SlideShare une entreprise Scribd logo
1  sur  12
SOLAR PV ROOFTOP SYSTEM PROPOSAL:
Solar Proposal 10 KWp
Proposal for 10 KWp Roof top Solar PV System. With reference
to your query, we are pleased to submit herewith our
comprehensive proposal of the Technical & Commercial
overview, for your kind perusal. System Definition Size: 10
kWp total DC capacity 50 nos. 200-watt panels (To be procured
globally from leading international vendors like Photon Energy,
BP Solar, Solar Semiconductor etc.) Energy Production Site
location:
Note: Energy production projections are reasonably accurate
estimates based on site’s solar data and our experience with
similar systems. Energy makes no guarantees as to actual
production output from this system. Grid/Load Interfacing Solar
system output shall be connected to a suitable load bus capable
of taking the input. This input point shall be selected in field in
consultation with client’s Executive Engineer.
Solar Proposal Page 2:
System Components Solar Panels Note: Subject to availability at
installation time, a different panel from a leading vendor may be
selected without affecting system size and performance.
Tata BP Solar Model:
SSI-M6-200 Quantity: 50 Wattage: 200 W No. of Cells: 60 Voc: 37.1 V
Isc: 8.28 A Vmp: 29.6 V Imp: 7.6 A Dimensions: 1660X990X42 (mm)
Weight: 20 kg Operating Conditions: -40 to +90 C Maximum System
Voltage: 600 Vdc Inverter
Note: Subject to availability at installation time, a different inverter
may be selected without affecting system size and performance. SMA
Sunny Repowers 10000TL/
Inverters Quantity:
1 AC maximum output: 10 KW MPP voltage range: 360 – 800 V
Maximum current input DC/String: 33A Maximum efficiency: >98.1%
Power connection : 3-phase We may take any other reputed make with
efficiency > 95%. Mounting Structures Panels shall be mounted on
galvanized frames inclined at 30.3 degrees to the south. The structure is
designed in such a manner that module can be replaced easily and in line
with site requirements and it is easy to install and service in future.
The frames will be supported by angle legs of suitable lengths to provide
the pre-determined inclination. All fasteners, nut and bolts are
made of Stainless steel - SS 304 5.4.6 PCC. The structures shall
be pre engineered to meet special requirements of placing the
modules on the corrugated rooftops.
FOUNDATION BASE: The legs of the structures made with
GI angles are made of fixed and grouted in the PCC foundation
columns made with 1:2:4 cement concrete. Electrical
Accessories Cables will conform to IS 694 and shall be of 650
V/ 1.1 kV grade. Interconnections, array to junction boxes,
junction boxes to DCDB, DCDB to PCU etc. will be selected to
keep voltage drop and losses to the minimum. The bright
annealed 99.97% pure bare copper conductors offer low
conductor resistance,
Solar Proposal Page 4:
result in lower heating thereby increasing cable life and efficiency..
These wires are insulated with a special grade PVC compound
formulated and manufactured in-house.
Working voltage: up to 1100 V Temperature range: -15 deg C to +70
deg C Sizes: Suitable sizes Color codes: Red, Yellow, Black, Blue,
Green Battery None Energy Meter The Inverter shall have a built-in
meter that tracks energy production and displays it on a small LED
screen. The display can be used to determine real-time production, daily
production, and yearly production. For more sophisticated analysis and
visual data management, Solar Access modules can be included. Remote
Monitoring System The Sunny Web Box continuously records and
stores all available data of about 50 inverters in real time, in addition the
inverter parameters can be requested and modified. It provides you with
various modern data processing options for professional data
management. These are saved in conventional CSV or XML file
formats. The ability to exchange data by FTP allows you to easily
transfer these values to your PC. You can just as easily use an SD card
to save your data.
Solar Proposal Page 5:
Bill of Material S.No Component Type/Model No Specifications
Quantity 1 PV Modules SSI-M6 200/ Solar Semiconductor 50 2
Grid Tie Inverter SMA, Sunny Tripower 10000TL; Solivia 10
TL Central/ String Inverters 1 3 Mounting Structure Custom
made MS hot dip galvanized steel 1Set 4 Field Junction Box
ABB Junction Boxes IP65 standards As per stringing design 5
Main Junction Box ABB Junction Boxes IP65 standards As per
stringing design 6 Earthing Kit Reputed make 1 set 7 Lightening
Arrestors Reputed make 1 set 8 AC & DC cables Conforming to
BOS As per site requirements 9 Ground Fault Protection System
Included in the inverter 1 10 Remote Monitoring System Sunny
Web Box NA D.
Solar PV Plot Plan Solar Proposal Page 6:
Installation Details Area required:
The Total Area required for the System Installation shall be apex 1200 -
1400 sq feet, without any shades, facing south.
Structural Anchoring:
Panels shall be mounted on galvanized frames inclined at 30.3 degrees
to the south. The structure is designed in such a manner that module can
be replaced easily and in line with site requirements and it is easy to
install and service in future. The frames will be supported by angle legs
of suitable lengths to provide the pre-determined inclination. All
fasteners, nut and bolts are made of Stainless steel - SS 304 5.4.6 PCC.
Foundation Base:
The legs of the structures made with GI angles are made of fixed and
grouted in the PCC foundation columns made with 1:2:4 cement
concrete. Actual frame and other structural dimensions will be
determined during a more detailed site visit by specialists during full
design phase. Inverter Installation Based on the initial site visit, the
inverters could possibly be installed on the terrace. This space provides
ample accessibility and good air circulation. The inverter is available in
IP54 housing; however, an enclosed space has to be provided for the
same. Actual installation location and methods will be determined
during full design phase. Electrical Proposed fire hose shaft will be used
for running electrical cables down to the electrical panel room. A
detailed electrical design with single-line diagram and specifications will
be prepared during full design phase after receiving the PO, for the
client’s approval.
Solar Photovoltaic Proposal Page 8:
Scope of Work
1. We shall conduct a detailed site visit with specialists to take accurate
measurements, photographs, and other site-specific information for full
design.
2. Prepare full system design to include civil, structural, electrical and
mechanical components, with construction drawings and specifications.
3. Procure equipment and materials and deliver to site.
4. Perform complete system installation.
5. Test all electrical components in accordance with manufacturer
instructions.
6. Commission the system to full operability.
Client Scope Site-specific considerations will require assistance and
cooperation from the client, as outlined below:
1. Provide access to work site for delivery of equipment and materials
prior to and during project implementation.
2. Provide a suitable and secure space for storage of equipment and
materials.
3. Facilitate access of work crew to the work site 7 days a week.
4. Facilitate interfacing with the client’s resident engineering staff for
consultation as needed.
5. Separate electrical loads as discussed in Part A (Grid Interfacing) and
connect solar output to building load system.
6. All the Statutory clearances, if any, required for the Project. H.
Delivery Schedule & Project Cost Installation & Commissioning All the
Systems except Inverter will be installed within 8-10weeks from the date
of receipt of advance and approval of the “SLD”.
Warranty
Solar modules are warranted by the solar panel manufacturer for a
period of 25 years.
Panels: Manufacturing Warrantee for the System: 3 yrs after
installation and commissioning. Performance Warrantee: a. 90%
efficiency upto 12 yrs b. 80% efficiency upto 25 yrs 2. Inverter: 3 yrs or
5 yrs depending on the make 3. Balance of the Systems: Standard 12
months warrantee against manufacturing defects. We shall also ensure
supply of Spares for the System for the required.
Solar Proposal Page 10
Material Cost: Installation Service Charges
Therefore, the total price will be 10KWp system
The final system size shall be finalized based on site visit and load
conditions. Installation Charges included.
• Excise Duty/Service Tax: Currently, under present rules, Solar
Photo Voltaic system is exempted from Excise Duty. However, rate
prevalent at the time of dispatch will be applicable extra, at actual.
Service Tax extra at Actual will be charged, Presently Applicable
@10.32%.
• Octroi : Any Octroi /Entry tax, if any, will be payable will be extra
• Sales tax : CST@ 5% will be charged extra without Form-C OR CST@2%
• Delivery : Dispatch will be effected in 5-6 weeks from the date of acceptance
of your Purchase order(P.O).
System installation will be completed in 5 week’s time from date of receipt of
materials at site, provided site is ready for installation.
• Payment Terms: advance for site visit and detailed load conditions study. -
30% of the remaining amount payable as advance along with Formal PO for a
specific Solar System size. - 60% on supply of material (as indicated in BOM) at
the site.
Balance 10% on successful commissioning of the project.
Validity: This offer is valid for 30 days from the date hereof
Name: SUMIT NAHA
Designation: Head, Solar Infrastructure Services
Date: Dec, 2020
ADD: MALIYA,STATION ROAD,GROUND FLOOR, ROOM NO. 2, HOOGHLY,WB
Rooftop pro

Contenu connexe

Tendances

CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANTCARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANTAnkit Singh
 
Weg system-drive-vfd-ac-motors-usasysvfd613-brochure-english
Weg system-drive-vfd-ac-motors-usasysvfd613-brochure-englishWeg system-drive-vfd-ac-motors-usasysvfd613-brochure-english
Weg system-drive-vfd-ac-motors-usasysvfd613-brochure-englishDaniel García
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportsushi roy
 
GEA31219 Wind_2.3-107_Brochure_LR
GEA31219 Wind_2.3-107_Brochure_LRGEA31219 Wind_2.3-107_Brochure_LR
GEA31219 Wind_2.3-107_Brochure_LRHarold Schnetzka
 
New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal KristyDyer
 
Ballasted Ground Mount Presentation 2014_optimized
Ballasted Ground Mount Presentation 2014_optimizedBallasted Ground Mount Presentation 2014_optimized
Ballasted Ground Mount Presentation 2014_optimizedDavid Lewenz
 
Apex Modular Extrusion
Apex Modular Extrusion Apex Modular Extrusion
Apex Modular Extrusion Jeff West
 
Complexity in integration high voltage and ventilation systems Warwick Young
Complexity in integration   high voltage and ventilation systems Warwick YoungComplexity in integration   high voltage and ventilation systems Warwick Young
Complexity in integration high voltage and ventilation systems Warwick YoungNSW Environment and Planning
 
Session 07 site assessment & planning
Session 07   site assessment & planningSession 07   site assessment & planning
Session 07 site assessment & planningChirag Jain
 
Proper control plan assessment and the impact of high efficiency motors Dav...
Proper control plan assessment and the impact of high efficiency motors   Dav...Proper control plan assessment and the impact of high efficiency motors   Dav...
Proper control plan assessment and the impact of high efficiency motors Dav...NSW Environment and Planning
 
GEA30627A_Wind_1.85-87_Brochure_LR
GEA30627A_Wind_1.85-87_Brochure_LRGEA30627A_Wind_1.85-87_Brochure_LR
GEA30627A_Wind_1.85-87_Brochure_LRHarold Schnetzka
 
Customer Success Story Bently Nevada* Asset Condition Monitoring
Customer Success Story Bently Nevada* Asset Condition MonitoringCustomer Success Story Bently Nevada* Asset Condition Monitoring
Customer Success Story Bently Nevada* Asset Condition MonitoringGE Measurement & Control
 
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)Arulmani Dhandabani
 
Lv panel specification
Lv panel specificationLv panel specification
Lv panel specificationSajeewa Lakmal
 
Thermoelectric Generators - Gentherm Power Technologies
Thermoelectric Generators - Gentherm Power TechnologiesThermoelectric Generators - Gentherm Power Technologies
Thermoelectric Generators - Gentherm Power TechnologiesM.S. Jacobs & Associates
 
Customer Success Story: Bently Nevada Asset Condition Monitoring
Customer Success Story: Bently Nevada Asset Condition MonitoringCustomer Success Story: Bently Nevada Asset Condition Monitoring
Customer Success Story: Bently Nevada Asset Condition MonitoringGE Measurement & Control
 

Tendances (19)

CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANTCARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
CARBON FOOTPRINTING AND DESIGN OF SOLAR POWER PLANT
 
Weg system-drive-vfd-ac-motors-usasysvfd613-brochure-english
Weg system-drive-vfd-ac-motors-usasysvfd613-brochure-englishWeg system-drive-vfd-ac-motors-usasysvfd613-brochure-english
Weg system-drive-vfd-ac-motors-usasysvfd613-brochure-english
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant report
 
Eng Kamran zfp
Eng Kamran zfpEng Kamran zfp
Eng Kamran zfp
 
GEA31219 Wind_2.3-107_Brochure_LR
GEA31219 Wind_2.3-107_Brochure_LRGEA31219 Wind_2.3-107_Brochure_LR
GEA31219 Wind_2.3-107_Brochure_LR
 
New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal
 
Ballasted Ground Mount Presentation 2014_optimized
Ballasted Ground Mount Presentation 2014_optimizedBallasted Ground Mount Presentation 2014_optimized
Ballasted Ground Mount Presentation 2014_optimized
 
Apex Modular Extrusion
Apex Modular Extrusion Apex Modular Extrusion
Apex Modular Extrusion
 
Complexity in integration high voltage and ventilation systems Warwick Young
Complexity in integration   high voltage and ventilation systems Warwick YoungComplexity in integration   high voltage and ventilation systems Warwick Young
Complexity in integration high voltage and ventilation systems Warwick Young
 
Devang Technician
Devang TechnicianDevang Technician
Devang Technician
 
Session 07 site assessment & planning
Session 07   site assessment & planningSession 07   site assessment & planning
Session 07 site assessment & planning
 
Proper control plan assessment and the impact of high efficiency motors Dav...
Proper control plan assessment and the impact of high efficiency motors   Dav...Proper control plan assessment and the impact of high efficiency motors   Dav...
Proper control plan assessment and the impact of high efficiency motors Dav...
 
GEA30627A_Wind_1.85-87_Brochure_LR
GEA30627A_Wind_1.85-87_Brochure_LRGEA30627A_Wind_1.85-87_Brochure_LR
GEA30627A_Wind_1.85-87_Brochure_LR
 
Customer Success Story Bently Nevada* Asset Condition Monitoring
Customer Success Story Bently Nevada* Asset Condition MonitoringCustomer Success Story Bently Nevada* Asset Condition Monitoring
Customer Success Story Bently Nevada* Asset Condition Monitoring
 
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)
 
Lv panel specification
Lv panel specificationLv panel specification
Lv panel specification
 
Gen specs
Gen specsGen specs
Gen specs
 
Thermoelectric Generators - Gentherm Power Technologies
Thermoelectric Generators - Gentherm Power TechnologiesThermoelectric Generators - Gentherm Power Technologies
Thermoelectric Generators - Gentherm Power Technologies
 
Customer Success Story: Bently Nevada Asset Condition Monitoring
Customer Success Story: Bently Nevada Asset Condition MonitoringCustomer Success Story: Bently Nevada Asset Condition Monitoring
Customer Success Story: Bently Nevada Asset Condition Monitoring
 

Similaire à Rooftop pro

Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and StandardsSolar Reference
 
Inspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_complianceInspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_complianceAnkit Saxena
 
Design & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemDesign & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemSulaman Muhammad
 
Solar rooftop projects primotech
Solar rooftop projects primotechSolar rooftop projects primotech
Solar rooftop projects primotechvimalranaprimotech
 
Specification for electrical automation and instrumentation 02
Specification for electrical automation and instrumentation  02Specification for electrical automation and instrumentation  02
Specification for electrical automation and instrumentation 02Sajeewa Lakmal
 
Specifications of Solar Power system (Issue-II).pdf
Specifications of Solar Power system (Issue-II).pdfSpecifications of Solar Power system (Issue-II).pdf
Specifications of Solar Power system (Issue-II).pdfAmjiShah
 
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxMoturiVinodKumar
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and StandardsSolarReference
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and InstalltionEli Israeli
 
Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Kiran Singh
 
Lonnie 11x17 photo voltaic technology
Lonnie 11x17 photo voltaic technologyLonnie 11x17 photo voltaic technology
Lonnie 11x17 photo voltaic technologyspeedbeef
 
Presentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxPresentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxHafizAsimKhayyam
 

Similaire à Rooftop pro (20)

Exalta Quotation 10 kw_ongrid_rajkot_std
Exalta Quotation 10 kw_ongrid_rajkot_stdExalta Quotation 10 kw_ongrid_rajkot_std
Exalta Quotation 10 kw_ongrid_rajkot_std
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
 
SORALITE POWER
SORALITE POWERSORALITE POWER
SORALITE POWER
 
BOQ _UN.pptx
BOQ _UN.pptxBOQ _UN.pptx
BOQ _UN.pptx
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
Inspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_complianceInspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_compliance
 
Design & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemDesign & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic System
 
Solar rooftop projects primotech
Solar rooftop projects primotechSolar rooftop projects primotech
Solar rooftop projects primotech
 
Specification for electrical automation and instrumentation 02
Specification for electrical automation and instrumentation  02Specification for electrical automation and instrumentation  02
Specification for electrical automation and instrumentation 02
 
Specifications of Solar Power system (Issue-II).pdf
Specifications of Solar Power system (Issue-II).pdfSpecifications of Solar Power system (Issue-II).pdf
Specifications of Solar Power system (Issue-II).pdf
 
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
11.docx
11.docx11.docx
11.docx
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
Mohamed Abou mesalem updated CV
Mohamed Abou mesalem  updated CVMohamed Abou mesalem  updated CV
Mohamed Abou mesalem updated CV
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
 
Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
Lonnie 11x17 photo voltaic technology
Lonnie 11x17 photo voltaic technologyLonnie 11x17 photo voltaic technology
Lonnie 11x17 photo voltaic technology
 
Presentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxPresentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptx
 

Dernier

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 

Dernier (20)

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 

Rooftop pro

  • 1. SOLAR PV ROOFTOP SYSTEM PROPOSAL: Solar Proposal 10 KWp Proposal for 10 KWp Roof top Solar PV System. With reference to your query, we are pleased to submit herewith our comprehensive proposal of the Technical & Commercial overview, for your kind perusal. System Definition Size: 10 kWp total DC capacity 50 nos. 200-watt panels (To be procured globally from leading international vendors like Photon Energy, BP Solar, Solar Semiconductor etc.) Energy Production Site location: Note: Energy production projections are reasonably accurate estimates based on site’s solar data and our experience with similar systems. Energy makes no guarantees as to actual production output from this system. Grid/Load Interfacing Solar system output shall be connected to a suitable load bus capable of taking the input. This input point shall be selected in field in consultation with client’s Executive Engineer.
  • 2. Solar Proposal Page 2: System Components Solar Panels Note: Subject to availability at installation time, a different panel from a leading vendor may be selected without affecting system size and performance. Tata BP Solar Model: SSI-M6-200 Quantity: 50 Wattage: 200 W No. of Cells: 60 Voc: 37.1 V Isc: 8.28 A Vmp: 29.6 V Imp: 7.6 A Dimensions: 1660X990X42 (mm) Weight: 20 kg Operating Conditions: -40 to +90 C Maximum System Voltage: 600 Vdc Inverter Note: Subject to availability at installation time, a different inverter may be selected without affecting system size and performance. SMA Sunny Repowers 10000TL/ Inverters Quantity: 1 AC maximum output: 10 KW MPP voltage range: 360 – 800 V Maximum current input DC/String: 33A Maximum efficiency: >98.1% Power connection : 3-phase We may take any other reputed make with efficiency > 95%. Mounting Structures Panels shall be mounted on galvanized frames inclined at 30.3 degrees to the south. The structure is
  • 3. designed in such a manner that module can be replaced easily and in line with site requirements and it is easy to install and service in future. The frames will be supported by angle legs of suitable lengths to provide the pre-determined inclination. All fasteners, nut and bolts are made of Stainless steel - SS 304 5.4.6 PCC. The structures shall be pre engineered to meet special requirements of placing the modules on the corrugated rooftops. FOUNDATION BASE: The legs of the structures made with GI angles are made of fixed and grouted in the PCC foundation columns made with 1:2:4 cement concrete. Electrical Accessories Cables will conform to IS 694 and shall be of 650 V/ 1.1 kV grade. Interconnections, array to junction boxes, junction boxes to DCDB, DCDB to PCU etc. will be selected to keep voltage drop and losses to the minimum. The bright annealed 99.97% pure bare copper conductors offer low conductor resistance,
  • 4. Solar Proposal Page 4: result in lower heating thereby increasing cable life and efficiency.. These wires are insulated with a special grade PVC compound formulated and manufactured in-house. Working voltage: up to 1100 V Temperature range: -15 deg C to +70 deg C Sizes: Suitable sizes Color codes: Red, Yellow, Black, Blue, Green Battery None Energy Meter The Inverter shall have a built-in meter that tracks energy production and displays it on a small LED screen. The display can be used to determine real-time production, daily production, and yearly production. For more sophisticated analysis and visual data management, Solar Access modules can be included. Remote Monitoring System The Sunny Web Box continuously records and stores all available data of about 50 inverters in real time, in addition the inverter parameters can be requested and modified. It provides you with various modern data processing options for professional data management. These are saved in conventional CSV or XML file formats. The ability to exchange data by FTP allows you to easily transfer these values to your PC. You can just as easily use an SD card to save your data.
  • 5. Solar Proposal Page 5: Bill of Material S.No Component Type/Model No Specifications Quantity 1 PV Modules SSI-M6 200/ Solar Semiconductor 50 2 Grid Tie Inverter SMA, Sunny Tripower 10000TL; Solivia 10 TL Central/ String Inverters 1 3 Mounting Structure Custom made MS hot dip galvanized steel 1Set 4 Field Junction Box ABB Junction Boxes IP65 standards As per stringing design 5 Main Junction Box ABB Junction Boxes IP65 standards As per stringing design 6 Earthing Kit Reputed make 1 set 7 Lightening Arrestors Reputed make 1 set 8 AC & DC cables Conforming to BOS As per site requirements 9 Ground Fault Protection System Included in the inverter 1 10 Remote Monitoring System Sunny Web Box NA D.
  • 6. Solar PV Plot Plan Solar Proposal Page 6: Installation Details Area required: The Total Area required for the System Installation shall be apex 1200 - 1400 sq feet, without any shades, facing south. Structural Anchoring: Panels shall be mounted on galvanized frames inclined at 30.3 degrees to the south. The structure is designed in such a manner that module can be replaced easily and in line with site requirements and it is easy to install and service in future. The frames will be supported by angle legs of suitable lengths to provide the pre-determined inclination. All fasteners, nut and bolts are made of Stainless steel - SS 304 5.4.6 PCC.
  • 7. Foundation Base: The legs of the structures made with GI angles are made of fixed and grouted in the PCC foundation columns made with 1:2:4 cement concrete. Actual frame and other structural dimensions will be determined during a more detailed site visit by specialists during full design phase. Inverter Installation Based on the initial site visit, the inverters could possibly be installed on the terrace. This space provides ample accessibility and good air circulation. The inverter is available in IP54 housing; however, an enclosed space has to be provided for the same. Actual installation location and methods will be determined during full design phase. Electrical Proposed fire hose shaft will be used for running electrical cables down to the electrical panel room. A detailed electrical design with single-line diagram and specifications will be prepared during full design phase after receiving the PO, for the client’s approval.
  • 8. Solar Photovoltaic Proposal Page 8: Scope of Work 1. We shall conduct a detailed site visit with specialists to take accurate measurements, photographs, and other site-specific information for full design. 2. Prepare full system design to include civil, structural, electrical and mechanical components, with construction drawings and specifications. 3. Procure equipment and materials and deliver to site. 4. Perform complete system installation. 5. Test all electrical components in accordance with manufacturer instructions. 6. Commission the system to full operability.
  • 9. Client Scope Site-specific considerations will require assistance and cooperation from the client, as outlined below: 1. Provide access to work site for delivery of equipment and materials prior to and during project implementation. 2. Provide a suitable and secure space for storage of equipment and materials. 3. Facilitate access of work crew to the work site 7 days a week. 4. Facilitate interfacing with the client’s resident engineering staff for consultation as needed. 5. Separate electrical loads as discussed in Part A (Grid Interfacing) and connect solar output to building load system. 6. All the Statutory clearances, if any, required for the Project. H. Delivery Schedule & Project Cost Installation & Commissioning All the Systems except Inverter will be installed within 8-10weeks from the date of receipt of advance and approval of the “SLD”.
  • 10. Warranty Solar modules are warranted by the solar panel manufacturer for a period of 25 years. Panels: Manufacturing Warrantee for the System: 3 yrs after installation and commissioning. Performance Warrantee: a. 90% efficiency upto 12 yrs b. 80% efficiency upto 25 yrs 2. Inverter: 3 yrs or 5 yrs depending on the make 3. Balance of the Systems: Standard 12 months warrantee against manufacturing defects. We shall also ensure supply of Spares for the System for the required. Solar Proposal Page 10 Material Cost: Installation Service Charges Therefore, the total price will be 10KWp system The final system size shall be finalized based on site visit and load conditions. Installation Charges included. • Excise Duty/Service Tax: Currently, under present rules, Solar Photo Voltaic system is exempted from Excise Duty. However, rate prevalent at the time of dispatch will be applicable extra, at actual. Service Tax extra at Actual will be charged, Presently Applicable @10.32%.
  • 11. • Octroi : Any Octroi /Entry tax, if any, will be payable will be extra • Sales tax : CST@ 5% will be charged extra without Form-C OR CST@2% • Delivery : Dispatch will be effected in 5-6 weeks from the date of acceptance of your Purchase order(P.O). System installation will be completed in 5 week’s time from date of receipt of materials at site, provided site is ready for installation. • Payment Terms: advance for site visit and detailed load conditions study. - 30% of the remaining amount payable as advance along with Formal PO for a specific Solar System size. - 60% on supply of material (as indicated in BOM) at the site. Balance 10% on successful commissioning of the project. Validity: This offer is valid for 30 days from the date hereof Name: SUMIT NAHA Designation: Head, Solar Infrastructure Services Date: Dec, 2020 ADD: MALIYA,STATION ROAD,GROUND FLOOR, ROOM NO. 2, HOOGHLY,WB