Introduction to Oracle eAM
(Enterprise Asset Management)
and our implementation experiences

Jeremy Carson
Applications Manager
CMMS - Computerised Maintenance Management
System
Point Solution
e.g. Maximo, Mexx

or
ERP Integrated Solution
e.g Oracle E-Business Suite, JDE, Peoplesoft

or
Other
e.g. Excel
What do you have ?

?
Agenda
• Solid Energy Overview
• Key Configuration Steps
• Asset Model
• Maintenance Tasks
• Work Management
• Preventative Maintenance
• Cost Management
• Key experiences
• Questions ?
Solid Energy Overview
Solid Energy Overview – Energy Business
• Coal - Steel Production (Export / NZ Steel) Electricity Generation (Genesis)
- Domestic Industries (Fonterra / Holcim / Alliance / Silver Fern)
• Renewables – Wood pellets / Biodiesel / Solar
• New Energy – Coal Seam Gas, Coal to Fertiliser
Solid Energy Overview - People
• Approx 1200 employees nationwide, predominately in the Waikato, South
Island West Coast and Southland
• Approx 600 directly employed contractors
Solid Energy Overview - Assets
• An asset intensive business
• High focus on Health and Safety
• High focus on availability and utilisation of assets
• Predominately Mobile and Fixed Plant assets
Solid Energy Assets - Trucks
Solid Energy Assets - Excavators
Solid Energy Assets – Conveyors
Solid Energy Assets – Underground Miners
Solid Energy Assets – Water Treatment Plants
Solid Energy Assets – Train Loadouts
Solid Energy Overview – Our eAM Install
• Have used Oracle eAM since 2003 as an early adopter on Oracle EBusiness Suite 11.5.7
• Now using Oracle E-Business Suite 12.0.6
• Currently have 6 live Oracle eAM sites/organisations
• System Statistics
-

15,000+ work orders per annum
2000+ maintained assets
4000+ preventative maintenance activities
5000+ maintenance purchase requisitions per annum
10000+ maintenance inventory issues per annum
Key Configuration Steps
Configuration Steps – Taxonomy document
• As part of solution design create a Taxonomy document, which defines;
• eAM organization parameters e.g. default WIP Accounting Class
• Key lookups e.g. Areas, Departments, Categories
• Define standards and naming conventions for key setup areas
- Asset Model e.g. Asset Number/Groups/Hierarchy/Categories
- Maintenance Tasks e.g. Activities, Activity Type/Source/Cause
- Work Management e.g. Work Order Type/Status/Priority
- Preventative Maintenance e.g. Meters, Schedules
• Taxonomy must understand system limitations e.g. Asset Number must be
unique

• Taxonomy is a living document…refine with subsequent implementations
• Successful taxonomy makes system intuitive for users
Configuration Steps – Solution Design document
• Document how Oracle eAM will deliver each business process e.g. Asset
Breakdown to Work Order creation

• Swim lane the business process across business roles e.g. maintenance,
procurement, stores
• Detailed application mapping to requirements for each process step
• Review regularly and iteratively with key maintenance personnel
• Develop Proof of Concepts to assist with design validation and acceptance
Asset Model
Asset Model - Asset Numbers
•
•
•
•

Asset Numbers are the key entity in eAM
Mostly represent physical assets
Can be virtual assets in asset hierarchy for roll-up/grouping
Assets are setup either as a;
- Capital Asset or
- Rebuildable Inventory Components which rotate on/off Capital Assets and are
repaired/refurbished in between.
• Asset Numbers exist in separate register (using Oracle Install Base) than
the Fixed Asset register
• Asset Numbers can be linked to a single Fixed Asset Number

TIP: Asset Numbers must be unique through the system
Consider physical asset naming and common sites names
Asset Model - Asset Number screen
Asset Model - Asset Number screen
Asset Model - Asset Groups
• Each Asset belongs to an Asset Group
• Many key configurations driven by Asset Group
- Asset Bills of Materials – Typical materials used for maintenance
- Templates – Provides automatic creation of Preventative Maintenance
configuration e.g. Activities, Meters, Schedules
- Asset Attributes – Storage of additional asset information
- Failure Analysis – Failure, Cause and Resolution

• Define groups to represent virtually identical assets, in terms of materials
and preventative maintenance e.g. Make and Model combination.

TIP: Asset Groups must be unique through the system
Asset Model - Asset Groups screen
Asset Model - Asset Hierarchy
• Assets belong in a hierarchy
• Each Asset has a Parent Asset
• Establishes a roll-up mechanism for;
-

Cost reporting
Preventative Maintenance forecasting
Searches
Maintenance and failure history

• Virtual assets at top of hierarchy to deliver meaningful rollups;
- Production or process affinity
- Geographical or physical location
Asset Model - Asset Hierarchy screen
Asset Model - Summary
Maintenance Tasks
Maintenance Tasks - Activities
• Activities are predefined Maintenance work to be completed
• Generally routine work e.g. exchange pump, replace tyres or preventative
maintenance work e.g. services / inspections
• Activities define the following
- Tasks – More detailed tasks of the predefined work
- Bills of Materials – Required materials
- Routings – Required labour or equipment
- File attachments – Such as service sheet, diagrams, safety procedures
• Create Activity Association Template to associate to an Asset Group
or associate to an individual Asset
Maintenance Tasks – Activity Association screen
Work Management
Work Management – Work Requests
• Simple interface to capture reactive Maintenance work
• Can go through approval process, then be assigned to Work Orders
Work Management – Work Requests
Work Management – Work Orders
• Work Orders represent specific instances of Maintenance work for an asset
• Created in the following ways;
- Manually i.e. unplanned / corrective work
- Automatically by Preventative Maintenance forecast
- Automatically from Condition Based monitoring (via Oracle Quality)
• Work Orders record maintenance history and planned and actual costs
• Work Orders must have;
- Asset associated
- One or more Tasks i.e. Operations
- Scheduled Start / End Time

• Work Orders can have;
- Predefined Work assigned i.e. Activity
- Material requirements i.e. Stock, Non Stock, Requisitions
- Labour requirements i.e. Trade resource
Work Management – Work Orders screen
Work Management – Work Orders screen
Work Management – Completion
• Completion updates Last Service information e.g. 250hr service
completed at 12,500 hrs on 01-Feb-2010
• Prevents further costs being coded to the Work Order
• Captures the following information;
- Actual Start and End time
- Job Notes
- Failure Analysis
Work Management –Completion screen
Preventative Maintenance
Preventative Maintenance - Schedules
• Define when activities should occur for an Asset or Asset Group
• Defined to occur by;
- Date Rules – every 7 days
- Meter Rules – every 50 hours, 10000 km’s
- List Dates – on 01-Jan-2011
• Work forecasts from Last Service Information i.e. when activity was last
completed for the asset
- Date Rules – on 01-Jan-2010
- Meter Rules – at 2000 hours
- Combinations of the above
• Single definition can schedule multiple activities which share a common
base interval
• Schedules can include suppression e.g. 250hr service suppresses 50hr service
if its forecast within 20 hours of it
Preventative Maintenance – Schedules screen
Preventative Maintenance - Meters
• Meters used to schedule activities
• Ascending meters e.g. kilometres, hours
• Fluctuating meters e.g. temperature, pressure, vibration
• Meter hierarchies allowing parent meter to increment children e.g. truck
hours increments rim hours
Preventative Maintenance – Meters screen
Preventative Maintenance - Forecasting
• Forecasting generates Work Orders as per schedules
• Forecasts for a specified maintenance window e.g. next 14 days
• Can perform online or as a concurrent program
• Can selectively forecasts groups of assets
Preventative Maintenance - Forecasting
Preventative Maintenance - Summary
Cost Management
Cost Management – WIP Accounting Class (WAC)
• WIP Accounting Classes (WAC) define accounting rules
• Single GL accounts defined for Material and Resource transactions
• Limited capability for complex accounting requirements
• Default WAC for Organisation
• Can be superseded by WAC configured against the at Asset, Activity or
Work Order
Cost Management – Actual to Planned Costs
• Planned Costs built up on Work Order using
- Materials – Defaulted from Activity BOM or manually requested
- Labour – Defaulted from Activity Routing or manually requested
• Actual Costs accumulate on Work Order from
- Stores inventory issues to Work Order
- Purchase requisition (Direct Item) receipts
- Maintenance Resource transactions
- Invoice Price Variances (PO Matching)
• Cost Analysis can then be performed in multiple ways, such as;
- Asset using Hierarchy
- Work Order
- By Activity
Cost Management – Work Order costs
Key experiences
Key Experiences – What we have achieved
• A single maintenance system throughout the organization
• Better integration between stores and maintenance
• Comprehensive asset and component history
• Focus on preventative maintenance, driving better asset reliability
• Better management of maintenance workload
• Standardised asset information and maintenance procedures
• Ability to analyse asset and maintenance department performance
Key experiences – Maintenance Staff Involvement
• Maintenance staff involvement essential throughout implementation lifecycle
• Creates required buy-in for successful business transition and adoption
• Select “right” person carefully
- Positive / Seeks improvement i.e. this is something new, but we should use
- Resilient / Can do attitude i.e. that not ideal but we can make it work
- Well Respected i.e. will lead others to accept solution and advocate it
• Ensure the maintenance team is well trained and supported once live
Key experiences – Data load
• Data load is manual, complicated and time consuming
• Limited open interfaces
- Items (Asset Group, Activities) / Asset Number / Meter Reading

• Now several more APIs in R12
- Maintenance Object (Asset Number) / Activity / Preventative Maintenance

• We have built custom Excel templates and used DataLoad utility
• Have final dataset loaded for UAT, you will get many useful “corrections”
Key experiences – Reporting
• Standard reports are “limited”
• Develop a custom Work Order, probably in BI Publisher now
• Develop suite of reports to meet user requirements
• We developed Discoverer reports, some examples;
-

Asset Hierarchy / History / Availability
Asset / Work Order costing – by Hierarchy
Asset / Work Order Material Requirements
Asset Failure Analysis
Key Performance e.g. Planned Versus Unplanned, Maintenance backlog
Configuration reports e.g. BOMS, Activities, Schedules

• Other off the shelf options worth investigating
- Oracle eAM Daily Business Intelligence
- Vizaya WorkAlign® Analytics
- Signum EAM Analytics™
Key experiences – Reporting
Key experiences – Subledger Accounting
• “Get around” limitation of single material and labour GL accounts
• We use Subledger Accounting to re-code;
- Expense Account – Based on Item/PO Category
- Asset Account – Based on Flexfield held against Asset Number
• Not too complicated once you have a working prototype
• Use some consulting initially to get initial setup working
Key experiences – Usability
• Release 12 Self Service is a dramatic improvement
• Maintenance Supervisors can work solely in Self Service
• Personalisation can de-clutter Self Service
• Consider customisation for “pain points”
Questions ?
• Ask now if we have time
• Come see me afterwards
• Email me after the conference jeremy.carson@solidenergy.co.nz

Contenu connexe

Tendances

Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka Pathmendra
Janaka Pathmendra
 
Moving to the Maintenance Cloud
Moving to the Maintenance CloudMoving to the Maintenance Cloud
Moving to the Maintenance Cloud
Ian Monaghan
 
DocSet for SAP Plant Maintenance
DocSet for SAP Plant MaintenanceDocSet for SAP Plant Maintenance
DocSet for SAP Plant Maintenance
Norikkon, LLC.
 

Tendances (20)

SAP EAM Maintenance organisation structure
SAP EAM Maintenance organisation structureSAP EAM Maintenance organisation structure
SAP EAM Maintenance organisation structure
 
Oracle eAM - Right Fit To Oil & Gas Industries
Oracle eAM - Right Fit To Oil & Gas IndustriesOracle eAM - Right Fit To Oil & Gas Industries
Oracle eAM - Right Fit To Oil & Gas Industries
 
Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka Pathmendra
 
Simplifying SAP Plant Maintenance
Simplifying SAP Plant MaintenanceSimplifying SAP Plant Maintenance
Simplifying SAP Plant Maintenance
 
Sap PLM Online Training Course
Sap  PLM Online Training CourseSap  PLM Online Training Course
Sap PLM Online Training Course
 
Duncan Mills Mastering SAP PM 2011
Duncan Mills Mastering SAP PM 2011Duncan Mills Mastering SAP PM 2011
Duncan Mills Mastering SAP PM 2011
 
Enterprise resource planning ppt
Enterprise resource planning pptEnterprise resource planning ppt
Enterprise resource planning ppt
 
Moving to the Maintenance Cloud
Moving to the Maintenance CloudMoving to the Maintenance Cloud
Moving to the Maintenance Cloud
 
Erp
ErpErp
Erp
 
erp ppt
erp ppterp ppt
erp ppt
 
Collaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the FutureCollaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the Future
 
Introduction to ERP
Introduction to ERPIntroduction to ERP
Introduction to ERP
 
DocSet for SAP Plant Maintenance
DocSet for SAP Plant MaintenanceDocSet for SAP Plant Maintenance
DocSet for SAP Plant Maintenance
 
JD Edwards Distribution Deep Dive Workshop
JD Edwards Distribution Deep Dive WorkshopJD Edwards Distribution Deep Dive Workshop
JD Edwards Distribution Deep Dive Workshop
 
ERP Presentation
ERP PresentationERP Presentation
ERP Presentation
 
ERP Overview
ERP OverviewERP Overview
ERP Overview
 
Erp (sap report)
Erp (sap report)Erp (sap report)
Erp (sap report)
 
Erp introduction
Erp introductionErp introduction
Erp introduction
 
ERP System Development Plan
ERP System Development PlanERP System Development Plan
ERP System Development Plan
 
ERP Training
ERP TrainingERP Training
ERP Training
 

En vedette

Pool cleaning equipment
Pool cleaning equipmentPool cleaning equipment
Pool cleaning equipment
Fluidra India
 
The philosophical background of childhood education in
The philosophical background of childhood education inThe philosophical background of childhood education in
The philosophical background of childhood education in
Shadid Al
 
Fisheries NSW (Shark Smart) - Patrick Tully
Fisheries NSW (Shark Smart) - Patrick Tully Fisheries NSW (Shark Smart) - Patrick Tully
Fisheries NSW (Shark Smart) - Patrick Tully
Collaborative Solutions
 
Boom Chicka Pop Case Study
Boom Chicka Pop Case StudyBoom Chicka Pop Case Study
Boom Chicka Pop Case Study
sohmann1
 
Collaborative Solutions eHealth Event - Claydata
Collaborative Solutions eHealth Event - ClaydataCollaborative Solutions eHealth Event - Claydata
Collaborative Solutions eHealth Event - Claydata
Collaborative Solutions
 
Collaborative Solutions eHealth Event - FactNexus
Collaborative Solutions eHealth Event - FactNexusCollaborative Solutions eHealth Event - FactNexus
Collaborative Solutions eHealth Event - FactNexus
Collaborative Solutions
 
Module 2 - Life Cycle of a Lesson
Module 2 - Life Cycle of a LessonModule 2 - Life Cycle of a Lesson
Module 2 - Life Cycle of a Lesson
JoAnn Corley
 
Voice Thread
Voice ThreadVoice Thread
Voice Thread
adarr12
 

En vedette (15)

Pool cleaning equipment
Pool cleaning equipmentPool cleaning equipment
Pool cleaning equipment
 
Todo es para bien
Todo es para bienTodo es para bien
Todo es para bien
 
The philosophical background of childhood education in
The philosophical background of childhood education inThe philosophical background of childhood education in
The philosophical background of childhood education in
 
08. Past Recipient: Tapit
08. Past Recipient: Tapit08. Past Recipient: Tapit
08. Past Recipient: Tapit
 
Fisheries NSW (Shark Smart) - Patrick Tully
Fisheries NSW (Shark Smart) - Patrick Tully Fisheries NSW (Shark Smart) - Patrick Tully
Fisheries NSW (Shark Smart) - Patrick Tully
 
The Ripple Effect - The Power of Your Personal Brand in HR
The Ripple Effect - The Power of Your Personal Brand in HRThe Ripple Effect - The Power of Your Personal Brand in HR
The Ripple Effect - The Power of Your Personal Brand in HR
 
Dissertation defenseslides
Dissertation defenseslidesDissertation defenseslides
Dissertation defenseslides
 
Тренинги по управлению проектами в экстремальных условиях
Тренинги по управлению проектами в экстремальных условияхТренинги по управлению проектами в экстремальных условиях
Тренинги по управлению проектами в экстремальных условиях
 
Boom Chicka Pop Case Study
Boom Chicka Pop Case StudyBoom Chicka Pop Case Study
Boom Chicka Pop Case Study
 
Collaborative Solutions eHealth Event - Claydata
Collaborative Solutions eHealth Event - ClaydataCollaborative Solutions eHealth Event - Claydata
Collaborative Solutions eHealth Event - Claydata
 
Collaborative Solutions eHealth Event - FactNexus
Collaborative Solutions eHealth Event - FactNexusCollaborative Solutions eHealth Event - FactNexus
Collaborative Solutions eHealth Event - FactNexus
 
Module 2 - Life Cycle of a Lesson
Module 2 - Life Cycle of a LessonModule 2 - Life Cycle of a Lesson
Module 2 - Life Cycle of a Lesson
 
RMShapedImageview
RMShapedImageviewRMShapedImageview
RMShapedImageview
 
אמריקה הלטינית 1
אמריקה הלטינית 1אמריקה הלטינית 1
אמריקה הלטינית 1
 
Voice Thread
Voice ThreadVoice Thread
Voice Thread
 

Similaire à Jeremy carson nz oracle user group presentation an overview of enterprise asset management

Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesOm lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
videoaakash15
 
Oracle Enterprise Asset Management - Presentation.pptx
Oracle Enterprise Asset Management - Presentation.pptxOracle Enterprise Asset Management - Presentation.pptx
Oracle Enterprise Asset Management - Presentation.pptx
UmairIlyas21
 
ITIL V3 by Jisu Dasgupta
ITIL V3 by Jisu DasguptaITIL V3 by Jisu Dasgupta
ITIL V3 by Jisu Dasgupta
Jisu Dasgupta
 

Similaire à Jeremy carson nz oracle user group presentation an overview of enterprise asset management (20)

eAM 101 slides
eAM 101 slideseAM 101 slides
eAM 101 slides
 
Software testing performance testing
Software testing  performance testingSoftware testing  performance testing
Software testing performance testing
 
Lesson 3 - The Kimbal Lifecycle.pptx
Lesson 3 - The Kimbal Lifecycle.pptxLesson 3 - The Kimbal Lifecycle.pptx
Lesson 3 - The Kimbal Lifecycle.pptx
 
manufacturingoperationmanagement-ISA 95.ppt
manufacturingoperationmanagement-ISA 95.pptmanufacturingoperationmanagement-ISA 95.ppt
manufacturingoperationmanagement-ISA 95.ppt
 
Performance Assurance for Packaged Applications
Performance Assurance for Packaged ApplicationsPerformance Assurance for Packaged Applications
Performance Assurance for Packaged Applications
 
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesOm lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
 
eFACiLiTY Maintenance Management System
eFACiLiTY Maintenance Management SystemeFACiLiTY Maintenance Management System
eFACiLiTY Maintenance Management System
 
sanjeet.pptx
sanjeet.pptxsanjeet.pptx
sanjeet.pptx
 
eFACiLiTY Presentation
eFACiLiTY PresentationeFACiLiTY Presentation
eFACiLiTY Presentation
 
Plant Maintenance Overview.pptx
Plant Maintenance Overview.pptxPlant Maintenance Overview.pptx
Plant Maintenance Overview.pptx
 
IAM-EAM PPT.ppt
IAM-EAM PPT.pptIAM-EAM PPT.ppt
IAM-EAM PPT.ppt
 
Al 2012 Service manager and Project & Job Costing
Al 2012 Service manager and Project & Job CostingAl 2012 Service manager and Project & Job Costing
Al 2012 Service manager and Project & Job Costing
 
Manufacturing operation management
Manufacturing operation managementManufacturing operation management
Manufacturing operation management
 
Oracle Enterprise Asset Management - Presentation.pptx
Oracle Enterprise Asset Management - Presentation.pptxOracle Enterprise Asset Management - Presentation.pptx
Oracle Enterprise Asset Management - Presentation.pptx
 
Process Selection & Facility Layout.ppt
Process Selection & Facility Layout.pptProcess Selection & Facility Layout.ppt
Process Selection & Facility Layout.ppt
 
ERP 101: Inventory - Maintaining Accurate and Reliable Data
ERP 101: Inventory - Maintaining Accurate and Reliable DataERP 101: Inventory - Maintaining Accurate and Reliable Data
ERP 101: Inventory - Maintaining Accurate and Reliable Data
 
IT Operations Management as a Service
IT Operations Management as a ServiceIT Operations Management as a Service
IT Operations Management as a Service
 
ITIL V3 by Jisu Dasgupta
ITIL V3 by Jisu DasguptaITIL V3 by Jisu Dasgupta
ITIL V3 by Jisu Dasgupta
 
Itilv3
Itilv3Itilv3
Itilv3
 
Itilv3
Itilv3Itilv3
Itilv3
 

Plus de obulreddy biyyam (7)

Wo cost
Wo cost Wo cost
Wo cost
 
Uk standard-cdr-format
Uk standard-cdr-formatUk standard-cdr-format
Uk standard-cdr-format
 
Quick start guide-oracle_sourcing_v2
Quick start guide-oracle_sourcing_v2Quick start guide-oracle_sourcing_v2
Quick start guide-oracle_sourcing_v2
 
4 6 burns
4 6 burns4 6 burns
4 6 burns
 
54188703 i proc-catalog
54188703 i proc-catalog54188703 i proc-catalog
54188703 i proc-catalog
 
Proc contracts
Proc contractsProc contracts
Proc contracts
 
Proc contracts part1
Proc contracts part1Proc contracts part1
Proc contracts part1
 

Dernier

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Dernier (20)

The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 

Jeremy carson nz oracle user group presentation an overview of enterprise asset management

  • 1. Introduction to Oracle eAM (Enterprise Asset Management) and our implementation experiences Jeremy Carson Applications Manager
  • 2. CMMS - Computerised Maintenance Management System Point Solution e.g. Maximo, Mexx or ERP Integrated Solution e.g Oracle E-Business Suite, JDE, Peoplesoft or Other e.g. Excel
  • 3. What do you have ? ?
  • 4. Agenda • Solid Energy Overview • Key Configuration Steps • Asset Model • Maintenance Tasks • Work Management • Preventative Maintenance • Cost Management • Key experiences • Questions ?
  • 6. Solid Energy Overview – Energy Business • Coal - Steel Production (Export / NZ Steel) Electricity Generation (Genesis) - Domestic Industries (Fonterra / Holcim / Alliance / Silver Fern) • Renewables – Wood pellets / Biodiesel / Solar • New Energy – Coal Seam Gas, Coal to Fertiliser
  • 7. Solid Energy Overview - People • Approx 1200 employees nationwide, predominately in the Waikato, South Island West Coast and Southland • Approx 600 directly employed contractors
  • 8. Solid Energy Overview - Assets • An asset intensive business • High focus on Health and Safety • High focus on availability and utilisation of assets • Predominately Mobile and Fixed Plant assets
  • 10. Solid Energy Assets - Excavators
  • 11. Solid Energy Assets – Conveyors
  • 12. Solid Energy Assets – Underground Miners
  • 13. Solid Energy Assets – Water Treatment Plants
  • 14. Solid Energy Assets – Train Loadouts
  • 15. Solid Energy Overview – Our eAM Install • Have used Oracle eAM since 2003 as an early adopter on Oracle EBusiness Suite 11.5.7 • Now using Oracle E-Business Suite 12.0.6 • Currently have 6 live Oracle eAM sites/organisations • System Statistics - 15,000+ work orders per annum 2000+ maintained assets 4000+ preventative maintenance activities 5000+ maintenance purchase requisitions per annum 10000+ maintenance inventory issues per annum
  • 17. Configuration Steps – Taxonomy document • As part of solution design create a Taxonomy document, which defines; • eAM organization parameters e.g. default WIP Accounting Class • Key lookups e.g. Areas, Departments, Categories • Define standards and naming conventions for key setup areas - Asset Model e.g. Asset Number/Groups/Hierarchy/Categories - Maintenance Tasks e.g. Activities, Activity Type/Source/Cause - Work Management e.g. Work Order Type/Status/Priority - Preventative Maintenance e.g. Meters, Schedules • Taxonomy must understand system limitations e.g. Asset Number must be unique • Taxonomy is a living document…refine with subsequent implementations • Successful taxonomy makes system intuitive for users
  • 18. Configuration Steps – Solution Design document • Document how Oracle eAM will deliver each business process e.g. Asset Breakdown to Work Order creation • Swim lane the business process across business roles e.g. maintenance, procurement, stores • Detailed application mapping to requirements for each process step • Review regularly and iteratively with key maintenance personnel • Develop Proof of Concepts to assist with design validation and acceptance
  • 20. Asset Model - Asset Numbers • • • • Asset Numbers are the key entity in eAM Mostly represent physical assets Can be virtual assets in asset hierarchy for roll-up/grouping Assets are setup either as a; - Capital Asset or - Rebuildable Inventory Components which rotate on/off Capital Assets and are repaired/refurbished in between. • Asset Numbers exist in separate register (using Oracle Install Base) than the Fixed Asset register • Asset Numbers can be linked to a single Fixed Asset Number TIP: Asset Numbers must be unique through the system Consider physical asset naming and common sites names
  • 21. Asset Model - Asset Number screen
  • 22. Asset Model - Asset Number screen
  • 23. Asset Model - Asset Groups • Each Asset belongs to an Asset Group • Many key configurations driven by Asset Group - Asset Bills of Materials – Typical materials used for maintenance - Templates – Provides automatic creation of Preventative Maintenance configuration e.g. Activities, Meters, Schedules - Asset Attributes – Storage of additional asset information - Failure Analysis – Failure, Cause and Resolution • Define groups to represent virtually identical assets, in terms of materials and preventative maintenance e.g. Make and Model combination. TIP: Asset Groups must be unique through the system
  • 24. Asset Model - Asset Groups screen
  • 25. Asset Model - Asset Hierarchy • Assets belong in a hierarchy • Each Asset has a Parent Asset • Establishes a roll-up mechanism for; - Cost reporting Preventative Maintenance forecasting Searches Maintenance and failure history • Virtual assets at top of hierarchy to deliver meaningful rollups; - Production or process affinity - Geographical or physical location
  • 26. Asset Model - Asset Hierarchy screen
  • 27. Asset Model - Summary
  • 29. Maintenance Tasks - Activities • Activities are predefined Maintenance work to be completed • Generally routine work e.g. exchange pump, replace tyres or preventative maintenance work e.g. services / inspections • Activities define the following - Tasks – More detailed tasks of the predefined work - Bills of Materials – Required materials - Routings – Required labour or equipment - File attachments – Such as service sheet, diagrams, safety procedures • Create Activity Association Template to associate to an Asset Group or associate to an individual Asset
  • 30. Maintenance Tasks – Activity Association screen
  • 32. Work Management – Work Requests • Simple interface to capture reactive Maintenance work • Can go through approval process, then be assigned to Work Orders
  • 33. Work Management – Work Requests
  • 34. Work Management – Work Orders • Work Orders represent specific instances of Maintenance work for an asset • Created in the following ways; - Manually i.e. unplanned / corrective work - Automatically by Preventative Maintenance forecast - Automatically from Condition Based monitoring (via Oracle Quality) • Work Orders record maintenance history and planned and actual costs • Work Orders must have; - Asset associated - One or more Tasks i.e. Operations - Scheduled Start / End Time • Work Orders can have; - Predefined Work assigned i.e. Activity - Material requirements i.e. Stock, Non Stock, Requisitions - Labour requirements i.e. Trade resource
  • 35. Work Management – Work Orders screen
  • 36. Work Management – Work Orders screen
  • 37. Work Management – Completion • Completion updates Last Service information e.g. 250hr service completed at 12,500 hrs on 01-Feb-2010 • Prevents further costs being coded to the Work Order • Captures the following information; - Actual Start and End time - Job Notes - Failure Analysis
  • 40. Preventative Maintenance - Schedules • Define when activities should occur for an Asset or Asset Group • Defined to occur by; - Date Rules – every 7 days - Meter Rules – every 50 hours, 10000 km’s - List Dates – on 01-Jan-2011 • Work forecasts from Last Service Information i.e. when activity was last completed for the asset - Date Rules – on 01-Jan-2010 - Meter Rules – at 2000 hours - Combinations of the above • Single definition can schedule multiple activities which share a common base interval • Schedules can include suppression e.g. 250hr service suppresses 50hr service if its forecast within 20 hours of it
  • 41. Preventative Maintenance – Schedules screen
  • 42. Preventative Maintenance - Meters • Meters used to schedule activities • Ascending meters e.g. kilometres, hours • Fluctuating meters e.g. temperature, pressure, vibration • Meter hierarchies allowing parent meter to increment children e.g. truck hours increments rim hours
  • 44. Preventative Maintenance - Forecasting • Forecasting generates Work Orders as per schedules • Forecasts for a specified maintenance window e.g. next 14 days • Can perform online or as a concurrent program • Can selectively forecasts groups of assets
  • 48. Cost Management – WIP Accounting Class (WAC) • WIP Accounting Classes (WAC) define accounting rules • Single GL accounts defined for Material and Resource transactions • Limited capability for complex accounting requirements • Default WAC for Organisation • Can be superseded by WAC configured against the at Asset, Activity or Work Order
  • 49. Cost Management – Actual to Planned Costs • Planned Costs built up on Work Order using - Materials – Defaulted from Activity BOM or manually requested - Labour – Defaulted from Activity Routing or manually requested • Actual Costs accumulate on Work Order from - Stores inventory issues to Work Order - Purchase requisition (Direct Item) receipts - Maintenance Resource transactions - Invoice Price Variances (PO Matching) • Cost Analysis can then be performed in multiple ways, such as; - Asset using Hierarchy - Work Order - By Activity
  • 50. Cost Management – Work Order costs
  • 52. Key Experiences – What we have achieved • A single maintenance system throughout the organization • Better integration between stores and maintenance • Comprehensive asset and component history • Focus on preventative maintenance, driving better asset reliability • Better management of maintenance workload • Standardised asset information and maintenance procedures • Ability to analyse asset and maintenance department performance
  • 53. Key experiences – Maintenance Staff Involvement • Maintenance staff involvement essential throughout implementation lifecycle • Creates required buy-in for successful business transition and adoption • Select “right” person carefully - Positive / Seeks improvement i.e. this is something new, but we should use - Resilient / Can do attitude i.e. that not ideal but we can make it work - Well Respected i.e. will lead others to accept solution and advocate it • Ensure the maintenance team is well trained and supported once live
  • 54. Key experiences – Data load • Data load is manual, complicated and time consuming • Limited open interfaces - Items (Asset Group, Activities) / Asset Number / Meter Reading • Now several more APIs in R12 - Maintenance Object (Asset Number) / Activity / Preventative Maintenance • We have built custom Excel templates and used DataLoad utility • Have final dataset loaded for UAT, you will get many useful “corrections”
  • 55. Key experiences – Reporting • Standard reports are “limited” • Develop a custom Work Order, probably in BI Publisher now • Develop suite of reports to meet user requirements • We developed Discoverer reports, some examples; - Asset Hierarchy / History / Availability Asset / Work Order costing – by Hierarchy Asset / Work Order Material Requirements Asset Failure Analysis Key Performance e.g. Planned Versus Unplanned, Maintenance backlog Configuration reports e.g. BOMS, Activities, Schedules • Other off the shelf options worth investigating - Oracle eAM Daily Business Intelligence - Vizaya WorkAlign® Analytics - Signum EAM Analytics™
  • 56. Key experiences – Reporting
  • 57. Key experiences – Subledger Accounting • “Get around” limitation of single material and labour GL accounts • We use Subledger Accounting to re-code; - Expense Account – Based on Item/PO Category - Asset Account – Based on Flexfield held against Asset Number • Not too complicated once you have a working prototype • Use some consulting initially to get initial setup working
  • 58. Key experiences – Usability • Release 12 Self Service is a dramatic improvement • Maintenance Supervisors can work solely in Self Service • Personalisation can de-clutter Self Service • Consider customisation for “pain points”
  • 59. Questions ? • Ask now if we have time • Come see me afterwards • Email me after the conference jeremy.carson@solidenergy.co.nz