4. The Risks of Improper Grounding & Bonding
• Safety
– Shocks
– Fire hazards
• Lightning
– Insurance data: $500 million/year due to lightning
damage
• Equipment failure
– ESD (Electrostatic Discharge) responsible for 27-33% of
IT equipment failure
• The risk of electrical noise
– Noise degrades the electrical signal Ethernet response
is to retransmit
5. Electrostatic discharge (ESD)
• Electrostatic charges are generated when different
materials come into contact and are then
separated.”
• If you see or hear the ESD discharge it is a
minimum of 2,900V
• Here are some examples of voltages generated by
ESD events:
– Walking across carpet:
1,500 - 35,500 volts
– Picking up a plastic bag:
1,200 – 20,000 volts
– Crossing your legs:
300 volts
• Cables can acquire a charge during installation
when they are unreeled from a cable reel, or
dragged across a floor. There have also been
reports of cables developing their own charge from
moving air or from building occupants walking over
floor ducts.”
ESD Is greatly affected by
Relative Humidity > 30%
6. The IEEE Std. 837™-2002 tests
TIA/EIA 568
Copper & Fiber
Cabling
TIA/EIA 569
Pathways/Spaces
TIA/EIA 606
Administration
TIA/EIA 607
Grounding/Bonding
IEEE 1100
ITE
Grounding
ANSI/TIA-942
Telecommunications
Infrastructure Standard for
Data Centers
8. Integrated bonding and grounding enhances long-term
equipment reliability and safety
Telecommunications
room
Data center
Entrance and direct
burial
TGB
Telecommunications
Grounding Busbar
MCBN Mesh common
bonding networks
TBB
telecommunications
bonding backbones
Ground ring
9. Watch for this common problem
Common Bonding Network
Jumper Kit (RGCBNJ660P22)
Making this bond was in no one’s scope of work...
(20% of the data centers have this problem)
Specify who
bonds the racks
to the SBG!
11. Grounding standards compliance
for operability
Conductor to ground rod
Conductor to building steel
Conductor to rebar
Conductor to
grounding electrodes
Conductor to conductor
12. HTAP Crimping
• HTCT HTAPs require 12
tons of compression
• CT-2930/L is
recommended
• Can use other
manufacturers’ tools and
retain UL Listing/CSA
Certification
• Must use Panduit locator
dies
Patented
locating rib
guarantees full-
width crimp 1st
time, every
time!
HTCT HTAP
CD-930H-250 Locator Die
CT-2930/L
13. Supplemental bonding grid construction per TIA-607-B
Example supplemental bonding grid
Hinged U-bolt design allows for “no
look” installation—saving 67% of
installation time
15. The connector is then
bonded to the patch
panel
The system grounding
protection starts at the
jacks module with 360o
shielding
The patch panel is
bonded to the equipment
rack for protection
Finally, the entire
system is bonded to a
main bus bar located in
the floor
4
2
1
3
Bonding and Grounding for Shielded Cables
16. Implementing the equipment
grounding requirement
Bond equipment
with a jumper
when possible
Bonding screws have thread-
forming threads and serrations
under the head that remove the
paint off mounting flanges and
patch panels (RGTBSG-C)
Bonding cage nuts have
teeth that cut paint when
installed (CBN4K)
16
17. • UTP28SP8IN** 20cm/8in
• UTP28SP8IN**-48 Bulk pack
• Switch Port Replication
• No wire managers
TIA-942: “Wrist strap ports should be
attached to the rack…”
18. Grounding Problem Detection
• Finding a grounding problem is
incredibly simple.
• Current (Amps) should be reading Zero
(0) on all ground leads, horizontals and
backbones.
• What to do about it is the hard part.