• Captive power today is significant source of power
for the Indian economy, which plays an important
role in the present power scenario being
characterised by inadequate supply of power, poor
and unreliable power quality, and high tariffs
resulted due to heavy cross-subsidization. There is
paradigm shift in usage pattern of captive power
plants from back-up use to baseload use.
• Presently the captive power plants capacity
accounts for nearly one-fifth of the total installed
capacity. With liberalisation of economy and
technological developments many options are
available for captive structuring.
• The Electricity Act 2003 has
legislatively facilitated setting up &
operation of captive power plants.
Other policies such as the National
Electricity Policy 2005, the National
Tariff Policy 2006, the Captive Power
Policy (draft) and various state policies
contains the clauses relevant to
encourage the development of captive
power plants in India.
• Six states – Gujarat, Orissa, Andhra Pradesh, Madhya
Pradesh, Karnataka and Tamil Nadu – account for
almost two-thirds of the captive capacity. Other
significant contributors include Bihar, Maharashtra and
Uttar Pradesh.
• For the industries that use energy intensively, the energy
is the critical component of the total production cost.
• The engineering, chemical and mineral/metal industries
account for almost two-thirds of the total installed
capacity in the captive segment. Other industries include
cement, textiles and sugar.
• The captive generator has a number of fuel
options today. The choice could be between oil,
natural gas, naphtha, bagasse or coal.There are
also options like wind and hydro.
• Availability of open access is the major issue
related to the selling of power to grid by captive
power plants.
• Other issues are related to the strengthening of
intra-state and inter-state transmission network,
reasonable tariff and availability of available
additional fuel required by the captive power
plants.
• Installation of captive power plants in
future is likely to grow at a higher rate
compared to the current rate of growth.
The promise for future growth of captive power
plants lies with the renewable sources of energy.
Fossil fuels are limited and have adverse
environmental impact. Captive demand,
therefore, provides an attractive ‘niche’ for
renewable energy to be deployed in industry.
Some features:
• Captive Power refers to generation from a unit set up
by industry for its exclusive consumption.
• Captive power plants are essentially non utility power
plants.
• These power plants are owned by specific industries
which consume all the power produced for its
production purposes.
• The size of these power plants varies. These power
plants can be as small as 0.2 MW or can be as big as
300 MW.
The major factors responsible for the soaring growth of the
captive power plants are, as follows:
– Non-availability of adequate grid supply
– Poor quality and reliability of grid supply
– High tariff as a result of heavy cross
subsidisation
The Advantages
– Captive power plant is close to the load centre and
hence reduction in the fixed cost of electricity generated
due to lesser stranded assets
– Reduced transmission and distribution losses
– Grid is strengthened at multiple points, even at the tail-
ends.
– Higher thermal efficiency, due to waste heat recovery
by method of cogeneration
– Distribution of environmental impact
– Shorter gestation period to set up power plants
– Captive power plants have modular designs and hence
can match the load profile
Concern for state electricity boards on account of following
reasons:
Captive plants may have adverse impacts on the finances of
the utility, such as:
– Industrial load is the main source for cross-subsidising
revenue flows
– Billing and collection is much more efficient for HT consumers
– State electricity board’s ability to service escrow accounts for
security packages is also reduced
– Non-optimal growth of the sector
– Problems in grid management especially in case of states
with surplus power
– Adverse environmental impacts arising from types of fuels
used and from higher emissions per unit of production, as
compared to large power plants
– Reliability of power supply from captive and cogeneration
plants as a source of firm power
Concern of the owners of captive power plants
stems from:
– Non-remunerative tariff structure for surplus power
produced by them
– No risk sharing in case of non availability of fuel,
change in variable cost due to switching of fuel after
entering into power purchase agreement (PPA), etc
– Inadequacies in wheeling and banking facilities
– High contract demand charges
– High level of duties and taxes on sale of power
– High wheeling losses assumed for power to be sold
to grid by captive power plant
– Need to devote time and energy to an activity, which
is not their core business
– Restrictions on the minimum amount of power to be
wheeled
– If the captive power plant fails, charges for back-up or
standby power from the grid are generally twice the
normal rate for captive plants
Captive power plant has been defined
under the Electricity Act-2003 as
• “…a power plant set up by any person to
generate electricity primarily for his own
use and includes a power plant set up by
any co-operative society or association of
persons for generating electricity primarily
for use of members of such cooperative
society or association”.
• Provisions of the Electricity Act 2003 and Electricity Rules 2005
• The Electricity Act 2003 has legislatively facilitated setting up & operation of captive power
plants, which mandates the following:
• According to Section 2(8) of the Act
• “Captive Generating Plant” has been defined as a power plant set up by any person to generate
electricity primarily for his use and includes a power plant set up by co-operative society or
association of persons for generating electricity primarily for use of members of such co-operative
society or association.
• Section 9 of the Act Mandates that:
• 9. Captive generation. - (1) Notwithstanding anything contained in this Act, a person may
construct, maintain or operate a captive generating plant and dedicated transmission lines:
• Provided that the supply of electricity from the captive generating plant through the grid shall be
regulated in the same manner as the generating station of a generating company.
• (2) Every person, who has constructed a captive generating plant and maintains and operates
such plant, shall have the right to open access for the purposes of carrying electricity from his
captive generating plant to the destination of his use:
• Provided that such open access shall be subject to availability of adequate transmission facility
and such availability of transmission facility shall be determined by the Central Transmission
Utility or the State Transmission Utility, as the case may be:
• Provided further that any dispute regarding the availability of transmission facility shall be
adjudicated upon by the Appropriate Commission.”
Section 40 of the Act mandates that:
• 40. Duties of transmission licensees. -
• ………………………………………………..
• Provided also that such surcharge shall not be
leviable in case open access is provided to a
person who has established a captive
generating plant for carrying the electricity to the
destination of his own use.
42. Duties of distribution licensee and open access. –
• Provided also that such surcharge shall not be leviable in case open
access is provided to a person who has established a captive
generating plant for carrying the electricity to the destination of his
own use.
• A CPP connected with the grid acquires the status of a generating
company under the provisions of Section 9 of the Act and is thus
required to fulfill obligation of the generating company as contained
in the Act and rules/regulations framed thereunder. Section 10(2) of
the Act states that a generating company may supply electricity to
any licensee in accordance with the Act and rules & regulations
made thereunder and also to any consumer under open access
subject to proviso of Section 42(2) of the Act.
• Section 62 of the Act outlines that an
appropriate commission shall determine
the tariff of supply affected by a generating
company to the distribution licensee. This
section applies to such sale by CPP also.
Thus, it will also cover the contingency of
procurement and purchase of power on
day to day basis for meeting short term
requirement to meet shortages.
The relevant clause of the Electricity Act 2003 is given
as under:
• 62. Determination of tariff. - (1) The Appropriate Commission shall
determine the tariff in accordance with provisions of this Act for –
• (a) Supply of electricity by a generating company to a
distribution licensee:
• Provided that the Appropriate Commission may, in case of
shortage of supply of electricity, fix the minimum and maximum
ceiling of tariff for sale or purchase of electricity in pursuance of an
agreement, entered into between a generating company and a
licensee or between licensees, for a period not exceeding one year
to ensure reasonable prices of electricity;
• (b) Transmission of electricity;
• (c) Wheeling of electricity;
• (d) Retail sale of electricity.
Determination of tariff as per
Electricity Act contd.
• Provided that in case of distribution of electricity in the same area by
two or more distribution licensees, the Appropriate Commission
may, for promoting competition among distribution licensees, fix only
maximum ceiling of tariff for retail sale of electricity.”
• The Electricity Act mandates that an appropriate commission in case
of shortage of supply of electricity can also fix minimum and
maximum ceiling of tariff for sale or purchase of electricity.
• It is obligatory on part of a Captive Power Plant to get its tariff
determined for its sale of power to distribution licensee and for a
distribution licensee to enter in an agreement for power purchases
of power at the tariff determined by the Commission.
• It has been clarified under Electricity Rules 2005 issued by the
Government of India on dated 8.6.2005 that the captive
generating plant shall be qualified as such if not less than 26%
of the ownership is held by the captive user(s) and not less
than 51% of the aggregate electricity generated is consumed
for captive use.
• Provisions of the National Electricity Policy
• In the National Electricity Policy notified by the Government of India, it has
been stated that the liberal provisions for setting up CPPs have been made
in order to secure a cost effective quality power thereby generating
employment opportunities mandating a speedy and efficient growth of the
industry. The appropriate commissions shall determine the tariff of the
supply when a licensee takes power from a Captive Power Plant. The
relevant para of NEP reads as under:
• 5.2.2 The Government of India has initiated several reform measures to
create a favorable environment for addition of new generating capacity in
the country. The Electricity Act 2003 has put in place a highly liberal
framework for generation. There is no requirement of licensing for
generation. The requirement of techno-economic clearance of CEA for
thermal generation project is no longer there. For hydroelectric generation
also, the limit of capital expenditure, above which concurrence of CEA is
required, would be raised suitably from the present level. Captive
generation has been freed from all controls.
• 5.7.1 (c) Captive generating plants should be
permitted to sell electricity to licensees and
consumers when they are allowed open access
by SERCs under section 42 of the Act.
• 5.2.24 The liberal provision in the Electricity Act,
2003 with respect to setting up of captive power
plant has been made with a view to not only
securing reliable, quality and cost effective
power but also to facilitate creation of
employment opportunities through speedy and
efficient growth of industry.
Provisions of Group Captives as
per Electricity Act 2003
• 5.2.25 The provision relating to captive power
plants to be set up by group of consumers is
primarily aimed at enabling small and medium
industries or other consumers that may not
individually be in a position to set up plant of
optimal size in a cost effective manner. It needs
to be noted that efficient expansion of small and
medium industries across the country would
lead to creation of enormous employment
opportunities.
Surplus Power of Captives
• 5.2.26 A large number of captive and standby generating
stations in India have surplus capacity that could be
supplied to the grid continuously or during certain time
periods. These plants offer a sizeable and potentially
competitive capacity that could be harnessed for meeting
demand for power. Under the Act, captive generators
have access to licensees and would get access to
consumers who are allowed open access. Grid inter-
connections for captive generators shall be facilitated as
per section 30 of the Act. This should be done on priority
basis to enable captive generation to become available
as distributed generation along the grid.
Role of Non-Conventional Energy Sources
• Towards this end, non-conventional energy sources
including co-generation could also play a role.
Appropriate commercial arrangements would need to be
instituted between licensees and the captive generators
for harnessing of spare capacity energy from captive
power plants.
• The appropriate Regulatory Commission shall exercise
regulatory oversight on such commercial arrangements
between captive generators and licensees and
determine tariffs when a licensee is the off-taker of
power from captive plant.
• Provisions of the National Tariff Policy:
• In pursuance to section 3 of the Act, the Central
Government has notified on 6.01.06 the tariff policy,
which among others has also emphasized the need for
harnessing the Captive generation. The salient features
of which are as under:
• 5.4 While it is recognized that the State Governments
have the right to impose duties, taxes, cess on sale or
consumption of electricity, these could potentially distort
competition and optimal use of resources especially if
such levies are used selectively and on a non- uniform
basis.
• In some cases, the duties etc. on consumption of
electricity is linked to sources of generation (like captive
generation) and the level of duties levied is much higher
as compared to that being levied on the same category
of consumers who draw power from grid. Such a
distinction is invidious and inappropriate.
• The sole purpose of freely allowing captive generation is
to enable industries to access reliable, quality and cost
effective power. Particularly, the provisions relating to
captive power plants which can be set up by group of
consumers has been brought in recognition of the fact
that efficient expansion of small and medium industries
across the country will lead to faster economic growth
and creation of larger employment opportunities.
• For realizing the goal of making available
electricity to consumers at reasonable and
competitive prices, it is necessary that
such duties are kept at reasonable level.
Tariff structuring and associated issues
• (1) A two-part tariff structure should be adopted
for all long term contracts to facilitate Merit Order
dispatch.
• According to National Electricity Policy, the
Availability Based Tariff (ABT) is to be
introduced at State level by April 2006. This
framework would be extended to generating
stations (including grid connected captive plants
of capacities as determined by the SERC). The
Appropriate Commission may also introduce
differential rates of fixed charges for peak and
off peak hours for better management of load.
LIMITATIONS
– Transaction of power between CPP and grid depends
on availability of open access. Thus the issues related
to open access are
» The State Regulatory Commissions which have not
issued the regulations for open access may have to
expedite the process.
» The State Regulators may be urged to develop
progressive and encouraging policies for CPP (like
one issued by MERC)
» No electricity duty should be imposed on self
consumption of electricity generated by Captive
Power Plants of a industry. Reasonable duty may
be imposed for sale of power.
Limitations
» Reduction in contract demand of a CPP holder with
distribution licensee may be allowed without any penalty.
» CPPs which are parallel with the grid, standby demand
charges should be reasonable. However, if the CPP
exceeds the Contract standby Demand then reasonable
penal rate should be applicable on excess drawl.
» High wheeling charges & losses make open access
unviable.As captive surplus would be sold within a limited
area, wheeling charges / losses should be applied for the
particular area rather than average grid charge / losses.
» Wheeling charges for transfer of surplus power may not
exceed 7% of the generation cost within the state.
Limitations
» The cross subsidy surcharge applicable on HT
consumers opting to purchase surplus power from
CPPs must be reasonable. This may be fixed in
accordance with avoided cost method suggested by
FOIR (Forum of Indian Regulators).
» For the purpose of recovery of T&D losses in OA
charges, the losses should be benchmarked to
reflect technical losses, gradually reduced and
equitably distributed. Gradually recovery of
commercial losses needs to be reduced
» Parallel Operation Charges (POC) imposed by state
utility is very high. Aligning of POC with ABT regime
would encourage connectivity to grid for facilitating
transfer of surplus power to the licensee.
Limitations
» Banking of energy may be allowed by the distribution
licensee and shall be regulated by the energy banking
agreement.
» For Continuous Process Industry round the clock banking
should be permitted with a rider that energy banked at
night should be drawn during the night hours only.
» For the present, 0. 5 class metering arrangement may be
allowed. 0.2 class accuracy metering arrangement as
required as metering regulations may be installed in
phases.
» Imposition of cess on captive power generation.
– Strengthening of intra-state and inter-state transmission
network.
– Fixation of reasonable tariff by State Regulatory Commission
for the surplus power available from the CPPs.
• To make available additional fuel required by the CPPs.

Contenu connexe

Tendances

Restructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORRestructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORANKUR MAHESHWARI
 
Microgrid Presentation
Microgrid PresentationMicrogrid Presentation
Microgrid PresentationShahab Khan
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in indiaJasgt Singh
 
Smart grid(v1)
Smart grid(v1)Smart grid(v1)
Smart grid(v1)sahar148
 
Role of substation in smart grid
Role of substation in smart grid Role of substation in smart grid
Role of substation in smart grid MANGESHKULKARNI72
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in IndiaDaya Kherwar
 
Deregulation in power industry
Deregulation in power industryDeregulation in power industry
Deregulation in power industryjerry patel
 
Major electrical equipment in power plants
Major electrical equipment in power plantsMajor electrical equipment in power plants
Major electrical equipment in power plantsFateh Singh
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substationAshutosh Srivastava
 
Power Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & MonotoringPower Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & MonotoringParth Patel
 
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )Mathankumar S
 
Artificial intelligence in power system
Artificial intelligence in power systemArtificial intelligence in power system
Artificial intelligence in power systemBittu Goswami
 

Tendances (20)

Restructuring of power grid
Restructuring of power gridRestructuring of power grid
Restructuring of power grid
 
Restructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORRestructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTOR
 
Smart grid challenge
Smart grid challengeSmart grid challenge
Smart grid challenge
 
Microgrid Presentation
Microgrid PresentationMicrogrid Presentation
Microgrid Presentation
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in india
 
Smart grid(v1)
Smart grid(v1)Smart grid(v1)
Smart grid(v1)
 
Role of substation in smart grid
Role of substation in smart grid Role of substation in smart grid
Role of substation in smart grid
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Deregulation in power industry
Deregulation in power industryDeregulation in power industry
Deregulation in power industry
 
KSEB Training Reporty
KSEB Training ReportyKSEB Training Reporty
KSEB Training Reporty
 
Open access ppt
Open access pptOpen access ppt
Open access ppt
 
Major electrical equipment in power plants
Major electrical equipment in power plantsMajor electrical equipment in power plants
Major electrical equipment in power plants
 
Evolution of Smart Grids
Evolution of Smart GridsEvolution of Smart Grids
Evolution of Smart Grids
 
Energy management
Energy managementEnergy management
Energy management
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
Footstep power generation
Footstep power generationFootstep power generation
Footstep power generation
 
Restructuring
RestructuringRestructuring
Restructuring
 
Power Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & MonotoringPower Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & Monotoring
 
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )
POWER SYSTEM SIMULATION LAB-1 MANUAL (ELECTRICAL - POWER SYSTEM ENGINEERING )
 
Artificial intelligence in power system
Artificial intelligence in power systemArtificial intelligence in power system
Artificial intelligence in power system
 

Similaire à Captive power Policy

Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of ElectricityRupesh Bobbili
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxmsounak95
 
New Entrants in Electric Generation in Tennessee Valley
New Entrants in Electric Generation in Tennessee ValleyNew Entrants in Electric Generation in Tennessee Valley
New Entrants in Electric Generation in Tennessee ValleyTNenergy
 
Glen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REGlen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REANUECI
 
Tapping potential of waste heat to power and energy conservation
Tapping potential of waste heat to power and energy conservationTapping potential of waste heat to power and energy conservation
Tapping potential of waste heat to power and energy conservationIPPAI
 
roof top solar for net metering and gross metering.pptx
roof top solar for net metering and gross metering.pptxroof top solar for net metering and gross metering.pptx
roof top solar for net metering and gross metering.pptxsonu1811
 
brief policies.pptx
brief policies.pptxbrief policies.pptx
brief policies.pptxssuser9f2ad7
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNAIPPAI
 
Environmental show of the south 2014 new entrants in electricity generation
Environmental show of the south 2014 new entrants in electricity generationEnvironmental show of the south 2014 new entrants in electricity generation
Environmental show of the south 2014 new entrants in electricity generationTNenergy
 
RSN 4 Generation of ELectricity.pdf
RSN 4 Generation of ELectricity.pdfRSN 4 Generation of ELectricity.pdf
RSN 4 Generation of ELectricity.pdfSourav Bhunia
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Spark Network
 
Consideration of reactive energy in the tariff structure
Consideration of reactive energy in the tariff structureConsideration of reactive energy in the tariff structure
Consideration of reactive energy in the tariff structureIAEME Publication
 
Renewable Energy Certificate (REC) Mechanism
Renewable Energy Certificate (REC) MechanismRenewable Energy Certificate (REC) Mechanism
Renewable Energy Certificate (REC) MechanismKranav Sharma
 

Similaire à Captive power Policy (20)

Captive gen
Captive genCaptive gen
Captive gen
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
 
Electricity policies
Electricity policiesElectricity policies
Electricity policies
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptx
 
New Entrants in Electric Generation in Tennessee Valley
New Entrants in Electric Generation in Tennessee ValleyNew Entrants in Electric Generation in Tennessee Valley
New Entrants in Electric Generation in Tennessee Valley
 
Ee09 801 eed ppt
Ee09 801 eed pptEe09 801 eed ppt
Ee09 801 eed ppt
 
Glen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REGlen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of RE
 
Tapping potential of waste heat to power and energy conservation
Tapping potential of waste heat to power and energy conservationTapping potential of waste heat to power and energy conservation
Tapping potential of waste heat to power and energy conservation
 
roof top solar for net metering and gross metering.pptx
roof top solar for net metering and gross metering.pptxroof top solar for net metering and gross metering.pptx
roof top solar for net metering and gross metering.pptx
 
brief policies.pptx
brief policies.pptxbrief policies.pptx
brief policies.pptx
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
 
Environmental show of the south 2014 new entrants in electricity generation
Environmental show of the south 2014 new entrants in electricity generationEnvironmental show of the south 2014 new entrants in electricity generation
Environmental show of the south 2014 new entrants in electricity generation
 
RSN 4 Generation of ELectricity.pdf
RSN 4 Generation of ELectricity.pdfRSN 4 Generation of ELectricity.pdf
RSN 4 Generation of ELectricity.pdf
 
Draft Feed-In Tariffs
Draft Feed-In TariffsDraft Feed-In Tariffs
Draft Feed-In Tariffs
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013
 
DSM.pptx
DSM.pptxDSM.pptx
DSM.pptx
 
Consideration of reactive energy in the tariff structure
Consideration of reactive energy in the tariff structureConsideration of reactive energy in the tariff structure
Consideration of reactive energy in the tariff structure
 
A present energy scenario
A present energy scenarioA present energy scenario
A present energy scenario
 
Renewable Energy Certificate (REC) Mechanism
Renewable Energy Certificate (REC) MechanismRenewable Energy Certificate (REC) Mechanism
Renewable Energy Certificate (REC) Mechanism
 

Plus de PRIYANK JAIN

Training power exchanges_18-may-2014
Training power exchanges_18-may-2014Training power exchanges_18-may-2014
Training power exchanges_18-may-2014PRIYANK JAIN
 
Srldc 28 May2013_congestionEnergy & Power Meet
Srldc 28 May2013_congestionEnergy & Power MeetSrldc 28 May2013_congestionEnergy & Power Meet
Srldc 28 May2013_congestionEnergy & Power MeetPRIYANK JAIN
 
Hydro Power Harnessing priyank
Hydro Power Harnessing priyankHydro Power Harnessing priyank
Hydro Power Harnessing priyankPRIYANK JAIN
 
Priyank jain - Wind detailed project report _12 mw
Priyank jain - Wind detailed project report _12 mwPriyank jain - Wind detailed project report _12 mw
Priyank jain - Wind detailed project report _12 mwPRIYANK JAIN
 
Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl finalPRIYANK JAIN
 
Canada’s electricity sector reform
Canada’s electricity sector reform Canada’s electricity sector reform
Canada’s electricity sector reform PRIYANK JAIN
 
Enterprenure case study
Enterprenure case studyEnterprenure case study
Enterprenure case studyPRIYANK JAIN
 
Fuel gap for Power Sector priyank
Fuel gap for Power Sector  priyankFuel gap for Power Sector  priyank
Fuel gap for Power Sector priyankPRIYANK JAIN
 
Hydro Power Envirentment interface
Hydro Power Envirentment interfaceHydro Power Envirentment interface
Hydro Power Envirentment interfacePRIYANK JAIN
 
Assumptions: Strategy already defined Strategy not subject to sudden chang...
Assumptions:  Strategy already defined   Strategy not subject to sudden chang...Assumptions:  Strategy already defined   Strategy not subject to sudden chang...
Assumptions: Strategy already defined Strategy not subject to sudden chang...PRIYANK JAIN
 
National housing & habitat policy priyank
National housing & habitat policy priyankNational housing & habitat policy priyank
National housing & habitat policy priyankPRIYANK JAIN
 
Knowledge management system priyank
Knowledge management system priyankKnowledge management system priyank
Knowledge management system priyankPRIYANK JAIN
 
Kingfisher Airlines Priyank Jain
Kingfisher Airlines Priyank JainKingfisher Airlines Priyank Jain
Kingfisher Airlines Priyank JainPRIYANK JAIN
 
Hydro Priyank jain
Hydro Priyank jain Hydro Priyank jain
Hydro Priyank jain PRIYANK JAIN
 
Copyrights priyanksaurabh
Copyrights priyanksaurabhCopyrights priyanksaurabh
Copyrights priyanksaurabhPRIYANK JAIN
 
Canada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainCanada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainPRIYANK JAIN
 
POWER SYSTEM INTRODUCTION priyank pulkit rads praveer
POWER SYSTEM INTRODUCTION  priyank pulkit rads praveerPOWER SYSTEM INTRODUCTION  priyank pulkit rads praveer
POWER SYSTEM INTRODUCTION priyank pulkit rads praveerPRIYANK JAIN
 
Indian eco priyank jain
Indian eco priyank jainIndian eco priyank jain
Indian eco priyank jainPRIYANK JAIN
 

Plus de PRIYANK JAIN (20)

Training power exchanges_18-may-2014
Training power exchanges_18-may-2014Training power exchanges_18-may-2014
Training power exchanges_18-may-2014
 
Srldc 28 May2013_congestionEnergy & Power Meet
Srldc 28 May2013_congestionEnergy & Power MeetSrldc 28 May2013_congestionEnergy & Power Meet
Srldc 28 May2013_congestionEnergy & Power Meet
 
Data collection
Data collectionData collection
Data collection
 
Hydro Power Harnessing priyank
Hydro Power Harnessing priyankHydro Power Harnessing priyank
Hydro Power Harnessing priyank
 
Priyank jain - Wind detailed project report _12 mw
Priyank jain - Wind detailed project report _12 mwPriyank jain - Wind detailed project report _12 mw
Priyank jain - Wind detailed project report _12 mw
 
Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl final
 
Canada’s electricity sector reform
Canada’s electricity sector reform Canada’s electricity sector reform
Canada’s electricity sector reform
 
Enterprenure case study
Enterprenure case studyEnterprenure case study
Enterprenure case study
 
Indian eco Reform
Indian eco ReformIndian eco Reform
Indian eco Reform
 
Fuel gap for Power Sector priyank
Fuel gap for Power Sector  priyankFuel gap for Power Sector  priyank
Fuel gap for Power Sector priyank
 
Hydro Power Envirentment interface
Hydro Power Envirentment interfaceHydro Power Envirentment interface
Hydro Power Envirentment interface
 
Assumptions: Strategy already defined Strategy not subject to sudden chang...
Assumptions:  Strategy already defined   Strategy not subject to sudden chang...Assumptions:  Strategy already defined   Strategy not subject to sudden chang...
Assumptions: Strategy already defined Strategy not subject to sudden chang...
 
National housing & habitat policy priyank
National housing & habitat policy priyankNational housing & habitat policy priyank
National housing & habitat policy priyank
 
Knowledge management system priyank
Knowledge management system priyankKnowledge management system priyank
Knowledge management system priyank
 
Kingfisher Airlines Priyank Jain
Kingfisher Airlines Priyank JainKingfisher Airlines Priyank Jain
Kingfisher Airlines Priyank Jain
 
Hydro Priyank jain
Hydro Priyank jain Hydro Priyank jain
Hydro Priyank jain
 
Copyrights priyanksaurabh
Copyrights priyanksaurabhCopyrights priyanksaurabh
Copyrights priyanksaurabh
 
Canada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainCanada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jain
 
POWER SYSTEM INTRODUCTION priyank pulkit rads praveer
POWER SYSTEM INTRODUCTION  priyank pulkit rads praveerPOWER SYSTEM INTRODUCTION  priyank pulkit rads praveer
POWER SYSTEM INTRODUCTION priyank pulkit rads praveer
 
Indian eco priyank jain
Indian eco priyank jainIndian eco priyank jain
Indian eco priyank jain
 

Dernier

BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 

Dernier (20)

BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 

Captive power Policy

  • 1. Captive Power Policy Issues, Regulations and Concerns Priyank Jain
  • 2. • Captive power today is significant source of power for the Indian economy, which plays an important role in the present power scenario being characterised by inadequate supply of power, poor and unreliable power quality, and high tariffs resulted due to heavy cross-subsidization. There is paradigm shift in usage pattern of captive power plants from back-up use to baseload use. • Presently the captive power plants capacity accounts for nearly one-fifth of the total installed capacity. With liberalisation of economy and technological developments many options are available for captive structuring.
  • 3. • The Electricity Act 2003 has legislatively facilitated setting up & operation of captive power plants. Other policies such as the National Electricity Policy 2005, the National Tariff Policy 2006, the Captive Power Policy (draft) and various state policies contains the clauses relevant to encourage the development of captive power plants in India.
  • 4. • Six states – Gujarat, Orissa, Andhra Pradesh, Madhya Pradesh, Karnataka and Tamil Nadu – account for almost two-thirds of the captive capacity. Other significant contributors include Bihar, Maharashtra and Uttar Pradesh. • For the industries that use energy intensively, the energy is the critical component of the total production cost. • The engineering, chemical and mineral/metal industries account for almost two-thirds of the total installed capacity in the captive segment. Other industries include cement, textiles and sugar.
  • 5. • The captive generator has a number of fuel options today. The choice could be between oil, natural gas, naphtha, bagasse or coal.There are also options like wind and hydro. • Availability of open access is the major issue related to the selling of power to grid by captive power plants. • Other issues are related to the strengthening of intra-state and inter-state transmission network, reasonable tariff and availability of available additional fuel required by the captive power plants.
  • 6. • Installation of captive power plants in future is likely to grow at a higher rate compared to the current rate of growth. The promise for future growth of captive power plants lies with the renewable sources of energy. Fossil fuels are limited and have adverse environmental impact. Captive demand, therefore, provides an attractive ‘niche’ for renewable energy to be deployed in industry.
  • 7. Some features: • Captive Power refers to generation from a unit set up by industry for its exclusive consumption. • Captive power plants are essentially non utility power plants. • These power plants are owned by specific industries which consume all the power produced for its production purposes. • The size of these power plants varies. These power plants can be as small as 0.2 MW or can be as big as 300 MW.
  • 8. The major factors responsible for the soaring growth of the captive power plants are, as follows: – Non-availability of adequate grid supply – Poor quality and reliability of grid supply – High tariff as a result of heavy cross subsidisation
  • 9. The Advantages – Captive power plant is close to the load centre and hence reduction in the fixed cost of electricity generated due to lesser stranded assets – Reduced transmission and distribution losses – Grid is strengthened at multiple points, even at the tail- ends. – Higher thermal efficiency, due to waste heat recovery by method of cogeneration – Distribution of environmental impact – Shorter gestation period to set up power plants – Captive power plants have modular designs and hence can match the load profile
  • 10. Concern for state electricity boards on account of following reasons: Captive plants may have adverse impacts on the finances of the utility, such as: – Industrial load is the main source for cross-subsidising revenue flows – Billing and collection is much more efficient for HT consumers – State electricity board’s ability to service escrow accounts for security packages is also reduced – Non-optimal growth of the sector – Problems in grid management especially in case of states with surplus power – Adverse environmental impacts arising from types of fuels used and from higher emissions per unit of production, as compared to large power plants – Reliability of power supply from captive and cogeneration plants as a source of firm power
  • 11. Concern of the owners of captive power plants stems from: – Non-remunerative tariff structure for surplus power produced by them – No risk sharing in case of non availability of fuel, change in variable cost due to switching of fuel after entering into power purchase agreement (PPA), etc – Inadequacies in wheeling and banking facilities – High contract demand charges – High level of duties and taxes on sale of power – High wheeling losses assumed for power to be sold to grid by captive power plant – Need to devote time and energy to an activity, which is not their core business – Restrictions on the minimum amount of power to be wheeled – If the captive power plant fails, charges for back-up or standby power from the grid are generally twice the normal rate for captive plants
  • 12. Captive power plant has been defined under the Electricity Act-2003 as • “…a power plant set up by any person to generate electricity primarily for his own use and includes a power plant set up by any co-operative society or association of persons for generating electricity primarily for use of members of such cooperative society or association”.
  • 13. • Provisions of the Electricity Act 2003 and Electricity Rules 2005 • The Electricity Act 2003 has legislatively facilitated setting up & operation of captive power plants, which mandates the following: • According to Section 2(8) of the Act • “Captive Generating Plant” has been defined as a power plant set up by any person to generate electricity primarily for his use and includes a power plant set up by co-operative society or association of persons for generating electricity primarily for use of members of such co-operative society or association. • Section 9 of the Act Mandates that: • 9. Captive generation. - (1) Notwithstanding anything contained in this Act, a person may construct, maintain or operate a captive generating plant and dedicated transmission lines: • Provided that the supply of electricity from the captive generating plant through the grid shall be regulated in the same manner as the generating station of a generating company. • (2) Every person, who has constructed a captive generating plant and maintains and operates such plant, shall have the right to open access for the purposes of carrying electricity from his captive generating plant to the destination of his use: • Provided that such open access shall be subject to availability of adequate transmission facility and such availability of transmission facility shall be determined by the Central Transmission Utility or the State Transmission Utility, as the case may be: • Provided further that any dispute regarding the availability of transmission facility shall be adjudicated upon by the Appropriate Commission.”
  • 14. Section 40 of the Act mandates that: • 40. Duties of transmission licensees. - • ……………………………………………….. • Provided also that such surcharge shall not be leviable in case open access is provided to a person who has established a captive generating plant for carrying the electricity to the destination of his own use.
  • 15. 42. Duties of distribution licensee and open access. – • Provided also that such surcharge shall not be leviable in case open access is provided to a person who has established a captive generating plant for carrying the electricity to the destination of his own use. • A CPP connected with the grid acquires the status of a generating company under the provisions of Section 9 of the Act and is thus required to fulfill obligation of the generating company as contained in the Act and rules/regulations framed thereunder. Section 10(2) of the Act states that a generating company may supply electricity to any licensee in accordance with the Act and rules & regulations made thereunder and also to any consumer under open access subject to proviso of Section 42(2) of the Act.
  • 16. • Section 62 of the Act outlines that an appropriate commission shall determine the tariff of supply affected by a generating company to the distribution licensee. This section applies to such sale by CPP also. Thus, it will also cover the contingency of procurement and purchase of power on day to day basis for meeting short term requirement to meet shortages.
  • 17. The relevant clause of the Electricity Act 2003 is given as under: • 62. Determination of tariff. - (1) The Appropriate Commission shall determine the tariff in accordance with provisions of this Act for – • (a) Supply of electricity by a generating company to a distribution licensee: • Provided that the Appropriate Commission may, in case of shortage of supply of electricity, fix the minimum and maximum ceiling of tariff for sale or purchase of electricity in pursuance of an agreement, entered into between a generating company and a licensee or between licensees, for a period not exceeding one year to ensure reasonable prices of electricity; • (b) Transmission of electricity; • (c) Wheeling of electricity; • (d) Retail sale of electricity.
  • 18. Determination of tariff as per Electricity Act contd. • Provided that in case of distribution of electricity in the same area by two or more distribution licensees, the Appropriate Commission may, for promoting competition among distribution licensees, fix only maximum ceiling of tariff for retail sale of electricity.” • The Electricity Act mandates that an appropriate commission in case of shortage of supply of electricity can also fix minimum and maximum ceiling of tariff for sale or purchase of electricity. • It is obligatory on part of a Captive Power Plant to get its tariff determined for its sale of power to distribution licensee and for a distribution licensee to enter in an agreement for power purchases of power at the tariff determined by the Commission. • It has been clarified under Electricity Rules 2005 issued by the Government of India on dated 8.6.2005 that the captive generating plant shall be qualified as such if not less than 26% of the ownership is held by the captive user(s) and not less than 51% of the aggregate electricity generated is consumed for captive use.
  • 19. • Provisions of the National Electricity Policy • In the National Electricity Policy notified by the Government of India, it has been stated that the liberal provisions for setting up CPPs have been made in order to secure a cost effective quality power thereby generating employment opportunities mandating a speedy and efficient growth of the industry. The appropriate commissions shall determine the tariff of the supply when a licensee takes power from a Captive Power Plant. The relevant para of NEP reads as under: • 5.2.2 The Government of India has initiated several reform measures to create a favorable environment for addition of new generating capacity in the country. The Electricity Act 2003 has put in place a highly liberal framework for generation. There is no requirement of licensing for generation. The requirement of techno-economic clearance of CEA for thermal generation project is no longer there. For hydroelectric generation also, the limit of capital expenditure, above which concurrence of CEA is required, would be raised suitably from the present level. Captive generation has been freed from all controls.
  • 20. • 5.7.1 (c) Captive generating plants should be permitted to sell electricity to licensees and consumers when they are allowed open access by SERCs under section 42 of the Act. • 5.2.24 The liberal provision in the Electricity Act, 2003 with respect to setting up of captive power plant has been made with a view to not only securing reliable, quality and cost effective power but also to facilitate creation of employment opportunities through speedy and efficient growth of industry.
  • 21. Provisions of Group Captives as per Electricity Act 2003 • 5.2.25 The provision relating to captive power plants to be set up by group of consumers is primarily aimed at enabling small and medium industries or other consumers that may not individually be in a position to set up plant of optimal size in a cost effective manner. It needs to be noted that efficient expansion of small and medium industries across the country would lead to creation of enormous employment opportunities.
  • 22. Surplus Power of Captives • 5.2.26 A large number of captive and standby generating stations in India have surplus capacity that could be supplied to the grid continuously or during certain time periods. These plants offer a sizeable and potentially competitive capacity that could be harnessed for meeting demand for power. Under the Act, captive generators have access to licensees and would get access to consumers who are allowed open access. Grid inter- connections for captive generators shall be facilitated as per section 30 of the Act. This should be done on priority basis to enable captive generation to become available as distributed generation along the grid.
  • 23. Role of Non-Conventional Energy Sources • Towards this end, non-conventional energy sources including co-generation could also play a role. Appropriate commercial arrangements would need to be instituted between licensees and the captive generators for harnessing of spare capacity energy from captive power plants. • The appropriate Regulatory Commission shall exercise regulatory oversight on such commercial arrangements between captive generators and licensees and determine tariffs when a licensee is the off-taker of power from captive plant.
  • 24. • Provisions of the National Tariff Policy: • In pursuance to section 3 of the Act, the Central Government has notified on 6.01.06 the tariff policy, which among others has also emphasized the need for harnessing the Captive generation. The salient features of which are as under: • 5.4 While it is recognized that the State Governments have the right to impose duties, taxes, cess on sale or consumption of electricity, these could potentially distort competition and optimal use of resources especially if such levies are used selectively and on a non- uniform basis.
  • 25. • In some cases, the duties etc. on consumption of electricity is linked to sources of generation (like captive generation) and the level of duties levied is much higher as compared to that being levied on the same category of consumers who draw power from grid. Such a distinction is invidious and inappropriate. • The sole purpose of freely allowing captive generation is to enable industries to access reliable, quality and cost effective power. Particularly, the provisions relating to captive power plants which can be set up by group of consumers has been brought in recognition of the fact that efficient expansion of small and medium industries across the country will lead to faster economic growth and creation of larger employment opportunities.
  • 26. • For realizing the goal of making available electricity to consumers at reasonable and competitive prices, it is necessary that such duties are kept at reasonable level.
  • 27. Tariff structuring and associated issues • (1) A two-part tariff structure should be adopted for all long term contracts to facilitate Merit Order dispatch. • According to National Electricity Policy, the Availability Based Tariff (ABT) is to be introduced at State level by April 2006. This framework would be extended to generating stations (including grid connected captive plants of capacities as determined by the SERC). The Appropriate Commission may also introduce differential rates of fixed charges for peak and off peak hours for better management of load.
  • 28. LIMITATIONS – Transaction of power between CPP and grid depends on availability of open access. Thus the issues related to open access are » The State Regulatory Commissions which have not issued the regulations for open access may have to expedite the process. » The State Regulators may be urged to develop progressive and encouraging policies for CPP (like one issued by MERC) » No electricity duty should be imposed on self consumption of electricity generated by Captive Power Plants of a industry. Reasonable duty may be imposed for sale of power.
  • 29. Limitations » Reduction in contract demand of a CPP holder with distribution licensee may be allowed without any penalty. » CPPs which are parallel with the grid, standby demand charges should be reasonable. However, if the CPP exceeds the Contract standby Demand then reasonable penal rate should be applicable on excess drawl. » High wheeling charges & losses make open access unviable.As captive surplus would be sold within a limited area, wheeling charges / losses should be applied for the particular area rather than average grid charge / losses. » Wheeling charges for transfer of surplus power may not exceed 7% of the generation cost within the state.
  • 30. Limitations » The cross subsidy surcharge applicable on HT consumers opting to purchase surplus power from CPPs must be reasonable. This may be fixed in accordance with avoided cost method suggested by FOIR (Forum of Indian Regulators). » For the purpose of recovery of T&D losses in OA charges, the losses should be benchmarked to reflect technical losses, gradually reduced and equitably distributed. Gradually recovery of commercial losses needs to be reduced » Parallel Operation Charges (POC) imposed by state utility is very high. Aligning of POC with ABT regime would encourage connectivity to grid for facilitating transfer of surplus power to the licensee.
  • 31. Limitations » Banking of energy may be allowed by the distribution licensee and shall be regulated by the energy banking agreement. » For Continuous Process Industry round the clock banking should be permitted with a rider that energy banked at night should be drawn during the night hours only. » For the present, 0. 5 class metering arrangement may be allowed. 0.2 class accuracy metering arrangement as required as metering regulations may be installed in phases. » Imposition of cess on captive power generation. – Strengthening of intra-state and inter-state transmission network. – Fixation of reasonable tariff by State Regulatory Commission for the surplus power available from the CPPs. • To make available additional fuel required by the CPPs.