PAS 106 Workshops
ADVISORY TEAM FOR
LARGE APPLICATIONS
 Advisory Team for Large Applications
 Impartial advice
 Provided at the request of Local
Authorities …. but available to the
benefit of all partners
 Large Scale (200+, 500+ housing units)
 Projects at all stages in planning process
 Working on “large sites”: urban
extensions, new settlements, LIF
projects, public sector land, garden cities
Introducing ATLAS
ATLAS Project Activity - Jan 2016
ESE SSW MID NTH Total
Projects
Total
Units
Total 16 17 17 26 75 239,816
LSIP/ HDF
- Sites >1,500 15 15 16 16 62 227,825
- Sites <1,500 1 1 1 10 13 11,991
- Housing Zones 1 3 3 5 12 23,067
- Priority Sites 3 4 0 2 9 44,870
Garden Cities
- DCLG Supported 3 1 1 0 5 42,700
- DCLG Awareness 4 0 0 0 4 31,500
Public Sector Land
- HCA Land 0 0 1 0 1 1,880
- OGDs Land 0 2 0 0 2 5,745
Large Site ( >1500)
Large Site ( <1500)
Public Sector Land
Garden City (supported)
Housing Zone
Garden City (aware)
Priority Sites
What we’ll cover
 Look at challenges that
large sites present for 106’s
 How to deal with these
issues in a timely manner
 Tools and techniques from
our experience
 Infrastructure not just
mitigation
 Requires balance and
mix of uses -
sustainability
 Significant
infrastructure needs:
transport, utilities, social
& community
 Often multiple land
owners
 Over a long time –
many phases
Key Challenges of Large Scale
Creating Quality Places
 Start early!!
 Get clarity on vision &
critical outcomes
 Collaborate & share
information
 Ensure evidence is robust
 Test alternative ways of
doing things
 Work positively to find
solutions
 Be flexible where possible
 Don’t compromise too far
Vision
Does the potential solution fit
the agreed vision and
objectives / anticipated
outcomes? If not, is it
acceptable?
Impact on Viability
Will the potential solution
close the viability gap and
enable the development to
proceed.
Prospect of Delivery
Will the potential solution be
deliverable, i.e. are the
appropriate partners on
board, is the solution eligible
for potential funding?
Level of
“Acceptable”
Risk
What are the risks
associated with the
solution. Is this
considered
acceptable?
Some Key Themes
Pitfalls - of course it’s not that
simple…….
 CIL can get in the way
 Reg 122 – contributions have to be necessary; directly
related; and fair & reasonable
 Reg 123 – no longer pool more than 5 contributions for
single piece of infrastructure
 Evidence of Inspectors beginning to apply strictly
 Starter Homes – unclear impact on viability and AH
provision going forward
Your Experiences…….
 Political risk taking – setting priorities; being flexible etc.
 Issues of openness and collaboration (not to mention
skills) on viability?
 Pooling issues – is this starting to cause a problem?
 Use of s106 Frameworks - any experiences?
 Use of review mechanisms?
 Views on Starter Homes
impact?
 Significant
infrastructure needs:
transport, utilities,
social & community
 Often multiple land
owners
 Over a long time –
many phases
 Engaging with
organisations (HE,
EA, Health)
Key Challenges of Large Scale
Delivery Issues
Typical large scale approach
 6000 homes
extension to
Scunthorpe
 Significant
infrastructure –
flooding
 Multiple ownerships
 Define as much as
possible at policy
stage
Understanding the detail….
Breaking the site down
Outline application stage –
design parameters
Site Specific Infrastructure
Delivery Plan
 What infrastructure is needed?
 When will it be needed?
 How will it be paid for?
 Who will deliver it?
 CIL may well impact upon this?
Constructing a 106
Define required infrastructure
(Masterplan/IDP/Policy)
Test Viability
Fix site specific priorities
Agree review mechanism (for viability and
masterplan/IDP)
Agree S.106 HOTs – Clarity of committee
resolution
Discuss legal drafting
Sign S.106
NNDA
Persimmon
Taylor Wimpey
Church
Commissioners
Upper Callerton
Lower Callerton
Middle Callerton
Green Belt
Line of O.O.R
Collaborative and Integrated
Approach
 Initial land release:
“patient” money
 Multiple developer
/ land interests
 Phasing of
infrastructure &
enabling works
 Long term returns
on investment
-10,000
-8,000
-6,000
-4,000
-2,000
0
2,000
4,000
6,000
8,000
1 2 3 4 5 6 7 8 9 10
Balance
Additional Challenges
Scale & land, phasing & cashflow
Review Mechanisms
 NPPF promotes the approach – ‘to take account of
changes in market conditions over time and be sufficiently flexible to
prevent planned development from being stalled ‘(para 205)
 Accept due to project viability, based on current
costs and values not all S106 obligations will be fully
funded
 Re-appraisals will need to be carried out
 Involves risk – if viability does not improve then some
obligations will not be fully met!
Some Key Principles
 Baseline on viability approved up front
 Be clear on S106 priorities and accept all cannot be provided
now!
 Don’t review too often
 Keep any mechanisms simple
 Often based on 2 key variables – costs and sales values
 Cap overall obligations
 Has to work for the developer as well
Deferred obligations
(one variable: value uplift)
Actual Sale
Price
Implementation
Baseline appraisal
Deferred
Obligations,
contingent on
uplift in values
Initial “Residual Regardless” contributions
Capped Total
Appraisal Tools
• Development Appraisal Tool
• Works for up to 20 years
• Populate income with: unit numbers, sizes, values and rents amongst
others and allows up to 5 phases
• Costs can be specified and
include developer overheads
and return for risk, and
planning obligations
• Garden Cities Model
• Bespoke for very large
schemes – at high level
• Allows public funding to be
included
• Allows for value capture
Framework Agreements
• Establishes a
mechanism for
collection and
management of
contributions
• Agreed
infrastructure
package
• Specifies what
infrastructure
needs to be
provided and when
Framework Agreements
Some Considerations
 Overall Planning Strategy agreed
 Consistent approach to the Planning Applications
 The components of proposed Framework S106
Agreement itself
 Infrastructure Delivery Plans
 Relationship to CIL
 Development Framework Plans
 Relationship to Masterplanning
 Start early!!
 Get clarity on vision &
critical outcomes
 Collaborate & share
information
 Ensure evidence is robust
 Test alternative ways of
doing things
 Work positively to find
solutions
 Be flexible where possible
 Don’t compromise too far
Vision
Does the potential solution fit
the agreed vision and
objectives / anticipated
outcomes? If not, is it
acceptable?
Impact on Viability
Will the potential solution
close the viability gap and
enable the development to
proceed.
Prospect of Delivery
Will the potential solution be
deliverable, i.e. are the
appropriate partners on
board, is the solution eligible
for potential funding?
Level of
“Acceptable”
Risk
What are the risks
associated with the
solution. Is this
considered
acceptable?
In conclusion
Hints & tips
Points for discussion
 Use of review mechanisms?
 Issues of openness and collaboration (not to mention
skills) on viability?
 Political risk taking – setting priorities; being flexible etc.
 Pooling issue – is this starting to cause a problem?
 Use of 106 Frameworks - any experience?
 View on Starter Home impact?
Further Information
The ATLAS Guide:
Planning for Large Scale Development:
www.atlasplanning.com
The HCA’s guide to a development appraisal tool:
http://www.homesandcommunities.co.uk/ourwork/development-
appraisal-tool

Contenu connexe

Tendances

Viability rate setting
Viability rate setting Viability rate setting
Viability rate setting
PAS_Team
 

Tendances (20)

Darren WIlding, DCLG - Section 106: What they are and where we are
Darren WIlding, DCLG - Section 106: What they are and where we areDarren WIlding, DCLG - Section 106: What they are and where we are
Darren WIlding, DCLG - Section 106: What they are and where we are
 
Bristol Event Presentations
Bristol Event PresentationsBristol Event Presentations
Bristol Event Presentations
 
Viability Session 1: An Introduction to viability (including definitions and ...
Viability Session 1: An Introduction to viability (including definitions and ...Viability Session 1: An Introduction to viability (including definitions and ...
Viability Session 1: An Introduction to viability (including definitions and ...
 
Gilian Macinnes, PAS: S106 – Where we are - current context
Gilian Macinnes, PAS: S106 – Where we are - current contextGilian Macinnes, PAS: S106 – Where we are - current context
Gilian Macinnes, PAS: S106 – Where we are - current context
 
Jim Cliffe, Planning Obligations Manager, Bristol City Council - Planning Obl...
Jim Cliffe, Planning Obligations Manager, Bristol City Council - Planning Obl...Jim Cliffe, Planning Obligations Manager, Bristol City Council - Planning Obl...
Jim Cliffe, Planning Obligations Manager, Bristol City Council - Planning Obl...
 
Phillipa Silcock, PAS - Using and discharging conditions
Phillipa Silcock, PAS - Using and discharging conditionsPhillipa Silcock, PAS - Using and discharging conditions
Phillipa Silcock, PAS - Using and discharging conditions
 
Atlas Presentation: Birmingham
Atlas Presentation: BirminghamAtlas Presentation: Birmingham
Atlas Presentation: Birmingham
 
Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...
Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...
Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...
 
CIL: Project planning and infrastructure with notes
CIL: Project planning and infrastructure with notesCIL: Project planning and infrastructure with notes
CIL: Project planning and infrastructure with notes
 
Viability rate setting
Viability rate setting Viability rate setting
Viability rate setting
 
CIL: Rate setting
CIL: Rate settingCIL: Rate setting
CIL: Rate setting
 
S106 case law update
S106 case law updateS106 case law update
S106 case law update
 
Making CIL Work
Making CIL WorkMaking CIL Work
Making CIL Work
 
Peter Ollivere, Durham County Council Experience of Section 106
Peter Ollivere, Durham County Council Experience of Section 106Peter Ollivere, Durham County Council Experience of Section 106
Peter Ollivere, Durham County Council Experience of Section 106
 
CIL implementation
CIL implementationCIL implementation
CIL implementation
 
To cil or not to cil
To cil or not to cilTo cil or not to cil
To cil or not to cil
 
S106 viability york july 2015
S106 viability york july 2015S106 viability york july 2015
S106 viability york july 2015
 
150713 pas section 106 dclg
150713  pas section 106 dclg150713  pas section 106 dclg
150713 pas section 106 dclg
 
Getting to grips with the new technical standards for housing
Getting to grips with the new technical standards for housingGetting to grips with the new technical standards for housing
Getting to grips with the new technical standards for housing
 
Minor Alterations to the London Plan
Minor Alterations to the London PlanMinor Alterations to the London Plan
Minor Alterations to the London Plan
 

En vedette

En vedette (14)

Christopher Cant S106 presentation
Christopher Cant S106 presentationChristopher Cant S106 presentation
Christopher Cant S106 presentation
 
S106 ATLAS
S106 ATLASS106 ATLAS
S106 ATLAS
 
Pas Cil operation Gerard Coll
Pas   Cil operation  Gerard CollPas   Cil operation  Gerard Coll
Pas Cil operation Gerard Coll
 
Sheffield CIL - Richard Holmes
Sheffield CIL - Richard HolmesSheffield CIL - Richard Holmes
Sheffield CIL - Richard Holmes
 
Evershed CIL legal update Jan 2016- Paul McLean
Evershed CIL legal update Jan 2016- Paul McLeanEvershed CIL legal update Jan 2016- Paul McLean
Evershed CIL legal update Jan 2016- Paul McLean
 
Preston Implementing CIL Jan 2016 – Mike M
Preston Implementing CIL Jan 2016 – Mike MPreston Implementing CIL Jan 2016 – Mike M
Preston Implementing CIL Jan 2016 – Mike M
 
Stephen Pointer - Local Authority experience
Stephen Pointer - Local Authority experienceStephen Pointer - Local Authority experience
Stephen Pointer - Local Authority experience
 
Andrew Parkinson - S106 case law update
Andrew Parkinson - S106 case law update Andrew Parkinson - S106 case law update
Andrew Parkinson - S106 case law update
 
Meyric lewis, Francis Taylor Building section: S106 – potted summary of recen...
Meyric lewis, Francis Taylor Building section: S106 – potted summary of recen...Meyric lewis, Francis Taylor Building section: S106 – potted summary of recen...
Meyric lewis, Francis Taylor Building section: S106 – potted summary of recen...
 
Shabana Anwar, Bircham Dyson Bell, Section 106 presentation (PPT 19 pages)
Shabana Anwar, Bircham Dyson Bell, Section 106 presentation (PPT 19 pages)Shabana Anwar, Bircham Dyson Bell, Section 106 presentation (PPT 19 pages)
Shabana Anwar, Bircham Dyson Bell, Section 106 presentation (PPT 19 pages)
 
39578899 1
39578899 139578899 1
39578899 1
 
Housing Standards Review: Building Regulations Perspective
Housing Standards Review: Building Regulations PerspectiveHousing Standards Review: Building Regulations Perspective
Housing Standards Review: Building Regulations Perspective
 
Edna and sheila slideshare composite
Edna and sheila slideshare compositeEdna and sheila slideshare composite
Edna and sheila slideshare composite
 
Lecture 4
Lecture 4Lecture 4
Lecture 4
 

Similaire à PAS 106 Workshops Leeds

RPN 2022 Manila: Session 3.3 David Annandale DDA Consulting.pdf
RPN 2022 Manila: Session 3.3 David Annandale DDA Consulting.pdfRPN 2022 Manila: Session 3.3 David Annandale DDA Consulting.pdf
RPN 2022 Manila: Session 3.3 David Annandale DDA Consulting.pdf
OECD Environment
 
World Bank & IDB Workshop PBCs Finance and Risk - Thornton Wyatt 2015
World Bank & IDB Workshop PBCs Finance and Risk - Thornton Wyatt 2015World Bank & IDB Workshop PBCs Finance and Risk - Thornton Wyatt 2015
World Bank & IDB Workshop PBCs Finance and Risk - Thornton Wyatt 2015
Julian Thornton
 
Evaluating Rewards for Environmental Services Schemes
Evaluating Rewards for Environmental Services SchemesEvaluating Rewards for Environmental Services Schemes
Evaluating Rewards for Environmental Services Schemes
World Agroforestry (ICRAF)
 
Roundtable Process And Lessons Learned
Roundtable Process And Lessons LearnedRoundtable Process And Lessons Learned
Roundtable Process And Lessons Learned
watershedprotection
 

Similaire à PAS 106 Workshops Leeds (20)

Today's Contracting - Contracts Risks and Disputes
Today's Contracting - Contracts Risks and Disputes Today's Contracting - Contracts Risks and Disputes
Today's Contracting - Contracts Risks and Disputes
 
Facilitating scaling: Initial ideas for Livestock CRP Integrated Core Project
Facilitating scaling: Initial ideas for Livestock CRP Integrated Core ProjectFacilitating scaling: Initial ideas for Livestock CRP Integrated Core Project
Facilitating scaling: Initial ideas for Livestock CRP Integrated Core Project
 
Summary of Key Findings: APP Zero Energy Homes Workshop
Summary of Key Findings: APP Zero Energy Homes WorkshopSummary of Key Findings: APP Zero Energy Homes Workshop
Summary of Key Findings: APP Zero Energy Homes Workshop
 
RPN 2022 Manila: Session 3.3 David Annandale DDA Consulting.pdf
RPN 2022 Manila: Session 3.3 David Annandale DDA Consulting.pdfRPN 2022 Manila: Session 3.3 David Annandale DDA Consulting.pdf
RPN 2022 Manila: Session 3.3 David Annandale DDA Consulting.pdf
 
Project Execution in Changing Times - Focus on the Essentials
Project Execution in Changing Times - Focus on the EssentialsProject Execution in Changing Times - Focus on the Essentials
Project Execution in Changing Times - Focus on the Essentials
 
SC-webinar_0621.pptx
SC-webinar_0621.pptxSC-webinar_0621.pptx
SC-webinar_0621.pptx
 
Unpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management ToolboxUnpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management Toolbox
 
Agile Presentation Standing Committee on Gov't Operations Oct 17
Agile Presentation Standing Committee on Gov't Operations Oct 17Agile Presentation Standing Committee on Gov't Operations Oct 17
Agile Presentation Standing Committee on Gov't Operations Oct 17
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5
 
World Bank & IDB Workshop PBCs Finance and Risk - Thornton Wyatt 2015
World Bank & IDB Workshop PBCs Finance and Risk - Thornton Wyatt 2015World Bank & IDB Workshop PBCs Finance and Risk - Thornton Wyatt 2015
World Bank & IDB Workshop PBCs Finance and Risk - Thornton Wyatt 2015
 
Town Hall April 14 2022.pptx
Town Hall April 14 2022.pptxTown Hall April 14 2022.pptx
Town Hall April 14 2022.pptx
 
Evaluating Rewards for Environmental Services Schemes
Evaluating Rewards for Environmental Services SchemesEvaluating Rewards for Environmental Services Schemes
Evaluating Rewards for Environmental Services Schemes
 
29 july webinar presentation
29 july webinar presentation 29 july webinar presentation
29 july webinar presentation
 
Strategic Environmental Assessment Methodology
Strategic Environmental Assessment MethodologyStrategic Environmental Assessment Methodology
Strategic Environmental Assessment Methodology
 
Helass project overview and lessons v1.0
Helass project overview and lessons v1.0Helass project overview and lessons v1.0
Helass project overview and lessons v1.0
 
Turning projects around from red to black presentation
Turning projects around from red to black presentationTurning projects around from red to black presentation
Turning projects around from red to black presentation
 
Pas hdt support april 19 as delivered
Pas hdt support april 19 as deliveredPas hdt support april 19 as delivered
Pas hdt support april 19 as delivered
 
Integrated Assurance with Sellafield - Nuclear Decommissioning Authority (NDA...
Integrated Assurance with Sellafield - Nuclear Decommissioning Authority (NDA...Integrated Assurance with Sellafield - Nuclear Decommissioning Authority (NDA...
Integrated Assurance with Sellafield - Nuclear Decommissioning Authority (NDA...
 
Sustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS CaseSustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS Case
 
Roundtable Process And Lessons Learned
Roundtable Process And Lessons LearnedRoundtable Process And Lessons Learned
Roundtable Process And Lessons Learned
 

Plus de PAS_Team

PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS_Team
 

Plus de PAS_Team (20)

231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf
 
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
 
PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023
 
Guildford BC BNG Policy June 2023.pdf
Guildford BC BNG Policy June 2023.pdfGuildford BC BNG Policy June 2023.pdf
Guildford BC BNG Policy June 2023.pdf
 
BNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdfBNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdf
 
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
 
Leeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptxLeeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptx
 
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
 
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
 
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
 
PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23
 
EOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptxEOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptx
 
230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx
 
PAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdfPAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdf
 
CBC Monitoring Review.pptx
CBC Monitoring  Review.pptxCBC Monitoring  Review.pptx
CBC Monitoring Review.pptx
 
PAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptxPAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptx
 
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdfPAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
 
PAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptxPAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptx
 
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptxPAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
 
PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy
 

Dernier

Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
ScottMeyers35
 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
HyderabadDolls
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
ScottMeyers35
 

Dernier (20)

Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
 
sponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfsponsor for poor old age person food.pdf
sponsor for poor old age person food.pdf
 
tOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTRtOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTR
 
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdf
 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
 

PAS 106 Workshops Leeds

  • 1. PAS 106 Workshops ADVISORY TEAM FOR LARGE APPLICATIONS
  • 2.  Advisory Team for Large Applications  Impartial advice  Provided at the request of Local Authorities …. but available to the benefit of all partners  Large Scale (200+, 500+ housing units)  Projects at all stages in planning process  Working on “large sites”: urban extensions, new settlements, LIF projects, public sector land, garden cities Introducing ATLAS
  • 3. ATLAS Project Activity - Jan 2016 ESE SSW MID NTH Total Projects Total Units Total 16 17 17 26 75 239,816 LSIP/ HDF - Sites >1,500 15 15 16 16 62 227,825 - Sites <1,500 1 1 1 10 13 11,991 - Housing Zones 1 3 3 5 12 23,067 - Priority Sites 3 4 0 2 9 44,870 Garden Cities - DCLG Supported 3 1 1 0 5 42,700 - DCLG Awareness 4 0 0 0 4 31,500 Public Sector Land - HCA Land 0 0 1 0 1 1,880 - OGDs Land 0 2 0 0 2 5,745 Large Site ( >1500) Large Site ( <1500) Public Sector Land Garden City (supported) Housing Zone Garden City (aware) Priority Sites
  • 4. What we’ll cover  Look at challenges that large sites present for 106’s  How to deal with these issues in a timely manner  Tools and techniques from our experience
  • 5.  Infrastructure not just mitigation  Requires balance and mix of uses - sustainability  Significant infrastructure needs: transport, utilities, social & community  Often multiple land owners  Over a long time – many phases Key Challenges of Large Scale Creating Quality Places
  • 6.  Start early!!  Get clarity on vision & critical outcomes  Collaborate & share information  Ensure evidence is robust  Test alternative ways of doing things  Work positively to find solutions  Be flexible where possible  Don’t compromise too far Vision Does the potential solution fit the agreed vision and objectives / anticipated outcomes? If not, is it acceptable? Impact on Viability Will the potential solution close the viability gap and enable the development to proceed. Prospect of Delivery Will the potential solution be deliverable, i.e. are the appropriate partners on board, is the solution eligible for potential funding? Level of “Acceptable” Risk What are the risks associated with the solution. Is this considered acceptable? Some Key Themes
  • 7. Pitfalls - of course it’s not that simple…….  CIL can get in the way  Reg 122 – contributions have to be necessary; directly related; and fair & reasonable  Reg 123 – no longer pool more than 5 contributions for single piece of infrastructure  Evidence of Inspectors beginning to apply strictly  Starter Homes – unclear impact on viability and AH provision going forward
  • 8. Your Experiences…….  Political risk taking – setting priorities; being flexible etc.  Issues of openness and collaboration (not to mention skills) on viability?  Pooling issues – is this starting to cause a problem?  Use of s106 Frameworks - any experiences?  Use of review mechanisms?  Views on Starter Homes impact?
  • 9.  Significant infrastructure needs: transport, utilities, social & community  Often multiple land owners  Over a long time – many phases  Engaging with organisations (HE, EA, Health) Key Challenges of Large Scale Delivery Issues
  • 10. Typical large scale approach  6000 homes extension to Scunthorpe  Significant infrastructure – flooding  Multiple ownerships  Define as much as possible at policy stage
  • 13. Outline application stage – design parameters
  • 14. Site Specific Infrastructure Delivery Plan  What infrastructure is needed?  When will it be needed?  How will it be paid for?  Who will deliver it?  CIL may well impact upon this?
  • 16. Define required infrastructure (Masterplan/IDP/Policy) Test Viability Fix site specific priorities Agree review mechanism (for viability and masterplan/IDP) Agree S.106 HOTs – Clarity of committee resolution Discuss legal drafting Sign S.106
  • 18. Upper Callerton Lower Callerton Middle Callerton Green Belt Line of O.O.R
  • 20.  Initial land release: “patient” money  Multiple developer / land interests  Phasing of infrastructure & enabling works  Long term returns on investment -10,000 -8,000 -6,000 -4,000 -2,000 0 2,000 4,000 6,000 8,000 1 2 3 4 5 6 7 8 9 10 Balance Additional Challenges Scale & land, phasing & cashflow
  • 21. Review Mechanisms  NPPF promotes the approach – ‘to take account of changes in market conditions over time and be sufficiently flexible to prevent planned development from being stalled ‘(para 205)  Accept due to project viability, based on current costs and values not all S106 obligations will be fully funded  Re-appraisals will need to be carried out  Involves risk – if viability does not improve then some obligations will not be fully met!
  • 22. Some Key Principles  Baseline on viability approved up front  Be clear on S106 priorities and accept all cannot be provided now!  Don’t review too often  Keep any mechanisms simple  Often based on 2 key variables – costs and sales values  Cap overall obligations  Has to work for the developer as well
  • 23. Deferred obligations (one variable: value uplift) Actual Sale Price Implementation Baseline appraisal Deferred Obligations, contingent on uplift in values Initial “Residual Regardless” contributions Capped Total
  • 24. Appraisal Tools • Development Appraisal Tool • Works for up to 20 years • Populate income with: unit numbers, sizes, values and rents amongst others and allows up to 5 phases • Costs can be specified and include developer overheads and return for risk, and planning obligations • Garden Cities Model • Bespoke for very large schemes – at high level • Allows public funding to be included • Allows for value capture
  • 25. Framework Agreements • Establishes a mechanism for collection and management of contributions • Agreed infrastructure package • Specifies what infrastructure needs to be provided and when
  • 26. Framework Agreements Some Considerations  Overall Planning Strategy agreed  Consistent approach to the Planning Applications  The components of proposed Framework S106 Agreement itself  Infrastructure Delivery Plans  Relationship to CIL  Development Framework Plans  Relationship to Masterplanning
  • 27.  Start early!!  Get clarity on vision & critical outcomes  Collaborate & share information  Ensure evidence is robust  Test alternative ways of doing things  Work positively to find solutions  Be flexible where possible  Don’t compromise too far Vision Does the potential solution fit the agreed vision and objectives / anticipated outcomes? If not, is it acceptable? Impact on Viability Will the potential solution close the viability gap and enable the development to proceed. Prospect of Delivery Will the potential solution be deliverable, i.e. are the appropriate partners on board, is the solution eligible for potential funding? Level of “Acceptable” Risk What are the risks associated with the solution. Is this considered acceptable? In conclusion Hints & tips
  • 28. Points for discussion  Use of review mechanisms?  Issues of openness and collaboration (not to mention skills) on viability?  Political risk taking – setting priorities; being flexible etc.  Pooling issue – is this starting to cause a problem?  Use of 106 Frameworks - any experience?  View on Starter Home impact?
  • 29. Further Information The ATLAS Guide: Planning for Large Scale Development: www.atlasplanning.com The HCA’s guide to a development appraisal tool: http://www.homesandcommunities.co.uk/ourwork/development- appraisal-tool

Notes de l'éditeur

  1. 2
  2. 3
  3. Emphasise that it’s important to identify issues EARLY – S106’s for large schemes are complex and need time to resolve – so the earlier you start the better!!
  4. Large scale has number of significant and different components and many of these will need to feature in 106 – key is working out what it is you want to deliver. What kind of place do you want to create and how can a 106 help you deliver this? Different land use components; infrastructure requirements etc.
  5. Reg 122 has now enshrined the tests for 106 in law and inspectors are beginning to scrutinise this. Inspectors are also looking closely at pooling and can take a strict line
  6. Discussion should be generated via going through a list of questions and offering to capture responses to feedback to PAS/DCLG. The questions listed are based on bringing out the experience from the audience, as well as their views on what the impact of starter homes may be on viability.
  7. Large scale has number of significant and different components and many of these will need to feature in 106 – key is working out what it is you want to deliver. What kind of place do you want to create and how can a 106 help you deliver this? Different land use components; infrastructure requirements etc.
  8. This example is Lincs Lakes – but substitute an example of your own if you wish, but the key is to start with a masterplan – you need a clear idea on the key components that need to be delivered and where they will go. A masterplan (or framework plan) will start to map this out and allow you to define key infrastructure. If CIL is in place or being considered, then think about it early.
  9. The detail of this site is not important – the important point here is that as well as knowing what you want to deliver, you also need to understand the detail of when it will need to be delivered. This is a key part of place making – delivering timely infrastructure. Understanding phasing will help in the formulation of a realistic and deliverable 106.
  10. Where it’s a particularly large scheme, you may need to break the site down into areas to be able to understand how they will work and what infrastructure is required, when. The extract demonstrates that if you start early enough, you can be prescriptive in your policy (although still allow for flexibility), to create a robust basis for formulating a S106 further down the line.
  11. The example is from The Avenue and demonstrates how important it is to keep the masterplanning approach going – to help further define the key infrastructure from a place making point of view. This needs to be constructed via a collaborative approach.
  12. Before you start to construct a S106, you need clarity at this level – a delivery plan that is specific for your site. This can come in at policy and/or outline stage.
  13. This slide highlights the number of people/organisations that may need to be involved and that this will have to be structured and led! Tough choices and decisions need to be made with the right level of information and ideally need to be understood by all.
  14. Understanding the economics of how developer’s approach things is also important to understand how to construct a 106 and where to be flexible – helps create pragmatic solutions and problem solving.
  15. Large scale 106’s lend themselves to review mechanisms as they will be developed over a significant period of time and several economic cycles (potentially). Including review mechanisms also avoids obsessing over detail that can’t really be fixed now – but enables you to understand some of these issues further down the line.
  16. This illustrates how review mechanisms can work in relation to the baseline appraisal. 106 will need to specify how often to review; what to review; and what to do with any additional monies. Can also build in other sources of funding that may emerge over time etc.
  17. Getting into the detail of viability is crucial and needs to be an open and transparent process to enable decisions to be made and solutions found – don’t just rely on developers figures and avoid the adversarial approach. Helpful to use District Valuer to inform on costs and values.
  18. Framework agreements MAY be a solution but relatively untested – help to create a defacto equalisation agreement and is basically an agreement to agree contributions in the future.
  19. Framework agreements MAY be a solution but relatively untested – help to create a defacto equalisation agreement and is basically an agreement to agree contributions in the future.
  20. Discussion should be generated via going through a list of questions and offering to capture responses to feedback to PAS/DCLG. The questions listed are based on bringing out the experience from the audience, as well as their views on what the impact of starter homes may be on viability.