Legal aspects of implementation of  projects under  “green” tariff NUCC MEETING 19.01.2012 Borys Danevych, attorney-at-Law,  Partner at PARITET law firm
Content ,[object Object],[object Object],[object Object],[object Object]
Potential ,[object Object],Types of renewable energy sources  Annual energy potential Theoretically  possible Technically achievable billion kWh million  tce billion kWh million  tce Wind Power 270.0 97.2 41.7 15.0 Small Hydro Power 12.5 4.5 8.3 3.0 Biomass 407.0 50.0 162.8 20.0
Actual statistics ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1. Incentives for development of projects under GT ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
2. Minimal fixed GT rates Type of energy Power station capacity and other factors influencing the rate of GT Rate of the tariff (€ / kW) Wind less 600 kW* 0,0646 600-2000 kW* 0,0754 more 2000 kW* 0,1131 Solar energy     Power plants on ground surface 0,4653 Power plants on the roofs of buildings with  power capacity exceeding 100 kW   0,4459 Power plants on the roofs of buildings with  power capacity of up to 100 kW 0,4265 Biomass Should be at least partially of plant origin to be eligible 0,1239 Small hydropower plants not more than 10000 kW 0,0775
2. Rates of “green” for other alternative energy sources  ,[object Object],[object Object],[object Object]
2. Coverage of minimal  fixed GT rate for biomass *Under Draft Law No. 8028 of 28.01.2011 all types of biomass expected to have the same legal status in terms of eligibility but not biogas and gasification processes Types of biomass (biogas) Process of electricity generation Eligibility to minimal fixed GT Biomass of plant or at least partially of plant origin* Steam turbine process Yes Gasification  and other processes where biomass is  not used directly as a fuel No Biomass of animal origin* Any processes No Biogas, including landfill gas, waste gas similar biogases  Any processes No
2. Change/Decrease of GT in the future ,[object Object],2014 –  by  10% 2019 –  by  20% 2024 –  by  30% ,[object Object]
[object Object],[object Object],[object Object],2. Change/Decrease of GT in the future
3. Ukrainian content requirement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
4. Approval of GT ,[object Object],[object Object],[object Object],[object Object],GOOD NEWS!   No Approval Fee
Conditions for  Implementation of GT Projects ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Connection of cogeneration power plants Conditions for  Implementation of GT Projects Set up of a company (charter shall provide that the company produces electricity)  Acquisition of rights in land Construction   Registration of ownership Registration of leases  Registration of easements and superficies  Change of designated purpose  License for electricity production  Joining WEM and Signing WEM Agreement Conclusion of agreement with Energorynok GT approval by NERC Sale of electricity at GT Tax and customs duties breaks Exemption from import VAT and customs duties 25% of required land tax Maximal annual lease payments – 3% of appraisal value Exemption from corporate profit tax till 2011 Receipt of initial data Receipt of technical conditions  Development of project documentation Examination of PD, if necessary Registration of declaration re preparatory works, if necessary  Registration of declaration re beginning of construction Receipt of permission r e construction works Issue of Certificate on readiness for exploitation Registration of declaration on readiness Registration of ownership  Connection to the grid  Connection of certain types of wind farms Connection of other power plants
[object Object],[object Object],[object Object],[object Object],[object Object],PARITET law firm
Thank you for your attention !

Contenu connexe

Tendances

Presentation Maksym Sysoiev_Biogas
Presentation Maksym Sysoiev_BiogasPresentation Maksym Sysoiev_Biogas
Presentation Maksym Sysoiev_Biogas
Irina Koroleva
 
The EU Renewables Directive
The EU Renewables DirectiveThe EU Renewables Directive
The EU Renewables Directive
Leonardo ENERGY
 
Presentation Paritet law firm_Cissolar
Presentation Paritet law firm_CissolarPresentation Paritet law firm_Cissolar
Presentation Paritet law firm_Cissolar
IrinaParitet
 

Tendances (17)

Task 24 The Swiss Energy Story
Task 24 The Swiss Energy StoryTask 24 The Swiss Energy Story
Task 24 The Swiss Energy Story
 
GIZ support mechanism for RE development in Vietnam
GIZ support mechanism for RE development in VietnamGIZ support mechanism for RE development in Vietnam
GIZ support mechanism for RE development in Vietnam
 
Ucraina green tariff
Ucraina  green tariffUcraina  green tariff
Ucraina green tariff
 
tew (10.10.18) - Principles of regulatory setting prices for guaranteed suppl...
tew (10.10.18) - Principles of regulatory setting prices for guaranteed suppl...tew (10.10.18) - Principles of regulatory setting prices for guaranteed suppl...
tew (10.10.18) - Principles of regulatory setting prices for guaranteed suppl...
 
RES auctions and CfDs in Germany
RES auctions and CfDs in GermanyRES auctions and CfDs in Germany
RES auctions and CfDs in Germany
 
Presentation Maksym Sysoiev_Biogas
Presentation Maksym Sysoiev_BiogasPresentation Maksym Sysoiev_Biogas
Presentation Maksym Sysoiev_Biogas
 
Febeliec Energy Forum 2016
Febeliec Energy Forum 2016Febeliec Energy Forum 2016
Febeliec Energy Forum 2016
 
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
 
Pv market business and price developments in italy
Pv market business and price developments in italy  Pv market business and price developments in italy
Pv market business and price developments in italy
 
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOWVIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
 
The Italian White Certificates Scheme - D.Rotiroti, GSE
The Italian White Certificates Scheme - D.Rotiroti, GSE The Italian White Certificates Scheme - D.Rotiroti, GSE
The Italian White Certificates Scheme - D.Rotiroti, GSE
 
The Proposed new EU Renewables Directive
The Proposed new EU Renewables DirectiveThe Proposed new EU Renewables Directive
The Proposed new EU Renewables Directive
 
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
 
PV 2.0: Italian Focus - Luca Bendetti, GSE
PV 2.0: Italian Focus - Luca Bendetti, GSE PV 2.0: Italian Focus - Luca Bendetti, GSE
PV 2.0: Italian Focus - Luca Bendetti, GSE
 
Auctions for Renewable Energy – Model based Analysis
Auctions for Renewable Energy – Model based AnalysisAuctions for Renewable Energy – Model based Analysis
Auctions for Renewable Energy – Model based Analysis
 
The EU Renewables Directive
The EU Renewables DirectiveThe EU Renewables Directive
The EU Renewables Directive
 
Presentation Paritet law firm_Cissolar
Presentation Paritet law firm_CissolarPresentation Paritet law firm_Cissolar
Presentation Paritet law firm_Cissolar
 

En vedette

Palabras de inauguración ferrocarril de santa marta
Palabras de inauguración ferrocarril de santa martaPalabras de inauguración ferrocarril de santa marta
Palabras de inauguración ferrocarril de santa marta
Municipio de Fundación
 
Segundo reto en point
Segundo  reto en pointSegundo  reto en point
Segundo reto en point
analis8
 
Só passei para saber
Só passei para saberSó passei para saber
Só passei para saber
Aldo Cioffi
 
石油伯伯的故事
石油伯伯的故事石油伯伯的故事
石油伯伯的故事
li_youyou
 
Iguazu
IguazuIguazu
Iguazu
Art 37
 
Fotos instantes del pasado
Fotos instantes del pasadoFotos instantes del pasado
Fotos instantes del pasado
Lukas Siberas
 
PINTANDO CAMISETAS
PINTANDO CAMISETASPINTANDO CAMISETAS
PINTANDO CAMISETAS
Rachel816
 
Entrega Premios Cogersa
Entrega Premios CogersaEntrega Premios Cogersa
Entrega Premios Cogersa
Merce Maribona
 
Dia internacionaldelhombre
Dia internacionaldelhombreDia internacionaldelhombre
Dia internacionaldelhombre
jose cruz
 
Octavio Ocampo
Octavio OcampoOctavio Ocampo
Octavio Ocampo
webmae
 
Creative Photographs
Creative PhotographsCreative Photographs
Creative Photographs
Thilini
 

En vedette (20)

Palabras de inauguración ferrocarril de santa marta
Palabras de inauguración ferrocarril de santa martaPalabras de inauguración ferrocarril de santa marta
Palabras de inauguración ferrocarril de santa marta
 
Taller de Creeacion Literaria
Taller de Creeacion LiterariaTaller de Creeacion Literaria
Taller de Creeacion Literaria
 
Segundo reto en point
Segundo  reto en pointSegundo  reto en point
Segundo reto en point
 
Rincones provincia león
Rincones provincia leónRincones provincia león
Rincones provincia león
 
San ignacio de loyola (2)
San ignacio de loyola (2)San ignacio de loyola (2)
San ignacio de loyola (2)
 
Só passei para saber
Só passei para saberSó passei para saber
Só passei para saber
 
LES FLORETES
LES FLORETESLES FLORETES
LES FLORETES
 
Campaña contra el robo de libros 2014
Campaña contra el robo de libros 2014Campaña contra el robo de libros 2014
Campaña contra el robo de libros 2014
 
石油伯伯的故事
石油伯伯的故事石油伯伯的故事
石油伯伯的故事
 
Iguazu
IguazuIguazu
Iguazu
 
Fotos instantes del pasado
Fotos instantes del pasadoFotos instantes del pasado
Fotos instantes del pasado
 
Rock Rules
Rock RulesRock Rules
Rock Rules
 
PINTANDO CAMISETAS
PINTANDO CAMISETASPINTANDO CAMISETAS
PINTANDO CAMISETAS
 
Plagpy slideshow Version 3.0
Plagpy slideshow Version 3.0Plagpy slideshow Version 3.0
Plagpy slideshow Version 3.0
 
Bailando
BailandoBailando
Bailando
 
Entrega Premios Cogersa
Entrega Premios CogersaEntrega Premios Cogersa
Entrega Premios Cogersa
 
Dia internacionaldelhombre
Dia internacionaldelhombreDia internacionaldelhombre
Dia internacionaldelhombre
 
Octavio Ocampo
Octavio OcampoOctavio Ocampo
Octavio Ocampo
 
Creative Photographs
Creative PhotographsCreative Photographs
Creative Photographs
 
Adelgazar
AdelgazarAdelgazar
Adelgazar
 

Similaire à Paritet presentation gt_ renewable energy projects_nucc

Photovoltaics EN
Photovoltaics ENPhotovoltaics EN
Photovoltaics EN
Martin Ille
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANT
Renato Borra
 
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
weerokoster
 
CONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTCONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANT
Renato Borra
 

Similaire à Paritet presentation gt_ renewable energy projects_nucc (20)

Photovoltaics EN
Photovoltaics ENPhotovoltaics EN
Photovoltaics EN
 
Fotovoltaika Bg
Fotovoltaika BgFotovoltaika Bg
Fotovoltaika Bg
 
Romania
RomaniaRomania
Romania
 
The Renewables EU Directive
The Renewables EU DirectiveThe Renewables EU Directive
The Renewables EU Directive
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...
 
IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANT
 
Om ass investment in the energy sector_
Om ass  investment in the energy sector_Om ass  investment in the energy sector_
Om ass investment in the energy sector_
 
Lawyer in Vietnam Oliver Massmann Solar Power Vietnam Breaking News: First Ev...
Lawyer in Vietnam Oliver Massmann Solar Power Vietnam Breaking News: First Ev...Lawyer in Vietnam Oliver Massmann Solar Power Vietnam Breaking News: First Ev...
Lawyer in Vietnam Oliver Massmann Solar Power Vietnam Breaking News: First Ev...
 
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
 
CONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTCONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANT
 
VIETNAM - New rules on Electricity Pricing and Power Purchase Agreements fro...
VIETNAM - New rules on Electricity Pricing  and Power Purchase Agreements fro...VIETNAM - New rules on Electricity Pricing  and Power Purchase Agreements fro...
VIETNAM - New rules on Electricity Pricing and Power Purchase Agreements fro...
 
Czech republic
Czech republicCzech republic
Czech republic
 
Can Balkan authorities afford to subsidise renewable energy?
Can Balkan authorities afford to subsidise renewable energy?Can Balkan authorities afford to subsidise renewable energy?
Can Balkan authorities afford to subsidise renewable energy?
 
2010 Amendments to the Polish Energy Law
2010 Amendments to the Polish Energy Law2010 Amendments to the Polish Energy Law
2010 Amendments to the Polish Energy Law
 
Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...
Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...
Energy Savings Insurance as a tool to foster energy efficiency investment: Gi...
 
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
 
Tariff policy of India: Salient Points
Tariff policy of India: Salient Points Tariff policy of India: Salient Points
Tariff policy of India: Salient Points
 
VIETNAM – LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
VIETNAM –  LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8VIETNAM –  LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
VIETNAM – LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
 
Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy Market
 
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in VietnamDecision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
 

Dernier

Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Dernier (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdf
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 

Paritet presentation gt_ renewable energy projects_nucc

  • 1. Legal aspects of implementation of projects under “green” tariff NUCC MEETING 19.01.2012 Borys Danevych, attorney-at-Law, Partner at PARITET law firm
  • 2.
  • 3.
  • 4.
  • 5.
  • 6. 2. Minimal fixed GT rates Type of energy Power station capacity and other factors influencing the rate of GT Rate of the tariff (€ / kW) Wind less 600 kW* 0,0646 600-2000 kW* 0,0754 more 2000 kW* 0,1131 Solar energy     Power plants on ground surface 0,4653 Power plants on the roofs of buildings with power capacity exceeding 100 kW   0,4459 Power plants on the roofs of buildings with power capacity of up to 100 kW 0,4265 Biomass Should be at least partially of plant origin to be eligible 0,1239 Small hydropower plants not more than 10000 kW 0,0775
  • 7.
  • 8. 2. Coverage of minimal fixed GT rate for biomass *Under Draft Law No. 8028 of 28.01.2011 all types of biomass expected to have the same legal status in terms of eligibility but not biogas and gasification processes Types of biomass (biogas) Process of electricity generation Eligibility to minimal fixed GT Biomass of plant or at least partially of plant origin* Steam turbine process Yes Gasification and other processes where biomass is not used directly as a fuel No Biomass of animal origin* Any processes No Biogas, including landfill gas, waste gas similar biogases Any processes No
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14. Connection of cogeneration power plants Conditions for Implementation of GT Projects Set up of a company (charter shall provide that the company produces electricity) Acquisition of rights in land Construction Registration of ownership Registration of leases Registration of easements and superficies Change of designated purpose License for electricity production Joining WEM and Signing WEM Agreement Conclusion of agreement with Energorynok GT approval by NERC Sale of electricity at GT Tax and customs duties breaks Exemption from import VAT and customs duties 25% of required land tax Maximal annual lease payments – 3% of appraisal value Exemption from corporate profit tax till 2011 Receipt of initial data Receipt of technical conditions Development of project documentation Examination of PD, if necessary Registration of declaration re preparatory works, if necessary Registration of declaration re beginning of construction Receipt of permission r e construction works Issue of Certificate on readiness for exploitation Registration of declaration on readiness Registration of ownership Connection to the grid Connection of certain types of wind farms Connection of other power plants
  • 15.
  • 16. Thank you for your attention !