SlideShare une entreprise Scribd logo
1  sur  12
Télécharger pour lire hors ligne
© Siemens AG 2018
September 2018Page 1 siemens.com
How to Implement Intelligent Tender
Documents Screening Portal to Improve
Project Proposal Processes
siemens.comUnrestricted © Siemens AG 2018
© Siemens AG 2018
September 2018Page 2 siemens.com
How to Implement Intelligent Tender Documents Screening
Portal to Improve Project Proposal Processes
• Siemens – strong partner for project solutions
around the world
• Tender Documents Screening – the idea behind
• AI in tender document screening
• Use cases that will be addressed to improve
proposal preparation processes
• Lessons learned and benefits for large project
proposal work
© Siemens AG 2018
September 2018Page 3 siemens.com
With its timetable
change in mid-
December 2017,
Deutsche Bahn
AG introduced the
ICE 4 from
Siemens into
regular service.
The fleet will grow
to nine trains by
the summer of
2018. Siemens
will deliver a total
of 119 trains by
2023. Of these,
100 will be in a
twelve-car
configuration and
19 in a seven-car
configuration.
Siemens –
A strong partner for project solutions around the world
Siemens is
building a shore
power supply
system for so-
called ro-ro (roll-
on/roll-off) ships
in Cuxhaven,
Germany. The
system eliminates
the need to
combust ship fuels
for generating
electricity during
lay time – one of
the main causes
of air pollution in
ports.
Siemens is
supplying
transformers for
a HVDC link
between
England and
France. The link
will transmit
power efficiently
between the two
countries,
supplying up to
three million
homes with
electricity.
Siemens will
complete the
project by mid-
2019.
Siemens is
working with
Dutch railway
station operator
NS Stations to
equip 47 railway
stations in the
Netherlands with
a user-friendly
and secure self-
service bicycle
parking solution.
The bike parking
facilities will be
available for
privately owned
as well as rental
bikes.
Siemens has
received an order
from its customer
Nizhnekamsknef-
tekhim for the
turnkey
construction of a
combined cycle
power plant in
Tatarstan. As
general
contractor,
Siemens will
partner with a
Turkish company
to build the 495-
megawatt
combined cycle
power plant on a
turnkey basis.
Siemens is
planning and
installing twelve
microgrids for
the Brazilian
utility Centrais
Elétricas do
Pará. The
microgrids will be
built in power
generation plants
in the state of
Pará. The two
power plants that
are furthest apart
are located 890
kilometers from
one another.
The first new
light-rail vehicle
from Siemens is
now being
deployed for
passenger service
in San
Francisco. The
new vehicles are
being built at the
Siemens plant in
Sacramento,
California. The
company will
deliver a total of
219 vehicles.
This is Siemens’
largest order to
date for light rail
vehicles in the
U.S.
Siemens is
supplying the
electrical
equipment for a
new conveyor
system in an
underground
copper mine in
Mongolia. The
system, which will
expand the
existing open-pit
mining facility, is
expected to bring
95,000 tons of
copper ore to the
surface per day.
Siemens has
received an order
from Pakistan for
a complete
power island for
the new combined
cycle Punjab
Power Plant
Jhang. To be
operated with
liquid natural gas
(LNG), the plant is
being constructed
250 kilometers
southwest of
Lahore and will
have a power-
generating
capacity of 1.3
gigawatts.
Siemens is
building a fully
automated
people mover for
Suvarnabhumi
Airport in
Bangkok. The
train system is to
connect the
existing terminal
with a new
satellite terminal.
Siemens is to
deliver a total of
six two-car trains.
Plans call for the
project to be
commissioned in
2020.
Selected project examples
© Siemens AG 2018
September 2018Page 4 siemens.com
Project Business is a very strong piece of the Siemens’ DNA
and of our portfolio .
1870 2018 2020 …
~48%
Project
Business
~35%
Service
Business
~17%
Product
Business
Order backlog
Industrial
Business
Source: PM@Siemens
© Siemens AG 2018
September 2018Page 5 siemens.com
Project Business is a very strong piece of the Siemens’ DNA
and of our portfolio .
1870 2018 2020 …
~48%
Project
Business
~35%
Service
Business
~17%
Product
Business
Order backlog
Industrial
Business
Source: PM@Siemens
© Siemens AG 2018
September 2018Page 6 siemens.com
Tender Screening Solutions to address challenges of large
project proposal work
riskDNA1) – Method for early and systematic risk Detection and Awareness
Challenge Project business's dilemma Tender Screening Solution
• Digitalization of especially
proposal processes is
key to be fast
• Usability of commercial
tools for text analysis
does not fit project business
needs
• Data quality and availability
are often not sufficient for
automatic artificial
intelligence approaches
• Customization of state-of-
the-art text search
functionality for project
business is often not
affordable for single
business organizations
• To be aware of risks and opportunities is prerequisite
to be able to act
• Requirements are often hidden in huge specifications –
and analyzing large amounts of text can be tricky
and is very time-consuming
• Fast and comprehensive requirements evaluation at the beginning
of proposal projects is hard to achieve due to "specification-bergs"
• Advanced text analysis
functionality on a secure
server enables efficient
analysis of large
specifications
• Systematic reuse of digita-
lized expert intelligence,
knowledge and lessons
learned avoids repetition of
failures
• riskDNA1) services comprise
software access including
process consulting to
ensure most beneficial use
Show
stoppers "Specification"
Terms and
conditions
Laws and
standards
Technical
requirements
Risks and
opportunities
1) riskDNA – our tender screening solution
© Siemens AG 2018
September 2018Page 7 siemens.com
riskDNA drives digitalization where it matters:
In daily project business
Basic principle of dictionary-based screening for best assignment of right content to relevant experts
ScreeningInput Results
Specifications,
contracts, …
(PDF files or
CSV Tables)
Project business
knowledge and
expertise
Advanced text
analysis and search
engine on a secure
server
Classified Requirements
for requirements
management
Summary
with overview and business
specific file assignment
information
Marked-up PDF files
with dictionary-based
business-specific book-
marks and indices
PDF
CSV
© Siemens AG 2018
September 2018Page 8 siemens.com
The screened PDF files contain content-related mark-ups,
screening bookmarks and indexes for efficient text evaluation
Screenshot from PDF bookmarks and content-related marked-up text after file screening
Original PDF specification with mark-ups
according to business-specific search criteria
Content-related bookmarks including
pages without machine-readable text
and indexes at the end of each document
Text screening can be linguistic tolerant.
Types of search criteria 1) can be
• Buzzwords and phrases
• Combination of words within the same sentence
• Text patterns for unknown content (e.g. "values below 1%")
• Combinations thereof
For high usability of results search criteria can also be enriched by
semantic information, e.g. optional and/or excluded text as well as
page context data
© Siemens AG 2018
September 2018Page 9 siemens.com
Within riskDNA method several typical elements are included
that are also base for AI technology
Overview of AI elements used within tender document handling
ScreeningInput Results
Specifications,
contracts, …
(PDF files or
CSV Tables)
Project business
knowledge and
expertise
Advanced text
analysis and search
engine on a secure
server
Classified Requirements
for requirements
management
Summary
with overview and business
specific file assignment
information
Marked-up PDF files
with dictionary-based
business-specific book-
marks and indices
PDF
CSV
Natural Language
Processing (NLP)
Knowledge
modeling
Knowledge
representation
Processing of
unstructured data
Semi-automatic
supervised learning
It is not:
Machine learning
Semantic recognition
Requirements
recognition
Requirements
classification
Content
visualization
© Siemens AG 2018
September 2018Page 10 siemens.com
Several use cases can be addressed to improve proposal
preparation processes
 Short proposal preparation
times are key elements for
sales phases to act like
customers want and to
outperform competitors
 To be able to produce high
speed proposals shows high
responsiveness and therefore
showcasing interaction quality
and speed
 Comparison of the amount of
Siemens wording and the
corresponding competitor
wording indicates most wanted
contractor of customer
 To be able to estimate the most
wanted contractor of the
customer is a popular indicator
to estimate hit-rates in order to
stop proposal preparation right
on time or to start
countermeasures addressing /
influencing the customer
immediately
 Showstopper and high risk
topics have to be identified
extremely early in the proposal
phase in order to stop proposal
preparation or to start actions
immediately
 To be aware of risks and
opportunities is prerequisite
to be able to act
 Requirements are often hidden
in huge specifications – and
analyzing large amounts of text
can be tricky and is very time-
consuming
 Fast and comprehensive
requirements apportionment
and at the beginning of
proposal preparation especially
for large RfQ documents
(thousand pages) is hard to
achieve due to huge
"specification-bergs“
 To be able to apportion
thousands of requirements /
chapters / pages / documents
to the right expert in a short
timeframe
Amount of "Competitor wording“ vs
Siemens wording
Is there a „Showstopper“ for us
integrated in the RfQ
Fast assignment of tender content
and requirements to right experts
Speed-Up of proposal preparation
Selected typical questions to be answered during proposal preparation
© Siemens AG 2018
September 2018Page 11 siemens.com
… used by Siemens on a
worldwide basis
Our success story
Proposal preparation
processes using
intelligent tender
documents screening
speeded up
by ~300% …
© Siemens AG 2018
September 2018Page 12 siemens.com
Siemens Consulting –
Project Business Consulting
Sten Wery
Siemens AG
Siemens Consulting
Project Business Consulting
Mobile: +49 (174) 15 50 96 0
E-mail: sten.wery@siemens.com

Contenu connexe

Similaire à 2018 09-27 cba 2018 - siemens - tender screening - wery

Open Source and the New Economics of IT - Ingres CIO Doug Harr
Open Source and the New Economics of IT - Ingres CIO Doug HarrOpen Source and the New Economics of IT - Ingres CIO Doug Harr
Open Source and the New Economics of IT - Ingres CIO Doug HarrAlfresco Software
 
Ideagen Content Overview
Ideagen Content OverviewIdeagen Content Overview
Ideagen Content Overviewdarren_s
 
[DSC Europe 23] Djordje Grozdic - Transforming Business Process Automation wi...
[DSC Europe 23] Djordje Grozdic - Transforming Business Process Automation wi...[DSC Europe 23] Djordje Grozdic - Transforming Business Process Automation wi...
[DSC Europe 23] Djordje Grozdic - Transforming Business Process Automation wi...DataScienceConferenc1
 
Serverless Design Patterns for Rethinking Traditional Enterprise Application ...
Serverless Design Patterns for Rethinking Traditional Enterprise Application ...Serverless Design Patterns for Rethinking Traditional Enterprise Application ...
Serverless Design Patterns for Rethinking Traditional Enterprise Application ...Amazon Web Services
 
Mythbusting the Federal Cloud Journey
Mythbusting the Federal Cloud JourneyMythbusting the Federal Cloud Journey
Mythbusting the Federal Cloud JourneyAmazon Web Services
 
Gen AI Cognizant & AWS event presentation_12 Oct.pdf
Gen AI Cognizant & AWS event presentation_12 Oct.pdfGen AI Cognizant & AWS event presentation_12 Oct.pdf
Gen AI Cognizant & AWS event presentation_12 Oct.pdfPhilipBasford
 
Confluent Partner Tech Talk with QLIK
Confluent Partner Tech Talk with QLIKConfluent Partner Tech Talk with QLIK
Confluent Partner Tech Talk with QLIKconfluent
 
2014 12-16 biwug - cgi SharePoint Factory Framework
2014 12-16 biwug - cgi SharePoint Factory Framework2014 12-16 biwug - cgi SharePoint Factory Framework
2014 12-16 biwug - cgi SharePoint Factory FrameworkBIWUG
 
First Tech: From bricks and mortar to cloud first api driven banking
First Tech: From bricks and mortar to cloud first api driven bankingFirst Tech: From bricks and mortar to cloud first api driven banking
First Tech: From bricks and mortar to cloud first api driven bankingDynatrace
 
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)SINTAS
 
cloud economics - Toronto FSI Symposium - October 2016
cloud economics - Toronto FSI Symposium - October 2016cloud economics - Toronto FSI Symposium - October 2016
cloud economics - Toronto FSI Symposium - October 2016Amazon Web Services
 
[AIIM18] Automation and Integration (Not Rip and Replace) - Stephen Ludlow
[AIIM18] Automation and Integration (Not Rip and Replace) - Stephen Ludlow[AIIM18] Automation and Integration (Not Rip and Replace) - Stephen Ludlow
[AIIM18] Automation and Integration (Not Rip and Replace) - Stephen LudlowAIIM International
 
Wp a-break-in-the-clouds
Wp a-break-in-the-cloudsWp a-break-in-the-clouds
Wp a-break-in-the-cloudsMohsen Tayefeh
 
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...MuleSoft
 
Ανδρέας Τσαγκάρης, 7th Digital Banking Forum
Ανδρέας Τσαγκάρης, 7th Digital Banking ForumΑνδρέας Τσαγκάρης, 7th Digital Banking Forum
Ανδρέας Τσαγκάρης, 7th Digital Banking ForumStarttech Ventures
 
Adrian Smith CV - 20151113
Adrian Smith CV - 20151113Adrian Smith CV - 20151113
Adrian Smith CV - 20151113Adrian Smith
 

Similaire à 2018 09-27 cba 2018 - siemens - tender screening - wery (20)

Open Source and the New Economics of IT - Ingres CIO Doug Harr
Open Source and the New Economics of IT - Ingres CIO Doug HarrOpen Source and the New Economics of IT - Ingres CIO Doug Harr
Open Source and the New Economics of IT - Ingres CIO Doug Harr
 
Ideagen Content Overview
Ideagen Content OverviewIdeagen Content Overview
Ideagen Content Overview
 
[DSC Europe 23] Djordje Grozdic - Transforming Business Process Automation wi...
[DSC Europe 23] Djordje Grozdic - Transforming Business Process Automation wi...[DSC Europe 23] Djordje Grozdic - Transforming Business Process Automation wi...
[DSC Europe 23] Djordje Grozdic - Transforming Business Process Automation wi...
 
Serverless Design Patterns for Rethinking Traditional Enterprise Application ...
Serverless Design Patterns for Rethinking Traditional Enterprise Application ...Serverless Design Patterns for Rethinking Traditional Enterprise Application ...
Serverless Design Patterns for Rethinking Traditional Enterprise Application ...
 
Mythbusting the Federal Cloud Journey
Mythbusting the Federal Cloud JourneyMythbusting the Federal Cloud Journey
Mythbusting the Federal Cloud Journey
 
Showcase slide
Showcase slideShowcase slide
Showcase slide
 
Meetup Spark UDF performance
Meetup Spark UDF performanceMeetup Spark UDF performance
Meetup Spark UDF performance
 
Gen AI Cognizant & AWS event presentation_12 Oct.pdf
Gen AI Cognizant & AWS event presentation_12 Oct.pdfGen AI Cognizant & AWS event presentation_12 Oct.pdf
Gen AI Cognizant & AWS event presentation_12 Oct.pdf
 
FON Jan 2015 23
FON Jan 2015 23FON Jan 2015 23
FON Jan 2015 23
 
Confluent Partner Tech Talk with QLIK
Confluent Partner Tech Talk with QLIKConfluent Partner Tech Talk with QLIK
Confluent Partner Tech Talk with QLIK
 
2014 12-16 biwug - cgi SharePoint Factory Framework
2014 12-16 biwug - cgi SharePoint Factory Framework2014 12-16 biwug - cgi SharePoint Factory Framework
2014 12-16 biwug - cgi SharePoint Factory Framework
 
First Tech: From bricks and mortar to cloud first api driven banking
First Tech: From bricks and mortar to cloud first api driven bankingFirst Tech: From bricks and mortar to cloud first api driven banking
First Tech: From bricks and mortar to cloud first api driven banking
 
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
 
cloud economics - Toronto FSI Symposium - October 2016
cloud economics - Toronto FSI Symposium - October 2016cloud economics - Toronto FSI Symposium - October 2016
cloud economics - Toronto FSI Symposium - October 2016
 
Arocom - Projects and Resource Portfolio.pdf
Arocom - Projects and Resource Portfolio.pdfArocom - Projects and Resource Portfolio.pdf
Arocom - Projects and Resource Portfolio.pdf
 
[AIIM18] Automation and Integration (Not Rip and Replace) - Stephen Ludlow
[AIIM18] Automation and Integration (Not Rip and Replace) - Stephen Ludlow[AIIM18] Automation and Integration (Not Rip and Replace) - Stephen Ludlow
[AIIM18] Automation and Integration (Not Rip and Replace) - Stephen Ludlow
 
Wp a-break-in-the-clouds
Wp a-break-in-the-cloudsWp a-break-in-the-clouds
Wp a-break-in-the-clouds
 
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...
 
Ανδρέας Τσαγκάρης, 7th Digital Banking Forum
Ανδρέας Τσαγκάρης, 7th Digital Banking ForumΑνδρέας Τσαγκάρης, 7th Digital Banking Forum
Ανδρέας Τσαγκάρης, 7th Digital Banking Forum
 
Adrian Smith CV - 20151113
Adrian Smith CV - 20151113Adrian Smith CV - 20151113
Adrian Smith CV - 20151113
 

Dernier

Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance managementVaishnaviGunji
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareWorkforce Group
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challengeshemanthkumar470700
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdflaloo_007
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfDerekIwanaka1
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannaBusinessPlans
 

Dernier (20)

Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 

2018 09-27 cba 2018 - siemens - tender screening - wery

  • 1. © Siemens AG 2018 September 2018Page 1 siemens.com How to Implement Intelligent Tender Documents Screening Portal to Improve Project Proposal Processes siemens.comUnrestricted © Siemens AG 2018
  • 2. © Siemens AG 2018 September 2018Page 2 siemens.com How to Implement Intelligent Tender Documents Screening Portal to Improve Project Proposal Processes • Siemens – strong partner for project solutions around the world • Tender Documents Screening – the idea behind • AI in tender document screening • Use cases that will be addressed to improve proposal preparation processes • Lessons learned and benefits for large project proposal work
  • 3. © Siemens AG 2018 September 2018Page 3 siemens.com With its timetable change in mid- December 2017, Deutsche Bahn AG introduced the ICE 4 from Siemens into regular service. The fleet will grow to nine trains by the summer of 2018. Siemens will deliver a total of 119 trains by 2023. Of these, 100 will be in a twelve-car configuration and 19 in a seven-car configuration. Siemens – A strong partner for project solutions around the world Siemens is building a shore power supply system for so- called ro-ro (roll- on/roll-off) ships in Cuxhaven, Germany. The system eliminates the need to combust ship fuels for generating electricity during lay time – one of the main causes of air pollution in ports. Siemens is supplying transformers for a HVDC link between England and France. The link will transmit power efficiently between the two countries, supplying up to three million homes with electricity. Siemens will complete the project by mid- 2019. Siemens is working with Dutch railway station operator NS Stations to equip 47 railway stations in the Netherlands with a user-friendly and secure self- service bicycle parking solution. The bike parking facilities will be available for privately owned as well as rental bikes. Siemens has received an order from its customer Nizhnekamsknef- tekhim for the turnkey construction of a combined cycle power plant in Tatarstan. As general contractor, Siemens will partner with a Turkish company to build the 495- megawatt combined cycle power plant on a turnkey basis. Siemens is planning and installing twelve microgrids for the Brazilian utility Centrais Elétricas do Pará. The microgrids will be built in power generation plants in the state of Pará. The two power plants that are furthest apart are located 890 kilometers from one another. The first new light-rail vehicle from Siemens is now being deployed for passenger service in San Francisco. The new vehicles are being built at the Siemens plant in Sacramento, California. The company will deliver a total of 219 vehicles. This is Siemens’ largest order to date for light rail vehicles in the U.S. Siemens is supplying the electrical equipment for a new conveyor system in an underground copper mine in Mongolia. The system, which will expand the existing open-pit mining facility, is expected to bring 95,000 tons of copper ore to the surface per day. Siemens has received an order from Pakistan for a complete power island for the new combined cycle Punjab Power Plant Jhang. To be operated with liquid natural gas (LNG), the plant is being constructed 250 kilometers southwest of Lahore and will have a power- generating capacity of 1.3 gigawatts. Siemens is building a fully automated people mover for Suvarnabhumi Airport in Bangkok. The train system is to connect the existing terminal with a new satellite terminal. Siemens is to deliver a total of six two-car trains. Plans call for the project to be commissioned in 2020. Selected project examples
  • 4. © Siemens AG 2018 September 2018Page 4 siemens.com Project Business is a very strong piece of the Siemens’ DNA and of our portfolio . 1870 2018 2020 … ~48% Project Business ~35% Service Business ~17% Product Business Order backlog Industrial Business Source: PM@Siemens
  • 5. © Siemens AG 2018 September 2018Page 5 siemens.com Project Business is a very strong piece of the Siemens’ DNA and of our portfolio . 1870 2018 2020 … ~48% Project Business ~35% Service Business ~17% Product Business Order backlog Industrial Business Source: PM@Siemens
  • 6. © Siemens AG 2018 September 2018Page 6 siemens.com Tender Screening Solutions to address challenges of large project proposal work riskDNA1) – Method for early and systematic risk Detection and Awareness Challenge Project business's dilemma Tender Screening Solution • Digitalization of especially proposal processes is key to be fast • Usability of commercial tools for text analysis does not fit project business needs • Data quality and availability are often not sufficient for automatic artificial intelligence approaches • Customization of state-of- the-art text search functionality for project business is often not affordable for single business organizations • To be aware of risks and opportunities is prerequisite to be able to act • Requirements are often hidden in huge specifications – and analyzing large amounts of text can be tricky and is very time-consuming • Fast and comprehensive requirements evaluation at the beginning of proposal projects is hard to achieve due to "specification-bergs" • Advanced text analysis functionality on a secure server enables efficient analysis of large specifications • Systematic reuse of digita- lized expert intelligence, knowledge and lessons learned avoids repetition of failures • riskDNA1) services comprise software access including process consulting to ensure most beneficial use Show stoppers "Specification" Terms and conditions Laws and standards Technical requirements Risks and opportunities 1) riskDNA – our tender screening solution
  • 7. © Siemens AG 2018 September 2018Page 7 siemens.com riskDNA drives digitalization where it matters: In daily project business Basic principle of dictionary-based screening for best assignment of right content to relevant experts ScreeningInput Results Specifications, contracts, … (PDF files or CSV Tables) Project business knowledge and expertise Advanced text analysis and search engine on a secure server Classified Requirements for requirements management Summary with overview and business specific file assignment information Marked-up PDF files with dictionary-based business-specific book- marks and indices PDF CSV
  • 8. © Siemens AG 2018 September 2018Page 8 siemens.com The screened PDF files contain content-related mark-ups, screening bookmarks and indexes for efficient text evaluation Screenshot from PDF bookmarks and content-related marked-up text after file screening Original PDF specification with mark-ups according to business-specific search criteria Content-related bookmarks including pages without machine-readable text and indexes at the end of each document Text screening can be linguistic tolerant. Types of search criteria 1) can be • Buzzwords and phrases • Combination of words within the same sentence • Text patterns for unknown content (e.g. "values below 1%") • Combinations thereof For high usability of results search criteria can also be enriched by semantic information, e.g. optional and/or excluded text as well as page context data
  • 9. © Siemens AG 2018 September 2018Page 9 siemens.com Within riskDNA method several typical elements are included that are also base for AI technology Overview of AI elements used within tender document handling ScreeningInput Results Specifications, contracts, … (PDF files or CSV Tables) Project business knowledge and expertise Advanced text analysis and search engine on a secure server Classified Requirements for requirements management Summary with overview and business specific file assignment information Marked-up PDF files with dictionary-based business-specific book- marks and indices PDF CSV Natural Language Processing (NLP) Knowledge modeling Knowledge representation Processing of unstructured data Semi-automatic supervised learning It is not: Machine learning Semantic recognition Requirements recognition Requirements classification Content visualization
  • 10. © Siemens AG 2018 September 2018Page 10 siemens.com Several use cases can be addressed to improve proposal preparation processes  Short proposal preparation times are key elements for sales phases to act like customers want and to outperform competitors  To be able to produce high speed proposals shows high responsiveness and therefore showcasing interaction quality and speed  Comparison of the amount of Siemens wording and the corresponding competitor wording indicates most wanted contractor of customer  To be able to estimate the most wanted contractor of the customer is a popular indicator to estimate hit-rates in order to stop proposal preparation right on time or to start countermeasures addressing / influencing the customer immediately  Showstopper and high risk topics have to be identified extremely early in the proposal phase in order to stop proposal preparation or to start actions immediately  To be aware of risks and opportunities is prerequisite to be able to act  Requirements are often hidden in huge specifications – and analyzing large amounts of text can be tricky and is very time- consuming  Fast and comprehensive requirements apportionment and at the beginning of proposal preparation especially for large RfQ documents (thousand pages) is hard to achieve due to huge "specification-bergs“  To be able to apportion thousands of requirements / chapters / pages / documents to the right expert in a short timeframe Amount of "Competitor wording“ vs Siemens wording Is there a „Showstopper“ for us integrated in the RfQ Fast assignment of tender content and requirements to right experts Speed-Up of proposal preparation Selected typical questions to be answered during proposal preparation
  • 11. © Siemens AG 2018 September 2018Page 11 siemens.com … used by Siemens on a worldwide basis Our success story Proposal preparation processes using intelligent tender documents screening speeded up by ~300% …
  • 12. © Siemens AG 2018 September 2018Page 12 siemens.com Siemens Consulting – Project Business Consulting Sten Wery Siemens AG Siemens Consulting Project Business Consulting Mobile: +49 (174) 15 50 96 0 E-mail: sten.wery@siemens.com