 Water is one of the vital inputs for thermal power generation.
 Water has the highest specific heat amongst all materials
available in abundance, hence, ideal as cooling fluid. (Sp Heat
of Water = 1 Kcal/Kg deg C)
 Process cooling in the condenser, ash disposal, removal of
heat generated in plant auxiliaries and various other activities
require water.
 Large coal based Power Plants are likely to come up in future.
 Difficulties are already being faced in existing thermal power
plants due to non-availability of water and expected to be
aggravated in future with more coal fire TPP coming up.
Introduction:
Water Insufficiency issues of Existing Plants:
NTPC’s 2100 MW Farakka STPP
in West Bengal has come to a
halt due to falling water level
in the Feeder Canal. This is in
the news and the crisis is
continuing.
Effect is being felt in
Jharkhand, Orrisa, Bihar and
Bengal.
Non-availability of water is
encountered in existing Power
Plants which are situated in
coal bearing states like Orissa,
Jharkhand and Chhattisgarh.
Consumption Areas of Water in Power Plant:
Water is used in almost all areas/ facilities of thermal power
stations in one way or other. A typical list of plant systems/
applications requiring consumptive water is indicated as below:
– Cooling water system (Condenser & ACW)
– Ash handling system
– Power cycle make up
– Coal dust suppression system
– Service water system
– Potable water system
– Gardening
– Evaporation from raw water reservoir
Typical Water Consumption Figures
Plant water consumption is governed by a number of factors
such as :
Quality of raw water, type of condenser cooling system, Quality of
coal, Ash utilization, Type of ash disposal system, Waste water
management aspects etc.
In the past, power stations were designed with water systems having
liberal considerations and high design margins.
The consumptive water requirement for coal based plants with
cooling towers used to be about 7 m3/h per MW
In recent times, plants have been designed with reduced Plant water
consumption rate in the range 3.5 - 4 m3/h per MW
Water consumption of a typical Coal Based TPP
Water consumption of a typical 2x500 MW TPP is given below (As
per recent design)
@ 4 m3/h per MW
Cooling tower make up : 3450
Ash disposal : 1300*
DM water make up : 120
Potable & service water : 250
Clarifier sludge etc. : 110
Coal dust suppression : 70
Total : 4000*
*Ash Water to be tapped from CT blow down water
Cooling Tower
Make-up
Ash Disposal
DM Water
make-up
Potable &
Service Water
Clarifier
Sludge
Coal Dust
Suppression
MoEF Notification:
Ministry of Environment, Forest and Climate Change (MoEF)
in its recent notification dated December 07, 2015 on
Environment (Protection) Amendment Rules, 2015 have
notified the following:
I. All plants with Once Through Cooling (OTC) shall install Cooling Tower
(CT) and achieve specific water consumption upto maximum of
3.5m3/MWh within a period of two years from the date of publication
of this notification.
II. All existing CT-based plants shall have to reduce specific water
consumption upto maximum of 3.5m3/MWh within a period of two
years from the date of publication of this notification.
III. New plants to be installed after 1st January, 2017 shall have to meet
specific water consumption upto maximum of 2.5 m3/MWh and achieve
zero waste water discharged
Cooling Water System:
Cooling Systems in Practice in India:
1. Cooling Tower (IDCT / NDCT) – Wet Cooling
2. Air Cooled Condenser – Dry Cooling
3. Once Through Cooling – To be replaced as per Dec 7, 2015 Notification
Wet Cooling System:
Natural Draught Cooling Tower
Induced Draught Cooling Towers
Dry Cooling System
Air Cooled Condenser
Air Cooled Condenser
Economics of Dry Cooling vs Wet
Cooling System
50
120
150
Wet Cooling - IDCT Wet Cooling - NDCT Dry Cooling - ACC
Initial Cost (Rs Crore)
For a typical 660 MW Coal Based TPP
*Considering Steam cycle efficiency as 40%
Space Requirement of Dry Cooling vs
Wet Cooling System(NDCT & IDCT)
8000
15000
14000
Wet Cooling - IDCT Wet Cooling - NDCT Dry Cooling - ACC
Foot Print Area (Sq M)
For a typical 660 MW Coal Based TPP
*Considering Steam cycle efficiency as 40%
Power Consumption of Dry Cooling vs
Wet Cooling System
6500
5000
8000
Wet Cooling - IDCT Wet Cooling - NDCT Dry Cooling - ACC
Aux. Power Consumption* (KW)
For a typical 660 MW Coal Based TPP
*Considering above plan area.
#CW Pump Power included for IDCT & NDCT.
Water Consumption Comparison of
Dry Cooling vs Wet Cooling System
1.60% 1.60%
0
0.75% 0.75%
0
0.05% 0.05%
0
IDCT NDCT ACC
Water Losses as ‘%’ Circulating Water Flow
Evaporation Loss Blowdown Loss Drift Loss
For a typical 660 MW Coal Based TPP
*Considering Steam cycle efficiency as 40% and COC=3.0
Water Conservation Techniques for CW System
 Replace Once Through Cooling System with Cooling Towers /
Air Cooled Condensers
 Implementation of High operating COC (Cycles of
Concentration) to reduce the blow-down loss
Increasing COC to 5 from COC=3.0, Blow-down loss will reduce
by 50%.
 Installation of Air Cooled Condensers
Techno- economics of Dry & Wet Cooling
Systems
As compared to wet cooling system, dry condenser cooling
system results in reduction of unit output by about 7%
88
90
92
94
96
98
100
102
IDCT NDCT ACC
Unit Output (%)
Unit Output (%)
Techno- economics of Dry & Wet Cooling
Systems
The heat rate of the unit with dry condenser cooling system is higher by
about 7% in accordance with reduced output as indicated.
Heat Rate on ACC
In terms of efficiency, thermal efficiency of the plant shall reduce by about
2.5 percentage points
Plant Thermal efficiency
with dry Cooling system
7%
2.5%
Techno- economics of Dry & Wet Cooling
Systems
Specific coal consumption of the unit shall increase by about 7%.
Specific coal consumption
with dry Cooling system
Typical CO2 emission from the plant shall also increase by about 7% (from
0.9 kg/kWh to 0.96 kg/kWh) with dry cooling system as compared to wet
cooling system.
Specific CO2 emission
with dry Cooling system
7%
7%
Techno- economics of Dry & Wet Cooling
Systems
For a conventional 500 MW unit, Aux Power Consumption is 6.5 % with
IDCT, 6 % with NDCT based CW system and 6.8 % of gross output for plant
with direct cooling air cooled condensers
5.6
5.8
6
6.2
6.4
6.6
6.8
7
IDCT NDCT ACC
Plant Auxiliary Power Consumption (% of
Rated Plant Output)
Auxiliary Power
Consumption (%
of Rated Output)
Techno- economics of Dry & Wet Cooling
Systems
• Cost for plant with wet cooling system as ` 5 crore/MW, the cost of the
plant with dry cooling system would vary from ` 5.5 to 5.7 crore/MW
Cost of Plant with dry Cooling system
• The levelised tariff is expected to increase by about 8- 9% over base
levelised tariff for plant with dry Cooling system
Levelised Tariff with dry Cooling system
10%
8-9%
Key Findings
• Dry condenser cooling system can be considered for the sites where
availability of water is very scarce. In such case, the requirement of plant
consumptive water shall reduce by about 80%.
• However, for typical Indian conditions, dry cooling system shall result in
reduction of plant output by about 7% and correspondingly, gross heat
rate shall increase by 7%.
• The capital cost per MW of the plant, shall increase by about 10%.
#These are indicative values as per data considered in the report.
Conclusion
Dry cooling systems, as such, are costly technologies and are
not comparable to wet cooling system on techno economic
considerations.
However, for sites where water availability is scarce or
unreliable, dry cooling system using air-cooled steam
condenser offers the only solution for power plant
installation.
When we are discussing changeover from once-through
cooling system to a cooling tower system, there is no point in
considering a dry cooling system as the need for this
changeover is to reduce the water requirement and not
eliminate it completely. And, it is safe to pre-suppose that, if
the plant was working on once through system abundant
water is available.
Conclusion (Cont.)
In such changeover cases, it is important to tailor the
dimensions of the cooling tower to suit the available space
as experience shows that the existing power plants are
likely to be very tight on open space. It is also important to
select cooling towers which can be installed quickly as the
time permitted by the Ministry of Environment for the
changeover is short (it has to be implemented within 6th
December 2017).
To meet these requirements, it is our considered
recommendation that you look seriously at cooling towers
with pultruded FRP or treated wood structure.
Water Efficiency in Thermal Power plants

Contenu connexe

Tendances

Power plant chemistry
Power plant chemistryPower plant chemistry
Power plant chemistryRaghab Gorain
 
Measurement of silica
Measurement of silica Measurement of silica
Measurement of silica kumarswamy927
 
Condensate Polishing Unit - CPU
Condensate Polishing Unit - CPUCondensate Polishing Unit - CPU
Condensate Polishing Unit - CPURama Chandra Reddy
 
HRSG water chemistry & corrosion control
HRSG water chemistry & corrosion controlHRSG water chemistry & corrosion control
HRSG water chemistry & corrosion controlAbdul Hannan
 
Pre and post treatment of water
Pre and post treatment of waterPre and post treatment of water
Pre and post treatment of waterPrudhvi raj
 
HANDBOOK ON POWER PLANT CHEMISTRY.pdf
HANDBOOK ON POWER PLANT CHEMISTRY.pdfHANDBOOK ON POWER PLANT CHEMISTRY.pdf
HANDBOOK ON POWER PLANT CHEMISTRY.pdfMohamedHusseinHamed
 
Water Conservation - Cooling Tower Management Overview
Water Conservation - Cooling Tower Management Overview Water Conservation - Cooling Tower Management Overview
Water Conservation - Cooling Tower Management Overview brentmwhite
 
Power Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTPower Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTDilip Kumar
 
Essentials for a sound boiler water treatment program
Essentials for a sound boiler water treatment programEssentials for a sound boiler water treatment program
Essentials for a sound boiler water treatment programlorenzo Monasca
 
Boiler Cycle water chemistry by Sudhanshu Dash
Boiler Cycle water chemistry by Sudhanshu DashBoiler Cycle water chemistry by Sudhanshu Dash
Boiler Cycle water chemistry by Sudhanshu DashSudhanshu Sekhar Dash
 
Raw Water Intake & Pre Treatment of Raw Water in a Thermal Power Plant
Raw Water Intake & Pre Treatment of Raw Water in a Thermal Power PlantRaw Water Intake & Pre Treatment of Raw Water in a Thermal Power Plant
Raw Water Intake & Pre Treatment of Raw Water in a Thermal Power PlantSUDHEER KUMAR KALYANAM
 
23291582 dm-plant
23291582 dm-plant23291582 dm-plant
23291582 dm-plantyashlion
 
COLLODAL SILICA JULY2016
COLLODAL SILICA JULY2016COLLODAL SILICA JULY2016
COLLODAL SILICA JULY2016Dilip Kumar
 
RO & NF chemical cleaning
RO & NF chemical cleaningRO & NF chemical cleaning
RO & NF chemical cleaningMohamed Elshora
 
S k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plantsS k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plantsteddy tavares
 

Tendances (20)

Power plant chemistry
Power plant chemistryPower plant chemistry
Power plant chemistry
 
Measurement of silica
Measurement of silica Measurement of silica
Measurement of silica
 
Condensate Polishing Unit - CPU
Condensate Polishing Unit - CPUCondensate Polishing Unit - CPU
Condensate Polishing Unit - CPU
 
HRSG water chemistry & corrosion control
HRSG water chemistry & corrosion controlHRSG water chemistry & corrosion control
HRSG water chemistry & corrosion control
 
Boiler feedwater
Boiler feedwaterBoiler feedwater
Boiler feedwater
 
Cooling Water Treatment
Cooling Water TreatmentCooling Water Treatment
Cooling Water Treatment
 
Pre and post treatment of water
Pre and post treatment of waterPre and post treatment of water
Pre and post treatment of water
 
HANDBOOK ON POWER PLANT CHEMISTRY.pdf
HANDBOOK ON POWER PLANT CHEMISTRY.pdfHANDBOOK ON POWER PLANT CHEMISTRY.pdf
HANDBOOK ON POWER PLANT CHEMISTRY.pdf
 
Boiler Water Treatment -
Boiler Water Treatment - Boiler Water Treatment -
Boiler Water Treatment -
 
Water Conservation - Cooling Tower Management Overview
Water Conservation - Cooling Tower Management Overview Water Conservation - Cooling Tower Management Overview
Water Conservation - Cooling Tower Management Overview
 
Boiler Water Treatment
Boiler Water TreatmentBoiler Water Treatment
Boiler Water Treatment
 
Power Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTPower Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENT
 
Essentials for a sound boiler water treatment program
Essentials for a sound boiler water treatment programEssentials for a sound boiler water treatment program
Essentials for a sound boiler water treatment program
 
Boiler Cycle water chemistry by Sudhanshu Dash
Boiler Cycle water chemistry by Sudhanshu DashBoiler Cycle water chemistry by Sudhanshu Dash
Boiler Cycle water chemistry by Sudhanshu Dash
 
Raw Water Intake & Pre Treatment of Raw Water in a Thermal Power Plant
Raw Water Intake & Pre Treatment of Raw Water in a Thermal Power PlantRaw Water Intake & Pre Treatment of Raw Water in a Thermal Power Plant
Raw Water Intake & Pre Treatment of Raw Water in a Thermal Power Plant
 
Boiler problems
Boiler problemsBoiler problems
Boiler problems
 
23291582 dm-plant
23291582 dm-plant23291582 dm-plant
23291582 dm-plant
 
COLLODAL SILICA JULY2016
COLLODAL SILICA JULY2016COLLODAL SILICA JULY2016
COLLODAL SILICA JULY2016
 
RO & NF chemical cleaning
RO & NF chemical cleaningRO & NF chemical cleaning
RO & NF chemical cleaning
 
S k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plantsS k-sharma-water-chemistry-in-thermal-power-plants
S k-sharma-water-chemistry-in-thermal-power-plants
 

Similaire à Water Efficiency in Thermal Power plants

BerbariGeorge.pdf
BerbariGeorge.pdfBerbariGeorge.pdf
BerbariGeorge.pdfNijas10
 
Adiabatic cooling tower v3 08.08
Adiabatic cooling tower v3 08.08Adiabatic cooling tower v3 08.08
Adiabatic cooling tower v3 08.08Er Ramgarhia
 
hvac and refrigeration system
hvac and refrigeration systemhvac and refrigeration system
hvac and refrigeration systemSRINIVASGILLALA
 
Nuclear energy for district cooling
Nuclear energy for district coolingNuclear energy for district cooling
Nuclear energy for district coolingssuser3a5da0
 
Concerntatini solar plant ppt
Concerntatini solar plant pptConcerntatini solar plant ppt
Concerntatini solar plant pptkarmbir saini
 
CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)Leonardo ENERGY
 
Improve plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlImprove plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlHossam Zein
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsGlobal CCS Institute
 
Power Key Elements of a Thermal Power Generation
Power Key Elements of a Thermal Power GenerationPower Key Elements of a Thermal Power Generation
Power Key Elements of a Thermal Power GenerationAnurak Atthasit
 
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdf
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdfQuestion Answer on Energy Conservation Vol 1 By Prem Baboo.pdf
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdfPremBaboo4
 
Geothermal Heating & Cooling Systems (Residential &
Geothermal Heating & Cooling Systems (Residential &Geothermal Heating & Cooling Systems (Residential &
Geothermal Heating & Cooling Systems (Residential &wtdurkin
 
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR eecfncci
 
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINALSuresh Jambunathan
 
Heat pump water heaters
Heat pump water heatersHeat pump water heaters
Heat pump water heatersVikas Markanda
 
INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANT
  INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANT  INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANT
INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANTIAEME Publication
 
SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)The SEAM Centre
 

Similaire à Water Efficiency in Thermal Power plants (20)

Understanding the water requirements of the power sector, by Anna Delgado fro...
Understanding the water requirements of the power sector, by Anna Delgado fro...Understanding the water requirements of the power sector, by Anna Delgado fro...
Understanding the water requirements of the power sector, by Anna Delgado fro...
 
BerbariGeorge.pdf
BerbariGeorge.pdfBerbariGeorge.pdf
BerbariGeorge.pdf
 
Adiabatic cooling tower v3 08.08
Adiabatic cooling tower v3 08.08Adiabatic cooling tower v3 08.08
Adiabatic cooling tower v3 08.08
 
hvac and refrigeration system
hvac and refrigeration systemhvac and refrigeration system
hvac and refrigeration system
 
Nuclear energy for district cooling
Nuclear energy for district coolingNuclear energy for district cooling
Nuclear energy for district cooling
 
Air cooled condensers
Air cooled condensersAir cooled condensers
Air cooled condensers
 
Concerntatini solar plant ppt
Concerntatini solar plant pptConcerntatini solar plant ppt
Concerntatini solar plant ppt
 
CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)
 
Improve plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlImprove plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater control
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systems
 
Power Key Elements of a Thermal Power Generation
Power Key Elements of a Thermal Power GenerationPower Key Elements of a Thermal Power Generation
Power Key Elements of a Thermal Power Generation
 
Article - 2012 PTQ Q1
Article - 2012 PTQ Q1Article - 2012 PTQ Q1
Article - 2012 PTQ Q1
 
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdf
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdfQuestion Answer on Energy Conservation Vol 1 By Prem Baboo.pdf
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdf
 
Geothermal Heating & Cooling Systems (Residential &
Geothermal Heating & Cooling Systems (Residential &Geothermal Heating & Cooling Systems (Residential &
Geothermal Heating & Cooling Systems (Residential &
 
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
OVERVIEW OF COGENERATION OPPORTUNITIES IN NEPALESE SUGAR SECTOR
 
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
 
Zero Carbon technology
Zero Carbon technologyZero Carbon technology
Zero Carbon technology
 
Heat pump water heaters
Heat pump water heatersHeat pump water heaters
Heat pump water heaters
 
INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANT
  INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANT  INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANT
INDUSTRIAL WASTE HEAT USED IN TYPICAL THERMAL POWER PLANT
 
SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)
 

Dernier

Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 

Dernier (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 

Water Efficiency in Thermal Power plants

  • 1. Water Efficiency in Thermal power Plant: An Outline of Cooling Technology in India Speaker: Kalyan Bhattacharya, Vice President – E & BD Paharpur Cooling Towers Ltd, Kolkata, INDIA
  • 2.  Water is one of the vital inputs for thermal power generation.  Water has the highest specific heat amongst all materials available in abundance, hence, ideal as cooling fluid. (Sp Heat of Water = 1 Kcal/Kg deg C)  Process cooling in the condenser, ash disposal, removal of heat generated in plant auxiliaries and various other activities require water.  Large coal based Power Plants are likely to come up in future.  Difficulties are already being faced in existing thermal power plants due to non-availability of water and expected to be aggravated in future with more coal fire TPP coming up. Introduction:
  • 3. Water Insufficiency issues of Existing Plants: NTPC’s 2100 MW Farakka STPP in West Bengal has come to a halt due to falling water level in the Feeder Canal. This is in the news and the crisis is continuing. Effect is being felt in Jharkhand, Orrisa, Bihar and Bengal. Non-availability of water is encountered in existing Power Plants which are situated in coal bearing states like Orissa, Jharkhand and Chhattisgarh.
  • 4. Consumption Areas of Water in Power Plant: Water is used in almost all areas/ facilities of thermal power stations in one way or other. A typical list of plant systems/ applications requiring consumptive water is indicated as below: – Cooling water system (Condenser & ACW) – Ash handling system – Power cycle make up – Coal dust suppression system – Service water system – Potable water system – Gardening – Evaporation from raw water reservoir
  • 5. Typical Water Consumption Figures Plant water consumption is governed by a number of factors such as : Quality of raw water, type of condenser cooling system, Quality of coal, Ash utilization, Type of ash disposal system, Waste water management aspects etc. In the past, power stations were designed with water systems having liberal considerations and high design margins. The consumptive water requirement for coal based plants with cooling towers used to be about 7 m3/h per MW In recent times, plants have been designed with reduced Plant water consumption rate in the range 3.5 - 4 m3/h per MW
  • 6. Water consumption of a typical Coal Based TPP Water consumption of a typical 2x500 MW TPP is given below (As per recent design) @ 4 m3/h per MW Cooling tower make up : 3450 Ash disposal : 1300* DM water make up : 120 Potable & service water : 250 Clarifier sludge etc. : 110 Coal dust suppression : 70 Total : 4000* *Ash Water to be tapped from CT blow down water Cooling Tower Make-up Ash Disposal DM Water make-up Potable & Service Water Clarifier Sludge Coal Dust Suppression
  • 7. MoEF Notification: Ministry of Environment, Forest and Climate Change (MoEF) in its recent notification dated December 07, 2015 on Environment (Protection) Amendment Rules, 2015 have notified the following: I. All plants with Once Through Cooling (OTC) shall install Cooling Tower (CT) and achieve specific water consumption upto maximum of 3.5m3/MWh within a period of two years from the date of publication of this notification. II. All existing CT-based plants shall have to reduce specific water consumption upto maximum of 3.5m3/MWh within a period of two years from the date of publication of this notification. III. New plants to be installed after 1st January, 2017 shall have to meet specific water consumption upto maximum of 2.5 m3/MWh and achieve zero waste water discharged
  • 8. Cooling Water System: Cooling Systems in Practice in India: 1. Cooling Tower (IDCT / NDCT) – Wet Cooling 2. Air Cooled Condenser – Dry Cooling 3. Once Through Cooling – To be replaced as per Dec 7, 2015 Notification
  • 12. Dry Cooling System Air Cooled Condenser
  • 14. Economics of Dry Cooling vs Wet Cooling System 50 120 150 Wet Cooling - IDCT Wet Cooling - NDCT Dry Cooling - ACC Initial Cost (Rs Crore) For a typical 660 MW Coal Based TPP *Considering Steam cycle efficiency as 40%
  • 15. Space Requirement of Dry Cooling vs Wet Cooling System(NDCT & IDCT) 8000 15000 14000 Wet Cooling - IDCT Wet Cooling - NDCT Dry Cooling - ACC Foot Print Area (Sq M) For a typical 660 MW Coal Based TPP *Considering Steam cycle efficiency as 40%
  • 16. Power Consumption of Dry Cooling vs Wet Cooling System 6500 5000 8000 Wet Cooling - IDCT Wet Cooling - NDCT Dry Cooling - ACC Aux. Power Consumption* (KW) For a typical 660 MW Coal Based TPP *Considering above plan area. #CW Pump Power included for IDCT & NDCT.
  • 17. Water Consumption Comparison of Dry Cooling vs Wet Cooling System 1.60% 1.60% 0 0.75% 0.75% 0 0.05% 0.05% 0 IDCT NDCT ACC Water Losses as ‘%’ Circulating Water Flow Evaporation Loss Blowdown Loss Drift Loss For a typical 660 MW Coal Based TPP *Considering Steam cycle efficiency as 40% and COC=3.0
  • 18. Water Conservation Techniques for CW System  Replace Once Through Cooling System with Cooling Towers / Air Cooled Condensers  Implementation of High operating COC (Cycles of Concentration) to reduce the blow-down loss Increasing COC to 5 from COC=3.0, Blow-down loss will reduce by 50%.  Installation of Air Cooled Condensers
  • 19. Techno- economics of Dry & Wet Cooling Systems As compared to wet cooling system, dry condenser cooling system results in reduction of unit output by about 7% 88 90 92 94 96 98 100 102 IDCT NDCT ACC Unit Output (%) Unit Output (%)
  • 20. Techno- economics of Dry & Wet Cooling Systems The heat rate of the unit with dry condenser cooling system is higher by about 7% in accordance with reduced output as indicated. Heat Rate on ACC In terms of efficiency, thermal efficiency of the plant shall reduce by about 2.5 percentage points Plant Thermal efficiency with dry Cooling system 7% 2.5%
  • 21. Techno- economics of Dry & Wet Cooling Systems Specific coal consumption of the unit shall increase by about 7%. Specific coal consumption with dry Cooling system Typical CO2 emission from the plant shall also increase by about 7% (from 0.9 kg/kWh to 0.96 kg/kWh) with dry cooling system as compared to wet cooling system. Specific CO2 emission with dry Cooling system 7% 7%
  • 22. Techno- economics of Dry & Wet Cooling Systems For a conventional 500 MW unit, Aux Power Consumption is 6.5 % with IDCT, 6 % with NDCT based CW system and 6.8 % of gross output for plant with direct cooling air cooled condensers 5.6 5.8 6 6.2 6.4 6.6 6.8 7 IDCT NDCT ACC Plant Auxiliary Power Consumption (% of Rated Plant Output) Auxiliary Power Consumption (% of Rated Output)
  • 23. Techno- economics of Dry & Wet Cooling Systems • Cost for plant with wet cooling system as ` 5 crore/MW, the cost of the plant with dry cooling system would vary from ` 5.5 to 5.7 crore/MW Cost of Plant with dry Cooling system • The levelised tariff is expected to increase by about 8- 9% over base levelised tariff for plant with dry Cooling system Levelised Tariff with dry Cooling system 10% 8-9%
  • 24. Key Findings • Dry condenser cooling system can be considered for the sites where availability of water is very scarce. In such case, the requirement of plant consumptive water shall reduce by about 80%. • However, for typical Indian conditions, dry cooling system shall result in reduction of plant output by about 7% and correspondingly, gross heat rate shall increase by 7%. • The capital cost per MW of the plant, shall increase by about 10%. #These are indicative values as per data considered in the report.
  • 25. Conclusion Dry cooling systems, as such, are costly technologies and are not comparable to wet cooling system on techno economic considerations. However, for sites where water availability is scarce or unreliable, dry cooling system using air-cooled steam condenser offers the only solution for power plant installation. When we are discussing changeover from once-through cooling system to a cooling tower system, there is no point in considering a dry cooling system as the need for this changeover is to reduce the water requirement and not eliminate it completely. And, it is safe to pre-suppose that, if the plant was working on once through system abundant water is available.
  • 26. Conclusion (Cont.) In such changeover cases, it is important to tailor the dimensions of the cooling tower to suit the available space as experience shows that the existing power plants are likely to be very tight on open space. It is also important to select cooling towers which can be installed quickly as the time permitted by the Ministry of Environment for the changeover is short (it has to be implemented within 6th December 2017). To meet these requirements, it is our considered recommendation that you look seriously at cooling towers with pultruded FRP or treated wood structure.