Format for Impact Assessment Report
1. Brief about the proposed project giving location details, coordinates, google/ toposheet
maps, etc. demarcating the project area.
1.1 Land Use Land Cover of the surrounding area, Percentage of LULC categories
1.2 Topography and drainage.
1.3 Details of wetlands [Highlight protected wetlands / Ramsar sites / NLCP lakes/ other
important wetlands in terms of dependencies of local communities if any]
2. Ground water situation in and around the project area including water level and quality data
and maps along with quality issues, if any. In case of mines, ground water conditions in both
core and buffer zone should be described.
2.1 Brief geology of the area
2.2 Hydrogeology of the area
2.2.1 Aquifer description [type, depth, storativity, permeability and porosity]
2.2.2 Ground water flow and aquifer interaction [flow direction, Ground
water – surface water connectivity]
2.2.3 Ground water level trend analysis [pre – monsoon and post – monsoon] for 10 years
2.2.4 Hydrograph of the water level for 10 years
2.2.5 Predicted water level declines for affected aquifers [Ground water modeling]
2.2.6 Ground water quality [pre - monsoon and post – monsoon]
2.2.7 Water quality of nearby water bodies
3. Details of the tubewells/ borewells proposed to be constructed. This includes the aquifer
parameters, drilling depth, diameter, tentative lithological log, details of pump to be lowered,
H.P. of pump, tentative discharge of tubewells/ borewells, etc. Locations to be marked on the
site plan/ map. Location of proposed piezometers.
5. Approved detailed dewatering plan in case of infrastructure dewatering projects.
6. Proposed usage of pumped water in case of infrastructure dewatering projects.
6.1 For drinking, irrigation etc.
6.2 6.3 Recharge
6.3 Runoff to stream
6.4 Benefitted area
7. Comprehensive assessment of the impact on the ground water regime in and around the
project area highlighting the risks and proposed management strategies proposed to
overcome any significant environmental issues.
7.2 Impact on groundwater sources
7.2.1. A description of the impacts on environmental values that have occurred, or are
likely to occur, because of any past ground water abstraction.
7.2.2 An assessment of the likely impacts on environment that will occur, or are likely to
occur, because of the ground water abstraction for a five years period starting on the
consultation day for the report; and over the projected life of the resource project area,
affected area and radius of influence in case of dewatering.
7.3 Socio-Economic Aspects:
7.3.1 Settlements and population dynamics around project area
7.3.2 Dependency on sources of water [surface or sub-surface]
7.3.3 Ground water uses [e.g. irrigation (irrigation method, number of watering)
water supply etc.]
7.3.4 Improvement / decline in agricultural yield in last 5 years and likely impact after NOC
7.3.5 Impact of proposed / existing project on local communities [based on local
interactions (interactions must be with stakeholders like fishermen community,
farmers etc.]
8. Proposed measures for disposal of waste water by industries drawing saline water.
9. Measures to be adopted for water conservation which include recycling, reuse, treatment,
etc. This includes the water balance chart being adopted by the firm along with details of
water conservation methods to be adopted.
- Brief write up along with capacity and flow chart of Sewage Treatment Plants / Effluent
Treatment Plants / Combined Effluent Treatment Plants existing/ proposed within the
project.
- Details of water conservation measures to be adopted to reduce/ save the ground water.
- Total water balance chart showing the usage of water for various processes.
10. Any other details pertaining to the project.
Format for Comprehensive report on ground water conditions in both core and
buffer zones for Mining Projects
1. Brief about the proposed project giving location details, coordinates, google/ toposheet
maps, etc. demarcating the project area.
1.1 Land Use Land Cover of the surrounding area, Percentage of LULC categories
1.2 Topography and drainage.
1.3 Details of wetlands [Highlight protected wetlands / Ramsar sites / NLCP lakes/ other
important wetlands in terms of dependencies of local communities if any]
2. Ground water situation in and around the project area including water level and quality data
and maps along with quality issues, if any. In case of mines, ground water conditions in both
core and buffer zone should be described.
2.1 Brief geology of the area
2.2 Hydrogeology of the area
2.2.1 Aquifer description [type, depth, storativity, permeability and porosity]
2.2.2 Ground water flow and aquifer interaction [flow direction, Ground
water – surface water connectivity]
2.2.3 Ground water level trend analysis [pre – monsoon and post – monsoon] for 10 years
2.2.4 Hydrograph of the water level for 10 years
2.2.5 Predicted water level declines for affected aquifers [Ground water modeling]
2.2.6 Ground water quality [pre - monsoon and post – monsoon]
2.2.7 Water quality of nearby water bodies
3. Details of the tubewells/ borewells proposed to be constructed. This includes the aquifer
parameters, drilling depth, diameter, tentative lithological log, details of pump to be lowered,
H.P. of pump, tentative discharge of tubewells/ borewells, etc. Locations to be marked on the
site plan/ map. Location of proposed piezometers.
4. Details of Geophysical studies carried out in and around the project area. Ground water
resources computation of the block in which the project falls.
4.1 Results of Geophysical analysis [vertical electrical sounding (VES), horizontal profiling
and imaging, transient electromagnetism method (TEM)] etc
5. Approved Mine plan in case .
5.1 Year wise mine plan including excavation depth, area and mine seepage.
6. Proposed usage of pumped water in case of mine dewatering projects.
6.1 For drinking,
6.2 Irrigation.
6.3 Recharge
6.3 Runoff to stream
6.4 Benefitted area
6.5 Dust suppression, Green belt development etc
7. Comprehensive assessment of the impact on the ground water regime in and around the
project area highlighting the risks and proposed management strategies proposed to
overcome any significant environmental issues.
7.1. Impact on surface water sources
7.1.1 Diversion of existing channels [constructed dam/barrages/weir/canals/hydro-
electric projects]
7.1.2 Change in land use [change in flood plain, lotic & lentic systems etc.]
7.1.3 Current & Potential threats
7.2 Impact on groundwater sources
7.2.1. A description of the impacts on environmental values that have occurred, or are
likely to occur, because of any past ground water abstraction.
7.2.2 An assessment of the likely impacts on environmental that will occur, or are likely to
occur, because of the ground water abstraction for a five years period starting on the
consultation day for the report; and over the projected life of the resource project area,
affected area and radius of influence.
7.3 Socio-Economic Aspects:
7.3.1 Settlements and population dynamics around project area
7.3.2 Dependency on sources of water [surface or sub-surface]
7.3.3 Ground water uses [e.g. irrigation (irrigation method, number of watering)
water supply etc.]
7.3.4 Improvement / decline in agricultural yield in last 5 years and likely impact after NOC
7.3.5 Impact of proposed / existing project on local communities [based on local
interactions (interactions must be with stakeholders like fishermen community,
farmers etc.]
8. Proposed measures for disposal of waste water by mine drawing saline water.
9. Measures to be adopted for water conservation which include recycling, reuse, treatment,
etc. This includes the water balance chart being adopted by the firm along with details of
water conservation methods to be adopted.
- Brief write up along with capacity and flow chart of Sewage Treatment Plants / Effluent
Treatment Plants / Combined Effluent Treatment Plants existing/ proposed within the
project.
- Details of water conservation measures to be adopted to reduce/ save the ground water.
- Total water balance chart showing the usage of water for various processes.
10. Any other details pertaining to the project.
Impact assessmentreportmining

Contenu connexe

Tendances

Water Efficient Landscape Guidelines - Costa Mesa, California
Water Efficient Landscape Guidelines - Costa Mesa, CaliforniaWater Efficient Landscape Guidelines - Costa Mesa, California
Water Efficient Landscape Guidelines - Costa Mesa, CaliforniaKaila694m
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesSteve Williams
 
LCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen BondyLCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen BondyTWCA
 
Modeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingModeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingAdam Nayak
 
Comprehensive Plan Amendment and Rezoning Criteria
Comprehensive Plan Amendment and Rezoning CriteriaComprehensive Plan Amendment and Rezoning Criteria
Comprehensive Plan Amendment and Rezoning CriteriaCity of College Station
 
2016_amalone_resume
2016_amalone_resume2016_amalone_resume
2016_amalone_resumeAndy Malone
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Fairfax County
 
Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsAndrea Drabicki
 
Environmentally sensitive areas
Environmentally sensitive areasEnvironmentally sensitive areas
Environmentally sensitive areasgscplanning
 
Operation of SAWS New Groundwater Desal Plant - Richard Donat
Operation of SAWS New Groundwater Desal Plant - Richard DonatOperation of SAWS New Groundwater Desal Plant - Richard Donat
Operation of SAWS New Groundwater Desal Plant - Richard DonatTWCA
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Fairfax County
 
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...Deltares
 
Lower Lackawanna Watershed Assessment and Restoration Plan
Lower Lackawanna Watershed Assessment and Restoration PlanLower Lackawanna Watershed Assessment and Restoration Plan
Lower Lackawanna Watershed Assessment and Restoration PlanMichael Hewitt, GISP
 
Swot analysis of gap
Swot analysis of gapSwot analysis of gap
Swot analysis of gapFRANK Water
 
Essex climatechangeflooding_ScottHursley
Essex climatechangeflooding_ScottHursleyEssex climatechangeflooding_ScottHursley
Essex climatechangeflooding_ScottHursleygreenbelt82
 
Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectFairfax County
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Fairfax County
 

Tendances (20)

File287
File287File287
File287
 
Water Efficient Landscape Guidelines - Costa Mesa, California
Water Efficient Landscape Guidelines - Costa Mesa, CaliforniaWater Efficient Landscape Guidelines - Costa Mesa, California
Water Efficient Landscape Guidelines - Costa Mesa, California
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental Activities
 
LCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen BondyLCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen Bondy
 
Modeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingModeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on Flooding
 
Comprehensive Plan Amendment and Rezoning Criteria
Comprehensive Plan Amendment and Rezoning CriteriaComprehensive Plan Amendment and Rezoning Criteria
Comprehensive Plan Amendment and Rezoning Criteria
 
2016_amalone_resume
2016_amalone_resume2016_amalone_resume
2016_amalone_resume
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
 
Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation Recommendaitons
 
Environmentally sensitive areas
Environmentally sensitive areasEnvironmentally sensitive areas
Environmentally sensitive areas
 
Operation of SAWS New Groundwater Desal Plant - Richard Donat
Operation of SAWS New Groundwater Desal Plant - Richard DonatOperation of SAWS New Groundwater Desal Plant - Richard Donat
Operation of SAWS New Groundwater Desal Plant - Richard Donat
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
 
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
 
Lower Lackawanna Watershed Assessment and Restoration Plan
Lower Lackawanna Watershed Assessment and Restoration PlanLower Lackawanna Watershed Assessment and Restoration Plan
Lower Lackawanna Watershed Assessment and Restoration Plan
 
Swot analysis of gap
Swot analysis of gapSwot analysis of gap
Swot analysis of gap
 
Essex climatechangeflooding_ScottHursley
Essex climatechangeflooding_ScottHursleyEssex climatechangeflooding_ScottHursley
Essex climatechangeflooding_ScottHursley
 
Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation Project
 
21 Design Work Shop 7.30.2009
21 Design Work Shop 7.30.200921 Design Work Shop 7.30.2009
21 Design Work Shop 7.30.2009
 
Low impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigationLow impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigation
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
 

Similaire à Impact assessmentreportmining

EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVERvikas rahangdale
 
Understanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modellingUnderstanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modellingAlex Nwoko
 
LECTURE 3-HYDROLOGICAL DATA FOR WATERSHED PLANNING.pptx
LECTURE 3-HYDROLOGICAL DATA FOR WATERSHED PLANNING.pptxLECTURE 3-HYDROLOGICAL DATA FOR WATERSHED PLANNING.pptx
LECTURE 3-HYDROLOGICAL DATA FOR WATERSHED PLANNING.pptxCHU DICKSON
 
I need someone to paraphrase these words just change it to dif.docx
I need someone to paraphrase these words  just change it to dif.docxI need someone to paraphrase these words  just change it to dif.docx
I need someone to paraphrase these words just change it to dif.docxwilcockiris
 
Water resources planning and development m5
Water resources planning and development m5Water resources planning and development m5
Water resources planning and development m5Bibhabasu Mohanty
 
Critical Study on Kochi Barrage
Critical Study on Kochi BarrageCritical Study on Kochi Barrage
Critical Study on Kochi BarrageIRJET Journal
 
Guidelines for Santee Water Efficient Landscape
Guidelines for Santee Water Efficient LandscapeGuidelines for Santee Water Efficient Landscape
Guidelines for Santee Water Efficient LandscapeFujita64g
 
Application of GIS and RS in Watershed Management
Application of GIS and RS in Watershed ManagementApplication of GIS and RS in Watershed Management
Application of GIS and RS in Watershed Managementholegajendra
 
Renew outlinefor compliance report
Renew outlinefor compliance reportRenew outlinefor compliance report
Renew outlinefor compliance reportAmardeep Jadeja
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectFairfax County
 
1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_riverRavi Naid Gorle
 
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIAWATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIAIRJET Journal
 
Margaret River Water Recycling Water Balance and Cost Benefit Analysis
Margaret River Water Recycling Water Balance and Cost Benefit AnalysisMargaret River Water Recycling Water Balance and Cost Benefit Analysis
Margaret River Water Recycling Water Balance and Cost Benefit AnalysisWayne Prangnell
 
Day 1 neno kukuric igrac - methodology
Day 1 neno kukuric   igrac - methodologyDay 1 neno kukuric   igrac - methodology
Day 1 neno kukuric igrac - methodologygroundwatercop
 
Writing Sample - Draft EIR
Writing Sample - Draft EIRWriting Sample - Draft EIR
Writing Sample - Draft EIRSharanya Ganesh
 

Similaire à Impact assessmentreportmining (20)

EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVER
 
Understanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modellingUnderstanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modelling
 
Ground water prospects map
Ground water prospects mapGround water prospects map
Ground water prospects map
 
NIO final report
NIO final reportNIO final report
NIO final report
 
LECTURE 3-HYDROLOGICAL DATA FOR WATERSHED PLANNING.pptx
LECTURE 3-HYDROLOGICAL DATA FOR WATERSHED PLANNING.pptxLECTURE 3-HYDROLOGICAL DATA FOR WATERSHED PLANNING.pptx
LECTURE 3-HYDROLOGICAL DATA FOR WATERSHED PLANNING.pptx
 
I need someone to paraphrase these words just change it to dif.docx
I need someone to paraphrase these words  just change it to dif.docxI need someone to paraphrase these words  just change it to dif.docx
I need someone to paraphrase these words just change it to dif.docx
 
Water resources planning and development m5
Water resources planning and development m5Water resources planning and development m5
Water resources planning and development m5
 
Dam engineering i 3
Dam engineering i 3Dam engineering i 3
Dam engineering i 3
 
Critical Study on Kochi Barrage
Critical Study on Kochi BarrageCritical Study on Kochi Barrage
Critical Study on Kochi Barrage
 
Guidelines for Santee Water Efficient Landscape
Guidelines for Santee Water Efficient LandscapeGuidelines for Santee Water Efficient Landscape
Guidelines for Santee Water Efficient Landscape
 
Application of GIS and RS in Watershed Management
Application of GIS and RS in Watershed ManagementApplication of GIS and RS in Watershed Management
Application of GIS and RS in Watershed Management
 
Renew outlinefor compliance report
Renew outlinefor compliance reportRenew outlinefor compliance report
Renew outlinefor compliance report
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration Project
 
1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river
 
Online Watershed Analysis Tool
Online Watershed Analysis Tool Online Watershed Analysis Tool
Online Watershed Analysis Tool
 
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIAWATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
 
Margaret River Water Recycling Water Balance and Cost Benefit Analysis
Margaret River Water Recycling Water Balance and Cost Benefit AnalysisMargaret River Water Recycling Water Balance and Cost Benefit Analysis
Margaret River Water Recycling Water Balance and Cost Benefit Analysis
 
Day 1 neno kukuric igrac - methodology
Day 1 neno kukuric   igrac - methodologyDay 1 neno kukuric   igrac - methodology
Day 1 neno kukuric igrac - methodology
 
16 Aug-2013 - Ary van der Lely - A stratigraphic model of the MIA
16 Aug-2013 - Ary van der Lely - A stratigraphic model of the MIA16 Aug-2013 - Ary van der Lely - A stratigraphic model of the MIA
16 Aug-2013 - Ary van der Lely - A stratigraphic model of the MIA
 
Writing Sample - Draft EIR
Writing Sample - Draft EIRWriting Sample - Draft EIR
Writing Sample - Draft EIR
 

Dernier

Call Girls Chikhali ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Chikhali ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Chikhali ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Chikhali ( 8250092165 ) Cheap rates call girls | Get low budgetSareena Khatun
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...kumargunjan9515
 
Your Budget Call Girls in Hassan 9332606886Call Girls Advance Cash On Delive...
Your Budget Call Girls in Hassan  9332606886Call Girls Advance Cash On Delive...Your Budget Call Girls in Hassan  9332606886Call Girls Advance Cash On Delive...
Your Budget Call Girls in Hassan 9332606886Call Girls Advance Cash On Delive...kumargunjan9515
 
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelBook Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotelkumargunjan9515
 
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevicekumargunjan9515
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Hyderabad Escorts Agency
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...kumargunjan9515
 
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...kumargunjan9515
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...Sareena Khatun
 
Only Cash On Delivery Call Girls Service In Kanpur 🧿 6378878445 🧿 High Class...
Only Cash On Delivery Call Girls Service In Kanpur  🧿 6378878445 🧿 High Class...Only Cash On Delivery Call Girls Service In Kanpur  🧿 6378878445 🧿 High Class...
Only Cash On Delivery Call Girls Service In Kanpur 🧿 6378878445 🧿 High Class...vershagrag
 
Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...
Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...
Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...vershagrag
 
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...kumargunjan9515
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxNazmusSakibNS
 
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterYil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterNisqually River Council
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServicePriya Reddy
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsMonica Sydney
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxarnab132
 

Dernier (20)

Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Call Girls Chikhali ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Chikhali ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Chikhali ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Chikhali ( 8250092165 ) Cheap rates call girls | Get low budget
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
Your Budget Call Girls in Hassan 9332606886Call Girls Advance Cash On Delive...
Your Budget Call Girls in Hassan  9332606886Call Girls Advance Cash On Delive...Your Budget Call Girls in Hassan  9332606886Call Girls Advance Cash On Delive...
Your Budget Call Girls in Hassan 9332606886Call Girls Advance Cash On Delive...
 
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelBook Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
 
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Only Cash On Delivery Call Girls Service In Kanpur 🧿 6378878445 🧿 High Class...
Only Cash On Delivery Call Girls Service In Kanpur  🧿 6378878445 🧿 High Class...Only Cash On Delivery Call Girls Service In Kanpur  🧿 6378878445 🧿 High Class...
Only Cash On Delivery Call Girls Service In Kanpur 🧿 6378878445 🧿 High Class...
 
Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...
Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...
Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...
 
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterYil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girls
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 

Impact assessmentreportmining

  • 1. Format for Impact Assessment Report 1. Brief about the proposed project giving location details, coordinates, google/ toposheet maps, etc. demarcating the project area. 1.1 Land Use Land Cover of the surrounding area, Percentage of LULC categories 1.2 Topography and drainage. 1.3 Details of wetlands [Highlight protected wetlands / Ramsar sites / NLCP lakes/ other important wetlands in terms of dependencies of local communities if any] 2. Ground water situation in and around the project area including water level and quality data and maps along with quality issues, if any. In case of mines, ground water conditions in both core and buffer zone should be described. 2.1 Brief geology of the area 2.2 Hydrogeology of the area 2.2.1 Aquifer description [type, depth, storativity, permeability and porosity] 2.2.2 Ground water flow and aquifer interaction [flow direction, Ground water – surface water connectivity] 2.2.3 Ground water level trend analysis [pre – monsoon and post – monsoon] for 10 years 2.2.4 Hydrograph of the water level for 10 years 2.2.5 Predicted water level declines for affected aquifers [Ground water modeling] 2.2.6 Ground water quality [pre - monsoon and post – monsoon] 2.2.7 Water quality of nearby water bodies 3. Details of the tubewells/ borewells proposed to be constructed. This includes the aquifer parameters, drilling depth, diameter, tentative lithological log, details of pump to be lowered, H.P. of pump, tentative discharge of tubewells/ borewells, etc. Locations to be marked on the site plan/ map. Location of proposed piezometers. 5. Approved detailed dewatering plan in case of infrastructure dewatering projects. 6. Proposed usage of pumped water in case of infrastructure dewatering projects. 6.1 For drinking, irrigation etc. 6.2 6.3 Recharge 6.3 Runoff to stream 6.4 Benefitted area 7. Comprehensive assessment of the impact on the ground water regime in and around the project area highlighting the risks and proposed management strategies proposed to overcome any significant environmental issues. 7.2 Impact on groundwater sources 7.2.1. A description of the impacts on environmental values that have occurred, or are likely to occur, because of any past ground water abstraction. 7.2.2 An assessment of the likely impacts on environment that will occur, or are likely to occur, because of the ground water abstraction for a five years period starting on the
  • 2. consultation day for the report; and over the projected life of the resource project area, affected area and radius of influence in case of dewatering. 7.3 Socio-Economic Aspects: 7.3.1 Settlements and population dynamics around project area 7.3.2 Dependency on sources of water [surface or sub-surface] 7.3.3 Ground water uses [e.g. irrigation (irrigation method, number of watering) water supply etc.] 7.3.4 Improvement / decline in agricultural yield in last 5 years and likely impact after NOC 7.3.5 Impact of proposed / existing project on local communities [based on local interactions (interactions must be with stakeholders like fishermen community, farmers etc.] 8. Proposed measures for disposal of waste water by industries drawing saline water. 9. Measures to be adopted for water conservation which include recycling, reuse, treatment, etc. This includes the water balance chart being adopted by the firm along with details of water conservation methods to be adopted. - Brief write up along with capacity and flow chart of Sewage Treatment Plants / Effluent Treatment Plants / Combined Effluent Treatment Plants existing/ proposed within the project. - Details of water conservation measures to be adopted to reduce/ save the ground water. - Total water balance chart showing the usage of water for various processes. 10. Any other details pertaining to the project.
  • 3. Format for Comprehensive report on ground water conditions in both core and buffer zones for Mining Projects 1. Brief about the proposed project giving location details, coordinates, google/ toposheet maps, etc. demarcating the project area. 1.1 Land Use Land Cover of the surrounding area, Percentage of LULC categories 1.2 Topography and drainage. 1.3 Details of wetlands [Highlight protected wetlands / Ramsar sites / NLCP lakes/ other important wetlands in terms of dependencies of local communities if any] 2. Ground water situation in and around the project area including water level and quality data and maps along with quality issues, if any. In case of mines, ground water conditions in both core and buffer zone should be described. 2.1 Brief geology of the area 2.2 Hydrogeology of the area 2.2.1 Aquifer description [type, depth, storativity, permeability and porosity] 2.2.2 Ground water flow and aquifer interaction [flow direction, Ground water – surface water connectivity] 2.2.3 Ground water level trend analysis [pre – monsoon and post – monsoon] for 10 years 2.2.4 Hydrograph of the water level for 10 years 2.2.5 Predicted water level declines for affected aquifers [Ground water modeling] 2.2.6 Ground water quality [pre - monsoon and post – monsoon] 2.2.7 Water quality of nearby water bodies 3. Details of the tubewells/ borewells proposed to be constructed. This includes the aquifer parameters, drilling depth, diameter, tentative lithological log, details of pump to be lowered, H.P. of pump, tentative discharge of tubewells/ borewells, etc. Locations to be marked on the site plan/ map. Location of proposed piezometers. 4. Details of Geophysical studies carried out in and around the project area. Ground water resources computation of the block in which the project falls. 4.1 Results of Geophysical analysis [vertical electrical sounding (VES), horizontal profiling and imaging, transient electromagnetism method (TEM)] etc 5. Approved Mine plan in case . 5.1 Year wise mine plan including excavation depth, area and mine seepage. 6. Proposed usage of pumped water in case of mine dewatering projects. 6.1 For drinking, 6.2 Irrigation. 6.3 Recharge 6.3 Runoff to stream
  • 4. 6.4 Benefitted area 6.5 Dust suppression, Green belt development etc 7. Comprehensive assessment of the impact on the ground water regime in and around the project area highlighting the risks and proposed management strategies proposed to overcome any significant environmental issues. 7.1. Impact on surface water sources 7.1.1 Diversion of existing channels [constructed dam/barrages/weir/canals/hydro- electric projects] 7.1.2 Change in land use [change in flood plain, lotic & lentic systems etc.] 7.1.3 Current & Potential threats 7.2 Impact on groundwater sources 7.2.1. A description of the impacts on environmental values that have occurred, or are likely to occur, because of any past ground water abstraction. 7.2.2 An assessment of the likely impacts on environmental that will occur, or are likely to occur, because of the ground water abstraction for a five years period starting on the consultation day for the report; and over the projected life of the resource project area, affected area and radius of influence. 7.3 Socio-Economic Aspects: 7.3.1 Settlements and population dynamics around project area 7.3.2 Dependency on sources of water [surface or sub-surface] 7.3.3 Ground water uses [e.g. irrigation (irrigation method, number of watering) water supply etc.] 7.3.4 Improvement / decline in agricultural yield in last 5 years and likely impact after NOC 7.3.5 Impact of proposed / existing project on local communities [based on local interactions (interactions must be with stakeholders like fishermen community, farmers etc.] 8. Proposed measures for disposal of waste water by mine drawing saline water. 9. Measures to be adopted for water conservation which include recycling, reuse, treatment, etc. This includes the water balance chart being adopted by the firm along with details of water conservation methods to be adopted. - Brief write up along with capacity and flow chart of Sewage Treatment Plants / Effluent Treatment Plants / Combined Effluent Treatment Plants existing/ proposed within the project. - Details of water conservation measures to be adopted to reduce/ save the ground water. - Total water balance chart showing the usage of water for various processes. 10. Any other details pertaining to the project.