Initiating Profitable Projects
Business Acumen - Strategic Objective
PMI Lebanon Chapter
Habtoor-Beirut / November 12, 2015
Saadi Adra, PhD c, PgMP, OPM3, PMP, RMP, SP, MPM, EVP
Managing Partner CMCS Lebanon SAL
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Outline
• Hypothetical Case Study
• Strategic Objectives
• Demand Generation Projects
• Hybrid (Internal/External) Projects
• Supply – Capacity Building Projects
• Portfolio Roadmap
• Reaping the Benefits
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
The content presents an overview on the different
reasons and objectives for initiating projects within an
organization. This includes revenue-generating projects
that participate in making profit, in addition to various
internal capacity and capability building projects. The
Focus is on how projects infiltrate the organization and
actually participate in achieving various organizational
objectives, ultimately generating profit.
Abstract
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
What is Business Acumen?
Business
Acumen
Leadership
Technical
PM
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Organization Structure
BOD
Top
Management
Administration
HR Finance IT
Business
Development Operations
Contracts Quality Manufacturing
Technical /
Services
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Hypothetical Case Context
• 2016 hard year to do business
• High employee turnover
• To sustain is to lower prices
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
BOD Strategic Goals
• Preserve same revenue/profit by lowering prices
and enhancing quality, hence increasing sales
• Lowering prices requires manufacturing some
components rather than import
• Enhancing quality require better QMS and
retaining qualified staff
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Supply and Demand Projects
Supply
Enhance quality,
Capacity Building,
Develop a better
methodology,…
Hybrid
Open a new branch;
Invest in Supply of
new office, staff,…
New branch prepares
proposals
Demand
Prepare proposals
to win new
contracts
Revenue
Generation
Consume
Budgets
Revenue
Generation
Capacity
Building
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
BOD Strategic Objectives 2016
1. Sustain revenue/profit
2. Increase market share by 20%
3. Expand business in new country
4. Initiate new manufacturing facility
5. Attain EFQM accreditation
6. Develop Talent Management System for
employee retainage
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Internal Vs External Investments
1. Sustain revenue/profit
2. Increase market share by 20%
3. Expand business in new country
4. Initiate new manufacturing facility
5. Attain EFQM accreditation
6. Develop Talent Management System for
employee retainage
Supply
Hybrid
Demand
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
BOD Strategic Objectives 2016
1. Sustain revenue/profit
2. Increase market share by 20%
3. Expand business in new country
4. Initiate new manufacturing facility
5. Attain EFQM accreditation
6. Develop Talent Management System for
employee retainage
Quality
HR
Business
Develop
ment
Manufact
uring
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(1) Sustain Revenue/Profit
CHARTERING
Link to strategic objectives:
• Sustain Revenue/Profit (#1):
– Lowering prices
– Increasing market share by 20% (#2) – more sales
– New country (#3) – sales outlets
– Manufacturing (#4) to lower cost, increase profit
• External Projects – proposals generate revenue
• Partially dependent on #2, #3 and #4
• Pace: Strategic/Long-term
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(1) Sustain Revenue/Profit
Key Stakeholders
BOD
Top
Management
Administration
HR Finance IT
Business
Development Operations
Contracts Quality Manufacturing
Technical /
Services
Clients
Support
PM
Internal
Stakeholders
External
Stakeholders
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(2) Increase market share by 20%
CHARTERING
Link to strategic objectives:
• Increase market share (#2):
– Lowering prices
– New country (#3) – expand sales outlets
– Earn EFQM Quality (#5) – increase trust
– Retain staff (#6)
• External Projects – proposals generate revenue
• Partially dependent on #3, #5 and #6
• Pace: Strategic/mid-term
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(2) Increase market share by 20%
Key Stakeholders
BOD
Top
Management
Administration
HR Finance IT
Business
Development Operations
Contracts Quality Manufacturing
Technical /
Services
New Clients
Support
PM
Internal
Stakeholders
External
Stakeholders
Existing
Clients
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(3) Expand business in new country
CHARTERING
Link to strategic objectives:
• Expand Business (#3):
– EFQM (#5)
• Internal Project – open new office
• External Projects – proposals generate revenue
• Fully dependent on #5
• Pace: Strategic/short-term
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(3) Expand business in new country
Key Stakeholders
BOD
Top
Management
Administration
HR Finance IT
Business
Development Operations
Contracts Quality Manufacturing
Technical /
Services
New Clients
Support
PM
Internal
Stakeholders
External
Stakeholders
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(4) Initiate new manufacturing facility
CHARTERING
Link to strategic objectives:
• Build new Manufacturing Facility (#4)
• Internal Project – overhead
• Pace: Strategic Capital Investment/Long-lead
Item
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(4) Initiate new manufacturing facility
Key Stakeholders
BOD
Top
Management
Administration
HR Finance IT
Business
Development Operations
Contracts Quality Manufacturing
Technical /
Services
EPC
Contractor
Support
PM
Internal
Stakeholders
External
Stakeholders
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(5) Attain EFQM accreditation
CHARTERING
Link to strategic objectives:
• Attain EFQM (#5) to facilitate expansion in new
country (#3) as entry requirement and help
increase market share (#2) by providing better
quality to clients.
• Internal Project – overhead
• Pre-requisite to #2 and #3
• Pace: Fast/Urgent
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(5) Attain EFQM accreditation
Key Stakeholders
BOD
Top
Management
Administration
HR Finance IT
Business
Development Operations
Contracts Quality Manufacturing
Technical /
Services
External
Consultant
Accreditation
Body
Support
PM
Internal
Stakeholders
External
Stakeholders
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(6) Develop Talent Management System
CHARTERING
Link to strategic objectives:
• Develop Talent Management (#5) to retain qualified
resources and build the capacity of more resources to:
– Aid expansion in new country (#3)
– Help increase market share (#2)
– Aid in setting up new manufacturing facility (#4)
– Support earning EFQM (#5)
• Internal Project – overhead
• Pre-requisite to #2, #3, #4, #5
• Pace: Fast/Urgent
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
(6) Talent Management
Key Stakeholders
BOD
Top
Management
Administration
HR Finance IT
Business
Development Operations
Contracts Quality Manufacturing
Technical /
Services
Support
PM
Internal
Stakeholders
External
Stakeholders
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Roadmap
Sustain
revenue/
profit
1
Market
Share up
20%
2
Open
Business
in New
Country
3
Manufac
turing
Facility
4
EFQM
5
Talent
Manage
ment
6
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Resource / Capacity Dimension
• HR is Project Manager for Talent Initiative
• HR is required to offer support for each one of
the 5 other projects
• How does business acumen help HR in
prioritizing resources, especially when there is –
and there will always be – shortage on qualified
resources?
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Conclusions
• Supply project are pre-requisite to Demand
projects in some cases
• Any Operational Manager can be a project
manager if he learns the discipline.
• Analyzing strategic objectives helps show how
smallest project (EFQM) can have impact on all
other projects.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Business Acumen
Without this Portfolio exercise – where
project charters are made – how would each
PM know the strategic alignment, business
insight and priority of his project?
Business Acumen helps the organization
initiate profitable projects
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Thank you for your participation
28
Eng. Saadi Adra, PhDc, PfMP, PgMP, PMP, PMI-RMP,
PMI-SP, OPM3 Professional, EVP
Managing Partner, CMCS Lebanon SAL
+961 3 338 254 / +961 1 345 111
saadi.adra@cmcs-mena.com
http://lb.linkedin.com/in/saadi
http://www.cmcslebanon.com
PMI-RCP / PMO Professional Consulting Services
PMI-REP /

Contenu connexe

Tendances

CFO Summit XXI-A.Elli M&A
CFO Summit XXI-A.Elli M&ACFO Summit XXI-A.Elli M&A
CFO Summit XXI-A.Elli M&A
Alberto Elli
 
Steve Ghost - Resume 2015
Steve Ghost - Resume 2015Steve Ghost - Resume 2015
Steve Ghost - Resume 2015
Steve Ghost
 
Business plan example for widget company v 1.1 november 1st 2011 j wight-c...
Business plan example for widget company v 1.1 november 1st 2011    j wight-c...Business plan example for widget company v 1.1 november 1st 2011    j wight-c...
Business plan example for widget company v 1.1 november 1st 2011 j wight-c...
J Wight Consulting
 
Business Plan Example Of Sample Business Plan
Business Plan   Example Of  Sample Business PlanBusiness Plan   Example Of  Sample Business Plan
Business Plan Example Of Sample Business Plan
rkouzami
 
Internal Audit Market Intel 2nd Quarter 2016
Internal Audit Market Intel 2nd Quarter 2016Internal Audit Market Intel 2nd Quarter 2016
Internal Audit Market Intel 2nd Quarter 2016
David McInnis
 
Q1 Market Insight Investment Management
Q1 Market Insight Investment ManagementQ1 Market Insight Investment Management
Q1 Market Insight Investment Management
Badenoch & Clark
 

Tendances (14)

CFO Summit XXI-A.Elli M&A
CFO Summit XXI-A.Elli M&ACFO Summit XXI-A.Elli M&A
CFO Summit XXI-A.Elli M&A
 
Steve Ghost - Resume 2015
Steve Ghost - Resume 2015Steve Ghost - Resume 2015
Steve Ghost - Resume 2015
 
Fueling Strategic Transformation at Emirates National Oil Company
Fueling Strategic Transformation at Emirates National Oil CompanyFueling Strategic Transformation at Emirates National Oil Company
Fueling Strategic Transformation at Emirates National Oil Company
 
Value creation through M&A : Cross border acquisitions (Mazars Presentation ...
Value creation through M&A : Cross border acquisitions (Mazars Presentation ...Value creation through M&A : Cross border acquisitions (Mazars Presentation ...
Value creation through M&A : Cross border acquisitions (Mazars Presentation ...
 
Business plan example for widget company v 1.1 november 1st 2011 j wight-c...
Business plan example for widget company v 1.1 november 1st 2011    j wight-c...Business plan example for widget company v 1.1 november 1st 2011    j wight-c...
Business plan example for widget company v 1.1 november 1st 2011 j wight-c...
 
Business Plan Example Of Sample Business Plan
Business Plan   Example Of  Sample Business PlanBusiness Plan   Example Of  Sample Business Plan
Business Plan Example Of Sample Business Plan
 
os54-44-47-hackett-group
os54-44-47-hackett-groupos54-44-47-hackett-group
os54-44-47-hackett-group
 
Strategic Level of Confidence Valuation Method
Strategic Level of Confidence Valuation MethodStrategic Level of Confidence Valuation Method
Strategic Level of Confidence Valuation Method
 
Internal Audit Market Intel 2nd Quarter 2016
Internal Audit Market Intel 2nd Quarter 2016Internal Audit Market Intel 2nd Quarter 2016
Internal Audit Market Intel 2nd Quarter 2016
 
Q1 Market Insight Investment Management
Q1 Market Insight Investment ManagementQ1 Market Insight Investment Management
Q1 Market Insight Investment Management
 
Faraday Venture Partners
Faraday Venture PartnersFaraday Venture Partners
Faraday Venture Partners
 
Executive Summary StartUp@Singapore
Executive Summary StartUp@SingaporeExecutive Summary StartUp@Singapore
Executive Summary StartUp@Singapore
 
2 Ch01
2 Ch012 Ch01
2 Ch01
 
Corporate Partnering Engagement
Corporate Partnering EngagementCorporate Partnering Engagement
Corporate Partnering Engagement
 

Similaire à Pmi lebanon conference workshop-initiating proftiable projects-saadi adra

Project management and organizational change management
Project management and organizational change managementProject management and organizational change management
Project management and organizational change management
Susan Boyd
 
Managing an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT programManaging an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT program
Gottfried Rudorfer
 
Beta for business & technology research & innovation 2015
Beta for business & technology research & innovation   2015Beta for business & technology research & innovation   2015
Beta for business & technology research & innovation 2015
Beta-Research.org
 
An Introduction to Visual Management Systems
An Introduction to Visual Management SystemsAn Introduction to Visual Management Systems
An Introduction to Visual Management Systems
Derek Huether
 

Similaire à Pmi lebanon conference workshop-initiating proftiable projects-saadi adra (20)

PMI Global Congress 2012
PMI Global Congress 2012PMI Global Congress 2012
PMI Global Congress 2012
 
SMAC and Transforming Innovation
SMAC and Transforming InnovationSMAC and Transforming Innovation
SMAC and Transforming Innovation
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinar
 
Webinar: Project portfolio management - slides
Webinar: Project portfolio management - slidesWebinar: Project portfolio management - slides
Webinar: Project portfolio management - slides
 
Project management and organizational change management
Project management and organizational change managementProject management and organizational change management
Project management and organizational change management
 
GOV05-final-ppt
GOV05-final-pptGOV05-final-ppt
GOV05-final-ppt
 
GOV05-final-ppt
GOV05-final-pptGOV05-final-ppt
GOV05-final-ppt
 
Managing an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT programManaging an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT program
 
PMI Global Congress North America 2015 - Change the system, not the people.
PMI Global Congress North America 2015 - Change the system, not the people.PMI Global Congress North America 2015 - Change the system, not the people.
PMI Global Congress North America 2015 - Change the system, not the people.
 
Beta for business & technology research & innovation 2015
Beta for business & technology research & innovation   2015Beta for business & technology research & innovation   2015
Beta for business & technology research & innovation 2015
 
Build Operate Market Transfer (BOMT) Model for Start-ups
Build Operate Market Transfer (BOMT) Model for Start-upsBuild Operate Market Transfer (BOMT) Model for Start-ups
Build Operate Market Transfer (BOMT) Model for Start-ups
 
An Introduction to Visual Management Systems
An Introduction to Visual Management SystemsAn Introduction to Visual Management Systems
An Introduction to Visual Management Systems
 
Climbing the Ladder Means Letting Go: Attributes that make you good at one le...
Climbing the Ladder Means Letting Go: Attributes that make you good at one le...Climbing the Ladder Means Letting Go: Attributes that make you good at one le...
Climbing the Ladder Means Letting Go: Attributes that make you good at one le...
 
Resume : "COBIT 5 for Business Benefits Realization"
Resume : "COBIT 5 for Business Benefits Realization"Resume : "COBIT 5 for Business Benefits Realization"
Resume : "COBIT 5 for Business Benefits Realization"
 
Investment Analysis Presentation Template
Investment Analysis Presentation TemplateInvestment Analysis Presentation Template
Investment Analysis Presentation Template
 
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish Relations Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
 
WORLD-CLASS EXCELLENCE MODEL Congreso internacional PMI Bogotá 1a3 nov2012 h
WORLD-CLASS EXCELLENCE MODEL Congreso internacional PMI Bogotá 1a3 nov2012 hWORLD-CLASS EXCELLENCE MODEL Congreso internacional PMI Bogotá 1a3 nov2012 h
WORLD-CLASS EXCELLENCE MODEL Congreso internacional PMI Bogotá 1a3 nov2012 h
 
A Stress-free Guide to Mergers Acquisitions and Divestitures.pdf
A Stress-free Guide to Mergers Acquisitions and Divestitures.pdfA Stress-free Guide to Mergers Acquisitions and Divestitures.pdf
A Stress-free Guide to Mergers Acquisitions and Divestitures.pdf
 
How to Choose the Right CRE Technology Partner Webinar.pdf
How to Choose the Right CRE Technology Partner Webinar.pdfHow to Choose the Right CRE Technology Partner Webinar.pdf
How to Choose the Right CRE Technology Partner Webinar.pdf
 
Scope: Mastering the Fuzzy Constraint
Scope: Mastering the Fuzzy ConstraintScope: Mastering the Fuzzy Constraint
Scope: Mastering the Fuzzy Constraint
 

Plus de PMILebanonChapter

Plus de PMILebanonChapter (20)

PMILC Newsletter Q3 2021
PMILC Newsletter Q3 2021PMILC Newsletter Q3 2021
PMILC Newsletter Q3 2021
 
PMI LC newsletter Q4 2020
PMI LC newsletter Q4 2020PMI LC newsletter Q4 2020
PMI LC newsletter Q4 2020
 
PMI LC Q3 2020
PMI LC Q3 2020PMI LC Q3 2020
PMI LC Q3 2020
 
PMI LC Newsletter Q2 2020
PMI LC Newsletter Q2 2020PMI LC Newsletter Q2 2020
PMI LC Newsletter Q2 2020
 
PMI LC Newsletter Q1 2020
PMI LC Newsletter Q1 2020PMI LC Newsletter Q1 2020
PMI LC Newsletter Q1 2020
 
PMI Lebanon Chapter Newsletter Q4 2019
PMI Lebanon Chapter Newsletter Q4 2019PMI Lebanon Chapter Newsletter Q4 2019
PMI Lebanon Chapter Newsletter Q4 2019
 
I, project manager, The rise of artificial intelligence in the world of proje...
I, project manager, The rise of artificial intelligence in the world of proje...I, project manager, The rise of artificial intelligence in the world of proje...
I, project manager, The rise of artificial intelligence in the world of proje...
 
insurance policies in projects
 insurance policies in projects insurance policies in projects
insurance policies in projects
 
PMI LC Newsletter 2019
PMI LC Newsletter 2019PMI LC Newsletter 2019
PMI LC Newsletter 2019
 
2019 August - Jad Abou Ibrahim
2019 August - Jad Abou Ibrahim2019 August - Jad Abou Ibrahim
2019 August - Jad Abou Ibrahim
 
2019 july pmi coaching and soft skills
2019 july pmi coaching and soft skills2019 july pmi coaching and soft skills
2019 july pmi coaching and soft skills
 
PMI Lebanon chapter newsletter Q219
PMI Lebanon chapter newsletter Q219PMI Lebanon chapter newsletter Q219
PMI Lebanon chapter newsletter Q219
 
Crypto currencies presentation by Dr. Andre Gholam
Crypto currencies presentation by Dr. Andre GholamCrypto currencies presentation by Dr. Andre Gholam
Crypto currencies presentation by Dr. Andre Gholam
 
Leading Millennials in a project context by Mr Charbel Azar
Leading Millennials in a project context by Mr Charbel AzarLeading Millennials in a project context by Mr Charbel Azar
Leading Millennials in a project context by Mr Charbel Azar
 
The Known Unknown - Importance of Project Risk Management by Mr Wissam Yaacoub
The Known Unknown - Importance of Project Risk Management by Mr Wissam YaacoubThe Known Unknown - Importance of Project Risk Management by Mr Wissam Yaacoub
The Known Unknown - Importance of Project Risk Management by Mr Wissam Yaacoub
 
PMI Lebanon chapter newsletter Q1 2019
PMI Lebanon chapter newsletter Q1 2019PMI Lebanon chapter newsletter Q1 2019
PMI Lebanon chapter newsletter Q1 2019
 
Values - Applying Emotional Intelligence Concepts in a Project Environment by...
Values - Applying Emotional Intelligence Concepts in a Project Environment by...Values - Applying Emotional Intelligence Concepts in a Project Environment by...
Values - Applying Emotional Intelligence Concepts in a Project Environment by...
 
Behavioral styles 2019 - Applying Emotional Intelligence Concepts in a Proj...
Behavioral styles   2019 - Applying Emotional Intelligence Concepts in a Proj...Behavioral styles   2019 - Applying Emotional Intelligence Concepts in a Proj...
Behavioral styles 2019 - Applying Emotional Intelligence Concepts in a Proj...
 
"so you think you know the code" by Mrs. Gretta Kelzi
"so you think you know the code" by Mrs. Gretta Kelzi"so you think you know the code" by Mrs. Gretta Kelzi
"so you think you know the code" by Mrs. Gretta Kelzi
 
Another Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham ZeinounAnother Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham Zeinoun
 

Dernier

Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 

Dernier (20)

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 

Pmi lebanon conference workshop-initiating proftiable projects-saadi adra

  • 1. Initiating Profitable Projects Business Acumen - Strategic Objective PMI Lebanon Chapter Habtoor-Beirut / November 12, 2015 Saadi Adra, PhD c, PgMP, OPM3, PMP, RMP, SP, MPM, EVP Managing Partner CMCS Lebanon SAL
  • 2. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Outline • Hypothetical Case Study • Strategic Objectives • Demand Generation Projects • Hybrid (Internal/External) Projects • Supply – Capacity Building Projects • Portfolio Roadmap • Reaping the Benefits
  • 3. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. The content presents an overview on the different reasons and objectives for initiating projects within an organization. This includes revenue-generating projects that participate in making profit, in addition to various internal capacity and capability building projects. The Focus is on how projects infiltrate the organization and actually participate in achieving various organizational objectives, ultimately generating profit. Abstract
  • 4. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. What is Business Acumen? Business Acumen Leadership Technical PM
  • 5. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Organization Structure BOD Top Management Administration HR Finance IT Business Development Operations Contracts Quality Manufacturing Technical / Services
  • 6. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Hypothetical Case Context • 2016 hard year to do business • High employee turnover • To sustain is to lower prices
  • 7. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. BOD Strategic Goals • Preserve same revenue/profit by lowering prices and enhancing quality, hence increasing sales • Lowering prices requires manufacturing some components rather than import • Enhancing quality require better QMS and retaining qualified staff
  • 8. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Supply and Demand Projects Supply Enhance quality, Capacity Building, Develop a better methodology,… Hybrid Open a new branch; Invest in Supply of new office, staff,… New branch prepares proposals Demand Prepare proposals to win new contracts Revenue Generation Consume Budgets Revenue Generation Capacity Building
  • 9. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. BOD Strategic Objectives 2016 1. Sustain revenue/profit 2. Increase market share by 20% 3. Expand business in new country 4. Initiate new manufacturing facility 5. Attain EFQM accreditation 6. Develop Talent Management System for employee retainage
  • 10. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Internal Vs External Investments 1. Sustain revenue/profit 2. Increase market share by 20% 3. Expand business in new country 4. Initiate new manufacturing facility 5. Attain EFQM accreditation 6. Develop Talent Management System for employee retainage Supply Hybrid Demand
  • 11. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. BOD Strategic Objectives 2016 1. Sustain revenue/profit 2. Increase market share by 20% 3. Expand business in new country 4. Initiate new manufacturing facility 5. Attain EFQM accreditation 6. Develop Talent Management System for employee retainage Quality HR Business Develop ment Manufact uring
  • 12. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (1) Sustain Revenue/Profit CHARTERING Link to strategic objectives: • Sustain Revenue/Profit (#1): – Lowering prices – Increasing market share by 20% (#2) – more sales – New country (#3) – sales outlets – Manufacturing (#4) to lower cost, increase profit • External Projects – proposals generate revenue • Partially dependent on #2, #3 and #4 • Pace: Strategic/Long-term
  • 13. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (1) Sustain Revenue/Profit Key Stakeholders BOD Top Management Administration HR Finance IT Business Development Operations Contracts Quality Manufacturing Technical / Services Clients Support PM Internal Stakeholders External Stakeholders
  • 14. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (2) Increase market share by 20% CHARTERING Link to strategic objectives: • Increase market share (#2): – Lowering prices – New country (#3) – expand sales outlets – Earn EFQM Quality (#5) – increase trust – Retain staff (#6) • External Projects – proposals generate revenue • Partially dependent on #3, #5 and #6 • Pace: Strategic/mid-term
  • 15. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (2) Increase market share by 20% Key Stakeholders BOD Top Management Administration HR Finance IT Business Development Operations Contracts Quality Manufacturing Technical / Services New Clients Support PM Internal Stakeholders External Stakeholders Existing Clients
  • 16. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (3) Expand business in new country CHARTERING Link to strategic objectives: • Expand Business (#3): – EFQM (#5) • Internal Project – open new office • External Projects – proposals generate revenue • Fully dependent on #5 • Pace: Strategic/short-term
  • 17. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (3) Expand business in new country Key Stakeholders BOD Top Management Administration HR Finance IT Business Development Operations Contracts Quality Manufacturing Technical / Services New Clients Support PM Internal Stakeholders External Stakeholders
  • 18. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (4) Initiate new manufacturing facility CHARTERING Link to strategic objectives: • Build new Manufacturing Facility (#4) • Internal Project – overhead • Pace: Strategic Capital Investment/Long-lead Item
  • 19. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (4) Initiate new manufacturing facility Key Stakeholders BOD Top Management Administration HR Finance IT Business Development Operations Contracts Quality Manufacturing Technical / Services EPC Contractor Support PM Internal Stakeholders External Stakeholders
  • 20. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (5) Attain EFQM accreditation CHARTERING Link to strategic objectives: • Attain EFQM (#5) to facilitate expansion in new country (#3) as entry requirement and help increase market share (#2) by providing better quality to clients. • Internal Project – overhead • Pre-requisite to #2 and #3 • Pace: Fast/Urgent
  • 21. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (5) Attain EFQM accreditation Key Stakeholders BOD Top Management Administration HR Finance IT Business Development Operations Contracts Quality Manufacturing Technical / Services External Consultant Accreditation Body Support PM Internal Stakeholders External Stakeholders
  • 22. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (6) Develop Talent Management System CHARTERING Link to strategic objectives: • Develop Talent Management (#5) to retain qualified resources and build the capacity of more resources to: – Aid expansion in new country (#3) – Help increase market share (#2) – Aid in setting up new manufacturing facility (#4) – Support earning EFQM (#5) • Internal Project – overhead • Pre-requisite to #2, #3, #4, #5 • Pace: Fast/Urgent
  • 23. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. (6) Talent Management Key Stakeholders BOD Top Management Administration HR Finance IT Business Development Operations Contracts Quality Manufacturing Technical / Services Support PM Internal Stakeholders External Stakeholders
  • 24. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Roadmap Sustain revenue/ profit 1 Market Share up 20% 2 Open Business in New Country 3 Manufac turing Facility 4 EFQM 5 Talent Manage ment 6
  • 25. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Resource / Capacity Dimension • HR is Project Manager for Talent Initiative • HR is required to offer support for each one of the 5 other projects • How does business acumen help HR in prioritizing resources, especially when there is – and there will always be – shortage on qualified resources?
  • 26. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Conclusions • Supply project are pre-requisite to Demand projects in some cases • Any Operational Manager can be a project manager if he learns the discipline. • Analyzing strategic objectives helps show how smallest project (EFQM) can have impact on all other projects.
  • 27. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Business Acumen Without this Portfolio exercise – where project charters are made – how would each PM know the strategic alignment, business insight and priority of his project? Business Acumen helps the organization initiate profitable projects
  • 28. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Thank you for your participation 28 Eng. Saadi Adra, PhDc, PfMP, PgMP, PMP, PMI-RMP, PMI-SP, OPM3 Professional, EVP Managing Partner, CMCS Lebanon SAL +961 3 338 254 / +961 1 345 111 saadi.adra@cmcs-mena.com http://lb.linkedin.com/in/saadi http://www.cmcslebanon.com PMI-RCP / PMO Professional Consulting Services PMI-REP /