An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Advanced Work Packaging (AWP)
Achieving Higher Project
Productivity And Predictability
1
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Today’s talking points
2
• The Construction Industry Productivity Dilemma
• Elements of a Successful Project Delivery
• Advanced Work Packaging (AWP)
² Structure
² Deliverables
² Practice Model
Ø A vision for our Industry
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Note about the webinar
• I hope this webinar provides you with new elements of
discussion that you may use to re-think and re-assess
your organizations project delivery maturity and identify
areas of improvements
• Although the primary research focus is on industrial
construction, many elements of this presentation could
very well be applied to other conventional construction
sectors
3
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Let's get started...
4
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
How productive is our industry?
5
A percentage point increase in productivity is worth $7
billion to the industry as a whole.
The industry is leaving big money on the table!
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
A Labor-Intensive Business...
6
Facing an increasingly challenging global market, the construction industry
has remained a labor-intensive business, struggling to achieve higher
capital effectiveness.
• Increased TechnicalComplexity
• Remote GeographicalLocations
• increasingly congested areas
• More Stringent Regulatory Requirements
• Higher Political Risk; more difficult to insure
• Shortage in skilled labor
• Workforce availability
• Unbalanced supply and demand in terms of engineering,procurement and
project managementservices
• Unstable commodity pricing
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
What are we trying to do to cut costs?
7
Gorgon Project, Australia
(source: Chevron.com)
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
More so than ever, Business and
Projects/Engineering concerns are aligned
• Many of these factors are out of control of
individual companies and project teams. It
is, therefore, more compelling to enhance
one's project delivery effectiveness through
executing projects the "right way"
• That encompasses mastering project and
business risk identification, sharing and
management within a project delivery
system capable of delivering the promised
business value, in a predictable fashion
8
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Doing the right projects...
AND doing projects right!
9
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
10
How to deliver profitable capital projects?
Field	Labor	
Productivity
Engineering	 Quality	&	
Timeliness
Procurement	Quality	
&	Effectiveness
Doing	the	right	project	
Alignment	of	Business	Case,	Scope	and	Project	Objectives
Contracting	Strategies	In	
Line	with	Stakeholders	
Capabilities
Strong	Project	
Management	
Capabilities
Reliable	
Constructability	
Strategy	
Cost Schedule Safety Operability
Project’s	
Economic		
Output
Exhibit	1
© www.workpackaging.org,2016
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
11
I - Project Outcomes
Field	Labor	
Productivity
Engineering	 Quality	&	
Timeliness
Procurement	Quality	
&	Effectiveness
Doing	the	right	project	
Alignment	of	Business	Case,	Scope	and	Project	Objectives
Contracting	Strategies	In	
Line	with	Stakeholders	
Capabilities
Strong	Project	
Management	
Capabilities
Reliable	
Constructability	
Strategy	
Cost Schedule Safety Operability
Project’s	
Economic		
Output
Exhibit	1.	a
© www.workpackaging.org,2016
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
12
II - Project Critical Conditions
Field	Labor	
Productivity
Engineering	 Quality	&	
Timeliness
Procurement	Quality	
&	Effectiveness
Doing	the	right	project	
Alignment	of	Business	Case,	Scope	and	Project	Objectives
Contracting	Strategies	In	
Line	with	Stakeholders	
Capabilities
Strong	Project	
Management	
Capabilities
Reliable	
Constructability	
Strategy	
Cost Schedule Safety Operability
Project’s	
Economic		
Output
Exhibit	1.	b
© www.workpackaging.org,2016
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
13
III - Project Execution Success Indicators
Field	Labor	
Productivity
Engineering	 Quality	&	
Timeliness
Procurement	Quality	
&	Effectiveness
Doing	the	right	project	
Alignment	of	Business	Case,	Scope	and	Project	Objectives
Contracting	Strategies	In	
Line	with	Stakeholders	
Capabilities
Strong	Project	
Management	
Capabilities
Reliable	
Constructability	
Strategy	
Cost Schedule Safety Operability
Project’s	
Economic		
Output
Exhibit	1.	c
© www.workpackaging.org,2016
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
14
Delivering profitable capital projects requires thinking with the end in mind
Field	Labor	
Productivity
Engineering	 Quality	&	
Timeliness
Procurement	Quality	
&	Effectiveness
Doing	the	right	project	
Alignment	of	Business	Case,	Scope	and	Project	Objectives
Contracting	Strategies	In	
Line	with	Stakeholders	
Capabilities
Strong	Project	
Management	
Capabilities
Reliable	
Constructability	
Strategy	
Cost Schedule Safety Operability
Project’s	
Economic		
Output
Exhibit	1
© www.workpackaging.org,2016
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Reliable and effective
constructability strategy
Definition:
Constructability Reviews (CR) are “ the optimum use of
construction knowledge in planning, design, procurement, and
field operations to achieve overall project objectives". (CII)
A Constructability Review (CR) constitutes an analysis of the
plant design (usually performed by experienced construction,
maintenance, & operations personnel) intended to reduce costs,
save time, ensure quality and safety, as well as enhance the
management of risk in the construction phase, during plant
operation, and during subsequent maintenance of the facility.
15
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
How effective is your company's
CR process?
q Do you start you CR early in definition? (timing)
q Do you have multiple CR sessions throughout the definition phase?
(frequency)
q Does your primary Construction Manager (CM) participate in the
review? Will you have a new CM at execution? (continuity of strategy
ownership and accountability)
q Do you document your CR? (traceability)
q Do you provide enough information as input to your CR (such as
models, site reviews, technology considerations)? (quality)
q Do you use corporate project knowledge in your CR? (lessons
learned & continuous improvement)
q How involved is your project sponsor in the CR? (alignment with
business)
16
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
17
Field	Labor	ProductivityEngineering	Quality	&	Timeliness
Procurement	Quality	&	
Effectiveness
Doing	the	right	project	
Alignment	of	Business	Case,	Scope	and	Project	Objectives
Contracting	Strategies	In	Line	with	
Stakeholders	Capabilities
Strong	Project	Management	
Capabilities Reliable	Constructability	Strategy	
Cost Schedule Safety Operability
Project’s	Economic		
Output
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
The Mortar Concept©
(MC Concept)
18
© www.workpackaging.org,2016
MC
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Linking Together Project Delivery Components:
" The Mortar Concept© "
• To enable the holistic effectiveness of all
these project delivery components, a project
needs to operate within a framework
capable of ensuring both the right timing and
the optimum quality of information used
• This framework is defined based on two
structural features:
1. It needs to support timeliness of decisions
through a Project Decision Support
System (PDSS©)
2. It needs to ensure accurate project
information flow through a workable
Project Information Flow Protocol (PIFP©)
19
©	Hamdi,	The	Mortar	Concept	 in	Project	Management,	2015
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
20
Linking Project Delivery Components
" The Mortar Concept© "
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
21
Linking Project Delivery Components
" The Mortar Concept© "
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Advanced Work Packaging
(AWP)
22
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Research & Development History
• 4 Year Academia-Industry
Research Collaboration (RT272)
• Industry Implementation
Resource – 3 volumes
• First Academic Publication on
AWP from The University of
Texas at Austin
• Implementation case studies &
Validation
23
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Advanced Work Packaging (AWP) is a
project delivery system that emphasizes
construction as a primary planning driver
24
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
What is Advanced Work Packaging
(AWP)?
“Advanced Work Packaging (AWP) is a work process
framework fundamentally based on the idea of thinking with
the end in mind. It is designed to allow engineering
planning be driven by construction sequencing. Simply put,
this is achieved by breaking down the project scope into
Construction Work Packages that are fed with Engineering
Work Packages.”
25
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
How is that achieved?
1. Extending PEPs to the front-end planning phase; "bringing the field
to the office"
2. A focus on field work packages/installation work packages as
project information units
3. Work packaging structure becomes the skeleton of the project; a
workface planner is dedicated to the management of these
packages
4. The benefit of a common intuitive project language and tools
26
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
A quick look at the boundaries
defining each of the Advanced Work
Packaging (AWP) system
deliverables
Key Deliverables:
CWP- Construction Work Packages
IWP- Installation Work Packages
EWP- Engineering Work Packages
27
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Overall Project
Exhibit	of	CII/COAA	RT.272
28
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Construction Work Package (CWP) Boundary
Exhibit	of	CII/COAA	RT.272
29
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Engineering Work Package (EWP) boundary
Exhibit	of	CII/COAA	RT.272
30
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Installation Work Package (IWP) boundary
Exhibit	of	CII/COAA	RT.272
31
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Inside a CWP
CWP Content
• Scope description and
constructability strategy
• Safety Requirements
• Various EWPs (at least one)
• Schedule Requirements
• Budget (labor
hours/cost/plannedproductivity
rate)
• Quality Requirements
• Special Resource Requirements
(tools, equipments etc.)
CWP Features
• In line with the overall
construction plan
• Typically aligned with a bid
package / multiple CWPs
may form one larger bid
package
• In alignment with project
controls
• Measurable
• As independent as possible
32
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Inside an EWP
EWP Content
• Scope of work with equipment
list
• Drawings (e.g. general
arrangement and equipment
installation)
• Installation and material
specifications
• Vendor data
• Bill of materials
• Additional needed information
such as permitting studies,
geotechnicalstudies etc.
• Connection Points
Considerations
EWP Features
• Release plan should be
aligned with the construction
sequence and priorities
• Content should satisfy various
stakeholders requirements
• Planning of EWPs requires
construction input!!
• EWPs are discipline and area-
driven; connections points
expected
• Interface management should
be accounted for
33
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Inside an IWP
IWP Content
• Scope of Work
• Safety Requirements
• QA/QC Requirements
• Trade Coordination
• Material Take Offs & Locations
• Model Shots, Drawings and All
Other Necessary Engineering
Information
• Scaffold Requirements
• IWP Constraints
• Any Other Information Required to
Install the Work
IWP Features
• Reviewed and approved by the
supervisory team
34
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
AWP Recommended Practice Model
35
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
An Industry Momentum
• Multiple case studies of industrial projects (IR272-2 v3)
reported the achieved benefits of:
– 25% productivity improvement
– 10% decrease in total installed cost
• Documented the following benefits resulting from AWP
implementation:
– Greater schedule & cost predictability
– Improved safety performance
– Reduced engineering rework
– Improved quality & stakeholder alignment
– Improved contractor profitability
– Increased supervision time in the field
• Performance/maturity matrix established
36
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
ENR talking
about AWP
37
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Call for action
Advanced Work Packaging (AWP)
constitutes a major competitive advantage
for companies that go through the process
of assessing and improving the maturity and
effectiveness of their own project delivery
capabilities.
38
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
O.H.'s AWP Implementation Roadmap
- Level 1
39
Update corporate program
Implement AWP
Plan AWP implementation
Obtain AWP capabilities
Establish corporate AWP program
Assess current project delivery system effectiveness
Commit to implementing AWP
©	Olfa	Hamdi,	2015
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
O.H. Vision for AWP
and the construction industry
• AWP is currently a strong experience based model; theoretical
validation pending
• Aiming for an industry-wide protocol; project information mapping is
a first step but it should be executed in parallel to other industry-
wide efforts
• The AWP system requires further design
– Mostly a human-powered decision making system
– Spatial representation of projects needs to be integrated with business
decisions
– More to do in terms of quantification, storage, communication of
information
– Integration and interoperability are key
• We are still far from automation but we are heading in the right direction
– Our industry needs to learn from other sectors and experiences
– We need to capitalize on those successful implementations cases
– We need to bring in the best talents from the IT sector to
revolutionize our industry
40
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
"We do well bricks...
It's high time we tackle
the mortar"
41
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
From Project Management to
Project Leadership
42
An Introduction To A New Framework For Successful Construction Project Delivery
Olfa Hamdi, MSc Eng, MSc Res
Founder, The Advanced Work Packaging Institute
Thank You!
Contact:
Olfa Hamdi
The Advanced Work Packaging Institute
268 Bush Street #2926, San Francisco, CA, 94104
www.workpackaging.org
Email: ohamdi@workpackaging.org
43

Contenu connexe

Tendances

Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin C. Mattson II
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsIbrahim Al-Hudhaif
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016Rich Bellino
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...Ibrahim Al-Hudhaif
 
Jason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CVJason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CVjasonstephens
 
Introduction to the MIG TDP template
Introduction to the MIG TDP templateIntroduction to the MIG TDP template
Introduction to the MIG TDP templateDirk Ortloff
 
Creating successful R&D proposals to benefit small and medium enterprises
Creating successful R&D proposals to benefit small and medium enterprisesCreating successful R&D proposals to benefit small and medium enterprises
Creating successful R&D proposals to benefit small and medium enterprisesPMI-Montréal
 
Resume112414
Resume112414Resume112414
Resume112414Jim Cuatt
 
Arul.s.r project sales & estimation engineer
Arul.s.r project sales  & estimation engineerArul.s.r project sales  & estimation engineer
Arul.s.r project sales & estimation engineerArul Ranganathan
 
Red Marine Report (web)
Red Marine Report (web)Red Marine Report (web)
Red Marine Report (web)Joe Orrell
 
Global EPC Project Management Summit 2021
Global EPC Project Management Summit 2021Global EPC Project Management Summit 2021
Global EPC Project Management Summit 2021EPCConferenceAmsterd
 
R. Jay Gann - Resume - Project Management Leader
R. Jay Gann - Resume - Project Management LeaderR. Jay Gann - Resume - Project Management Leader
R. Jay Gann - Resume - Project Management LeaderJay Gann
 

Tendances (20)

Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015Austin_C _Mattson_II_resume_Sep_2015
Austin_C _Mattson_II_resume_Sep_2015
 
Advanced Work Packaging Overview
Advanced Work Packaging OverviewAdvanced Work Packaging Overview
Advanced Work Packaging Overview
 
LNABrochureEN
LNABrochureENLNABrochureEN
LNABrochureEN
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega Projects
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016
 
BF CV - 18th Nov16
BF CV - 18th Nov16BF CV - 18th Nov16
BF CV - 18th Nov16
 
Kevin Galvin CV
Kevin Galvin CVKevin Galvin CV
Kevin Galvin CV
 
Resume 08.01.10
Resume 08.01.10Resume 08.01.10
Resume 08.01.10
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...
 
Jason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CVJason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CV
 
Introduction to the MIG TDP template
Introduction to the MIG TDP templateIntroduction to the MIG TDP template
Introduction to the MIG TDP template
 
Creating successful R&D proposals to benefit small and medium enterprises
Creating successful R&D proposals to benefit small and medium enterprisesCreating successful R&D proposals to benefit small and medium enterprises
Creating successful R&D proposals to benefit small and medium enterprises
 
Resume112414
Resume112414Resume112414
Resume112414
 
akil R1.doc
akil R1.docakil R1.doc
akil R1.doc
 
Advanced work packaging Project Controls Process
Advanced work packaging Project Controls ProcessAdvanced work packaging Project Controls Process
Advanced work packaging Project Controls Process
 
Arul.s.r project sales & estimation engineer
Arul.s.r project sales  & estimation engineerArul.s.r project sales  & estimation engineer
Arul.s.r project sales & estimation engineer
 
Red Marine Report (web)
Red Marine Report (web)Red Marine Report (web)
Red Marine Report (web)
 
Global EPC Project Management Summit 2021
Global EPC Project Management Summit 2021Global EPC Project Management Summit 2021
Global EPC Project Management Summit 2021
 
Career_Skill_Set_Summary
Career_Skill_Set_SummaryCareer_Skill_Set_Summary
Career_Skill_Set_Summary
 
R. Jay Gann - Resume - Project Management Leader
R. Jay Gann - Resume - Project Management LeaderR. Jay Gann - Resume - Project Management Leader
R. Jay Gann - Resume - Project Management Leader
 

En vedette

Alimentazione americana e Mc donald' s Vittoria Tomas
Alimentazione americana e Mc donald' s Vittoria TomasAlimentazione americana e Mc donald' s Vittoria Tomas
Alimentazione americana e Mc donald' s Vittoria TomasAntonietta Palmieri
 
Grafico diario del dax perfomance index para el 11 12-2013
Grafico diario del dax perfomance index para el 11 12-2013Grafico diario del dax perfomance index para el 11 12-2013
Grafico diario del dax perfomance index para el 11 12-2013Experiencia Trading
 
獅子山下女同志
獅子山下女同志獅子山下女同志
獅子山下女同志lalacamp07
 
Grafico diario del dax perfomance index para el 09 07-2012
Grafico diario del dax perfomance index para el 09 07-2012Grafico diario del dax perfomance index para el 09 07-2012
Grafico diario del dax perfomance index para el 09 07-2012Experiencia Trading
 
Scientix 11th SPNE Brussels 18 Mar 2016: Amigo
Scientix 11th SPNE Brussels 18 Mar 2016: AmigoScientix 11th SPNE Brussels 18 Mar 2016: Amigo
Scientix 11th SPNE Brussels 18 Mar 2016: AmigoBrussels, Belgium
 
Tick Achieve - How To Get Stuff Done
Tick Achieve - How To Get Stuff DoneTick Achieve - How To Get Stuff Done
Tick Achieve - How To Get Stuff DoneKevin Duncan
 
3 d pie chart circular puzzle with hole in center pieces 7 stages style 4 pow...
3 d pie chart circular puzzle with hole in center pieces 7 stages style 4 pow...3 d pie chart circular puzzle with hole in center pieces 7 stages style 4 pow...
3 d pie chart circular puzzle with hole in center pieces 7 stages style 4 pow...SlideTeam.net
 
Sharing data from clinical and medical research
Sharing data from clinical and medical researchSharing data from clinical and medical research
Sharing data from clinical and medical researchChristoph Steinbeck
 
Система Постройком
Система ПостройкомСистема Постройком
Система Постройкомkulibin
 
Ready Player One - Week 2 Check-in
Ready Player One - Week 2 Check-inReady Player One - Week 2 Check-in
Ready Player One - Week 2 Check-incenter4edupunx
 

En vedette (19)

Interview with Olfa Hamdi - PM World Journal July 2016
Interview with Olfa Hamdi - PM World Journal July 2016Interview with Olfa Hamdi - PM World Journal July 2016
Interview with Olfa Hamdi - PM World Journal July 2016
 
1. cronograma 2014
1. cronograma 20141. cronograma 2014
1. cronograma 2014
 
Alimentazione americana e Mc donald' s Vittoria Tomas
Alimentazione americana e Mc donald' s Vittoria TomasAlimentazione americana e Mc donald' s Vittoria Tomas
Alimentazione americana e Mc donald' s Vittoria Tomas
 
「旅のことば」について
「旅のことば」について「旅のことば」について
「旅のことば」について
 
Grafico diario del dax perfomance index para el 11 12-2013
Grafico diario del dax perfomance index para el 11 12-2013Grafico diario del dax perfomance index para el 11 12-2013
Grafico diario del dax perfomance index para el 11 12-2013
 
獅子山下女同志
獅子山下女同志獅子山下女同志
獅子山下女同志
 
Grafico diario del dax perfomance index para el 09 07-2012
Grafico diario del dax perfomance index para el 09 07-2012Grafico diario del dax perfomance index para el 09 07-2012
Grafico diario del dax perfomance index para el 09 07-2012
 
Scientix 11th SPNE Brussels 18 Mar 2016: Amigo
Scientix 11th SPNE Brussels 18 Mar 2016: AmigoScientix 11th SPNE Brussels 18 Mar 2016: Amigo
Scientix 11th SPNE Brussels 18 Mar 2016: Amigo
 
Brochure about Stanford Corporate Governance Research Initiative
Brochure about Stanford Corporate Governance Research InitiativeBrochure about Stanford Corporate Governance Research Initiative
Brochure about Stanford Corporate Governance Research Initiative
 
LinkedIn Endorsements
LinkedIn EndorsementsLinkedIn Endorsements
LinkedIn Endorsements
 
Alat ukur
Alat ukurAlat ukur
Alat ukur
 
Tick Achieve - How To Get Stuff Done
Tick Achieve - How To Get Stuff DoneTick Achieve - How To Get Stuff Done
Tick Achieve - How To Get Stuff Done
 
3 d pie chart circular puzzle with hole in center pieces 7 stages style 4 pow...
3 d pie chart circular puzzle with hole in center pieces 7 stages style 4 pow...3 d pie chart circular puzzle with hole in center pieces 7 stages style 4 pow...
3 d pie chart circular puzzle with hole in center pieces 7 stages style 4 pow...
 
Sharing data from clinical and medical research
Sharing data from clinical and medical researchSharing data from clinical and medical research
Sharing data from clinical and medical research
 
Система Постройком
Система ПостройкомСистема Постройком
Система Постройком
 
Duke
DukeDuke
Duke
 
Sailor moon
Sailor moonSailor moon
Sailor moon
 
Artikel FI
Artikel FIArtikel FI
Artikel FI
 
Ready Player One - Week 2 Check-in
Ready Player One - Week 2 Check-inReady Player One - Week 2 Check-in
Ready Player One - Week 2 Check-in
 

Similaire à New Framework for Successful Construction Project Delivery

The Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project SuccessThe Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project SuccessIRJET Journal
 
Enaam Alum cv (2019)
Enaam Alum cv (2019)Enaam Alum cv (2019)
Enaam Alum cv (2019)EnaamAlum
 
Front-End Loading in the Oil and Gas Industry
Front-End Loading in the Oil and Gas IndustryFront-End Loading in the Oil and Gas Industry
Front-End Loading in the Oil and Gas IndustryDavid Pires
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers
 
M6 Toll Road Construction
M6 Toll Road ConstructionM6 Toll Road Construction
M6 Toll Road ConstructionHeidi Owens
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project managementIRJET Journal
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Aconex
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Gregoire Lesecq
 
Infosys - Aerospace Global Engineering & Modular Sourcing | Supplier Management
Infosys - Aerospace Global Engineering & Modular Sourcing | Supplier ManagementInfosys - Aerospace Global Engineering & Modular Sourcing | Supplier Management
Infosys - Aerospace Global Engineering & Modular Sourcing | Supplier ManagementInfosys
 
Building a Compelling Business Case for Continuous Delivery
Building a Compelling Business Case for Continuous DeliveryBuilding a Compelling Business Case for Continuous Delivery
Building a Compelling Business Case for Continuous DeliveryXebiaLabs
 
Fundamentals of value engineering
Fundamentals of value engineering Fundamentals of value engineering
Fundamentals of value engineering Karim Ragab
 

Similaire à New Framework for Successful Construction Project Delivery (20)

Amit_Kumar
Amit_KumarAmit_Kumar
Amit_Kumar
 
Mission Bo Kv3
Mission Bo Kv3Mission Bo Kv3
Mission Bo Kv3
 
Dawn Thompson
Dawn ThompsonDawn Thompson
Dawn Thompson
 
The Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project SuccessThe Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project Success
 
Kannan PEM
Kannan PEMKannan PEM
Kannan PEM
 
Enaam Alum cv (2019)
Enaam Alum cv (2019)Enaam Alum cv (2019)
Enaam Alum cv (2019)
 
Front-End Loading in the Oil and Gas Industry
Front-End Loading in the Oil and Gas IndustryFront-End Loading in the Oil and Gas Industry
Front-End Loading in the Oil and Gas Industry
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 
M6 Toll Road Construction
M6 Toll Road ConstructionM6 Toll Road Construction
M6 Toll Road Construction
 
10_PFCRoundup
10_PFCRoundup10_PFCRoundup
10_PFCRoundup
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project management
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
 
Creative Overview
Creative OverviewCreative Overview
Creative Overview
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016
 
India capability web
India capability webIndia capability web
India capability web
 
Predicting the future - increasing success
Predicting the future - increasing successPredicting the future - increasing success
Predicting the future - increasing success
 
Infosys - Aerospace Global Engineering & Modular Sourcing | Supplier Management
Infosys - Aerospace Global Engineering & Modular Sourcing | Supplier ManagementInfosys - Aerospace Global Engineering & Modular Sourcing | Supplier Management
Infosys - Aerospace Global Engineering & Modular Sourcing | Supplier Management
 
Building a Compelling Business Case for Continuous Delivery
Building a Compelling Business Case for Continuous DeliveryBuilding a Compelling Business Case for Continuous Delivery
Building a Compelling Business Case for Continuous Delivery
 
Fundamentals of value engineering
Fundamentals of value engineering Fundamentals of value engineering
Fundamentals of value engineering
 

Dernier

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Dernier (20)

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

New Framework for Successful Construction Project Delivery

  • 1. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Advanced Work Packaging (AWP) Achieving Higher Project Productivity And Predictability 1
  • 2. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Today’s talking points 2 • The Construction Industry Productivity Dilemma • Elements of a Successful Project Delivery • Advanced Work Packaging (AWP) ² Structure ² Deliverables ² Practice Model Ø A vision for our Industry
  • 3. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Note about the webinar • I hope this webinar provides you with new elements of discussion that you may use to re-think and re-assess your organizations project delivery maturity and identify areas of improvements • Although the primary research focus is on industrial construction, many elements of this presentation could very well be applied to other conventional construction sectors 3
  • 4. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Let's get started... 4
  • 5. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute How productive is our industry? 5 A percentage point increase in productivity is worth $7 billion to the industry as a whole. The industry is leaving big money on the table!
  • 6. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute A Labor-Intensive Business... 6 Facing an increasingly challenging global market, the construction industry has remained a labor-intensive business, struggling to achieve higher capital effectiveness. • Increased TechnicalComplexity • Remote GeographicalLocations • increasingly congested areas • More Stringent Regulatory Requirements • Higher Political Risk; more difficult to insure • Shortage in skilled labor • Workforce availability • Unbalanced supply and demand in terms of engineering,procurement and project managementservices • Unstable commodity pricing
  • 7. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute What are we trying to do to cut costs? 7 Gorgon Project, Australia (source: Chevron.com)
  • 8. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute More so than ever, Business and Projects/Engineering concerns are aligned • Many of these factors are out of control of individual companies and project teams. It is, therefore, more compelling to enhance one's project delivery effectiveness through executing projects the "right way" • That encompasses mastering project and business risk identification, sharing and management within a project delivery system capable of delivering the promised business value, in a predictable fashion 8
  • 9. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Doing the right projects... AND doing projects right! 9
  • 10. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute 10 How to deliver profitable capital projects? Field Labor Productivity Engineering Quality & Timeliness Procurement Quality & Effectiveness Doing the right project Alignment of Business Case, Scope and Project Objectives Contracting Strategies In Line with Stakeholders Capabilities Strong Project Management Capabilities Reliable Constructability Strategy Cost Schedule Safety Operability Project’s Economic Output Exhibit 1 © www.workpackaging.org,2016
  • 11. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute 11 I - Project Outcomes Field Labor Productivity Engineering Quality & Timeliness Procurement Quality & Effectiveness Doing the right project Alignment of Business Case, Scope and Project Objectives Contracting Strategies In Line with Stakeholders Capabilities Strong Project Management Capabilities Reliable Constructability Strategy Cost Schedule Safety Operability Project’s Economic Output Exhibit 1. a © www.workpackaging.org,2016
  • 12. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute 12 II - Project Critical Conditions Field Labor Productivity Engineering Quality & Timeliness Procurement Quality & Effectiveness Doing the right project Alignment of Business Case, Scope and Project Objectives Contracting Strategies In Line with Stakeholders Capabilities Strong Project Management Capabilities Reliable Constructability Strategy Cost Schedule Safety Operability Project’s Economic Output Exhibit 1. b © www.workpackaging.org,2016
  • 13. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute 13 III - Project Execution Success Indicators Field Labor Productivity Engineering Quality & Timeliness Procurement Quality & Effectiveness Doing the right project Alignment of Business Case, Scope and Project Objectives Contracting Strategies In Line with Stakeholders Capabilities Strong Project Management Capabilities Reliable Constructability Strategy Cost Schedule Safety Operability Project’s Economic Output Exhibit 1. c © www.workpackaging.org,2016
  • 14. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute 14 Delivering profitable capital projects requires thinking with the end in mind Field Labor Productivity Engineering Quality & Timeliness Procurement Quality & Effectiveness Doing the right project Alignment of Business Case, Scope and Project Objectives Contracting Strategies In Line with Stakeholders Capabilities Strong Project Management Capabilities Reliable Constructability Strategy Cost Schedule Safety Operability Project’s Economic Output Exhibit 1 © www.workpackaging.org,2016
  • 15. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Reliable and effective constructability strategy Definition: Constructability Reviews (CR) are “ the optimum use of construction knowledge in planning, design, procurement, and field operations to achieve overall project objectives". (CII) A Constructability Review (CR) constitutes an analysis of the plant design (usually performed by experienced construction, maintenance, & operations personnel) intended to reduce costs, save time, ensure quality and safety, as well as enhance the management of risk in the construction phase, during plant operation, and during subsequent maintenance of the facility. 15
  • 16. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute How effective is your company's CR process? q Do you start you CR early in definition? (timing) q Do you have multiple CR sessions throughout the definition phase? (frequency) q Does your primary Construction Manager (CM) participate in the review? Will you have a new CM at execution? (continuity of strategy ownership and accountability) q Do you document your CR? (traceability) q Do you provide enough information as input to your CR (such as models, site reviews, technology considerations)? (quality) q Do you use corporate project knowledge in your CR? (lessons learned & continuous improvement) q How involved is your project sponsor in the CR? (alignment with business) 16
  • 17. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute 17 Field Labor ProductivityEngineering Quality & Timeliness Procurement Quality & Effectiveness Doing the right project Alignment of Business Case, Scope and Project Objectives Contracting Strategies In Line with Stakeholders Capabilities Strong Project Management Capabilities Reliable Constructability Strategy Cost Schedule Safety Operability Project’s Economic Output
  • 18. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute The Mortar Concept© (MC Concept) 18 © www.workpackaging.org,2016 MC
  • 19. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Linking Together Project Delivery Components: " The Mortar Concept© " • To enable the holistic effectiveness of all these project delivery components, a project needs to operate within a framework capable of ensuring both the right timing and the optimum quality of information used • This framework is defined based on two structural features: 1. It needs to support timeliness of decisions through a Project Decision Support System (PDSS©) 2. It needs to ensure accurate project information flow through a workable Project Information Flow Protocol (PIFP©) 19 © Hamdi, The Mortar Concept in Project Management, 2015
  • 20. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute 20 Linking Project Delivery Components " The Mortar Concept© "
  • 21. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute 21 Linking Project Delivery Components " The Mortar Concept© "
  • 22. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Advanced Work Packaging (AWP) 22
  • 23. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Research & Development History • 4 Year Academia-Industry Research Collaboration (RT272) • Industry Implementation Resource – 3 volumes • First Academic Publication on AWP from The University of Texas at Austin • Implementation case studies & Validation 23
  • 24. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Advanced Work Packaging (AWP) is a project delivery system that emphasizes construction as a primary planning driver 24
  • 25. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute What is Advanced Work Packaging (AWP)? “Advanced Work Packaging (AWP) is a work process framework fundamentally based on the idea of thinking with the end in mind. It is designed to allow engineering planning be driven by construction sequencing. Simply put, this is achieved by breaking down the project scope into Construction Work Packages that are fed with Engineering Work Packages.” 25
  • 26. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute How is that achieved? 1. Extending PEPs to the front-end planning phase; "bringing the field to the office" 2. A focus on field work packages/installation work packages as project information units 3. Work packaging structure becomes the skeleton of the project; a workface planner is dedicated to the management of these packages 4. The benefit of a common intuitive project language and tools 26
  • 27. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute A quick look at the boundaries defining each of the Advanced Work Packaging (AWP) system deliverables Key Deliverables: CWP- Construction Work Packages IWP- Installation Work Packages EWP- Engineering Work Packages 27
  • 28. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Overall Project Exhibit of CII/COAA RT.272 28
  • 29. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Construction Work Package (CWP) Boundary Exhibit of CII/COAA RT.272 29
  • 30. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Engineering Work Package (EWP) boundary Exhibit of CII/COAA RT.272 30
  • 31. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Installation Work Package (IWP) boundary Exhibit of CII/COAA RT.272 31
  • 32. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Inside a CWP CWP Content • Scope description and constructability strategy • Safety Requirements • Various EWPs (at least one) • Schedule Requirements • Budget (labor hours/cost/plannedproductivity rate) • Quality Requirements • Special Resource Requirements (tools, equipments etc.) CWP Features • In line with the overall construction plan • Typically aligned with a bid package / multiple CWPs may form one larger bid package • In alignment with project controls • Measurable • As independent as possible 32
  • 33. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Inside an EWP EWP Content • Scope of work with equipment list • Drawings (e.g. general arrangement and equipment installation) • Installation and material specifications • Vendor data • Bill of materials • Additional needed information such as permitting studies, geotechnicalstudies etc. • Connection Points Considerations EWP Features • Release plan should be aligned with the construction sequence and priorities • Content should satisfy various stakeholders requirements • Planning of EWPs requires construction input!! • EWPs are discipline and area- driven; connections points expected • Interface management should be accounted for 33
  • 34. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Inside an IWP IWP Content • Scope of Work • Safety Requirements • QA/QC Requirements • Trade Coordination • Material Take Offs & Locations • Model Shots, Drawings and All Other Necessary Engineering Information • Scaffold Requirements • IWP Constraints • Any Other Information Required to Install the Work IWP Features • Reviewed and approved by the supervisory team 34
  • 35. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute AWP Recommended Practice Model 35
  • 36. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute An Industry Momentum • Multiple case studies of industrial projects (IR272-2 v3) reported the achieved benefits of: – 25% productivity improvement – 10% decrease in total installed cost • Documented the following benefits resulting from AWP implementation: – Greater schedule & cost predictability – Improved safety performance – Reduced engineering rework – Improved quality & stakeholder alignment – Improved contractor profitability – Increased supervision time in the field • Performance/maturity matrix established 36
  • 37. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute ENR talking about AWP 37
  • 38. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Call for action Advanced Work Packaging (AWP) constitutes a major competitive advantage for companies that go through the process of assessing and improving the maturity and effectiveness of their own project delivery capabilities. 38
  • 39. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute O.H.'s AWP Implementation Roadmap - Level 1 39 Update corporate program Implement AWP Plan AWP implementation Obtain AWP capabilities Establish corporate AWP program Assess current project delivery system effectiveness Commit to implementing AWP © Olfa Hamdi, 2015
  • 40. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute O.H. Vision for AWP and the construction industry • AWP is currently a strong experience based model; theoretical validation pending • Aiming for an industry-wide protocol; project information mapping is a first step but it should be executed in parallel to other industry- wide efforts • The AWP system requires further design – Mostly a human-powered decision making system – Spatial representation of projects needs to be integrated with business decisions – More to do in terms of quantification, storage, communication of information – Integration and interoperability are key • We are still far from automation but we are heading in the right direction – Our industry needs to learn from other sectors and experiences – We need to capitalize on those successful implementations cases – We need to bring in the best talents from the IT sector to revolutionize our industry 40
  • 41. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute "We do well bricks... It's high time we tackle the mortar" 41
  • 42. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute From Project Management to Project Leadership 42
  • 43. An Introduction To A New Framework For Successful Construction Project Delivery Olfa Hamdi, MSc Eng, MSc Res Founder, The Advanced Work Packaging Institute Thank You! Contact: Olfa Hamdi The Advanced Work Packaging Institute 268 Bush Street #2926, San Francisco, CA, 94104 www.workpackaging.org Email: ohamdi@workpackaging.org 43