRY OF
JUSTICE
All formal
stages of
policy cycle
PUBLIC ENGAGEMENT IN LEGISLATIVE PROCESS
• Proportionality – more significant the impact, deeper and wider the
engagement;
• Flexibility in terms of means and scope;
• Minimum requirement for all acts – publication in Information
System for Draft Acts;
• Sufficient time for comments (by rule, min 4 weeks);
• Adequate feedback (by rule, max within 30 days);
• Obligatory summary of consultation results for decision-makers;
• Analysis of the conduct of engagement (attainment of the goal,
relevance of the used methods, participation of interest groups in
consultation, efficiency of providing feedback and satisfaction of
interest groups with the engagement).
Principles of public engagement
Development and coordination
• Strategy Unit, Government Office
• Responsibilities:
• Enforcement of the Code of Public Engagement;
• Assistance to ministries (trainings, guidelines, explanatory materials);
• Network of Public Engagement Coordinators of ministries;
• Analysis of the conduct of engagement;
• Open Government Partnership
Day-to-day quality control
• Public
• All ministries
• Special responsibility on Ministry of Justice - RIA quality control body
Public Engagement in practice –
achievements and drawbacks
Evaluation of Public Engagement in Estonia
• 2004 – Engagement into Public Decision-Making
• 2010 – Analysis of Public Engagement Practices of Government
Institutions
• 2013 – Self-Assessment Report of Estonia's Open Government
Partnership (OGP)
• 2013 – Independent report on OGP implementation in Estonia
• 2013 – Independent Analysis of Engagement Practices with regard
to Environmental Regulation
• 2014 – Preparations for OGP Action Plan 2014-2016
Achievements
• Small, open, transparent Government, horizontal approach;
• Engagement system in place;
• Many very good examples of engagement;
• E-solutions;
• Extensive public engagement capacity building programme for both
public sector and stakeholders;
• Open Government Partnership – engagement focus + high level
cooperation between Government and stakeholders;
• Action on the basis of evaluation results;
• Increased awareness of the benefits of public engagement in
different levels
Stakeholders
Problem 1: Timing
• Ministries do not consult early
enough in the process
• There is not enough time left
for comments
• Introduction of legislative intent
Challenges:
 In 2014 only in 19% of the cases a legislative draft was preceded by a
legislative intent. Speedy law-making has continued.
Plans in 2015 BR Programme:
 Requirement of early political validation
 Changes to rules on exceptions
 Obligatory engagement plan
• Minimum requirement for time established
Challenge:
 Rules are too flexible
 Connected to communication problem
Stakeholders
Problem 2: Formalism
• Biggest motivation killer for
stakeholders
• Also related to timing –
consulting too late
• Training, awareness building
• Culture change
• More formal steps in the process
(legislative intent)
Stakeholders
Problem 3: Communication
• Unclear: What exactly do you
want an opinion on? Which of
these plans should affect me?
• Unclear: How does the decision
making process work? In which
stages can I step in?
• E-tools not well integrated and
not user friendly enough
• Focus of training courses – targeted
communication, clear language
OGP 2014-2016 + BR Programme draft:
• Visualisation following Finnish example
http://lainvalmistelu.finlex.fi/ ;
• Improvement of work plans
OGP priority for 2014-2016:
• Integration of www.osale.ee and e-system for
drafts;
• Increase user friendliness and activeness
Stakeholders
Problem 4: Feedback
• Feedback is too formalistic and
passive, often only in annex to
the draft;
• Not clear what purpose the
comments served
• OGP Action Plan 2014-2016:
- Improving feedback quality is a
priority;
- Substantive feedback document
obligatory
• Focus of public engagement
training courses
Stakeholders
Problem 5: Preparation for being engaged
• Stakeholders passive
• Not enough capacity and
skills for proper
participation
• Training (awareness+skills)
• OGP Action plan 2014-2016
- Priority;
- Funds for capacity
building programmes
Public sector
Problem 1: Regulatory framework
•Rules too soft and too
general;
•No rules on lobbying
•Currently no plans for
detailed regulation;
•OGP + renewed BR
Programme
Public sector
Problem 2: Planning and clear focus
• Public engagement training
focus;
• Renewed BR Programme 
consultation plans together with
legislative intent
Public sector
Problem 3: Analysis of the conduct of engagement
• No systematic case-by-case
collection and analysis of data;
• Existing analysis mainly on the
usefulness not on engagement
satisfaction
• Insufficient central coordination
– differences between
ministries
• No concrete plans for solving
these issues
• Plan to strengthen central
coordination + the role of
engagement coordinators
Thank you for your attention!
Helena Braun
Advisor of Regulatory Impact Assessment
Legislative Quality Division, Legislative Policy Department
Estonian Ministry of Justice
helena.braun@just.ee

Contenu connexe

Tendances

Processes and Institutions for Effective ex post Evaluation
Processes and Institutions for Effective ex post EvaluationProcesses and Institutions for Effective ex post Evaluation
Processes and Institutions for Effective ex post EvaluationOECD Governance
 
Advisory session on establishing a new institution - Elaine Gunn, Ireland & ...
Advisory session on establishing a new institution  - Elaine Gunn, Ireland & ...Advisory session on establishing a new institution  - Elaine Gunn, Ireland & ...
Advisory session on establishing a new institution - Elaine Gunn, Ireland & ...OECD Governance
 
Independent Fiscal Institutions - OECD
Independent Fiscal Institutions - OECDIndependent Fiscal Institutions - OECD
Independent Fiscal Institutions - OECDOECD Governance
 
Summary of findings - e-agriculture strategies in the ACP
Summary of findings - e-agriculture strategies in the ACPSummary of findings - e-agriculture strategies in the ACP
Summary of findings - e-agriculture strategies in the ACPNawsheen Hosenally
 
Measuring stakeholder engagement in regulatory process
Measuring stakeholder engagement in regulatory processMeasuring stakeholder engagement in regulatory process
Measuring stakeholder engagement in regulatory processOECD Governance
 
Session Three: Spending Power Of Sub National Governments, Meeting 2018
Session Three: Spending Power Of Sub National Governments, Meeting 2018Session Three: Spending Power Of Sub National Governments, Meeting 2018
Session Three: Spending Power Of Sub National Governments, Meeting 2018OECDtax
 
Evaluation methods for improved policy outcome
Evaluation methods for improved policy outcomeEvaluation methods for improved policy outcome
Evaluation methods for improved policy outcomeOECD Governance
 
Report on current policies and regulatory frameworks
Report on current policies and regulatory frameworksReport on current policies and regulatory frameworks
Report on current policies and regulatory frameworksOles Kulchytskyy
 
Session Three: Spending Power Performance Across Key Sectors Subnational Gove...
Session Three: Spending Power Performance Across Key Sectors Subnational Gove...Session Three: Spending Power Performance Across Key Sectors Subnational Gove...
Session Three: Spending Power Performance Across Key Sectors Subnational Gove...OECDtax
 
Workshop Proceedings: Embedding Regulatory Policy in Law and Practice
Workshop Proceedings: Embedding Regulatory Policy in Law and PracticeWorkshop Proceedings: Embedding Regulatory Policy in Law and Practice
Workshop Proceedings: Embedding Regulatory Policy in Law and PracticeOECD Governance
 
Session Four: Decentralisation Performance Measurement Systems Health Care, M...
Session Four: Decentralisation Performance Measurement Systems Health Care, M...Session Four: Decentralisation Performance Measurement Systems Health Care, M...
Session Four: Decentralisation Performance Measurement Systems Health Care, M...OECDtax
 
Applying systems thinking: Process mapping in Bangladesh
Applying systems thinking: Process mapping in BangladeshApplying systems thinking: Process mapping in Bangladesh
Applying systems thinking: Process mapping in BangladeshRebekah McKay-Smith
 
Delivering early benefits and trial outputs using administrative data
Delivering early benefits and trial outputs using administrative dataDelivering early benefits and trial outputs using administrative data
Delivering early benefits and trial outputs using administrative dataUKDSCensus
 
Public participation in fiscal policy: principles, mechanisms and country pra...
Public participation in fiscal policy: principles, mechanisms and country pra...Public participation in fiscal policy: principles, mechanisms and country pra...
Public participation in fiscal policy: principles, mechanisms and country pra...OECD Governance
 
Public participation in budgeting: applying the new GIFT principles - Anjali ...
Public participation in budgeting: applying the new GIFT principles - Anjali ...Public participation in budgeting: applying the new GIFT principles - Anjali ...
Public participation in budgeting: applying the new GIFT principles - Anjali ...OECD Governance
 
DELSA/GOV 3rd Health meeting - Mads Bager HOFFMANN
DELSA/GOV 3rd Health meeting - Mads Bager HOFFMANNDELSA/GOV 3rd Health meeting - Mads Bager HOFFMANN
DELSA/GOV 3rd Health meeting - Mads Bager HOFFMANNOECD Governance
 
New parliamentary budget procedures and IFIs - Rosemary Huxtable, Australia
New parliamentary budget procedures and IFIs - Rosemary Huxtable, AustraliaNew parliamentary budget procedures and IFIs - Rosemary Huxtable, Australia
New parliamentary budget procedures and IFIs - Rosemary Huxtable, AustraliaOECD Governance
 

Tendances (20)

Processes and Institutions for Effective ex post Evaluation
Processes and Institutions for Effective ex post EvaluationProcesses and Institutions for Effective ex post Evaluation
Processes and Institutions for Effective ex post Evaluation
 
Advisory session on establishing a new institution - Elaine Gunn, Ireland & ...
Advisory session on establishing a new institution  - Elaine Gunn, Ireland & ...Advisory session on establishing a new institution  - Elaine Gunn, Ireland & ...
Advisory session on establishing a new institution - Elaine Gunn, Ireland & ...
 
Independent Fiscal Institutions - OECD
Independent Fiscal Institutions - OECDIndependent Fiscal Institutions - OECD
Independent Fiscal Institutions - OECD
 
Summary of findings - e-agriculture strategies in the ACP
Summary of findings - e-agriculture strategies in the ACPSummary of findings - e-agriculture strategies in the ACP
Summary of findings - e-agriculture strategies in the ACP
 
Measuring stakeholder engagement in regulatory process
Measuring stakeholder engagement in regulatory processMeasuring stakeholder engagement in regulatory process
Measuring stakeholder engagement in regulatory process
 
Session Three: Spending Power Of Sub National Governments, Meeting 2018
Session Three: Spending Power Of Sub National Governments, Meeting 2018Session Three: Spending Power Of Sub National Governments, Meeting 2018
Session Three: Spending Power Of Sub National Governments, Meeting 2018
 
Evaluation methods for improved policy outcome
Evaluation methods for improved policy outcomeEvaluation methods for improved policy outcome
Evaluation methods for improved policy outcome
 
Report on current policies and regulatory frameworks
Report on current policies and regulatory frameworksReport on current policies and regulatory frameworks
Report on current policies and regulatory frameworks
 
Session Three: Spending Power Performance Across Key Sectors Subnational Gove...
Session Three: Spending Power Performance Across Key Sectors Subnational Gove...Session Three: Spending Power Performance Across Key Sectors Subnational Gove...
Session Three: Spending Power Performance Across Key Sectors Subnational Gove...
 
The Finnish Basic Income Experiment 2017-2018
The Finnish Basic Income Experiment 2017-2018The Finnish Basic Income Experiment 2017-2018
The Finnish Basic Income Experiment 2017-2018
 
Workshop Proceedings: Embedding Regulatory Policy in Law and Practice
Workshop Proceedings: Embedding Regulatory Policy in Law and PracticeWorkshop Proceedings: Embedding Regulatory Policy in Law and Practice
Workshop Proceedings: Embedding Regulatory Policy in Law and Practice
 
Full implementation of the WHO Framework Convention on Tobacco Control (WHO F...
Full implementation of the WHO Framework Convention on Tobacco Control (WHO F...Full implementation of the WHO Framework Convention on Tobacco Control (WHO F...
Full implementation of the WHO Framework Convention on Tobacco Control (WHO F...
 
Presentation Edwin Lau, OECD/GOV, Paris 4 December 2015
Presentation Edwin Lau, OECD/GOV, Paris 4 December 2015Presentation Edwin Lau, OECD/GOV, Paris 4 December 2015
Presentation Edwin Lau, OECD/GOV, Paris 4 December 2015
 
Session Four: Decentralisation Performance Measurement Systems Health Care, M...
Session Four: Decentralisation Performance Measurement Systems Health Care, M...Session Four: Decentralisation Performance Measurement Systems Health Care, M...
Session Four: Decentralisation Performance Measurement Systems Health Care, M...
 
Applying systems thinking: Process mapping in Bangladesh
Applying systems thinking: Process mapping in BangladeshApplying systems thinking: Process mapping in Bangladesh
Applying systems thinking: Process mapping in Bangladesh
 
Delivering early benefits and trial outputs using administrative data
Delivering early benefits and trial outputs using administrative dataDelivering early benefits and trial outputs using administrative data
Delivering early benefits and trial outputs using administrative data
 
Public participation in fiscal policy: principles, mechanisms and country pra...
Public participation in fiscal policy: principles, mechanisms and country pra...Public participation in fiscal policy: principles, mechanisms and country pra...
Public participation in fiscal policy: principles, mechanisms and country pra...
 
Public participation in budgeting: applying the new GIFT principles - Anjali ...
Public participation in budgeting: applying the new GIFT principles - Anjali ...Public participation in budgeting: applying the new GIFT principles - Anjali ...
Public participation in budgeting: applying the new GIFT principles - Anjali ...
 
DELSA/GOV 3rd Health meeting - Mads Bager HOFFMANN
DELSA/GOV 3rd Health meeting - Mads Bager HOFFMANNDELSA/GOV 3rd Health meeting - Mads Bager HOFFMANN
DELSA/GOV 3rd Health meeting - Mads Bager HOFFMANN
 
New parliamentary budget procedures and IFIs - Rosemary Huxtable, Australia
New parliamentary budget procedures and IFIs - Rosemary Huxtable, AustraliaNew parliamentary budget procedures and IFIs - Rosemary Huxtable, Australia
New parliamentary budget procedures and IFIs - Rosemary Huxtable, Australia
 

Similaire à Public Engagement in Estonia – lessons learnt and way forward

Opening Government in Croatia
Opening Government in CroatiaOpening Government in Croatia
Opening Government in CroatiaPoint_conference
 
Budget transparency - Juan Pablo GUERRERO, GIFT
Budget transparency - Juan Pablo GUERRERO, GIFTBudget transparency - Juan Pablo GUERRERO, GIFT
Budget transparency - Juan Pablo GUERRERO, GIFTOECD Governance
 
Open Government Data Ecosystems: Linking Transparency for Innovation with Tra...
Open Government Data Ecosystems: Linking Transparency for Innovation with Tra...Open Government Data Ecosystems: Linking Transparency for Innovation with Tra...
Open Government Data Ecosystems: Linking Transparency for Innovation with Tra...Luigi Reggi
 
Finnish Basic Income Experiment 2017-2018 - About the experiment and its’ eva...
Finnish Basic Income Experiment 2017-2018 - About the experiment and its’ eva...Finnish Basic Income Experiment 2017-2018 - About the experiment and its’ eva...
Finnish Basic Income Experiment 2017-2018 - About the experiment and its’ eva...Kelan tutkimus / Research at Kela
 
ADMINISTRATION REFORM IN INDONESIA
ADMINISTRATION REFORM IN INDONESIAADMINISTRATION REFORM IN INDONESIA
ADMINISTRATION REFORM IN INDONESIAAwang ANWARUDDIN
 
OECD Regulatory Policy Review of Korea 2017 - Key Findings
OECD Regulatory Policy Review of Korea 2017 - Key FindingsOECD Regulatory Policy Review of Korea 2017 - Key Findings
OECD Regulatory Policy Review of Korea 2017 - Key FindingsOECD Governance
 
OECD Regulatory Policy Review of Korea - Key Findings
OECD Regulatory Policy Review of Korea - Key FindingsOECD Regulatory Policy Review of Korea - Key Findings
OECD Regulatory Policy Review of Korea - Key FindingsJustin Kavanagh
 
Setting up a SIB in Estonia- by Joanna Hofman, RAND Europe
Setting up a SIB in Estonia- by Joanna Hofman, RAND EuropeSetting up a SIB in Estonia- by Joanna Hofman, RAND Europe
Setting up a SIB in Estonia- by Joanna Hofman, RAND EuropeOECD CFE
 
2015 05 26 - OECD Open Government Data review of Poland
2015 05 26 - OECD Open Government Data review of Poland2015 05 26 - OECD Open Government Data review of Poland
2015 05 26 - OECD Open Government Data review of PolandArthur Mickoleit
 
Spending reviews - Joonas Parenson, Estonia
Spending reviews - Joonas Parenson, EstoniaSpending reviews - Joonas Parenson, Estonia
Spending reviews - Joonas Parenson, EstoniaOECD Governance
 
UK Government experience in Performance Framework Reform
UK Government experience in Performance Framework ReformUK Government experience in Performance Framework Reform
UK Government experience in Performance Framework ReformUNDP India
 
BEPS Webcast #1 - Update on project
BEPS Webcast #1 - Update on projectBEPS Webcast #1 - Update on project
BEPS Webcast #1 - Update on projectOECDtax
 
Acting on the Future: Practical Foresight Implementation in Canada
Acting on the Future: Practical Foresight Implementation in CanadaActing on the Future: Practical Foresight Implementation in Canada
Acting on the Future: Practical Foresight Implementation in CanadaWorldFuture2015
 
Building Strategic Framework for Government - Civil Society Cooperation in L...
Building Strategic Framework for  Government - Civil Society Cooperation in L...Building Strategic Framework for  Government - Civil Society Cooperation in L...
Building Strategic Framework for Government - Civil Society Cooperation in L...Parliamentary Exchange and Dialogue
 
Industrial relations - Information and consultation of employees in the Europ...
Industrial relations - Information and consultation of employees in the Europ...Industrial relations - Information and consultation of employees in the Europ...
Industrial relations - Information and consultation of employees in the Europ...Eurofound
 
Integration (Joint (Public Bodies) Bill presentation slides - oct 2013 - tr...
Integration  (Joint (Public Bodies) Bill  presentation slides - oct 2013 - tr...Integration  (Joint (Public Bodies) Bill  presentation slides - oct 2013 - tr...
Integration (Joint (Public Bodies) Bill presentation slides - oct 2013 - tr...scottread
 

Similaire à Public Engagement in Estonia – lessons learnt and way forward (20)

Opening Government in Croatia
Opening Government in CroatiaOpening Government in Croatia
Opening Government in Croatia
 
Budget transparency - Juan Pablo GUERRERO, GIFT
Budget transparency - Juan Pablo GUERRERO, GIFTBudget transparency - Juan Pablo GUERRERO, GIFT
Budget transparency - Juan Pablo GUERRERO, GIFT
 
Open Government Data Ecosystems: Linking Transparency for Innovation with Tra...
Open Government Data Ecosystems: Linking Transparency for Innovation with Tra...Open Government Data Ecosystems: Linking Transparency for Innovation with Tra...
Open Government Data Ecosystems: Linking Transparency for Innovation with Tra...
 
Finnish Basic Income Experiment 2017-2018 - About the experiment and its’ eva...
Finnish Basic Income Experiment 2017-2018 - About the experiment and its’ eva...Finnish Basic Income Experiment 2017-2018 - About the experiment and its’ eva...
Finnish Basic Income Experiment 2017-2018 - About the experiment and its’ eva...
 
ADMINISTRATION REFORM IN INDONESIA
ADMINISTRATION REFORM IN INDONESIAADMINISTRATION REFORM IN INDONESIA
ADMINISTRATION REFORM IN INDONESIA
 
Presentation by M. Sinclair (English), Regional Conference for Supreme Audit ...
Presentation by M. Sinclair (English), Regional Conference for Supreme Audit ...Presentation by M. Sinclair (English), Regional Conference for Supreme Audit ...
Presentation by M. Sinclair (English), Regional Conference for Supreme Audit ...
 
Efficiency and effectiveness in public administration reform
Efficiency and effectiveness in public administration reform Efficiency and effectiveness in public administration reform
Efficiency and effectiveness in public administration reform
 
OECD Regulatory Policy Review of Korea 2017 - Key Findings
OECD Regulatory Policy Review of Korea 2017 - Key FindingsOECD Regulatory Policy Review of Korea 2017 - Key Findings
OECD Regulatory Policy Review of Korea 2017 - Key Findings
 
OECD Regulatory Policy Review of Korea - Key Findings
OECD Regulatory Policy Review of Korea - Key FindingsOECD Regulatory Policy Review of Korea - Key Findings
OECD Regulatory Policy Review of Korea - Key Findings
 
Setting up a SIB in Estonia- by Joanna Hofman, RAND Europe
Setting up a SIB in Estonia- by Joanna Hofman, RAND EuropeSetting up a SIB in Estonia- by Joanna Hofman, RAND Europe
Setting up a SIB in Estonia- by Joanna Hofman, RAND Europe
 
SIGMA Baseline Measurement Report presentation
SIGMA Baseline Measurement Report presentationSIGMA Baseline Measurement Report presentation
SIGMA Baseline Measurement Report presentation
 
2015 05 26 - OECD Open Government Data review of Poland
2015 05 26 - OECD Open Government Data review of Poland2015 05 26 - OECD Open Government Data review of Poland
2015 05 26 - OECD Open Government Data review of Poland
 
Node health seminar 8 april 2015_jan-erik johanson [compatibility mode]
Node health seminar 8 april 2015_jan-erik johanson [compatibility mode]Node health seminar 8 april 2015_jan-erik johanson [compatibility mode]
Node health seminar 8 april 2015_jan-erik johanson [compatibility mode]
 
Spending reviews - Joonas Parenson, Estonia
Spending reviews - Joonas Parenson, EstoniaSpending reviews - Joonas Parenson, Estonia
Spending reviews - Joonas Parenson, Estonia
 
UK Government experience in Performance Framework Reform
UK Government experience in Performance Framework ReformUK Government experience in Performance Framework Reform
UK Government experience in Performance Framework Reform
 
BEPS Webcast #1 - Update on project
BEPS Webcast #1 - Update on projectBEPS Webcast #1 - Update on project
BEPS Webcast #1 - Update on project
 
Acting on the Future: Practical Foresight Implementation in Canada
Acting on the Future: Practical Foresight Implementation in CanadaActing on the Future: Practical Foresight Implementation in Canada
Acting on the Future: Practical Foresight Implementation in Canada
 
Building Strategic Framework for Government - Civil Society Cooperation in L...
Building Strategic Framework for  Government - Civil Society Cooperation in L...Building Strategic Framework for  Government - Civil Society Cooperation in L...
Building Strategic Framework for Government - Civil Society Cooperation in L...
 
Industrial relations - Information and consultation of employees in the Europ...
Industrial relations - Information and consultation of employees in the Europ...Industrial relations - Information and consultation of employees in the Europ...
Industrial relations - Information and consultation of employees in the Europ...
 
Integration (Joint (Public Bodies) Bill presentation slides - oct 2013 - tr...
Integration  (Joint (Public Bodies) Bill  presentation slides - oct 2013 - tr...Integration  (Joint (Public Bodies) Bill  presentation slides - oct 2013 - tr...
Integration (Joint (Public Bodies) Bill presentation slides - oct 2013 - tr...
 

Plus de OECD Governance

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators SlidesOECD Governance
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...OECD Governance
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)OECD Governance
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...OECD Governance
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...OECD Governance
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...OECD Governance
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmOECD Governance
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...OECD Governance
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...OECD Governance
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...OECD Governance
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023OECD Governance
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...OECD Governance
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsOECD Governance
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfOECD Governance
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxOECD Governance
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxOECD Governance
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxOECD Governance
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxOECD Governance
 

Plus de OECD Governance (20)

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators Slides
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and Recommendations
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdf
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptx
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptx
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
 

Dernier

Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at workChristina Parmionova
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Dipal Arora
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...tanu pandey
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 

Dernier (20)

Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 

Public Engagement in Estonia – lessons learnt and way forward

  • 1. Public Engagement in Estonia – lessons learnt and way forward 18.06.2015
  • 2. 1. Overview of the Public Engagement System in Estonia 2. Achievements and drawbacks in Public Engagement Practice
  • 3. Road to systematic public engagement in Estonia
  • 4. 4 2001 2012 2011 2007 2000 Public Information Act Today I Decide e-Participation Webpage osale.ee Information System for Draft Acts Adoption of: - Renewed rules of the Government of the Republic; - Renewed rules of legislative drafting; - Impact Assessment Guidelines; - New Version of Code of Good Engagement Practices 2001 Strategy on Estonian Third Sector Development (STSD) 2005Code of Good Engagement Practices Action Plan 2004-2006 for implementatino of STSD 2004 Estonia joins the Open Government Partnership 2015 2012 2007 Estonian Better Regulation Programme 2011 Guidelines for Development of Legislative Policy until 2018 Coalition Agreement 2015-2019 2015 (autumn) Renewed Better Regulation Programme 2002eRT – official publication portal of Estonian regulations
  • 5. Areas of application of public engagement rules • Legislative intents; • Drafts of laws and their amendments; • Drafts of secondary regulations; • Drafts of development plans, strategies of the state; • EU draft legislation and other strategic documents; • Conventions and international agreements, as well as the documents that are worked out within their framework, and that influence the society; • Ex-post evaluations (no practical examples yet) Main focus of the presentation
  • 6. PREPARATION OF LEGISLATIVE INTENT (since 2012) • PROBLEM  OBJECTIVE  PREFERRED POLICY CHOICE • PRELIMINARY IMPACT ASSESSMENT - IMPACTS AND THEIR SIGNIFICANCE • PUBLIC ENGAGEMENT CONSULTATION AND COORDINATION OF LEGISLATIVE INTENT • min 4 WEEKS OF CONSULTATION • ALL RELEVANT MINISTRIES MUST CHECK ENGAGEMENT PLANS AND ESTIMATED IMPACTS IN THEIR FIELD OF COMPETENCE • MINISTRY OF JUSTICE CHECKS THE OVERALL QUALITY •ALL COMMENTS BY MINISTRIES ARE PUBLIC PREPARATION OF LEGISLATIVE DRAFT • IN-DEPTH IMPACT ASSESSMENT OF SIGNIFICANT CHANGES • PUBLIC ENGAGEMENT • PLAN OF EX-POST RIA CONSULTATION • min 4 WEEKS OF CONSULTATION • FEEDBACK TO CONSULTATION All formal stages of policy cycle PUBLIC ENGAGEMENT IN LEGISLATIVE PROCESS
  • 7. INTER-MINISTERIAL COORDINATION • ALL MINISTRIES MUST CHECK ENGAGEMENT AND IMPACTS IN THEIR FIELD OF COMPETENCE • MINISTRY OF JUSTICE CHECKS THE OVERALL QUALITY •ALL COMMENTS BY MINISTRIES ARE PUBLIC GOVERNMENT ENDORSES PARLIAMENT RIIGIKOGU DECIDES EX-POST RIA (since 2012) •PRESENTED TO THE PARLIAMENT, THE STAKEHOLDERS AND THE MINISTRY OF JUSTICE All formal stages of policy cycle PUBLIC ENGAGEMENT IN LEGISLATIVE PROCESS
  • 8. • Proportionality – more significant the impact, deeper and wider the engagement; • Flexibility in terms of means and scope; • Minimum requirement for all acts – publication in Information System for Draft Acts; • Sufficient time for comments (by rule, min 4 weeks); • Adequate feedback (by rule, max within 30 days); • Obligatory summary of consultation results for decision-makers; • Analysis of the conduct of engagement (attainment of the goal, relevance of the used methods, participation of interest groups in consultation, efficiency of providing feedback and satisfaction of interest groups with the engagement). Principles of public engagement
  • 9. Development and coordination • Strategy Unit, Government Office • Responsibilities: • Enforcement of the Code of Public Engagement; • Assistance to ministries (trainings, guidelines, explanatory materials); • Network of Public Engagement Coordinators of ministries; • Analysis of the conduct of engagement; • Open Government Partnership Day-to-day quality control • Public • All ministries • Special responsibility on Ministry of Justice - RIA quality control body
  • 10. Public Engagement in practice – achievements and drawbacks
  • 11. Evaluation of Public Engagement in Estonia • 2004 – Engagement into Public Decision-Making • 2010 – Analysis of Public Engagement Practices of Government Institutions • 2013 – Self-Assessment Report of Estonia's Open Government Partnership (OGP) • 2013 – Independent report on OGP implementation in Estonia • 2013 – Independent Analysis of Engagement Practices with regard to Environmental Regulation • 2014 – Preparations for OGP Action Plan 2014-2016
  • 12. Achievements • Small, open, transparent Government, horizontal approach; • Engagement system in place; • Many very good examples of engagement; • E-solutions; • Extensive public engagement capacity building programme for both public sector and stakeholders; • Open Government Partnership – engagement focus + high level cooperation between Government and stakeholders; • Action on the basis of evaluation results; • Increased awareness of the benefits of public engagement in different levels
  • 13. Stakeholders Problem 1: Timing • Ministries do not consult early enough in the process • There is not enough time left for comments • Introduction of legislative intent Challenges:  In 2014 only in 19% of the cases a legislative draft was preceded by a legislative intent. Speedy law-making has continued. Plans in 2015 BR Programme:  Requirement of early political validation  Changes to rules on exceptions  Obligatory engagement plan • Minimum requirement for time established Challenge:  Rules are too flexible  Connected to communication problem
  • 14. Stakeholders Problem 2: Formalism • Biggest motivation killer for stakeholders • Also related to timing – consulting too late • Training, awareness building • Culture change • More formal steps in the process (legislative intent)
  • 15. Stakeholders Problem 3: Communication • Unclear: What exactly do you want an opinion on? Which of these plans should affect me? • Unclear: How does the decision making process work? In which stages can I step in? • E-tools not well integrated and not user friendly enough • Focus of training courses – targeted communication, clear language OGP 2014-2016 + BR Programme draft: • Visualisation following Finnish example http://lainvalmistelu.finlex.fi/ ; • Improvement of work plans OGP priority for 2014-2016: • Integration of www.osale.ee and e-system for drafts; • Increase user friendliness and activeness
  • 16. Stakeholders Problem 4: Feedback • Feedback is too formalistic and passive, often only in annex to the draft; • Not clear what purpose the comments served • OGP Action Plan 2014-2016: - Improving feedback quality is a priority; - Substantive feedback document obligatory • Focus of public engagement training courses
  • 17. Stakeholders Problem 5: Preparation for being engaged • Stakeholders passive • Not enough capacity and skills for proper participation • Training (awareness+skills) • OGP Action plan 2014-2016 - Priority; - Funds for capacity building programmes
  • 18. Public sector Problem 1: Regulatory framework •Rules too soft and too general; •No rules on lobbying •Currently no plans for detailed regulation; •OGP + renewed BR Programme
  • 19. Public sector Problem 2: Planning and clear focus • Public engagement training focus; • Renewed BR Programme  consultation plans together with legislative intent
  • 20. Public sector Problem 3: Analysis of the conduct of engagement • No systematic case-by-case collection and analysis of data; • Existing analysis mainly on the usefulness not on engagement satisfaction • Insufficient central coordination – differences between ministries • No concrete plans for solving these issues • Plan to strengthen central coordination + the role of engagement coordinators
  • 21. Thank you for your attention! Helena Braun Advisor of Regulatory Impact Assessment Legislative Quality Division, Legislative Policy Department Estonian Ministry of Justice helena.braun@just.ee