Scheme – E

                                     Sample Question Paper
Course Name : Diploma in Mechanical Engineering
Course Code : ME/MH/MI
Semester           : Fifth
                                                                             12160
Subject Title : Power Plant Engineering.
Marks              : 100                                                      Time : 3 Hrs.

Instruction:

   1)    All Questions are compulsory.
   2)    Illustrate your answers with neat sketches wherever necessary.
   3)    Figures to the right indicate full marks.
   4)    Assume suitable data if necessary.


Q. No. 1 [a] Attempt any THREE of the following.                                       12 Marks
        a) Draw feed water heating system in thermal power plant. Give the two advantages of
             feed water heating system.
        b) List the four factors to be considered while selecting the site for thermal power
             plant. Give details of any two factors.
        c) Draw open cycle for gas turbine power plant. Write the purpose of combustion
             chamber in it.
        d) How the waste heat from nuclear power plant can be used for agriculture and animal
             shelter?
Q. No. 1 [b] Attempt any ONE of the following.                                         06 Marks
        a)    Describe waste heat recovery boiler. State two advantages over conventional
              boiler.
        b) Describe with neat sketch the working principle of Magneto Hydrodynamic
              System (MHD).
Q. No. 2 Attempt any TWO of the following.                                           16 Marks

        a) A power station supplies the following loads to the consumer.
            Time in hours      0-6        6-10     10-12      12-16    16-20       20-22      22-24
               Loads in MW          20        50       60         40       80          70       40
             Find i) Draw the load curve         ii)The load factor of power plant iii) What is
             the load factor of stand by equipment of 20MW capacity if it takes up all loads
             above 60 MW?
b) Describe construction and working of Benson boiler with labeled diagram. State
         two advantages.

      c) Describe the construction and working of Bag filter with labeled diagram.

Q. No. 3 Attempt any FOUR of the following.                                      16 Marks
     a) List four advantages of gas turbine power plant over steam turbine power plant.
     b) State four advantages of wind power plant over other non-convectional power
        plants.
     c) State four system used for generating the power using geothermal energy. Draw
        labeled diagram of any one system.
     d) Draw P-V and T-S diagram of Carnot cycle.
     e) Compare fusion and fission process (any four points).


Q. No. 4 [a] Attempt any THREE of the following.                                  12 Marks

     a) List the four components of nuclear reactor. State the working of any two of them.
     b) Describe the impact of gas turbine power plant on environment.
     c) Name four impurities present in feed water. State the procedure to remove any one
        of them.
     d) Describe the working of Boiling Water Reactor (BWR) in nuclear power plant.


Q. No. 4 [b] Attempt any ONE of the following.                                   06 Marks
   a) List four components of nuclear reactor. Describe the function of moderator and
      control rod in nuclear reactor.
   b) Describe with neat sketch the working of closed cycle gas turbine power plant. State
      four advantages of closed cycle over open cycle gas turbine power plant.


Q. No. 5 Attempt any FOUR of the following.                                      16 Marks
     a) What are the requirements of fuel used in gas turbine? State the important feature of
        them.
     b) Explain how unit energy cost is calculated?
     c) List the major electrical equipment used in power plant. Give the function of
        generator.
     d) Describe with neat sketch of Brayton cycle used in gas turbine power plant.
     e) Draw neat sketch of flat plate collector. State its two limitations.
f) Describe latent heat and sensible heat recovery in thermal power plant.


Q. No. 6 Attempt any FOUR of the following.                                        16 Marks
     a) Differentiate boiling water reactor and pressurized water reactor (any four points).
     b) Describe with neat sketch regenerative cycle with two feed water heater used in
        thermal power plant.
     c) List the basic resources in India for power generation. Which one is used as a major
        resource of power generation? State reason.
     d) Describe the construction and working of Fast Breeder Reactor.
     e) State the meaning of sub-critical and supercritical boiler. Why supercritical boiler is
        preferred?

Contenu connexe

En vedette

SOLUTION TO Problem 2.2, 2.4, 2.10, 2.11, 2.19 From power plant technology by...
SOLUTION TO Problem 2.2, 2.4, 2.10, 2.11, 2.19 From power plant technology by...SOLUTION TO Problem 2.2, 2.4, 2.10, 2.11, 2.19 From power plant technology by...
SOLUTION TO Problem 2.2, 2.4, 2.10, 2.11, 2.19 From power plant technology by...ijaz Ali
 
Top 10 plant engineer interview questions and answers
Top 10 plant engineer interview questions and answersTop 10 plant engineer interview questions and answers
Top 10 plant engineer interview questions and answerskeyjonh724
 
Question & answers on boiler, MED 06209
Question & answers on boiler, MED 06209Question & answers on boiler, MED 06209
Question & answers on boiler, MED 06209Godiva-marwa
 
A technical overview of thermal power plant
A technical overview of thermal power plantA technical overview of thermal power plant
A technical overview of thermal power plantMirdul Amin Sarkar
 
Steam Power Plant and Coal Handling plant
Steam Power Plant and Coal Handling plantSteam Power Plant and Coal Handling plant
Steam Power Plant and Coal Handling plantTaimoor Muzaffar Gondal
 
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANTROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANTGaurav Rai
 
Tutorial questions reheat rankine cycle
Tutorial  questions   reheat rankine cycleTutorial  questions   reheat rankine cycle
Tutorial questions reheat rankine cycleIbrahim AboKhalil
 
Study Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power PlantStudy Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power PlantSUDHEER KUMAR KALYANAM
 
Ill effects of Thermal Power Plants
Ill effects of Thermal Power PlantsIll effects of Thermal Power Plants
Ill effects of Thermal Power Plantsguest1d7cce
 
solution to Problem 8.13,8.14,8.15,8.16 from power plant technology by MM.EL....
solution to Problem 8.13,8.14,8.15,8.16 from power plant technology by MM.EL....solution to Problem 8.13,8.14,8.15,8.16 from power plant technology by MM.EL....
solution to Problem 8.13,8.14,8.15,8.16 from power plant technology by MM.EL....ijaz Ali
 
Fire protection in thermal power station
Fire protection in thermal power stationFire protection in thermal power station
Fire protection in thermal power stationMOORTHY ASSOCIATES
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTRajashekar Gurrala
 
ENVIRONMENTAL IMPACT OF EMISSION OF POWER PLANTS
ENVIRONMENTAL                   IMPACT OF EMISSION OF POWER PLANTSENVIRONMENTAL                   IMPACT OF EMISSION OF POWER PLANTS
ENVIRONMENTAL IMPACT OF EMISSION OF POWER PLANTSMr. Mrunal Raut
 
Thermal power plant pollution control
Thermal power plant pollution controlThermal power plant pollution control
Thermal power plant pollution controlMithun Mohan
 
Safety health and environment aspects in thermal power plants
Safety health and environment aspects in thermal power plantsSafety health and environment aspects in thermal power plants
Safety health and environment aspects in thermal power plantsVudugundla Kodandapani
 
Effective Communication In The Classroom
Effective Communication In The ClassroomEffective Communication In The Classroom
Effective Communication In The ClassroomBabalou
 
Thermal pollution
Thermal pollutionThermal pollution
Thermal pollutionCarlo Roa
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - ManualSheel Shah
 

En vedette (20)

SOLUTION TO Problem 2.2, 2.4, 2.10, 2.11, 2.19 From power plant technology by...
SOLUTION TO Problem 2.2, 2.4, 2.10, 2.11, 2.19 From power plant technology by...SOLUTION TO Problem 2.2, 2.4, 2.10, 2.11, 2.19 From power plant technology by...
SOLUTION TO Problem 2.2, 2.4, 2.10, 2.11, 2.19 From power plant technology by...
 
Top 10 plant engineer interview questions and answers
Top 10 plant engineer interview questions and answersTop 10 plant engineer interview questions and answers
Top 10 plant engineer interview questions and answers
 
Question & answers on boiler, MED 06209
Question & answers on boiler, MED 06209Question & answers on boiler, MED 06209
Question & answers on boiler, MED 06209
 
A technical overview of thermal power plant
A technical overview of thermal power plantA technical overview of thermal power plant
A technical overview of thermal power plant
 
Steam Power Plant and Coal Handling plant
Steam Power Plant and Coal Handling plantSteam Power Plant and Coal Handling plant
Steam Power Plant and Coal Handling plant
 
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANTROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
ROLE OF CONTROL AND INSTRUMENTATION IN THERMAL POWER PLANT
 
Tutorial questions reheat rankine cycle
Tutorial  questions   reheat rankine cycleTutorial  questions   reheat rankine cycle
Tutorial questions reheat rankine cycle
 
Study Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power PlantStudy Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power Plant
 
Ill effects of Thermal Power Plants
Ill effects of Thermal Power PlantsIll effects of Thermal Power Plants
Ill effects of Thermal Power Plants
 
solution to Problem 8.13,8.14,8.15,8.16 from power plant technology by MM.EL....
solution to Problem 8.13,8.14,8.15,8.16 from power plant technology by MM.EL....solution to Problem 8.13,8.14,8.15,8.16 from power plant technology by MM.EL....
solution to Problem 8.13,8.14,8.15,8.16 from power plant technology by MM.EL....
 
Fire protection in thermal power station
Fire protection in thermal power stationFire protection in thermal power station
Fire protection in thermal power station
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
 
ENVIRONMENTAL IMPACT OF EMISSION OF POWER PLANTS
ENVIRONMENTAL                   IMPACT OF EMISSION OF POWER PLANTSENVIRONMENTAL                   IMPACT OF EMISSION OF POWER PLANTS
ENVIRONMENTAL IMPACT OF EMISSION OF POWER PLANTS
 
Thermal power plant pollution control
Thermal power plant pollution controlThermal power plant pollution control
Thermal power plant pollution control
 
Safety health and environment aspects in thermal power plants
Safety health and environment aspects in thermal power plantsSafety health and environment aspects in thermal power plants
Safety health and environment aspects in thermal power plants
 
Effective Communication In The Classroom
Effective Communication In The ClassroomEffective Communication In The Classroom
Effective Communication In The Classroom
 
Thermal Power Plant Safety
Thermal Power Plant SafetyThermal Power Plant Safety
Thermal Power Plant Safety
 
Thermal pollution
Thermal pollutionThermal pollution
Thermal pollution
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
 
Thermal Power Plant Hazards
Thermal Power Plant HazardsThermal Power Plant Hazards
Thermal Power Plant Hazards
 

Similaire à 12160 power plant engineering

17406 heat engineering
17406   heat engineering17406   heat engineering
17406 heat engineeringsoni_nits
 
17408 automobile engines
17408   automobile engines17408   automobile engines
17408 automobile enginessoni_nits
 
17424 electrical & electronics
17424   electrical & electronics17424   electrical & electronics
17424 electrical & electronicssoni_nits
 
17414 industrial instrumentation
17414   industrial instrumentation17414   industrial instrumentation
17414 industrial instrumentationsoni_nits
 
17413 elements of mechanical engineering
17413   elements of mechanical engineering17413   elements of mechanical engineering
17413 elements of mechanical engineeringsoni_nits
 
Power plant engineering question bank
Power plant engineering question bankPower plant engineering question bank
Power plant engineering question bankGeorge Oliver
 
17407 heat power engg
17407  heat power engg17407  heat power engg
17407 heat power enggsoni_nits
 
17404 electrical engineering
17404   electrical engineering17404   electrical engineering
17404 electrical engineeringsoni_nits
 
00121606 2110006-eme
00121606 2110006-eme00121606 2110006-eme
00121606 2110006-emeddkundaliya
 
Ktu question paper-s1-me-imes
Ktu question paper-s1-me-imesKtu question paper-s1-me-imes
Ktu question paper-s1-me-imesDr. Rejeesh C R
 
17415 d.c.machnes and transformer
17415   d.c.machnes and transformer17415   d.c.machnes and transformer
17415 d.c.machnes and transformersoni_nits
 
17444 power electronics
17444   power electronics17444   power electronics
17444 power electronicssoni_nits
 
Me2305 APPLIED HYDRAULICS AND PNEUMATICS
Me2305 APPLIED HYDRAULICS AND PNEUMATICSMe2305 APPLIED HYDRAULICS AND PNEUMATICS
Me2305 APPLIED HYDRAULICS AND PNEUMATICSBIBIN CHIDAMBARANATHAN
 

Similaire à 12160 power plant engineering (20)

17406 heat engineering
17406   heat engineering17406   heat engineering
17406 heat engineering
 
X10712 (me8792)
X10712 (me8792)X10712 (me8792)
X10712 (me8792)
 
17408 automobile engines
17408   automobile engines17408   automobile engines
17408 automobile engines
 
17424 electrical & electronics
17424   electrical & electronics17424   electrical & electronics
17424 electrical & electronics
 
17414 industrial instrumentation
17414   industrial instrumentation17414   industrial instrumentation
17414 industrial instrumentation
 
17413 elements of mechanical engineering
17413   elements of mechanical engineering17413   elements of mechanical engineering
17413 elements of mechanical engineering
 
Power plant engineering question bank
Power plant engineering question bankPower plant engineering question bank
Power plant engineering question bank
 
1 & 2 semester VTU 2018 cbcs scheme model question papers
1 & 2 semester VTU 2018 cbcs scheme model question papers1 & 2 semester VTU 2018 cbcs scheme model question papers
1 & 2 semester VTU 2018 cbcs scheme model question papers
 
17407 heat power engg
17407  heat power engg17407  heat power engg
17407 heat power engg
 
3rd Semester Mechanical Engineering (June-2016) Question Papers
3rd Semester Mechanical Engineering (June-2016) Question Papers3rd Semester Mechanical Engineering (June-2016) Question Papers
3rd Semester Mechanical Engineering (June-2016) Question Papers
 
8th Semester Mechanical Engineering (June-2016) Question Papers
8th Semester Mechanical Engineering (June-2016) Question Papers8th Semester Mechanical Engineering (June-2016) Question Papers
8th Semester Mechanical Engineering (June-2016) Question Papers
 
S.e 2003
S.e 2003S.e 2003
S.e 2003
 
1st and 2nd Semester 2018 scheme C cycle model question papers
1st and 2nd Semester 2018 scheme C cycle model question papers1st and 2nd Semester 2018 scheme C cycle model question papers
1st and 2nd Semester 2018 scheme C cycle model question papers
 
17404 electrical engineering
17404   electrical engineering17404   electrical engineering
17404 electrical engineering
 
00121606 2110006-eme
00121606 2110006-eme00121606 2110006-eme
00121606 2110006-eme
 
Ktu question paper-s1-me-imes
Ktu question paper-s1-me-imesKtu question paper-s1-me-imes
Ktu question paper-s1-me-imes
 
Ppe nov 2011
Ppe nov 2011Ppe nov 2011
Ppe nov 2011
 
17415 d.c.machnes and transformer
17415   d.c.machnes and transformer17415   d.c.machnes and transformer
17415 d.c.machnes and transformer
 
17444 power electronics
17444   power electronics17444   power electronics
17444 power electronics
 
Me2305 APPLIED HYDRAULICS AND PNEUMATICS
Me2305 APPLIED HYDRAULICS AND PNEUMATICSMe2305 APPLIED HYDRAULICS AND PNEUMATICS
Me2305 APPLIED HYDRAULICS AND PNEUMATICS
 

Dernier

Production Day 1.pptxjvjbvbcbcb bj bvcbj
Production Day 1.pptxjvjbvbcbcb bj bvcbjProduction Day 1.pptxjvjbvbcbcb bj bvcbj
Production Day 1.pptxjvjbvbcbcb bj bvcbjLewisJB
 
Call Girls Jayanagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jayanagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Jayanagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jayanagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...amitlee9823
 
Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)
Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)
Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)sonalinghatmal
 
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
CFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceCFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceSanjay Bokadia
 
Hot Call Girls |Delhi |Janakpuri ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Janakpuri ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Janakpuri ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Janakpuri ☎ 9711199171 Book Your One night Standkumarajju5765
 
Bur Dubai Call Girl Service #$# O56521286O Call Girls In Bur Dubai
Bur Dubai Call Girl Service #$# O56521286O Call Girls In Bur DubaiBur Dubai Call Girl Service #$# O56521286O Call Girls In Bur Dubai
Bur Dubai Call Girl Service #$# O56521286O Call Girls In Bur Dubaiparisharma5056
 
Résumé (2 pager - 12 ft standard syntax)
Résumé (2 pager -  12 ft standard syntax)Résumé (2 pager -  12 ft standard syntax)
Résumé (2 pager - 12 ft standard syntax)Soham Mondal
 
Motilal Oswal Gift City Fund PPT - Apr 2024.pptx
Motilal Oswal Gift City Fund PPT - Apr 2024.pptxMotilal Oswal Gift City Fund PPT - Apr 2024.pptx
Motilal Oswal Gift City Fund PPT - Apr 2024.pptxMaulikVasani1
 
Call Girls Hoodi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hoodi Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hoodi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hoodi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.GabrielaMiletti
 
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...sonalitrivedi431
 
WhatsApp 📞 8448380779 ✅Call Girls In Salarpur Sector 81 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Salarpur Sector 81 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Salarpur Sector 81 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Salarpur Sector 81 ( Noida)Delhi Call girls
 
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdfssuserded2d4
 
Presentation on Workplace Politics.ppt..
Presentation on Workplace Politics.ppt..Presentation on Workplace Politics.ppt..
Presentation on Workplace Politics.ppt..Masuk Ahmed
 
Personal Brand Exploration - Fernando Negron
Personal Brand Exploration - Fernando NegronPersonal Brand Exploration - Fernando Negron
Personal Brand Exploration - Fernando Negronnegronf24
 
Get To Know About "Lauren Prophet-Bryant''
Get To Know About "Lauren Prophet-Bryant''Get To Know About "Lauren Prophet-Bryant''
Get To Know About "Lauren Prophet-Bryant''Lauren Prophet-Bryant
 
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen Dating
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen DatingDubai Call Girls Starlet O525547819 Call Girls Dubai Showen Dating
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen Datingkojalkojal131
 
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...ranjana rawat
 
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual serviceanilsa9823
 

Dernier (20)

Production Day 1.pptxjvjbvbcbcb bj bvcbj
Production Day 1.pptxjvjbvbcbcb bj bvcbjProduction Day 1.pptxjvjbvbcbcb bj bvcbj
Production Day 1.pptxjvjbvbcbcb bj bvcbj
 
Call Girls Jayanagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jayanagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Jayanagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jayanagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
 
Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)
Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)
Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)
 
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Bidadi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
CFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceCFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector Experience
 
Hot Call Girls |Delhi |Janakpuri ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Janakpuri ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Janakpuri ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Janakpuri ☎ 9711199171 Book Your One night Stand
 
Bur Dubai Call Girl Service #$# O56521286O Call Girls In Bur Dubai
Bur Dubai Call Girl Service #$# O56521286O Call Girls In Bur DubaiBur Dubai Call Girl Service #$# O56521286O Call Girls In Bur Dubai
Bur Dubai Call Girl Service #$# O56521286O Call Girls In Bur Dubai
 
Résumé (2 pager - 12 ft standard syntax)
Résumé (2 pager -  12 ft standard syntax)Résumé (2 pager -  12 ft standard syntax)
Résumé (2 pager - 12 ft standard syntax)
 
Motilal Oswal Gift City Fund PPT - Apr 2024.pptx
Motilal Oswal Gift City Fund PPT - Apr 2024.pptxMotilal Oswal Gift City Fund PPT - Apr 2024.pptx
Motilal Oswal Gift City Fund PPT - Apr 2024.pptx
 
Call Girls Hoodi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hoodi Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hoodi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hoodi Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.
 
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...
Hyderabad 💫✅💃 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATIS...
 
WhatsApp 📞 8448380779 ✅Call Girls In Salarpur Sector 81 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Salarpur Sector 81 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Salarpur Sector 81 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Salarpur Sector 81 ( Noida)
 
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf
 
Presentation on Workplace Politics.ppt..
Presentation on Workplace Politics.ppt..Presentation on Workplace Politics.ppt..
Presentation on Workplace Politics.ppt..
 
Personal Brand Exploration - Fernando Negron
Personal Brand Exploration - Fernando NegronPersonal Brand Exploration - Fernando Negron
Personal Brand Exploration - Fernando Negron
 
Get To Know About "Lauren Prophet-Bryant''
Get To Know About "Lauren Prophet-Bryant''Get To Know About "Lauren Prophet-Bryant''
Get To Know About "Lauren Prophet-Bryant''
 
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen Dating
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen DatingDubai Call Girls Starlet O525547819 Call Girls Dubai Showen Dating
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen Dating
 
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...
 
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
 

12160 power plant engineering

  • 1. Scheme – E Sample Question Paper Course Name : Diploma in Mechanical Engineering Course Code : ME/MH/MI Semester : Fifth 12160 Subject Title : Power Plant Engineering. Marks : 100 Time : 3 Hrs. Instruction: 1) All Questions are compulsory. 2) Illustrate your answers with neat sketches wherever necessary. 3) Figures to the right indicate full marks. 4) Assume suitable data if necessary. Q. No. 1 [a] Attempt any THREE of the following. 12 Marks a) Draw feed water heating system in thermal power plant. Give the two advantages of feed water heating system. b) List the four factors to be considered while selecting the site for thermal power plant. Give details of any two factors. c) Draw open cycle for gas turbine power plant. Write the purpose of combustion chamber in it. d) How the waste heat from nuclear power plant can be used for agriculture and animal shelter? Q. No. 1 [b] Attempt any ONE of the following. 06 Marks a) Describe waste heat recovery boiler. State two advantages over conventional boiler. b) Describe with neat sketch the working principle of Magneto Hydrodynamic System (MHD). Q. No. 2 Attempt any TWO of the following. 16 Marks a) A power station supplies the following loads to the consumer. Time in hours 0-6 6-10 10-12 12-16 16-20 20-22 22-24 Loads in MW 20 50 60 40 80 70 40 Find i) Draw the load curve ii)The load factor of power plant iii) What is the load factor of stand by equipment of 20MW capacity if it takes up all loads above 60 MW?
  • 2. b) Describe construction and working of Benson boiler with labeled diagram. State two advantages. c) Describe the construction and working of Bag filter with labeled diagram. Q. No. 3 Attempt any FOUR of the following. 16 Marks a) List four advantages of gas turbine power plant over steam turbine power plant. b) State four advantages of wind power plant over other non-convectional power plants. c) State four system used for generating the power using geothermal energy. Draw labeled diagram of any one system. d) Draw P-V and T-S diagram of Carnot cycle. e) Compare fusion and fission process (any four points). Q. No. 4 [a] Attempt any THREE of the following. 12 Marks a) List the four components of nuclear reactor. State the working of any two of them. b) Describe the impact of gas turbine power plant on environment. c) Name four impurities present in feed water. State the procedure to remove any one of them. d) Describe the working of Boiling Water Reactor (BWR) in nuclear power plant. Q. No. 4 [b] Attempt any ONE of the following. 06 Marks a) List four components of nuclear reactor. Describe the function of moderator and control rod in nuclear reactor. b) Describe with neat sketch the working of closed cycle gas turbine power plant. State four advantages of closed cycle over open cycle gas turbine power plant. Q. No. 5 Attempt any FOUR of the following. 16 Marks a) What are the requirements of fuel used in gas turbine? State the important feature of them. b) Explain how unit energy cost is calculated? c) List the major electrical equipment used in power plant. Give the function of generator. d) Describe with neat sketch of Brayton cycle used in gas turbine power plant. e) Draw neat sketch of flat plate collector. State its two limitations.
  • 3. f) Describe latent heat and sensible heat recovery in thermal power plant. Q. No. 6 Attempt any FOUR of the following. 16 Marks a) Differentiate boiling water reactor and pressurized water reactor (any four points). b) Describe with neat sketch regenerative cycle with two feed water heater used in thermal power plant. c) List the basic resources in India for power generation. Which one is used as a major resource of power generation? State reason. d) Describe the construction and working of Fast Breeder Reactor. e) State the meaning of sub-critical and supercritical boiler. Why supercritical boiler is preferred?