A.64 baseline approaches (Draft Text)
Approach COP25 presidency texts
Best available technology
ver.1 option B
(ver.2 option A)
An approach based on technologies that represent an economically feasible and/or environmentally sound
course of action.
Performance-based approach
(1) ver.1 option A
Taking into account:
I. [Technologies that represent an economically feasible [and environmentally sound] course of action;]
II. The emissions of activities providing similar outputs and/or services in similar social, economic, environmental and
technological circumstances;
III. Barriers to investment;
(2) ver.1 option B
(ver.2 option A)
A baseline is based on the emissions of activities providing similar outputs and/or services in similar social,
economic, environmental and technological circumstances.
(3) ver.1 option C
(ver.2 option B)
An approach where the baseline is set at least at the average emission level of the best performing comparable
activities providing similar outputs and services within a defined scope and boundary in the past three years
and where the host Party may determine a more ambitious level at its discretion.
Benchmark baseline
ver.1 option B
(ver.2 option A)
A baseline is based on an ambitious benchmark representing a level of GHG emissions for activities within a
defined scope and boundary
Business as usual emissions / Projected emissions
ver.1 option A
(ver.1 option B)
(ver.2 option A)
(no definition)
Historical emissions
ver.1 option A
(ver.1 option B)
(ver.2 option A)
(no definition)
2
Baseline approaches in the CDM
Types of baseline approaches (CDM M&P para48(a to c))
(a) Existing actual or historical emissions, as applicable;
(b)
Emissions from a technology that represents an economically attractive course of action, taking into account
barriers to investment;
(c)
The average emissions of similar project activities undertaken in the previous five years, in similar social,
economic, environmental and technological circumstances, and whose performance is among the top 20 per
cent of their category.
*1
56.0%
36.0%
51.0%
51.4%
20.9%
16.0%
19.0%
19.4%
1.1%
0.0%
0.5%
13.2%
36.0%
12.0%
15.3%
4.0%
4.0%
2.3%
4.0%
0.5%
8.8%
4.0%
14.0%
10.6%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Large-scale Methodology
ACM
Small-scale Methodology
Total
(a) (b) (c) (a) &(b) (a) & (c) (b) & (c) unclassified Total
* For small-scale methodologies, applied approaches are not clearly defined in methodology documents
Out of 216 approved methodologies (*)
 About 50% of methodologies apply only (a, Existing or historical emissions).
 About 20% of methodologies apply the combination of baseline approaches.
 About 1 % of methodologies apply the performance approach (c)
3
Baseline approaches in the CDM
Only (a) applied
Project type Methodology
 Afforestation & reforestation
AR-ACM0003, AR-AMS0007, AR-
AM0004, AR-AMS0001, AR-ACM0001,
AR-AM0009, AR-AMS0004, AR-
AM0002, AR-AMS0003, AR-AM0005,
AR-AM0010, AR-AM0003, AR-AM0001
 Biogas ; Biomass AMS-I.D.
 Energy efficiency ; Biogas AMS-III.M.
 HFC reduction/avoidance AM0001, AMS-III.N.
 Leak reduction AM0023
 Methane avoidance ; Biogas AMS-I.D.
 N2O decomposition
ACM0009, ACM0019, AM0034,
AM0019, AM0028, AM0021
 SF6 replacement AM0065, AM0078, AM0079, AM0035
 Waste gas/heat utilization ;
Energy efficiency
AMS-III.Q.
 Wind power ; Other renewable
energies
AMS-I.D.
 Wind power, PV AMS-I.D.
(b) or (c) applied
Project type
 Biomass
 Hydro power
 Biogas
 Wind power
 PV
 Methane avoidance
 Methane recovery &
utilization
 Energy efficiency
 Waste gas/heat utilization
 Wind power, PV
 Wind power ; Other
renewable energies
 Other renewable energies
 HFC reduction/avoidance
 Material use
 Afforestation & reforestation
 Fuel switch
 Methane recovery &
utilization ; Transportation
 Hydro power ; Other
renewable energies
 Waste gas/heat utilization ;
Fuel switch
 Energy efficiency ; Biogas
 Biogas ; Biomass
 Energy efficiency ; Fuel
switch
 Waste gas/heat utilization ;
Energy efficiency
 Transportation
Out of 35 types projects registered under the CDM
11 types of projects applied only approach (a)
Another 24 types of projects applied approach (b) or (c)
4
Baseline approaches under the JCM
 In the JCM, baselines should be below BaU.
 Baseline approach in the JCM is positive list (32.4%), performance (30.4%),
bench mark (27.5%).
Types of baseline approaches
(1’) Based on economically feasible and environmentally friendly technology. (Positive list)
(2’) Based on data with good carbon efficiency from the latest past data of existing or similar equipment. (Performance)
(3’) Based on the target standard and the efficiency set to exceed the currently feasible efficiency (Bench mark)
32.4% 30.4% 27.5% 9.8%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Approved JCM methodologies
(1') (2') (3') Unclassified
 In the JCM, emission reductions to be credited are defined as the
difference between “reference emissions” and project emissions.
 The reference emissions are calculated below business-as-usual
(BaU) emissions which represent plausible emissions in providing
the same outputs or service level of the proposed JCM project in
the partner country.
 This approach will ensure a net decrease and/or avoidance of
GHG emissions.
Total:102
BaU
5
Baseline approaches in VCS
 In the VCS, each methodology is required to be below BaU in “Methodology Requirements” as an
Additionality.
“A project activity is additional if it can be demonstrated that the activity results in emission reductions or removals that are in
excess of what would be achieved under a “business-as-usual” scenario and the activity would not have occurred in the absence
of the incentive provided by the carbon markets.”
 VCS allows to use 2 types of standardized methods, Performance method and Activity methods, and
also to use other BL approaches depending on each project types .
Types of baseline approaches
(1)
Performance method: These methods establish performance benchmark metrics for determining additionality and/or the crediting
baseline. Projects that meet or exceed a predetermined level of the metric may be deemed as additional and a pre-determined level of the
metric may serve as the crediting baseline.
(2)
Activity method (positive list): "These methods pre-determine additionality for given classes of project activities using a positive list.
Projects that implement activities on the positive list are automatically deemed as additional and do not otherwise need to demonstrate
additionality. One of three options (namely activity penetration, financial feasibility or revenue streams) is used to qualify the project
activity for the positive list, as set out in Section 3.5.9."
(3) Project method / Others / Unclassified
5
Sector: 14.Agriculture Forestry and Other Land Use (AFOLU), Sector 15: Livestock and manure management
Total: 18
Total: 25
Total: 6
Total: 49
11.1%
8.0%
8.2%
88.9%
92.0%
100.0%
92%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
VM (except sector 14, 15)
VM (sector 14, 15)
VMR(revised based on CDM)
Total
(1) (2) (3)
(2)
(2)
(4)
(16)
(23)
(45)
(6)
6
A6.4ERs
CDM PJ activity/PoA
(End of crediting period (CP): before 31/12/2023)
A6.4 activity
CDM meth A6.4 meth
CDM PJ activity/PoA
(End of CP: after 31/12/2023)
A6.4 activity
CDM meth A6.4 meth
A6.4ERs
Applied CDM meth
Applied CDM meth
End of CP
from 1/1/2024
Activity flow for
CDM PJ: Crediting
Period ends before
31/12/2023
CER
Activity flow for
CDM PJ : Crediting
Period ends after
31/12/2023
KP PA
2021 2022 2023
2020 2024
CER
until 31/12/2023
Draft text on Article 6, paragraph 4
Draft text on Article 6, paragraph 4, ver.3)
72.Project activities and programmes of activities registered under the clean development mechanism under Article 12 of
the Kyoto Protocol (CDM) may transition to the mechanism and be registered as Article 6, paragraph 4, activities
subject to:
a. The provision of approval of such transition to the Supervisory Body by the host Party per decision 3/CMP.1 of the CDM project
activity or CDM programme of activities (CDM host Party), by no later than 31 December 2023;
b. The compliance with these rules, modalities and procedures and any further relevant decisions of the CMA and relevant
requirements adopted by the Supervisory Body, including those that relate to the application of a corresponding adjustment
consistent with decision X/CMA.2 (Guidance relating to cooperative approaches referred to in Article 6, paragraph2);
73.Where an activity is eligible for transition pursuant to paragraph 72 above:
a. The transition shall have been completed by no later than 31 December 2023;
b. It may continue to apply its current approved CDM methodology until the earlier of the end of its current crediting period or 31
December 2023, following which, it shall apply an approved methodology pursuant to chapter V. B (Methodologies);
c. For CDM project activities and CDM programmes of activities that have transitioned, A6.4ERs may be issued for emission
reductions achieved after 31 December 2020.
7
Number of CDM projects subject to consideration
 Out of registered PAs and CPAs (PAs: 7,857, CPAs: 2,674), 2,198 PAs and 2,340
CPAs may renew under the 64
As of February 2021
Registered PAs / CPAs (PAs: 7,857, CPAs: 2,674)
Current crediting period ends after 1/1/2021
 PAs: 3,644
 CPAs: 2,662
Current crediting period ends
before 31/12/2023
 PAs: 2,095
 CPAs: 593
Current crediting period ends
after 1/1/2024
 PAs: 1,549
 CPAs: 2,069
Crediting period is
fixed or Third
crediting period
 PAs: 1,446
 CPAs: 322
Crediting period is
renewable
 PAs: 649
 CPAs: 271
PAs: 2,198
CPAs: 2,340
Reflecting the EB decision regarding CP renewal
8
Analyzing CDM methodologies (PAs)
Methodology
CDM CP ends
on or after 1 Jan 2024
CP is renewable
beyond current CP
Total Accumulate
ACM0002
Grid-connected electricity generation
from renewable sources
936 356 1,292 58.8%
AMS-I.D.
Grid connected renewable electricity
generation
283 179 462 79.8%
ACM0001 Flaring or use of landfill gas 46 27 73 83.1%
AMS-I.C.
Thermal energy production with or
without electricity
31 7 38 84.8%
ACM0006
Electricity and heat generation from
biomass
10 8 18 85.7%
ACM0018
Electricity generation from biomass in
power-only plants
17 1 18 86.5%
AR-AMS0001
Simplified baseline and monitoring
methodologies for small-scale A/R CDM
project activities implemented on
grasslands or croplands with limited
displacement of pre-project activities
16 1 17 87.3%
ACM0012 Waste energy recovery 15 1 16 88.0%
AMS-I.E.
Switch from non-renewable biomass for
thermal applications by the user
5 8 13 88.6%
AMS-II.E.
Energy efficiency and fuel switching
measures for buildings
12 0 12 89.1%
Others - 178 61 239 100.0%
Total - 1,549 649 2,198
9
Analyzing CDM methodologies (CPAs)
Methodology
CDM CP ends
on or after 1 Jan 2024
CP is renewable
beyond current CP
Total Accumulate
AMS-III.D.
Methane recovery in animal manure
management systems
1,087 2 1,089 46.5%
AMS-II.G.
Energy efficiency measures in thermal
applications of non-renewable
biomass
456 88 544 69.8%
AMS-III.AV.
Low greenhouse gas emitting safe
drinking water production systems
117 16 133 75.5%
ACM0002
Grid-connected electricity generation
from renewable sources
56 65 121 80.6%
AMS-I.D.
Grid Connected Renewable Electricity
Generation
67 38 105 85.1%
AMS-I.E.
Switch from non-renewable biomass
for thermal applications by the user
61 29 90 89.0%
AMS-II.J.
Demand-side activities for efficient
lighting technologies
63 0 63 91.7%
AMS-I.C.
Thermal energy production with or
without electricity
47 4 51 93.8%
AMS-I.A. Electricity generation by the user 16 4 20 94.7%
AMS-I.F.
Renewable electricity generation for
captive use and mini-grid
8 11 19 95.5%
Others - 91 14 105 100.0%
Total - 2,069 271 2,340
10
Defining baseline approaches
 Need to define each baseline approach in 6.4 RMP in organized manner, taking
into account the experience of the CDM and other mechanisms.
 How to operationalize them would be further elaborated by Supervisory Body
 Menu or hierarchy?
 From the experience of CDM and other mechanisms, in actual, multiple baseline
approaches are applied according to the type of project and various circumstances.
 Streamline of Performance approach: The current draft texts are mixture of several
definitions. It is needed to streamline each definition by considering the experience of CDM
and other mechanisms. It may also be useful to consider how BAT and benchmark concept
could be incorporated in performance approach.
 BAU, Historical, and Projected emissions
 Can we consider applying conservative baseline emission calculation in the design of the
64 mechanism?
Details in text
11
Idea for the revision of ACM0002
Applied approach Baseline emissions
CDM
a. Actual or historical emissions,
or
b. Economically attractive
technology
BE = EG × EF
 The baseline emissions are calculated as above.
 A Combined Margin (CM) is applied to the emission factor for electricity as described in
“TOOL07: Tool to calculate the emission factor (EF) “.
A64
Best Available Technology  Determine the best available technology (e.g., high-efficient combined cycle gas
turbine) at host country level.
 Determine an emission factor based on the BAT and use it for the calculation of baseline
emissions.
Performance-based (1)  Calculate a emission factor using the recent data, and use low carbon-intensive
emission factor.
Performance-based (2)  Same as Performance-based (1)
Performance-based (3)  Calculate a emission factor using the recent data.
 Use the lowest carbon-intensive emission factor among the three years.
Benchmark  Determine a benchmark emission factor at host country level and use it for the
calculation of baseline emissions.
Projected / historical / BAU  Review parameters in conservative manner
 This methodology applies to project activities that include retrofitting, rehabilitation (or refurbishment),
replacement or capacity addition of an existing power plant or construction and operation of a
Greenfield power plant.
(Approaches in slide 1)

Contenu connexe

Tendances

CCXG Forum, March 2021, Key Takeaways
CCXG Forum, March 2021, Key TakeawaysCCXG Forum, March 2021, Key Takeaways
CCXG Forum, March 2021, Key TakeawaysOECD Environment
 
CCXG Forum, March 2021, Chiara Falduto
CCXG Forum, March 2021, Chiara FaldutoCCXG Forum, March 2021, Chiara Falduto
CCXG Forum, March 2021, Chiara FaldutoOECD Environment
 
CCXG Forum, March 2021, Jae Jung
CCXG Forum, March 2021, Jae JungCCXG Forum, March 2021, Jae Jung
CCXG Forum, March 2021, Jae JungOECD Environment
 
CCXG Forum, March 2021, Lydia Cavasin
CCXG Forum, March 2021, Lydia CavasinCCXG Forum, March 2021, Lydia Cavasin
CCXG Forum, March 2021, Lydia CavasinOECD Environment
 
CCXG Oct 2019 Benefits and implications of Article 6.4 design for host Partie...
CCXG Oct 2019 Benefits and implications of Article 6.4 design for host Partie...CCXG Oct 2019 Benefits and implications of Article 6.4 design for host Partie...
CCXG Oct 2019 Benefits and implications of Article 6.4 design for host Partie...OECD Environment
 
CCXG Workshop, February 2021, Hyung-Wook Choi
CCXG Workshop, February 2021, Hyung-Wook ChoiCCXG Workshop, February 2021, Hyung-Wook Choi
CCXG Workshop, February 2021, Hyung-Wook ChoiOECD Environment
 
CCXG Forum, September 2021, MJ Mace
CCXG Forum, September 2021, MJ MaceCCXG Forum, September 2021, MJ Mace
CCXG Forum, September 2021, MJ MaceOECD Environment
 
CCXG Workshop, February 2021, Chiara Falduto
CCXG Workshop, February 2021, Chiara FaldutoCCXG Workshop, February 2021, Chiara Falduto
CCXG Workshop, February 2021, Chiara FaldutoOECD Environment
 
CCXG Forum, September 2021, Amit Garg
CCXG Forum, September 2021, Amit GargCCXG Forum, September 2021, Amit Garg
CCXG Forum, September 2021, Amit GargOECD Environment
 
CCXG Workshop, February 2021, Amit Garg
CCXG Workshop, February 2021, Amit GargCCXG Workshop, February 2021, Amit Garg
CCXG Workshop, February 2021, Amit GargOECD Environment
 
CCXG Forum, September 2020, Chiara Falduto
CCXG Forum, September 2020, Chiara FaldutoCCXG Forum, September 2020, Chiara Falduto
CCXG Forum, September 2020, Chiara FaldutoOECD Environment
 
CCXG Forum, September 2020, Rueanna Haynes
CCXG Forum, September 2020, Rueanna HaynesCCXG Forum, September 2020, Rueanna Haynes
CCXG Forum, September 2020, Rueanna HaynesOECD Environment
 
CCXG Workshop, February 2021, Elsa Hatanaka
CCXG Workshop, February 2021, Elsa HatanakaCCXG Workshop, February 2021, Elsa Hatanaka
CCXG Workshop, February 2021, Elsa HatanakaOECD Environment
 
CCXG Forum, September 2020, Mausami Desai
CCXG Forum, September 2020, Mausami DesaiCCXG Forum, September 2020, Mausami Desai
CCXG Forum, September 2020, Mausami DesaiOECD Environment
 
CCXG Forum, September 2020, Yamikani Idriss
CCXG Forum, September 2020, Yamikani IdrissCCXG Forum, September 2020, Yamikani Idriss
CCXG Forum, September 2020, Yamikani IdrissOECD Environment
 
CCXG Special Event, November 2020, Chiara Falduto and Sina Wartmann
CCXG Special Event, November 2020, Chiara Falduto and Sina WartmannCCXG Special Event, November 2020, Chiara Falduto and Sina Wartmann
CCXG Special Event, November 2020, Chiara Falduto and Sina WartmannOECD Environment
 
CCXG Workshop, February 2021, Jongikhaya Witi
CCXG Workshop, February 2021, Jongikhaya WitiCCXG Workshop, February 2021, Jongikhaya Witi
CCXG Workshop, February 2021, Jongikhaya WitiOECD Environment
 
CCXG Forum, September 2021, Juan Carlos Monterrey
CCXG Forum, September 2021, Juan Carlos MonterreyCCXG Forum, September 2021, Juan Carlos Monterrey
CCXG Forum, September 2021, Juan Carlos MonterreyOECD Environment
 
CCXG Workshop, February 2021, Nashib Kefle and Tomo Aizawa
CCXG Workshop, February 2021, Nashib Kefle and Tomo AizawaCCXG Workshop, February 2021, Nashib Kefle and Tomo Aizawa
CCXG Workshop, February 2021, Nashib Kefle and Tomo AizawaOECD Environment
 
CCXG Workshop, February 2021, Elena Gavrilova
CCXG Workshop, February 2021, Elena GavrilovaCCXG Workshop, February 2021, Elena Gavrilova
CCXG Workshop, February 2021, Elena GavrilovaOECD Environment
 

Tendances (20)

CCXG Forum, March 2021, Key Takeaways
CCXG Forum, March 2021, Key TakeawaysCCXG Forum, March 2021, Key Takeaways
CCXG Forum, March 2021, Key Takeaways
 
CCXG Forum, March 2021, Chiara Falduto
CCXG Forum, March 2021, Chiara FaldutoCCXG Forum, March 2021, Chiara Falduto
CCXG Forum, March 2021, Chiara Falduto
 
CCXG Forum, March 2021, Jae Jung
CCXG Forum, March 2021, Jae JungCCXG Forum, March 2021, Jae Jung
CCXG Forum, March 2021, Jae Jung
 
CCXG Forum, March 2021, Lydia Cavasin
CCXG Forum, March 2021, Lydia CavasinCCXG Forum, March 2021, Lydia Cavasin
CCXG Forum, March 2021, Lydia Cavasin
 
CCXG Oct 2019 Benefits and implications of Article 6.4 design for host Partie...
CCXG Oct 2019 Benefits and implications of Article 6.4 design for host Partie...CCXG Oct 2019 Benefits and implications of Article 6.4 design for host Partie...
CCXG Oct 2019 Benefits and implications of Article 6.4 design for host Partie...
 
CCXG Workshop, February 2021, Hyung-Wook Choi
CCXG Workshop, February 2021, Hyung-Wook ChoiCCXG Workshop, February 2021, Hyung-Wook Choi
CCXG Workshop, February 2021, Hyung-Wook Choi
 
CCXG Forum, September 2021, MJ Mace
CCXG Forum, September 2021, MJ MaceCCXG Forum, September 2021, MJ Mace
CCXG Forum, September 2021, MJ Mace
 
CCXG Workshop, February 2021, Chiara Falduto
CCXG Workshop, February 2021, Chiara FaldutoCCXG Workshop, February 2021, Chiara Falduto
CCXG Workshop, February 2021, Chiara Falduto
 
CCXG Forum, September 2021, Amit Garg
CCXG Forum, September 2021, Amit GargCCXG Forum, September 2021, Amit Garg
CCXG Forum, September 2021, Amit Garg
 
CCXG Workshop, February 2021, Amit Garg
CCXG Workshop, February 2021, Amit GargCCXG Workshop, February 2021, Amit Garg
CCXG Workshop, February 2021, Amit Garg
 
CCXG Forum, September 2020, Chiara Falduto
CCXG Forum, September 2020, Chiara FaldutoCCXG Forum, September 2020, Chiara Falduto
CCXG Forum, September 2020, Chiara Falduto
 
CCXG Forum, September 2020, Rueanna Haynes
CCXG Forum, September 2020, Rueanna HaynesCCXG Forum, September 2020, Rueanna Haynes
CCXG Forum, September 2020, Rueanna Haynes
 
CCXG Workshop, February 2021, Elsa Hatanaka
CCXG Workshop, February 2021, Elsa HatanakaCCXG Workshop, February 2021, Elsa Hatanaka
CCXG Workshop, February 2021, Elsa Hatanaka
 
CCXG Forum, September 2020, Mausami Desai
CCXG Forum, September 2020, Mausami DesaiCCXG Forum, September 2020, Mausami Desai
CCXG Forum, September 2020, Mausami Desai
 
CCXG Forum, September 2020, Yamikani Idriss
CCXG Forum, September 2020, Yamikani IdrissCCXG Forum, September 2020, Yamikani Idriss
CCXG Forum, September 2020, Yamikani Idriss
 
CCXG Special Event, November 2020, Chiara Falduto and Sina Wartmann
CCXG Special Event, November 2020, Chiara Falduto and Sina WartmannCCXG Special Event, November 2020, Chiara Falduto and Sina Wartmann
CCXG Special Event, November 2020, Chiara Falduto and Sina Wartmann
 
CCXG Workshop, February 2021, Jongikhaya Witi
CCXG Workshop, February 2021, Jongikhaya WitiCCXG Workshop, February 2021, Jongikhaya Witi
CCXG Workshop, February 2021, Jongikhaya Witi
 
CCXG Forum, September 2021, Juan Carlos Monterrey
CCXG Forum, September 2021, Juan Carlos MonterreyCCXG Forum, September 2021, Juan Carlos Monterrey
CCXG Forum, September 2021, Juan Carlos Monterrey
 
CCXG Workshop, February 2021, Nashib Kefle and Tomo Aizawa
CCXG Workshop, February 2021, Nashib Kefle and Tomo AizawaCCXG Workshop, February 2021, Nashib Kefle and Tomo Aizawa
CCXG Workshop, February 2021, Nashib Kefle and Tomo Aizawa
 
CCXG Workshop, February 2021, Elena Gavrilova
CCXG Workshop, February 2021, Elena GavrilovaCCXG Workshop, February 2021, Elena Gavrilova
CCXG Workshop, February 2021, Elena Gavrilova
 

Similaire à CCXG Forum, March 2021, Kazuhisa Koakutsu

IPCC Paris Agreement/ Glasgow Accord : Article 6 rule book
IPCC Paris Agreement/ Glasgow Accord : Article 6 rule bookIPCC Paris Agreement/ Glasgow Accord : Article 6 rule book
IPCC Paris Agreement/ Glasgow Accord : Article 6 rule bookEnergy for One World
 
Embraer-RA16.pdf - relatorio anual das atividades
Embraer-RA16.pdf - relatorio anual das atividadesEmbraer-RA16.pdf - relatorio anual das atividades
Embraer-RA16.pdf - relatorio anual das atividadesVICTORMBEBE
 
CCXG Forum, March 2020, Miles Perry
CCXG Forum, March 2020, Miles PerryCCXG Forum, March 2020, Miles Perry
CCXG Forum, March 2020, Miles PerryOECD Environment
 
CCXG Forum, March 2020, Kazuhisa Koakutsu
CCXG Forum, March 2020, Kazuhisa KoakutsuCCXG Forum, March 2020, Kazuhisa Koakutsu
CCXG Forum, March 2020, Kazuhisa KoakutsuOECD Environment
 
CCXG Forum, June 2020, Julia Gardiner
CCXG Forum, June 2020, Julia GardinerCCXG Forum, June 2020, Julia Gardiner
CCXG Forum, June 2020, Julia GardinerOECD Environment
 
Scope 3 Bootcamp S3 history - Marty Spitzer.pdf
Scope 3 Bootcamp S3 history - Marty Spitzer.pdfScope 3 Bootcamp S3 history - Marty Spitzer.pdf
Scope 3 Bootcamp S3 history - Marty Spitzer.pdfGreenBiz Group
 
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIM
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIMSession 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIM
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIMOECD Environment
 
Quality Function Deployment in Construction Industry
Quality Function Deployment in Construction IndustryQuality Function Deployment in Construction Industry
Quality Function Deployment in Construction IndustryAmit Kumar
 
Life cycle costing_calculation_tool
Life cycle costing_calculation_toolLife cycle costing_calculation_tool
Life cycle costing_calculation_toolDemid Odkhuu
 
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...BlueScape
 
CCXG Forum, March 2020, Geoffrey Brouwer
CCXG Forum, March 2020, Geoffrey BrouwerCCXG Forum, March 2020, Geoffrey Brouwer
CCXG Forum, March 2020, Geoffrey BrouwerOECD Environment
 
Making Right Choices: Sustainability Assessment of Technologies
Making Right Choices: Sustainability Assessment of TechnologiesMaking Right Choices: Sustainability Assessment of Technologies
Making Right Choices: Sustainability Assessment of TechnologiesPrasad Modak
 
CCXG March 2019 Martin Hession Moving forward with article
CCXG March 2019 Martin Hession Moving forward with articleCCXG March 2019 Martin Hession Moving forward with article
CCXG March 2019 Martin Hession Moving forward with articleOECD Environment
 

Similaire à CCXG Forum, March 2021, Kazuhisa Koakutsu (20)

ISO 14067
ISO 14067ISO 14067
ISO 14067
 
IPCC Paris Agreement/ Glasgow Accord : Article 6 rule book
IPCC Paris Agreement/ Glasgow Accord : Article 6 rule bookIPCC Paris Agreement/ Glasgow Accord : Article 6 rule book
IPCC Paris Agreement/ Glasgow Accord : Article 6 rule book
 
Canada VCS freight meth version 1 3 (2)
Canada VCS freight meth version 1 3 (2)Canada VCS freight meth version 1 3 (2)
Canada VCS freight meth version 1 3 (2)
 
Cbp Seminar Presentation
Cbp Seminar PresentationCbp Seminar Presentation
Cbp Seminar Presentation
 
DENR Semi Annual Report (CMR) Form
DENR Semi Annual Report (CMR) FormDENR Semi Annual Report (CMR) Form
DENR Semi Annual Report (CMR) Form
 
Embraer-RA16.pdf - relatorio anual das atividades
Embraer-RA16.pdf - relatorio anual das atividadesEmbraer-RA16.pdf - relatorio anual das atividades
Embraer-RA16.pdf - relatorio anual das atividades
 
CCXG Forum, March 2020, Miles Perry
CCXG Forum, March 2020, Miles PerryCCXG Forum, March 2020, Miles Perry
CCXG Forum, March 2020, Miles Perry
 
CCXG Forum, March 2020, Kazuhisa Koakutsu
CCXG Forum, March 2020, Kazuhisa KoakutsuCCXG Forum, March 2020, Kazuhisa Koakutsu
CCXG Forum, March 2020, Kazuhisa Koakutsu
 
CCXG Forum, June 2020, Julia Gardiner
CCXG Forum, June 2020, Julia GardinerCCXG Forum, June 2020, Julia Gardiner
CCXG Forum, June 2020, Julia Gardiner
 
Scope 3 Bootcamp S3 history - Marty Spitzer.pdf
Scope 3 Bootcamp S3 history - Marty Spitzer.pdfScope 3 Bootcamp S3 history - Marty Spitzer.pdf
Scope 3 Bootcamp S3 history - Marty Spitzer.pdf
 
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIM
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIMSession 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIM
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIM
 
Quality Function Deployment in Construction Industry
Quality Function Deployment in Construction IndustryQuality Function Deployment in Construction Industry
Quality Function Deployment in Construction Industry
 
saccr - 20150710 - final
saccr - 20150710 - finalsaccr - 20150710 - final
saccr - 20150710 - final
 
11 Pdd
11 Pdd11 Pdd
11 Pdd
 
Life cycle costing_calculation_tool
Life cycle costing_calculation_toolLife cycle costing_calculation_tool
Life cycle costing_calculation_tool
 
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
 
Day3_SideEvent_Federica Matteoli&Heather Jacobs
Day3_SideEvent_Federica Matteoli&Heather JacobsDay3_SideEvent_Federica Matteoli&Heather Jacobs
Day3_SideEvent_Federica Matteoli&Heather Jacobs
 
CCXG Forum, March 2020, Geoffrey Brouwer
CCXG Forum, March 2020, Geoffrey BrouwerCCXG Forum, March 2020, Geoffrey Brouwer
CCXG Forum, March 2020, Geoffrey Brouwer
 
Making Right Choices: Sustainability Assessment of Technologies
Making Right Choices: Sustainability Assessment of TechnologiesMaking Right Choices: Sustainability Assessment of Technologies
Making Right Choices: Sustainability Assessment of Technologies
 
CCXG March 2019 Martin Hession Moving forward with article
CCXG March 2019 Martin Hession Moving forward with articleCCXG March 2019 Martin Hession Moving forward with article
CCXG March 2019 Martin Hession Moving forward with article
 

Plus de OECD Environment

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfOECD Environment
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...OECD Environment
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...OECD Environment
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijOECD Environment
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...OECD Environment
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysOECD Environment
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsOECD Environment
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoOECD Environment
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghOECD Environment
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngOECD Environment
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikOECD Environment
 

Plus de OECD Environment (20)

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter results
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth Singh
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine Ang
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël Jachnik
 

Dernier

Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...SUHANI PANDEY
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756dollysharma2066
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...Amil baba
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Pooja Nehwal
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Numberkumarajju5765
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Anamikakaur10
 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...Escorts Call Girls
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...Call Girls in Nagpur High Profile
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 

Dernier (20)

Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 

CCXG Forum, March 2021, Kazuhisa Koakutsu

  • 1. 6.4 baseline and CDM transition Climate Change Expert Group 16 March, 2021 Kazuhisa KOAKUTSU
  • 2. 1 A.64 baseline approaches (Draft Text) Approach COP25 presidency texts Best available technology ver.1 option B (ver.2 option A) An approach based on technologies that represent an economically feasible and/or environmentally sound course of action. Performance-based approach (1) ver.1 option A Taking into account: I. [Technologies that represent an economically feasible [and environmentally sound] course of action;] II. The emissions of activities providing similar outputs and/or services in similar social, economic, environmental and technological circumstances; III. Barriers to investment; (2) ver.1 option B (ver.2 option A) A baseline is based on the emissions of activities providing similar outputs and/or services in similar social, economic, environmental and technological circumstances. (3) ver.1 option C (ver.2 option B) An approach where the baseline is set at least at the average emission level of the best performing comparable activities providing similar outputs and services within a defined scope and boundary in the past three years and where the host Party may determine a more ambitious level at its discretion. Benchmark baseline ver.1 option B (ver.2 option A) A baseline is based on an ambitious benchmark representing a level of GHG emissions for activities within a defined scope and boundary Business as usual emissions / Projected emissions ver.1 option A (ver.1 option B) (ver.2 option A) (no definition) Historical emissions ver.1 option A (ver.1 option B) (ver.2 option A) (no definition)
  • 3. 2 Baseline approaches in the CDM Types of baseline approaches (CDM M&P para48(a to c)) (a) Existing actual or historical emissions, as applicable; (b) Emissions from a technology that represents an economically attractive course of action, taking into account barriers to investment; (c) The average emissions of similar project activities undertaken in the previous five years, in similar social, economic, environmental and technological circumstances, and whose performance is among the top 20 per cent of their category. *1 56.0% 36.0% 51.0% 51.4% 20.9% 16.0% 19.0% 19.4% 1.1% 0.0% 0.5% 13.2% 36.0% 12.0% 15.3% 4.0% 4.0% 2.3% 4.0% 0.5% 8.8% 4.0% 14.0% 10.6% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Large-scale Methodology ACM Small-scale Methodology Total (a) (b) (c) (a) &(b) (a) & (c) (b) & (c) unclassified Total * For small-scale methodologies, applied approaches are not clearly defined in methodology documents Out of 216 approved methodologies (*)  About 50% of methodologies apply only (a, Existing or historical emissions).  About 20% of methodologies apply the combination of baseline approaches.  About 1 % of methodologies apply the performance approach (c)
  • 4. 3 Baseline approaches in the CDM Only (a) applied Project type Methodology  Afforestation & reforestation AR-ACM0003, AR-AMS0007, AR- AM0004, AR-AMS0001, AR-ACM0001, AR-AM0009, AR-AMS0004, AR- AM0002, AR-AMS0003, AR-AM0005, AR-AM0010, AR-AM0003, AR-AM0001  Biogas ; Biomass AMS-I.D.  Energy efficiency ; Biogas AMS-III.M.  HFC reduction/avoidance AM0001, AMS-III.N.  Leak reduction AM0023  Methane avoidance ; Biogas AMS-I.D.  N2O decomposition ACM0009, ACM0019, AM0034, AM0019, AM0028, AM0021  SF6 replacement AM0065, AM0078, AM0079, AM0035  Waste gas/heat utilization ; Energy efficiency AMS-III.Q.  Wind power ; Other renewable energies AMS-I.D.  Wind power, PV AMS-I.D. (b) or (c) applied Project type  Biomass  Hydro power  Biogas  Wind power  PV  Methane avoidance  Methane recovery & utilization  Energy efficiency  Waste gas/heat utilization  Wind power, PV  Wind power ; Other renewable energies  Other renewable energies  HFC reduction/avoidance  Material use  Afforestation & reforestation  Fuel switch  Methane recovery & utilization ; Transportation  Hydro power ; Other renewable energies  Waste gas/heat utilization ; Fuel switch  Energy efficiency ; Biogas  Biogas ; Biomass  Energy efficiency ; Fuel switch  Waste gas/heat utilization ; Energy efficiency  Transportation Out of 35 types projects registered under the CDM 11 types of projects applied only approach (a) Another 24 types of projects applied approach (b) or (c)
  • 5. 4 Baseline approaches under the JCM  In the JCM, baselines should be below BaU.  Baseline approach in the JCM is positive list (32.4%), performance (30.4%), bench mark (27.5%). Types of baseline approaches (1’) Based on economically feasible and environmentally friendly technology. (Positive list) (2’) Based on data with good carbon efficiency from the latest past data of existing or similar equipment. (Performance) (3’) Based on the target standard and the efficiency set to exceed the currently feasible efficiency (Bench mark) 32.4% 30.4% 27.5% 9.8% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Approved JCM methodologies (1') (2') (3') Unclassified  In the JCM, emission reductions to be credited are defined as the difference between “reference emissions” and project emissions.  The reference emissions are calculated below business-as-usual (BaU) emissions which represent plausible emissions in providing the same outputs or service level of the proposed JCM project in the partner country.  This approach will ensure a net decrease and/or avoidance of GHG emissions. Total:102 BaU
  • 6. 5 Baseline approaches in VCS  In the VCS, each methodology is required to be below BaU in “Methodology Requirements” as an Additionality. “A project activity is additional if it can be demonstrated that the activity results in emission reductions or removals that are in excess of what would be achieved under a “business-as-usual” scenario and the activity would not have occurred in the absence of the incentive provided by the carbon markets.”  VCS allows to use 2 types of standardized methods, Performance method and Activity methods, and also to use other BL approaches depending on each project types . Types of baseline approaches (1) Performance method: These methods establish performance benchmark metrics for determining additionality and/or the crediting baseline. Projects that meet or exceed a predetermined level of the metric may be deemed as additional and a pre-determined level of the metric may serve as the crediting baseline. (2) Activity method (positive list): "These methods pre-determine additionality for given classes of project activities using a positive list. Projects that implement activities on the positive list are automatically deemed as additional and do not otherwise need to demonstrate additionality. One of three options (namely activity penetration, financial feasibility or revenue streams) is used to qualify the project activity for the positive list, as set out in Section 3.5.9." (3) Project method / Others / Unclassified 5 Sector: 14.Agriculture Forestry and Other Land Use (AFOLU), Sector 15: Livestock and manure management Total: 18 Total: 25 Total: 6 Total: 49 11.1% 8.0% 8.2% 88.9% 92.0% 100.0% 92% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% VM (except sector 14, 15) VM (sector 14, 15) VMR(revised based on CDM) Total (1) (2) (3) (2) (2) (4) (16) (23) (45) (6)
  • 7. 6 A6.4ERs CDM PJ activity/PoA (End of crediting period (CP): before 31/12/2023) A6.4 activity CDM meth A6.4 meth CDM PJ activity/PoA (End of CP: after 31/12/2023) A6.4 activity CDM meth A6.4 meth A6.4ERs Applied CDM meth Applied CDM meth End of CP from 1/1/2024 Activity flow for CDM PJ: Crediting Period ends before 31/12/2023 CER Activity flow for CDM PJ : Crediting Period ends after 31/12/2023 KP PA 2021 2022 2023 2020 2024 CER until 31/12/2023 Draft text on Article 6, paragraph 4 Draft text on Article 6, paragraph 4, ver.3) 72.Project activities and programmes of activities registered under the clean development mechanism under Article 12 of the Kyoto Protocol (CDM) may transition to the mechanism and be registered as Article 6, paragraph 4, activities subject to: a. The provision of approval of such transition to the Supervisory Body by the host Party per decision 3/CMP.1 of the CDM project activity or CDM programme of activities (CDM host Party), by no later than 31 December 2023; b. The compliance with these rules, modalities and procedures and any further relevant decisions of the CMA and relevant requirements adopted by the Supervisory Body, including those that relate to the application of a corresponding adjustment consistent with decision X/CMA.2 (Guidance relating to cooperative approaches referred to in Article 6, paragraph2); 73.Where an activity is eligible for transition pursuant to paragraph 72 above: a. The transition shall have been completed by no later than 31 December 2023; b. It may continue to apply its current approved CDM methodology until the earlier of the end of its current crediting period or 31 December 2023, following which, it shall apply an approved methodology pursuant to chapter V. B (Methodologies); c. For CDM project activities and CDM programmes of activities that have transitioned, A6.4ERs may be issued for emission reductions achieved after 31 December 2020.
  • 8. 7 Number of CDM projects subject to consideration  Out of registered PAs and CPAs (PAs: 7,857, CPAs: 2,674), 2,198 PAs and 2,340 CPAs may renew under the 64 As of February 2021 Registered PAs / CPAs (PAs: 7,857, CPAs: 2,674) Current crediting period ends after 1/1/2021  PAs: 3,644  CPAs: 2,662 Current crediting period ends before 31/12/2023  PAs: 2,095  CPAs: 593 Current crediting period ends after 1/1/2024  PAs: 1,549  CPAs: 2,069 Crediting period is fixed or Third crediting period  PAs: 1,446  CPAs: 322 Crediting period is renewable  PAs: 649  CPAs: 271 PAs: 2,198 CPAs: 2,340 Reflecting the EB decision regarding CP renewal
  • 9. 8 Analyzing CDM methodologies (PAs) Methodology CDM CP ends on or after 1 Jan 2024 CP is renewable beyond current CP Total Accumulate ACM0002 Grid-connected electricity generation from renewable sources 936 356 1,292 58.8% AMS-I.D. Grid connected renewable electricity generation 283 179 462 79.8% ACM0001 Flaring or use of landfill gas 46 27 73 83.1% AMS-I.C. Thermal energy production with or without electricity 31 7 38 84.8% ACM0006 Electricity and heat generation from biomass 10 8 18 85.7% ACM0018 Electricity generation from biomass in power-only plants 17 1 18 86.5% AR-AMS0001 Simplified baseline and monitoring methodologies for small-scale A/R CDM project activities implemented on grasslands or croplands with limited displacement of pre-project activities 16 1 17 87.3% ACM0012 Waste energy recovery 15 1 16 88.0% AMS-I.E. Switch from non-renewable biomass for thermal applications by the user 5 8 13 88.6% AMS-II.E. Energy efficiency and fuel switching measures for buildings 12 0 12 89.1% Others - 178 61 239 100.0% Total - 1,549 649 2,198
  • 10. 9 Analyzing CDM methodologies (CPAs) Methodology CDM CP ends on or after 1 Jan 2024 CP is renewable beyond current CP Total Accumulate AMS-III.D. Methane recovery in animal manure management systems 1,087 2 1,089 46.5% AMS-II.G. Energy efficiency measures in thermal applications of non-renewable biomass 456 88 544 69.8% AMS-III.AV. Low greenhouse gas emitting safe drinking water production systems 117 16 133 75.5% ACM0002 Grid-connected electricity generation from renewable sources 56 65 121 80.6% AMS-I.D. Grid Connected Renewable Electricity Generation 67 38 105 85.1% AMS-I.E. Switch from non-renewable biomass for thermal applications by the user 61 29 90 89.0% AMS-II.J. Demand-side activities for efficient lighting technologies 63 0 63 91.7% AMS-I.C. Thermal energy production with or without electricity 47 4 51 93.8% AMS-I.A. Electricity generation by the user 16 4 20 94.7% AMS-I.F. Renewable electricity generation for captive use and mini-grid 8 11 19 95.5% Others - 91 14 105 100.0% Total - 2,069 271 2,340
  • 11. 10 Defining baseline approaches  Need to define each baseline approach in 6.4 RMP in organized manner, taking into account the experience of the CDM and other mechanisms.  How to operationalize them would be further elaborated by Supervisory Body  Menu or hierarchy?  From the experience of CDM and other mechanisms, in actual, multiple baseline approaches are applied according to the type of project and various circumstances.  Streamline of Performance approach: The current draft texts are mixture of several definitions. It is needed to streamline each definition by considering the experience of CDM and other mechanisms. It may also be useful to consider how BAT and benchmark concept could be incorporated in performance approach.  BAU, Historical, and Projected emissions  Can we consider applying conservative baseline emission calculation in the design of the 64 mechanism? Details in text
  • 12. 11 Idea for the revision of ACM0002 Applied approach Baseline emissions CDM a. Actual or historical emissions, or b. Economically attractive technology BE = EG × EF  The baseline emissions are calculated as above.  A Combined Margin (CM) is applied to the emission factor for electricity as described in “TOOL07: Tool to calculate the emission factor (EF) “. A64 Best Available Technology  Determine the best available technology (e.g., high-efficient combined cycle gas turbine) at host country level.  Determine an emission factor based on the BAT and use it for the calculation of baseline emissions. Performance-based (1)  Calculate a emission factor using the recent data, and use low carbon-intensive emission factor. Performance-based (2)  Same as Performance-based (1) Performance-based (3)  Calculate a emission factor using the recent data.  Use the lowest carbon-intensive emission factor among the three years. Benchmark  Determine a benchmark emission factor at host country level and use it for the calculation of baseline emissions. Projected / historical / BAU  Review parameters in conservative manner  This methodology applies to project activities that include retrofitting, rehabilitation (or refurbishment), replacement or capacity addition of an existing power plant or construction and operation of a Greenfield power plant. (Approaches in slide 1)