Under the guidance of:
Dr. Ramadhar Singh
AGM, Engine Division,Tata Motors Ltd.
PARTHA PRATIM
Fuel costs are rising and emission restrictions are getting tighter all over the
world. Automakers are required to comply, but at the same time do not
want to sacrifice performance or raise prices to put themselves at a
competitive disadvantage.
The research project work is a novel effort to demonstrate the functioning
of latest technologies concerned with modern automobile requirements.
The “Study and Improvement of OEE” project is to monitor the various
factors and parameters affecting the OEE of an assembly line and with
factors related to the performance and time of thee processes involved.
TATA Motors Limited is India’s largest automobile company, with
revenues of Rs. 54,000 crores in 2011-12. It is the leader in commercial
vehicles in each segment, and the second largest in the passenger
vehicles market with winning products in the compact, midsize car and
utility vehicle segments. The company is the world’s fifth largest medium
and heavy commercial vehicle manufacturer, and the world’s second
largest medium and heavy bus manufacturer.
The TELCO plant in Jamshedpur is operating under two business units as
Automobile Business Unit TATA Motors and Construction Equipment
Business Unit TELCON (now TATA Hitachi Construction)
The Automobile Business Unit consisting of three plants – Truck, Engine
and Axle is the major part of the works and is engaged in machining of
over 200 components and assemble of various aggregates.
TATA
Motors Ltd.
CVPU
Pune Lko JSR
HVAL TML
HRD ERC APPC PL-1 PL-2 PL-3 VD AM
HVTL TTL TCL
PCBU
Pune
CVPU: Commercial Vehicle Business Unit
PCBU: Public Carrier Business Unit
TML:Tata Motors Ltd
HVAL: Heavy Vehicle Axle Ltd
HVTL: Heavy Vehicle Transmission Ltd.
TTL:Tata Technologies Ltd.
TCL:Tata Construction Ltd.
ERC: Engg. and Research Centre
APPC: Auto Production Planning and Control
PL: Plant 1, 2, 3 (Vehicle Assembly Line,
Engine Division, Cab Manufacturing Unit)
VD:Vehicle Dispatch
AM: Auto Manufacturing
 FOUNDRY: supplies high grade SG iron castings for auto components and
excavators; has a sophisticated Kunkel Wagner high pressure moulding line
 FORGE: semi-automated forging line, state-of-art presses from Kurimito of Japan
 HV AXLES LTD: market leader in medium and heavy commercial vehicle axles in
India
 HV TRANSMISSIONS LTD: leading manufacturer of automotive transmissions,
components and engineering applications for a wide range of medium and heavy
commercial vehicles
 TEST TRACK: High speed tracks are specialized tracks for testing endurance of
cars and commercial vehicles.
 ENGINE DIVISION: Heart of Tata Motors; sub-divided into Machine Shop section,
Assembly section and Testing Section
Introduction to OEE – Overall Equipment Effectiveness
Many KPIs have been developed across industry. The measurement of the
effectiveness of manufacturing equipment, or the Mfg. equipment performance
needs to be quantified to determine if the plant is under-achieving. A quantifiable
indicator is Overall Equipment Effectiveness (OEE)
The OEE measure is unique as a KPI in that it provides a holistic view of asset
utilization. It drives an organization to examine all aspects of asset performance in
order to ensure we are obtaining the maximum benefit from a piece of equipment
that is already bought and paid for.
OEE is frequently used as a key metric in TPM and Lean Manufacturing programs by
providing an overall framework for measuring production efficiency.
What is OEE?
OEE = Availability x Performance x Quality
OEE is essentially the ratio of Fully Productive time to Planned Production Time.
OEE begins with Planned Production Time (Plant Operating Time – Planned
Shut Down) and scrutinizes efficiency and productivity losses that occur (Down
Time Losses, Speed Loss and Quality Loss)
Availability takes into account Down Time Loss
Performance takes into account Speed Loss
Quality takes into account Quality Loss
Calculating OEE
Availability = Operating Time / Planned Production Time
Performance = Ideal Cycle Time / (Operating Time / Total Pieces)
or, = (Total Pieces / Operating Time) / Ideal Run Rate
Quality = Good Pieces / Total Pieces
World Class OEE
The generally accepted world class goals for each factors are:
OEE Factor World Class
Availability 90.0%
Performance 95.0%
Quality 99.9%
Overall OEE 85.0%
Six Big Losses
The following six big losses are the common causes of efficiency loss in
manufacturing.
Six Big Loss Category OEE Loss CategoryEvent Examples
Breakdowns Down Time Loss Unplanned Maintenance; Equipment Failure
Setup and Adjustments Down Time Loss
Setup/Changeover; Material Shortages; Operator
Shortages
Small Stops Speed Loss
Obstructed Product Flow; Component Jams
Mis-feeds, Cleaning; Sensor/ Delivery Blocked
Reduced Speed Speed Loss Rough Running; Equipment Wear; Operator Inefficiency
Startup Rejects Quality Loss
Scrap; Rework; In-Process Damage
In-Process Expiration; Incorrect Assembly
Production Rejects Quality Loss
•Scrap; Rework; In-Process Damage
•In-Process Expiration; Incorrect Assembly
Addressing the Six Big Losses
Now that we know the Six Big Losses, we can focus on ways to monitor and
correct them. Categorizing data makes loss analysis much easier, and a key
goal should be fast and efficient data collection, with data put to use
throughout the day and in real-time.
Breakdowns >> Root Cause Analysis
Setup and Adjustments >> Use of assembling changeover carts and
prefabricated setup gauges
Small stops and Reduced speed >> Cycle Time Analysis with automated data
logging
Startup Rejects and Production Rejects >> Six Sigma
 Select the Pilot area >> single machine
 Where to measure OEE >> bottleneck
 Automating OEE measurement
 Capturing data for OEE >> Only three pieces of information are needed to calculate OEE: Good
Count, Ideal Cycle Time, and Planned Production Time:
• Capturing Good Count -- include parts that are defect-free the first time through the process.
• Determining Ideal Cycle Time -- theoretical minimum time to produce one piece or Nameplate
Capacity (the design capacity specified by the equipment builder or design engineer)
• Capturing Planned Production Time -- total time that the process is scheduled for production.
 Capturing Detailed Loss Data
• Capturing Operating Time -- total time that the process is actually running.
• Capturing Total Count
 Capturing Stop Reasons -- Reason codes explain why the process stopped (for both planned and
unplanned stops). They provide an objective view of what needs to be improved.
1. What are the factors responsible for OEE calculation at the TML Engine
Division assembly line?
2. What are the parameters for the measurement of OEE of the assembly
line?
3. How much is the deviation of the TML Engine Division assembly line OEE
from the World and India standards of OEE?
4. What are the reasons for deviation of OEE from the industry standards
and the root cause analysis?
5. What are the alternative ways to increase OEE at the TML Engine Division
assembly line?
Sl.
No.
Machine No. Machine Type Pure
Cutting
Time
(minutes)
Idle Time
(minutes)
Floor to
Floor
Time
(minutes)
Ideal
Time
(mins)
Performance
Factor
1 M36-6009A Very Critical 5.459897 2.569363 8.02926 7.42 0.92412
2 M36-6009B Critical 5.323697 2.505269 7.828966 7.02 0.89667
3 M36-6076B Critical 2.999989 1.411760 4.411749 4 0.90667
4 NAGEL M/C Critical 3.585470 1.687280 5.27275 4.6 0.87241
5 M50-0452 Very Critical 3.144349 1.479694 4.624043 4.1 0.88667
6 M36-6019 Very Critical 3.911942 1.840914 5.752856 4.5 0.78222
7 Torque Plate Very Critical 2.883922 1.357140 4.241062 4 0.94316
8 M36-7903 Very Critical 6.972334 2.578809 9.551143 8.12 0.85016
9 M15-7903 Critical 4.806108 1.777602 6.58371 5.82 0.884
10 M50-0455 Critical 5.273383 1.950431 7.223814 6.08 0.841661
11 M15-6076A Critical 5.500844 2.034559 7.535403 6.066 0.805
Sl.
No.
Machine No. Machine
Type
Pure
Cutting
Time
(minutes)
Idle Time
(minutes)
Floor to
Floor
Time
(minutes)
Ideal
Time
(mins)
Performance
Factor
12 M15-6073 Very Critical 4.248285 1.571284 5.819569 4.82 0.82824
13 M50-0329 Critical 4.159474 1.538436 5.69791 5.07 0.8898
14 M15-6069 Very Critical 6.549834 2.422541 8.972375 8.12 0.905
15 M15-6070 Very Critical 5.694742 2.106275 7.801017 6.9 0.8845
16 M50-0453 Critical 2.188940 1.231279 3.420219 2.93 0.85667
17 M50-0456 Very Critical 2.657895 1.495066 4.152961 3.51 0.84518
18 M36-7937 Very Critical 3.981651 2.239679 6.22133 5.52 0.88727
19 M36-4031 Critical 2.423822 1.3634 3.787222 3.5 0.92416
20 M36-6260 (TAL) Very Critical 5.455737 3.068852 8.524589 7.8 0.915
21 M36-4050 Critical 4.230508 2.379661 6.610169 5.85 0.885
22 M36-4051 Critical 1.292025 0.726764 2.018789 1.79 0.88667
Desc of
Technical
Object
Breakdown
Hours
Nature of Breakdown Nature of Activity Text
M15-6069B 0.67 Side rail to be welded Welded ok
M15-6070A 2.67 Spindle not getting on Motor replaced ok
M15-6073 1.17 Cutting oil leakage Rectified ok
M15-7903 3 Coolant not coming Pump fitted ok
M36-4031 1.42 Spindle unit not going in reverse l/s adjusted ok
M36-4050 1.58 a/c bore facing not being done Dog rail mounted ok
M36-6009A 2.5 m/c getting tripped frequently Tool problem setting done
ok
M36-6009B 2.58 Clamping bar broken Clamping arm fitted
M36-6019 0.42 Spark from press button Press button wire short
rectified ok
M36-6076A 2.17 Pit pump problem Pipe cleaned ok
M36-6076B 1.42 Lift table DC valve to changed Valve replaced ok
Desc of
Technical
Object
Breakdown
Hours
Nature of Breakdown Nature of Activity Text
M36-6260 2.08 Air gun to be fitted Air gun fitted ok
M36-7903 1.92 M/c not working in auto cycle Slide position corrected ok
M50-0452 2 Side clamping not working Air pressure adjusted
M50-0453 8.5 Roller is not rotating Roller mode in position ok
M50-0454 5.83 After operation block not getting
down
CnC problem
M36-4050 2.17 Air pipe be fitted Air pipe fitted ok
M50-0456 26.5 Autocycle not working with job Adjusted job clamp l/s ok
Breakdown
32%
Setup/Adjustm
ents
24%
Small Stops
18%
Reduced
Speeds
7%
Startup Rejects
9%
Prod. Rejects
10%
LOSS ANALYSIS
Leakage
Problems
23%
Clamping/Wel
ding Problems
34%
Fitting
Problems
15%
Autocycle
Problems
16%
Other
Problems
12%
BREAKDOWN NATURE
Sl. No. M/C No. Quality Factor Machine
Availability
Performance
Factor
OEE
1 M36-6009A 0.998 0.952 0.92412 87.800%
2 M36-6009B 0.992 0.944 0.89667 83.968%
3 M36-6076B 0.997 0.952 0.90667 86.056%
4 NAGEL M/C 0.980 0.974 0.87241 83.273%
5 M50-0452 0.992 0.924 0.88667 81.273%
6 M36-6019 0.994 0.954 0.78222 74.176%
7 Torque Plate 0.980 0.922 0.94316 85.220%
8 M36-7903 0.989 0.917 0.85016 77.102%
9 M15-7903 0.994 0.947 0.884 83.213%
10 M50-0455 0.999 0.972 0.841661 81.728%
11 M15-6076A 0.997 0.944 0.805 75.764%
Sl. No. M/C No. Quality
Factor
Machine
Availability
Performance
Factor
OEE
12 M15-6073 0.991 0.955 0.82824 78.385%
13 M50-0329 0.992 0.966 0.8898 85.267%
14 M15-6069 0.987 0.945 0.905 84.411%
15 M15-6070 0.992 0.926 0.8845 81.249%
16 M50-0453 0.994 0.906 0.85667 77.149%
17 M50-0456 0.995 0.945 0.84518 79.470%
18 M36-7937 0.997 0.916 0.88727 81.030%
19 M36-4031 0.992 0.952 0.92416 87.276%
20 M36-6260 (TAL) 0.994 0.974 0.915 88.586%
21 M36-4050 0.993 0.922 0.885 81.026%
22 M36-4051 0.996 0.937 0.88667 82.749%
70 72 74 76 78 80 82 84 86 88 90
Milling Machines
Grooving Machines
Honing Machines
Boring Machines
Drilling Machines
Fitting Machines
AVERAGE OEE
Average OEE
17.9
17.9
6.4
0.75
0
70% 75% 80% 85% 90% 95% 100%
OEE
Availability
Performance
Quality
Scheduled Operations
OEE LOSS ANALYSIS
 Fitting Machines cause the most loss in OEE. They must be properly addressed.
 The clamping and declamping systems were manual in several machines, must be made
automatic
 There must be accessibility to the remotest point of the machine for repairing as and
when required
 Any repairing must be done as a permanent solution and not on a temporary basis
 There must be proper lubrication of machine parts
 There must be proper flow of jobs throughout the time. Each worker must supply the job
to their customer at the right time.
 Control panel must be completely closed so that the worker could not re-adjust the
setting of the machines.
 OEE is one of the pillars of Total Productive Maintenance (TPM)
 TPM and OEE, both are focused on increasing the dependability and robustness of
asset (machine) performance through problem solving and the involvement of
front line and support staff.
 Improving OEE is a big step towards implementing TPM which constitutes of zero
breakdowns, zero abnormalities, zero defects and zero accidents
 The improvement in the OEE number will take the use of other lean applications,
such as SMED (setup reduction), TPM (Total Productive Maintenance),
standardized operations and “kaizen events” targeting specific areas.
 The OEE measure is central to the formulation and execution of a TPM
improvement strategy. Initial benchmarking of machine OEE performance often
reveals a potential for improvement that is far greater than existing measures
 Texas Instruments reported increased production figures of up to 80% in some
areas through the application of improved OEE and TPM.
Internship Report

Contenu connexe

En vedette

Telling stories with data
Telling stories with dataTelling stories with data
Telling stories with datamattsadler
 
Economía Popular y Solidaria - José Adrián Gómez G.
Economía Popular y Solidaria - José Adrián Gómez G.Economía Popular y Solidaria - José Adrián Gómez G.
Economía Popular y Solidaria - José Adrián Gómez G.José Adrián Gómez
 
Textus; szövegek hálójában
Textus; szövegek hálójábanTextus; szövegek hálójában
Textus; szövegek hálójábanZoltan Varju
 
Build the mobile web you want
Build the mobile web you wantBuild the mobile web you want
Build the mobile web you wantk88hudson
 
Koningin Paola heeft nu ook vast adres in Rome
Koningin Paola heeft nu ook vast adres in RomeKoningin Paola heeft nu ook vast adres in Rome
Koningin Paola heeft nu ook vast adres in RomeThierry Debels
 
Api days tech sparking social change by chief disrupter 2016.ppt
Api days   tech sparking social change by chief disrupter 2016.pptApi days   tech sparking social change by chief disrupter 2016.ppt
Api days tech sparking social change by chief disrupter 2016.pptAnne-Marie Elias
 
La atencion primaria en salud y la bioetica
La atencion primaria en salud y la bioeticaLa atencion primaria en salud y la bioetica
La atencion primaria en salud y la bioeticaSamanta Tapia
 
Aanikaaaaaalien
AanikaaaaaalienAanikaaaaaalien
Aanikaaaaaaliennainish
 
Sha-Menz-Link-Cleanup-and-Aiditing-for-Fun-and-Profit-SMX-West-2016
Sha-Menz-Link-Cleanup-and-Aiditing-for-Fun-and-Profit-SMX-West-2016Sha-Menz-Link-Cleanup-and-Aiditing-for-Fun-and-Profit-SMX-West-2016
Sha-Menz-Link-Cleanup-and-Aiditing-for-Fun-and-Profit-SMX-West-2016Sha Menz
 
Ce 150210107029 presentation
Ce 150210107029 presentationCe 150210107029 presentation
Ce 150210107029 presentationShyam Kanani
 
2014 Culinary Forecast: Top 20 Trends from Natl Rest Assoc
2014 Culinary Forecast: Top 20 Trends from Natl Rest Assoc2014 Culinary Forecast: Top 20 Trends from Natl Rest Assoc
2014 Culinary Forecast: Top 20 Trends from Natl Rest AssocCambro Manufacturing
 
The Rockefeller Foundation–Lancet Commission on Planetary Health: Safeguardin...
The Rockefeller Foundation–Lancet Commission on Planetary Health: Safeguardin...The Rockefeller Foundation–Lancet Commission on Planetary Health: Safeguardin...
The Rockefeller Foundation–Lancet Commission on Planetary Health: Safeguardin...The Rockefeller Foundation
 
Dig Deep: Uncovering the hidden costs of health care
Dig Deep: Uncovering the hidden costs of health careDig Deep: Uncovering the hidden costs of health care
Dig Deep: Uncovering the hidden costs of health careDeloitte United States
 
A'dam Sustainability Jam Introduction booklet
A'dam Sustainability Jam Introduction bookletA'dam Sustainability Jam Introduction booklet
A'dam Sustainability Jam Introduction bookletFranziska Krüger
 
Studentqgworkingoncampus 110209171107-phpapp02
Studentqgworkingoncampus 110209171107-phpapp02Studentqgworkingoncampus 110209171107-phpapp02
Studentqgworkingoncampus 110209171107-phpapp02emathews
 

En vedette (16)

Telling stories with data
Telling stories with dataTelling stories with data
Telling stories with data
 
Economía Popular y Solidaria - José Adrián Gómez G.
Economía Popular y Solidaria - José Adrián Gómez G.Economía Popular y Solidaria - José Adrián Gómez G.
Economía Popular y Solidaria - José Adrián Gómez G.
 
Textus; szövegek hálójában
Textus; szövegek hálójábanTextus; szövegek hálójában
Textus; szövegek hálójában
 
Build the mobile web you want
Build the mobile web you wantBuild the mobile web you want
Build the mobile web you want
 
En el café
En el caféEn el café
En el café
 
Koningin Paola heeft nu ook vast adres in Rome
Koningin Paola heeft nu ook vast adres in RomeKoningin Paola heeft nu ook vast adres in Rome
Koningin Paola heeft nu ook vast adres in Rome
 
Api days tech sparking social change by chief disrupter 2016.ppt
Api days   tech sparking social change by chief disrupter 2016.pptApi days   tech sparking social change by chief disrupter 2016.ppt
Api days tech sparking social change by chief disrupter 2016.ppt
 
La atencion primaria en salud y la bioetica
La atencion primaria en salud y la bioeticaLa atencion primaria en salud y la bioetica
La atencion primaria en salud y la bioetica
 
Aanikaaaaaalien
AanikaaaaaalienAanikaaaaaalien
Aanikaaaaaalien
 
Sha-Menz-Link-Cleanup-and-Aiditing-for-Fun-and-Profit-SMX-West-2016
Sha-Menz-Link-Cleanup-and-Aiditing-for-Fun-and-Profit-SMX-West-2016Sha-Menz-Link-Cleanup-and-Aiditing-for-Fun-and-Profit-SMX-West-2016
Sha-Menz-Link-Cleanup-and-Aiditing-for-Fun-and-Profit-SMX-West-2016
 
Ce 150210107029 presentation
Ce 150210107029 presentationCe 150210107029 presentation
Ce 150210107029 presentation
 
2014 Culinary Forecast: Top 20 Trends from Natl Rest Assoc
2014 Culinary Forecast: Top 20 Trends from Natl Rest Assoc2014 Culinary Forecast: Top 20 Trends from Natl Rest Assoc
2014 Culinary Forecast: Top 20 Trends from Natl Rest Assoc
 
The Rockefeller Foundation–Lancet Commission on Planetary Health: Safeguardin...
The Rockefeller Foundation–Lancet Commission on Planetary Health: Safeguardin...The Rockefeller Foundation–Lancet Commission on Planetary Health: Safeguardin...
The Rockefeller Foundation–Lancet Commission on Planetary Health: Safeguardin...
 
Dig Deep: Uncovering the hidden costs of health care
Dig Deep: Uncovering the hidden costs of health careDig Deep: Uncovering the hidden costs of health care
Dig Deep: Uncovering the hidden costs of health care
 
A'dam Sustainability Jam Introduction booklet
A'dam Sustainability Jam Introduction bookletA'dam Sustainability Jam Introduction booklet
A'dam Sustainability Jam Introduction booklet
 
Studentqgworkingoncampus 110209171107-phpapp02
Studentqgworkingoncampus 110209171107-phpapp02Studentqgworkingoncampus 110209171107-phpapp02
Studentqgworkingoncampus 110209171107-phpapp02
 

Similaire à Internship Report

Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenancevivekmsmech
 
Presentation.... Internship at Millat Tractors Limited (MTL)
Presentation.... Internship at Millat Tractors Limited (MTL)Presentation.... Internship at Millat Tractors Limited (MTL)
Presentation.... Internship at Millat Tractors Limited (MTL)Azlan
 
Case study final presentation ashish
Case study final presentation ashishCase study final presentation ashish
Case study final presentation ashishashish sinha
 
H0432045055
H0432045055H0432045055
H0432045055theijes
 
Assembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyAssembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyMd Abu Bakar Siddique
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET Journal
 
NTM Corp: Mobil SHC Presentation on power cost reduction using mobil shc - cu...
NTM Corp: Mobil SHC Presentation on power cost reduction using mobil shc - cu...NTM Corp: Mobil SHC Presentation on power cost reduction using mobil shc - cu...
NTM Corp: Mobil SHC Presentation on power cost reduction using mobil shc - cu...japjaca
 
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...IRJET Journal
 
Mid term presentation kartikey kr gupta
Mid term presentation kartikey kr guptaMid term presentation kartikey kr gupta
Mid term presentation kartikey kr guptakartik dogra
 
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDERDESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDERAkshay Deshpande
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenanceFELIX JONATHAN
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET Journal
 

Similaire à Internship Report (20)

Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenance
 
Presentation.... Internship at Millat Tractors Limited (MTL)
Presentation.... Internship at Millat Tractors Limited (MTL)Presentation.... Internship at Millat Tractors Limited (MTL)
Presentation.... Internship at Millat Tractors Limited (MTL)
 
AKS
AKSAKS
AKS
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Case study final presentation ashish
Case study final presentation ashishCase study final presentation ashish
Case study final presentation ashish
 
H0432045055
H0432045055H0432045055
H0432045055
 
Assembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyAssembly Line Balancing | Case Study
Assembly Line Balancing | Case Study
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
 
Internship.pptx
Internship.pptxInternship.pptx
Internship.pptx
 
Company Presentation.pptx
Company Presentation.pptxCompany Presentation.pptx
Company Presentation.pptx
 
NTM Corp: Mobil SHC Presentation on power cost reduction using mobil shc - cu...
NTM Corp: Mobil SHC Presentation on power cost reduction using mobil shc - cu...NTM Corp: Mobil SHC Presentation on power cost reduction using mobil shc - cu...
NTM Corp: Mobil SHC Presentation on power cost reduction using mobil shc - cu...
 
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
 
Mid term presentation kartikey kr gupta
Mid term presentation kartikey kr guptaMid term presentation kartikey kr gupta
Mid term presentation kartikey kr gupta
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDERDESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
DESIGN AND MANUFACTURING OF SPM FOR BRAKE WHEEL CYLINDER
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenance
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
 
resume_janardhan
resume_janardhanresume_janardhan
resume_janardhan
 
Enterprise
EnterpriseEnterprise
Enterprise
 

Internship Report

  • 1. Under the guidance of: Dr. Ramadhar Singh AGM, Engine Division,Tata Motors Ltd. PARTHA PRATIM
  • 2. Fuel costs are rising and emission restrictions are getting tighter all over the world. Automakers are required to comply, but at the same time do not want to sacrifice performance or raise prices to put themselves at a competitive disadvantage. The research project work is a novel effort to demonstrate the functioning of latest technologies concerned with modern automobile requirements. The “Study and Improvement of OEE” project is to monitor the various factors and parameters affecting the OEE of an assembly line and with factors related to the performance and time of thee processes involved.
  • 3. TATA Motors Limited is India’s largest automobile company, with revenues of Rs. 54,000 crores in 2011-12. It is the leader in commercial vehicles in each segment, and the second largest in the passenger vehicles market with winning products in the compact, midsize car and utility vehicle segments. The company is the world’s fifth largest medium and heavy commercial vehicle manufacturer, and the world’s second largest medium and heavy bus manufacturer. The TELCO plant in Jamshedpur is operating under two business units as Automobile Business Unit TATA Motors and Construction Equipment Business Unit TELCON (now TATA Hitachi Construction) The Automobile Business Unit consisting of three plants – Truck, Engine and Axle is the major part of the works and is engaged in machining of over 200 components and assemble of various aggregates.
  • 4. TATA Motors Ltd. CVPU Pune Lko JSR HVAL TML HRD ERC APPC PL-1 PL-2 PL-3 VD AM HVTL TTL TCL PCBU Pune CVPU: Commercial Vehicle Business Unit PCBU: Public Carrier Business Unit TML:Tata Motors Ltd HVAL: Heavy Vehicle Axle Ltd HVTL: Heavy Vehicle Transmission Ltd. TTL:Tata Technologies Ltd. TCL:Tata Construction Ltd. ERC: Engg. and Research Centre APPC: Auto Production Planning and Control PL: Plant 1, 2, 3 (Vehicle Assembly Line, Engine Division, Cab Manufacturing Unit) VD:Vehicle Dispatch AM: Auto Manufacturing
  • 5.  FOUNDRY: supplies high grade SG iron castings for auto components and excavators; has a sophisticated Kunkel Wagner high pressure moulding line  FORGE: semi-automated forging line, state-of-art presses from Kurimito of Japan  HV AXLES LTD: market leader in medium and heavy commercial vehicle axles in India  HV TRANSMISSIONS LTD: leading manufacturer of automotive transmissions, components and engineering applications for a wide range of medium and heavy commercial vehicles  TEST TRACK: High speed tracks are specialized tracks for testing endurance of cars and commercial vehicles.  ENGINE DIVISION: Heart of Tata Motors; sub-divided into Machine Shop section, Assembly section and Testing Section
  • 6. Introduction to OEE – Overall Equipment Effectiveness Many KPIs have been developed across industry. The measurement of the effectiveness of manufacturing equipment, or the Mfg. equipment performance needs to be quantified to determine if the plant is under-achieving. A quantifiable indicator is Overall Equipment Effectiveness (OEE) The OEE measure is unique as a KPI in that it provides a holistic view of asset utilization. It drives an organization to examine all aspects of asset performance in order to ensure we are obtaining the maximum benefit from a piece of equipment that is already bought and paid for. OEE is frequently used as a key metric in TPM and Lean Manufacturing programs by providing an overall framework for measuring production efficiency.
  • 7. What is OEE? OEE = Availability x Performance x Quality OEE is essentially the ratio of Fully Productive time to Planned Production Time. OEE begins with Planned Production Time (Plant Operating Time – Planned Shut Down) and scrutinizes efficiency and productivity losses that occur (Down Time Losses, Speed Loss and Quality Loss) Availability takes into account Down Time Loss Performance takes into account Speed Loss Quality takes into account Quality Loss
  • 8. Calculating OEE Availability = Operating Time / Planned Production Time Performance = Ideal Cycle Time / (Operating Time / Total Pieces) or, = (Total Pieces / Operating Time) / Ideal Run Rate Quality = Good Pieces / Total Pieces World Class OEE The generally accepted world class goals for each factors are: OEE Factor World Class Availability 90.0% Performance 95.0% Quality 99.9% Overall OEE 85.0%
  • 9. Six Big Losses The following six big losses are the common causes of efficiency loss in manufacturing. Six Big Loss Category OEE Loss CategoryEvent Examples Breakdowns Down Time Loss Unplanned Maintenance; Equipment Failure Setup and Adjustments Down Time Loss Setup/Changeover; Material Shortages; Operator Shortages Small Stops Speed Loss Obstructed Product Flow; Component Jams Mis-feeds, Cleaning; Sensor/ Delivery Blocked Reduced Speed Speed Loss Rough Running; Equipment Wear; Operator Inefficiency Startup Rejects Quality Loss Scrap; Rework; In-Process Damage In-Process Expiration; Incorrect Assembly Production Rejects Quality Loss •Scrap; Rework; In-Process Damage •In-Process Expiration; Incorrect Assembly
  • 10. Addressing the Six Big Losses Now that we know the Six Big Losses, we can focus on ways to monitor and correct them. Categorizing data makes loss analysis much easier, and a key goal should be fast and efficient data collection, with data put to use throughout the day and in real-time. Breakdowns >> Root Cause Analysis Setup and Adjustments >> Use of assembling changeover carts and prefabricated setup gauges Small stops and Reduced speed >> Cycle Time Analysis with automated data logging Startup Rejects and Production Rejects >> Six Sigma
  • 11.  Select the Pilot area >> single machine  Where to measure OEE >> bottleneck  Automating OEE measurement  Capturing data for OEE >> Only three pieces of information are needed to calculate OEE: Good Count, Ideal Cycle Time, and Planned Production Time: • Capturing Good Count -- include parts that are defect-free the first time through the process. • Determining Ideal Cycle Time -- theoretical minimum time to produce one piece or Nameplate Capacity (the design capacity specified by the equipment builder or design engineer) • Capturing Planned Production Time -- total time that the process is scheduled for production.  Capturing Detailed Loss Data • Capturing Operating Time -- total time that the process is actually running. • Capturing Total Count  Capturing Stop Reasons -- Reason codes explain why the process stopped (for both planned and unplanned stops). They provide an objective view of what needs to be improved.
  • 12. 1. What are the factors responsible for OEE calculation at the TML Engine Division assembly line? 2. What are the parameters for the measurement of OEE of the assembly line? 3. How much is the deviation of the TML Engine Division assembly line OEE from the World and India standards of OEE? 4. What are the reasons for deviation of OEE from the industry standards and the root cause analysis? 5. What are the alternative ways to increase OEE at the TML Engine Division assembly line?
  • 13. Sl. No. Machine No. Machine Type Pure Cutting Time (minutes) Idle Time (minutes) Floor to Floor Time (minutes) Ideal Time (mins) Performance Factor 1 M36-6009A Very Critical 5.459897 2.569363 8.02926 7.42 0.92412 2 M36-6009B Critical 5.323697 2.505269 7.828966 7.02 0.89667 3 M36-6076B Critical 2.999989 1.411760 4.411749 4 0.90667 4 NAGEL M/C Critical 3.585470 1.687280 5.27275 4.6 0.87241 5 M50-0452 Very Critical 3.144349 1.479694 4.624043 4.1 0.88667 6 M36-6019 Very Critical 3.911942 1.840914 5.752856 4.5 0.78222 7 Torque Plate Very Critical 2.883922 1.357140 4.241062 4 0.94316 8 M36-7903 Very Critical 6.972334 2.578809 9.551143 8.12 0.85016 9 M15-7903 Critical 4.806108 1.777602 6.58371 5.82 0.884 10 M50-0455 Critical 5.273383 1.950431 7.223814 6.08 0.841661 11 M15-6076A Critical 5.500844 2.034559 7.535403 6.066 0.805
  • 14. Sl. No. Machine No. Machine Type Pure Cutting Time (minutes) Idle Time (minutes) Floor to Floor Time (minutes) Ideal Time (mins) Performance Factor 12 M15-6073 Very Critical 4.248285 1.571284 5.819569 4.82 0.82824 13 M50-0329 Critical 4.159474 1.538436 5.69791 5.07 0.8898 14 M15-6069 Very Critical 6.549834 2.422541 8.972375 8.12 0.905 15 M15-6070 Very Critical 5.694742 2.106275 7.801017 6.9 0.8845 16 M50-0453 Critical 2.188940 1.231279 3.420219 2.93 0.85667 17 M50-0456 Very Critical 2.657895 1.495066 4.152961 3.51 0.84518 18 M36-7937 Very Critical 3.981651 2.239679 6.22133 5.52 0.88727 19 M36-4031 Critical 2.423822 1.3634 3.787222 3.5 0.92416 20 M36-6260 (TAL) Very Critical 5.455737 3.068852 8.524589 7.8 0.915 21 M36-4050 Critical 4.230508 2.379661 6.610169 5.85 0.885 22 M36-4051 Critical 1.292025 0.726764 2.018789 1.79 0.88667
  • 15. Desc of Technical Object Breakdown Hours Nature of Breakdown Nature of Activity Text M15-6069B 0.67 Side rail to be welded Welded ok M15-6070A 2.67 Spindle not getting on Motor replaced ok M15-6073 1.17 Cutting oil leakage Rectified ok M15-7903 3 Coolant not coming Pump fitted ok M36-4031 1.42 Spindle unit not going in reverse l/s adjusted ok M36-4050 1.58 a/c bore facing not being done Dog rail mounted ok M36-6009A 2.5 m/c getting tripped frequently Tool problem setting done ok M36-6009B 2.58 Clamping bar broken Clamping arm fitted M36-6019 0.42 Spark from press button Press button wire short rectified ok M36-6076A 2.17 Pit pump problem Pipe cleaned ok M36-6076B 1.42 Lift table DC valve to changed Valve replaced ok
  • 16. Desc of Technical Object Breakdown Hours Nature of Breakdown Nature of Activity Text M36-6260 2.08 Air gun to be fitted Air gun fitted ok M36-7903 1.92 M/c not working in auto cycle Slide position corrected ok M50-0452 2 Side clamping not working Air pressure adjusted M50-0453 8.5 Roller is not rotating Roller mode in position ok M50-0454 5.83 After operation block not getting down CnC problem M36-4050 2.17 Air pipe be fitted Air pipe fitted ok M50-0456 26.5 Autocycle not working with job Adjusted job clamp l/s ok
  • 17. Breakdown 32% Setup/Adjustm ents 24% Small Stops 18% Reduced Speeds 7% Startup Rejects 9% Prod. Rejects 10% LOSS ANALYSIS Leakage Problems 23% Clamping/Wel ding Problems 34% Fitting Problems 15% Autocycle Problems 16% Other Problems 12% BREAKDOWN NATURE
  • 18. Sl. No. M/C No. Quality Factor Machine Availability Performance Factor OEE 1 M36-6009A 0.998 0.952 0.92412 87.800% 2 M36-6009B 0.992 0.944 0.89667 83.968% 3 M36-6076B 0.997 0.952 0.90667 86.056% 4 NAGEL M/C 0.980 0.974 0.87241 83.273% 5 M50-0452 0.992 0.924 0.88667 81.273% 6 M36-6019 0.994 0.954 0.78222 74.176% 7 Torque Plate 0.980 0.922 0.94316 85.220% 8 M36-7903 0.989 0.917 0.85016 77.102% 9 M15-7903 0.994 0.947 0.884 83.213% 10 M50-0455 0.999 0.972 0.841661 81.728% 11 M15-6076A 0.997 0.944 0.805 75.764%
  • 19. Sl. No. M/C No. Quality Factor Machine Availability Performance Factor OEE 12 M15-6073 0.991 0.955 0.82824 78.385% 13 M50-0329 0.992 0.966 0.8898 85.267% 14 M15-6069 0.987 0.945 0.905 84.411% 15 M15-6070 0.992 0.926 0.8845 81.249% 16 M50-0453 0.994 0.906 0.85667 77.149% 17 M50-0456 0.995 0.945 0.84518 79.470% 18 M36-7937 0.997 0.916 0.88727 81.030% 19 M36-4031 0.992 0.952 0.92416 87.276% 20 M36-6260 (TAL) 0.994 0.974 0.915 88.586% 21 M36-4050 0.993 0.922 0.885 81.026% 22 M36-4051 0.996 0.937 0.88667 82.749%
  • 20. 70 72 74 76 78 80 82 84 86 88 90 Milling Machines Grooving Machines Honing Machines Boring Machines Drilling Machines Fitting Machines AVERAGE OEE Average OEE
  • 21. 17.9 17.9 6.4 0.75 0 70% 75% 80% 85% 90% 95% 100% OEE Availability Performance Quality Scheduled Operations OEE LOSS ANALYSIS
  • 22.  Fitting Machines cause the most loss in OEE. They must be properly addressed.  The clamping and declamping systems were manual in several machines, must be made automatic  There must be accessibility to the remotest point of the machine for repairing as and when required  Any repairing must be done as a permanent solution and not on a temporary basis  There must be proper lubrication of machine parts  There must be proper flow of jobs throughout the time. Each worker must supply the job to their customer at the right time.  Control panel must be completely closed so that the worker could not re-adjust the setting of the machines.
  • 23.  OEE is one of the pillars of Total Productive Maintenance (TPM)  TPM and OEE, both are focused on increasing the dependability and robustness of asset (machine) performance through problem solving and the involvement of front line and support staff.  Improving OEE is a big step towards implementing TPM which constitutes of zero breakdowns, zero abnormalities, zero defects and zero accidents  The improvement in the OEE number will take the use of other lean applications, such as SMED (setup reduction), TPM (Total Productive Maintenance), standardized operations and “kaizen events” targeting specific areas.  The OEE measure is central to the formulation and execution of a TPM improvement strategy. Initial benchmarking of machine OEE performance often reveals a potential for improvement that is far greater than existing measures  Texas Instruments reported increased production figures of up to 80% in some areas through the application of improved OEE and TPM.