SlideShare une entreprise Scribd logo
1  sur  14
Télécharger pour lire hors ligne
Environmental and Social
YoungProfsNet
Development Practitioners
Project proposal:
Review and evaluation of
Environmental Impact Assessment reports
on filling station projects in South Africa
Project goal
To review and evaluate critically the quality of Environmental Impact Assessment reports on
filling station projects in South Africa.
Objectives
1. To review recent Environmental Impact Assessment (EIA) reports that have been approved
by the lead authority: Department of Environmental Affairs, for learning purposes.
2. To analyze the reports with reference to legal and regulatory compliance as well as best
practice standards and existing guidelines, based on established criteria.
3. To determine if the EIA’s conducted on filling stations comply with legal and regulatory
requirements, meet a number of generally accepted quality criteria and available best
practice guidelines and standards.
Background to Environmental Impact Assessment
Environmental Impact Assessment (EIA) was first established as a response to increasing
concerns regarding the environmental effects of major developments (IEMA, 2004). The United
States (US) became the pioneer country to establish the first comprehensive environmental
protection law, known as the National Environmental Policy Act (NEPA) in 1969. NEPA
provided a baseline for EIA legislation throughout the world.
Environmental impact assessment is a policy and management tool for both planning and
decision-making (Glasson, Therivel & Chadwick, 2005; Modak & Biswas, 1999). EIA’s seek to
assess the environmental and social and socio-economic impacts (both positive and negative) of
proposed activities in order to promote sustainable development. EIA’s have been conducted
since the 1970’s, however the first South African EIA regulations were promulgated in
September 1997 as required in Sections 21, 22 and 26 of the Environment Conservation Act
(Act 73 of 1989).
The ECA EIA regulations were later later replaced by the National Environmental Management
Act (NEMA) 107 of 1998 EIA. The newly promulgated NEMA EIA regulations recognize petrol
stations as one of the activities for which a full EIA is mandatory (NEMA: EIA Regulations 2010
(GNR 543, 544, 545 and 546)). Regarding petrol stations, the current legislation states that only
projects with tank capacities over 80 m3 are required to conduct an EIA.
Lawrence (2003) defines EIA as a systematic process of:
Determining and managing (identifying, describing, measuring, predicting, interpreting,
integrating, communicating, involving and controlling) the potential (or real) impacts (positive
and negative, direct and indirect, individual and cumulative, likelihood of occurrence) of
proposed (or existing) human actions (projects, plans, programmes, legislation, activities) and
2
their alternatives on the environment (physical, chemical, biological, ecological, human health,
cultural, social, economic, built, and interrelations).
This definition shows that EIA is a process that blends many activities. The systematic
exploration of interrelationships between the proposal and the environment and among
alternatives and impacts is clearly crucial in EIA (Lawrence, 2003). In essence EIA is a
systematic process that examines the environmental, social and socio-economic consequences
of development actions and ensures that these effects are taken into account during project
design (Glasson et al, 2005).
Effectiveness of Environmental Impact Assessment
EIA can be an effective environmental management tool if it achieves three purposes:
1. assist the developer of a project
2. inform decision-making and
3. promote sustainable development (Glasson et al, 2005).
As argued by Glasson et al (2005) EIA should be a means to good environmental (, social and
socio-economic) management over the life of a project. Generally, it is agreed that EIA has led to
improvements in the environmental (, social and socio-economic) management of development
activities (Bailey, 1997; Glasson et al, 2005). However, the development of EIA practice has also
been accompanied by a significant amount of literature that identifies numerous weaknesses:
lack of consideration of cumulative impacts, insufficient public participation, little monitoring
and auditing, limited influence on the decision making process, inadequate consideration of
alternatives and the poor quality of environmental impact assessment reports have been
highlighted as weaknesses of current practice (Glasson et al, 2005; Mokhehle & Diab, 2001;
Wood, 2003).
Project approach
To achieve the objectives of the project a team of members of YoungProfsNet will carry out the
review and collectively produce a report. Each EIA report will be reviewed independently by
three members of the project team and the EIA reports will be assigned for review to members
in such a way that each report will be reviewed by a different trio of team members. The team
shall set SMART (Specific, Measurable, Achievable, Realistic and Time-based) targets for the
execution of the project. These targets will set a timeline for the project work to meet the
project objectives. The resulting report will be peer-reviewed by other YoungProfsNet
members. The project report may be the basis for a formal publication.
Review and evaluation
 Review checklists
A simple and effective review technique is to use a checklist with pre-defined questions.
Checklists are useful to review the completeness of an EIA.
There are several review checklists available internationally that can be used and adapted to
meet the requirements of the project. An example is the review checklist used by the Southern
African Institute for Environmental Assessment (SAIEA) that is subdivided into the following
eight sections:
1. Methodology used in compiling the EIA report
2. Description of the project
3. Assessment of alternatives to the project
3
4. Description of the environment
5. Description of impacts (a description of the affected environment (baseline conditions) and
an estimation and prediction of the main impacts)
6. Consideration of measures to mitigate impacts (necessary measures or environmental
management plan identified, including follow up and monitoring arrangements and a
specification of contingency plans and non-standard operating responses)
7. Non-technical summary
 Evaluation criteria
Each report will be reviewed separately and evaluated according to a number of criteria:
1. Readability
2. Clarity
3. Comprehensiveness
4. Appropriate use of maps, tables, figures, graphs and other illustrations
5. Readability and clarity of the non-technical summary for the general public
6. Public availability of other information/communication material for specific (groups of)
stakeholders
7. Compliance with the National Environmental Management Act (107/1998): Environmental
Impact Assessment Regulations, 2014
Reports meeting these seven criteria (and the SAIEA criteria) satisfactorily are judged to
conform to good impact assessment practice.
EIA reports meeting the additional review criteria, the IFC Performance Standards and
conforming to ISO14000 would be judged to represent good international impact assessment
practice.
NEMA Environmental Impact Assessment Regulations 2014
1.1 Details of the EAP who prepared the report
1.2 Details of the expertise of the EAP, including a curriculum vitae
2 The location of the activity, including
2.1 the 21 digit Surveyor General code of each cadastral land parcel
2.2 where available, the physical address and farm name
2.3 here the required information in items 2.1 and 2.2 is not available, the
coordinates of the boundary of the property or properties
3 A plan which locates the proposed activity or activities applied for as well as
the associated structures and infrastructure at an appropriate scale, or, if it is
3.1 a linear activity, a description and coordinates of the corridor in which the
proposed activity or activities is to be undertaken
3.2 on land where the property has not been defined, the coordinates within
which the activity is to be undertaken
4 A description of the scope of the proposed activity, including
4.1 all listed and specified activities triggered and being applied for
4.2 a description of the associated structures and infrastructure related to the
development
5 A description of the policy and legislative context within which the
development is located and an explanation of how the proposed development
complies with and responds to the legislation and policy context
4
6 A motivation for the need and desirability for the proposed development,
including the need and desirability of the activity in the context of the
preferred location
7 A motivation for the preferred development footprint within the approved
site
8 A full description of the process followed to reach the proposed development
footprint within the approved site, including
8.1 details of the development footprint alternatives considered
8.2 details of the public participation process undertaken in terms of regulation
41 of the Regulations, including copies of the supporting documents and
inputs
8.3 a summary of the issues raised by interested and affected parties, and an
indication of the manner in which the issues were incorporated, or the
reasons for not including them
8.4 the environmental attributes associated with the development footprint
alternatives focusing on the geographical, physical, biological, social,
economic, heritage and cultural aspects
8.5 the environmental attributes associated with the development footprint
alternatives focusing on the geographical, physical, biological, social,
economic, heritage and cultural aspects
8.5.1 can be reversed
8.5.2 may cause irreplaceable loss of resources
8.5.3 can be avoided, managed or mitigated
8.6 the methodology used in determining and ranking the nature, significance,
consequences, extent, duration and probability of potential environmental
impacts and risks
8.7 positive and negative impacts that the proposed activity and alternatives will
have on the environment and on the community that may be affected
focusing on the geographical, physical, biological, social, economic, heritage
and cultural aspects
8.8 the possible mitigation measures that could be applied and level of residual
risk
8.9 if no alternative development locations for the activity were investigated, the
motivation for not considering such
8.10 a concluding statement indicating the preferred alternative development
location
within the approved site
9 A full description of the process undertaken to identify, assess and rank the
impacts the activity and associated structures and infrastructure will impose
on the preferred location through the life of the activity, including
9.1 a description of all environmental issues and risks that were identified during
the environmental impact assessment process
9.2 an assessment of the significance of each issue and risk and an indication of
the extent to which the issue and risk could be avoided or addressed by the
adoption of mitigation measures
10 an assessment of each identified potentially significant impact and risk,
including
10.1 cumulative impacts
10.2 the nature, significance and consequences of the impact and risk;
10.3 the extent and duration of the impact and risk
5
10.4 the probability of the impact and risk occurring
10.5 the degree to which the impact and risk can be reversed
10.6 the degree to which the impact and risk may cause irreplaceable loss of
resources
10.7 the degree to which the impact and risk can be mitigated
11 Where applicable, a summary of the findings and recommendations of any
specialist report complying with Appendix 6 to these Regulations and an
indication as to how these findings and recommendations have been included
in the final assessment report
12 An environmental impact statement which contains
12.1 a summary of the key findings of the environmental impact assessment
12.2 a map at an appropriate scale which superimposes the proposed activity and
its associated structures and infrastructure on the environmental
sensitivities of the preferred site indicating any areas that should be avoided,
including buffers
12.3 a summary of the positive and negative impacts and risks of the proposed
activity and identified alternatives
13 Based on the assessment, and where applicable, recommendations from
specialist reports, the recording of proposed impact management objectives,
and the impact management outcomes for the development for inclusion in
the EMPr as well as for inclusion as conditions of authorisation
14 The final proposed alternatives which respond to the impact management
measures, avoidance, and mitigation measures identified through the
assessment
15 Any aspects which were conditional to the findings of the assessment either
by the EAP or specialist which are to be included as conditions of
authorisation
16 A description of any assumptions, uncertainties and gaps in knowledge which
relate to the assessment and mitigation measures proposed
17 A reasoned opinion as to whether the proposed activity should or should not
be authorised, and if the opinion is that it should be authorised, any
conditions that should be made in respect of that authorisation
18 Where the proposed activity does not include operational aspects, the period
for which the environmental authorisation is required and the date on which
the activity will be concluded and the post construction monitoring
requirements finalised
19 An undertaking under oath or affirmation by the EAP in relation to
19.1 the correctness of the information provided in the reports
19.2 the inclusion of comments and inputs from stakeholders and interested and
affected parties
19.3 the inclusion of inputs and recommendations from the specialist reports
where relevant
19.4 any information provided by the EAP to interested and affected parties and
any responses by the EAP to comments or inputs made by interested or
affected parties
20 Where applicable, details of any financial provisions for the rehabilitation,
closure, and ongoing post decommissioning management of negative
environmental impacts
21 An indication of any deviation from the approved scoping report, including
the plan of study, including
6
21.1 any deviation from the methodology used in determining the significance of
potential environmental impacts and risks
21.2 a motivation for the deviation
22 Any specific information that may be required by the competent authority
23 Any other matters required in terms of section 24(4)(a) and (b) of the Act
 Additional review criteria
Each report will also be assessed by the following additional criteria:
1. Are project construction and operation assessed separately (and are separate
environmental management plans for construction and operation presented)
2. Are normal and abnormal (maintenance, emergency situations) operations assessed
3. Are emergency control and recovery covered
4. Are cumulative and possible future impacts of project extension covered
5. Are abandonment and restoration addressed
6. Is the ‘post development’ (‘boom-bust’) situation following construction and at
abandonment assessed ?
 IFC Performance Standards
While this may not be so relevant for filling station projects, external finance for project
development (by development banks or commercial lenders) may require compliance with the
IFC Performance Standards on Environmental and Social Sustainability
(http://www.ifc.org/wps/wcm/connect/115482804a0255db96fbffd1a5d13d27/PS_English_2
012_Full-Document.pdf?MOD=AJPERES
 ISO14000 (Environmental Management Standard) conformity
There would be considerable merit if impact assessment reports would be compatible with
ISO14000 (by including a regulatory, an aspects and an impacts register) and the
environmental, social and health management plans for construction and operation would meet
ISO14000 requirements.
 Review and evaluation summary
The quality review of the EIA report involves evaluating how well the assessment tasks have
been performed (Lee & George, 2000). The elements of EIA review and the aspects considered
will differ with the requirements that are in place in a particular country. Reviews must
establish a set of quality criteria to be met as well as a minimum standard for achieving these
(Pretorius, 2006). A review of the EIA report should not just be a matter of checking that
required information is presented. It should also consider the quality and success of the entire
EIA process (Jalava et al, 2010). When evaluating EIA report quality, meeting legal and
regulatory requirements is paramount.
7
Review and evaluation rating
An integrated checklist is given in Appendix 1.
Checklist items will be rated as follows:
Rating Description
3 Satisfactory or good
2 Needs to be improved
1 Unsatisfactory
0 Not applicable; not available for review; not relevant
References and further reading
GDACEL. (2001). EIA Administrative Guideline: Guideline for the Construction and Upgrade of
Filling Stations and Associated Tank Installations. Johannesburg.
Glasson, J., Therivel, R. & Chadwick, A. (2005). Introduction to Environmental Impact
Assessment. 3rd Edition. London: Routledge. pp. 222-223.
Government Notices R. 982 (2014). National Environmental Management Act
(107/1998): Environmental Impact Assessment Regulations. Government Gazette Vol.
594 (No. 38282): 3-74.
IEMA (2004). Guidelines for Environmental Impact Assessment, Lincoln: IEMA.
IEMA (2011). The State of Environmental Impact Assessment Practice in the UK (Special
Report), Lincoln: IEMA
Jalava K., Pasanen S., Saalasti M. & Kuitunen M. (2010). Quality of Environmental Impact
Assessment: Finnish EISs and the opinions of EIA professionals. Impact Assessment and
Project Appraisal 28(1):15-27.
Kruger, R. (2012). A critical analysis of the quality of EIA reports for filling stations in
South Africa. MSc thesis, North-West University, Potchefstroom.
Lawrence, D.P. (2003). Environmental Impact Assessment: Practical Solutions to
Recurrent Problems. John Wiley & Sons: New Jersey.
Lee, N. & George, C. (2000). Environmental Assessment in Developing and Transitional
Countries. John Wiley & Sons Ltd: Chichester.
Lee, N., Colley, R., Bonde, J. & Simpson, J. (1999). Reviewing the quality of environmental
statements and environmental appraisals. Occasional Paper number 55, EIA Centre,
Department of Planning and Landscape, University of Manchester, Manchester.
Modak, P. & Biswas, A.K. (1999). Conducting Environmental Impact Assessment in
Developing Countries. Tokyo: UN University Press.
Mokhehle, L. & Diab, R. (2001). Evolution of environmental impact assessment in a small
developing country: A review of Lesotho case studies from 1980 to 1999. Impact
Assessment and Project Appraisal 19(1):9-18.
Pretorius, H.M. (2006). The quality of environmental impact reports in the North-West
province, South Africa. MSc thesis, North-West University, Potchefstroom.
Warburton, C.L. (2014). Evaluating South African Environmental Impact Assessment
(EIA) processes in the context of the Gautrain Project. LLM thesis, University of the
Witwatersrand., Johannesburg.
Wood, C. (2003). Environmental Impact Assessment in Developing Countries: An
Overview. Retrieved from http://www.environment-integration.org/Download
/D123/Wood.pdf
8
2 November 2015
Contact:
Miss Thembie Ndlovu (YoungProfsNet project lead) email: omuhle.omuhle@gmail.com
Maarten Smies (YoungProfsNet project mentor) email: ms@frogsinternational.com
9
Appendix 1.
Integrated checklist of criteria for the review and evaluation of Environmental
Impact Assessment reports on filling station projects in South Africa
General criteria
1 Readability
2 Clarity
3 Comprehensiveness
4 Appropriate use of maps, tables, figures, graphs and other illustrations
5 Readability and clarity of the non-technical summary for the general public
6 Public availability of other information/communication material for specific
(groups of) stakeholders
Criteria Southern African Institute for Environmental Assessment (SAIEA)
1 Methodology used in compiling the EIA report
2 Description of the project
3 Assessment of alternatives to the project
4 Description of the environment
5 Description of impacts (a description of the affected environment (baseline
conditions) and an estimation and prediction of the main impacts)
6 Consideration of measures to mitigate impacts (necessary measures or
environmental management plan identified, including follow up and
monitoring arrangements and a specification of contingency plans and non-
standard operating responses)
7 Non-technical summary
NEMA EIA Regulations (2014)
1.1 Details of the EAP who prepared the report
1.2 Details of the expertise of the EAP, including a curriculum vitae
2 The location of the activity, including
2.1 the 21 digit Surveyor General code of each cadastral land parcel
2.2 where available, the physical address and farm name
2.3 here the required information in items 2.1 and 2.2 is not available, the
coordinates of the boundary of the property or properties
3 A plan which locates the proposed activity or activities applied for as well as
the associated structures and infrastructure at an appropriate scale, or, if it is
3.1 a linear activity, a description and coordinates of the corridor in which the
proposed activity or activities is to be undertaken
3.2 on land where the property has not been defined, the coordinates within
which the activity is to be undertaken
4 A description of the scope of the proposed activity, including
4.1 all listed and specified activities triggered and being applied for
4.2 a description of the associated structures and infrastructure related to the
development
5 A description of the policy and legislative context within which the
development is located and an explanation of how the proposed development
complies with and responds to the legislation and policy context
10
6 A motivation for the need and desirability for the proposed development,
including the need and desirability of the activity in the context of the
preferred location
7 A motivation for the preferred development footprint within the approved
site
8 A full description of the process followed to reach the proposed development
footprint within the approved site, including
8.1 details of the development footprint alternatives considered
8.2 details of the public participation process undertaken in terms of regulation
41 of the Regulations, including copies of the supporting documents and
inputs
8.3 a summary of the issues raised by interested and affected parties, and an
indication of the manner in which the issues were incorporated, or the
reasons for not including them
8.4 the environmental attributes associated with the development footprint
alternatives focusing on the geographical, physical, biological, social,
economic, heritage and cultural aspects
8.5 the environmental attributes associated with the development footprint
alternatives focusing on the geographical, physical, biological, social,
economic, heritage and cultural aspects
8.5.1 can be reversed
8.5.2 may cause irreplaceable loss of resources
8.5.3 can be avoided, managed or mitigated
8.6 the methodology used in determining and ranking the nature, significance,
consequences, extent, duration and probability of potential environmental
impacts and risks
8.7 positive and negative impacts that the proposed activity and alternatives will
have on the environment and on the community that may be affected
focusing on the geographical, physical, biological, social, economic, heritage
and cultural aspects
8.8 the possible mitigation measures that could be applied and level of residual
risk
8.9 if no alternative development locations for the activity were investigated, the
motivation for not considering such
8.10 a concluding statement indicating the preferred alternative development
location
within the approved site
9 A full description of the process undertaken to identify, assess and rank the
impacts the activity and associated structures and infrastructure will impose
on the preferred location through the life of the activity, including
9.1 a description of all environmental issues and risks that were identified
during the environmental impact assessment process
9.2 an assessment of the significance of each issue and risk and an indication of
the extent to which the issue and risk could be avoided or addressed by the
adoption of mitigation measures
10 an assessment of each identified potentially significant impact and risk,
including
10.1 cumulative impacts
10.2 the nature, significance and consequences of the impact and risk;
10.3 the extent and duration of the impact and risk
11
10.4 the probability of the impact and risk occurring
10.5 the degree to which the impact and risk can be reversed
10.6 the degree to which the impact and risk may cause irreplaceable loss of
resources
10.7 the degree to which the impact and risk can be mitigated
11 Where applicable, a summary of the findings and recommendations of any
specialist report complying with Appendix 6 to these Regulations and an
indication as to how these findings and recommendations have been
included in the final assessment report
12 An environmental impact statement which contains
12.1 a summary of the key findings of the environmental impact assessment
12.2 a map at an appropriate scale which superimposes the proposed activity and
its associated structures and infrastructure on the environmental
sensitivities of the preferred site indicating any areas that should be avoided,
including buffers
12.3 a summary of the positive and negative impacts and risks of the proposed
activity and identified alternatives
13 Based on the assessment, and where applicable, recommendations from
specialist reports, the recording of proposed impact management objectives,
and the impact management outcomes for the development for inclusion in
the EMPr as well as for inclusion as conditions of authorisation
14 The final proposed alternatives which respond to the impact management
measures, avoidance, and mitigation measures identified through the
assessment
15 Any aspects which were conditional to the findings of the assessment either
by the EAP or specialist which are to be included as conditions of
authorisation
16 A description of any assumptions, uncertainties and gaps in knowledge which
relate to the assessment and mitigation measures proposed
17 A reasoned opinion as to whether the proposed activity should or should not
be authorised, and if the opinion is that it should be authorised, any
conditions that should be made in respect of that authorisation
18 Where the proposed activity does not include operational aspects, the period
for which the environmental authorisation is required and the date on which
the activity will be concluded and the post construction monitoring
requirements finalised
19 An undertaking under oath or affirmation by the EAP in relation to
19.1 the correctness of the information provided in the reports
19.2 the inclusion of comments and inputs from stakeholders and interested and
affected parties
19.3 the inclusion of inputs and recommendations from the specialist reports
where relevant
19.4 any information provided by the EAP to interested and affected parties and
any responses by the EAP to comments or inputs made by interested or
affected parties
20 Where applicable, details of any financial provisions for the rehabilitation,
closure, and ongoing post decommissioning management of negative
environmental impacts
21 An indication of any deviation from the approved scoping report, including
the plan of study, including
12
21.1 any deviation from the methodology used in determining the significance of
potential environmental impacts and risks
21.2 a motivation for the deviation
22 Any specific information that may be required by the competent authority
23 Any other matters required in terms of section 24(4)(a) and (b) of the Act
GDACEL Gauteng guidelines for petrol stations
1 A 1:50 000 map and street map
2 Detailed site development plans; and must indicate the following: location of
the site in relation and the distance of the tank(s) from council boundaries;
lay-out of adjacent properties; current land use and zoning of the area; major
roads, railways, open spaces; environmentally sensitive/significant features;
places of social and cultural importance; seep lines, channels, dams, rivers
and other water bodies; existing filling station within a 5 or 25 km radius
(that which is applicable)
3 Description of the geology of the site with a description of the soil types in
terms of compatibility
4 Detailed motivation on the need and desirability of the proposed
development
5 Depth of the water table should be provided with a baseline reference of
groundwater quality of the site and surrounding areas
6 The location of wells and boreholes on the site and neighbouring properties
with an indication of the level of reliance of the neighbouring properties on
ground water resources
7 A description of other environmental issues (eg socio-economic aspects
related to the sense of place, visual impact, etc.) as a result of the
construction, upgrade or the operation of the filling station
8 A description of the public participation process prescribed by the EIA
regulation
9 Method of waste disposal from the premises. Details (quantity, quality and
method)
10 Specific site design and recommendations for installation of underground
tanks in relation to the receiving environment
11 If the proposed filling station will include a car wash, the following must be
taken into account: manual vs. automated systems; water recycling practices;
quantity and quality of the effluent discharged into the sewer must be
determined in consultation with the relevant local authority
12 A comparative assessment (benefits vs. disadvantages) of alternatives,
specifically location, land-use and the no-go option
13 In the case where there are existing filling stations in proximity, an
assessment of the cumulative impacts on the environment, as a result of
combined impacts from all filling stations in the applicable radius (5 or 25
km), must be undertaken:
13.1 the ability of the natural and social environment to assimilate cumulative
stresses placed on them
13.2 the likelihood of negative synergistic effects
13.3 whether the proposed development has a significant impact on, or is
constrained by existing or future development rights
13.4 the feed flow and anticipated traffic volume
13
13.5 a feasibility study which includes the information in item 4, but not entirely
based upon it
13.6 the demand (necessity) and desirability of the proposed development; with
an indication of the potential of the proposed filling station in terms of
fulfilling the need of the targeted consumer
13.7 impact on the feasibility of existing filling stations; the no-go option as an
alternative
Additional review criteria
1 Are project construction and operation assessed separately
1.1 are separate environmental management plans for construction and
operation presented
2 Are normal and abnormal (maintenance, emergency situations) operations
assessed
3 Are emergency control and recovery covered
4 Are cumulative and possible future impacts of project extension covered
5 Are abandonment and restoration addressed
6 Is the 'post development' ('boom-bust') situation following construction and
at abandonment assessed
ISO14000 conformity
Does the report contain a Regulatory register
Does the report contain an Aspects register
Does the report contain an Impacts register
Is the environmental management plan ISO14000 compatible
IFC Performance Standards on Environmental and Social Sustainability
1 Assessment and Management of Environmental and Social Risks and Impacts
1.1 Environmental and Social Assessment and Management System
1.2 Policy: environmental and social objectives and principles
1.3 Identification of environmental and social risks and impacts
1.4 Management Programme
1.5 Organizational Capacity and Competency
1.6 Emergency Preparedness and Response
1.7 Monitoring and Review
1.8 Stakeholder Engagement
1.9 External Communications and Grievance Mechanisms
1.10 Ongoing Reporting to Affected Communities
2 Labour and Working Conditions
2.1 Working Conditions and Management of Worker Relationship
2.2 Protecting the Work Force (child labour; forced labour)
2.3 Occupational Health and Safety
2.4 Workers Engaged by Third Parties
2.5 Supply Chain
3 Resource Efficiency and Pollution Prevention
3.1 Resource Efficiency (greenhouse gases; water consumption)
3.2 Pollution Prevention (wastes; hazardous materials management; pesticides
use and management)
14
4 Community Health, Safety, and Security
4.1 Community Health and Safety
4.2 Security Personnel
5 Land Acquisition and Involuntary Resettlement
5.1 General: project design; compensation and benefits for displaced persons;
community engagement; grievance mechanism; resettlement and livelihood
restoration planning and implementation
5.2 Displacement: physical displacement; economic displacement
5.3 Private Sector Responsibilities Under Government-Managed Resettlement
6 Biodiversity Conservation and Sustainable Management of Living Natural
Resources
6.1 General: impact assessment; avoidance of impacts on biodiversity and
ecosystem services
6.2 Protection and Conservation of Biodiversity (modified habitat; natural
habitat; critical habitat; legally protected and internationally recognized
areas; invasive alien species)
6.3 Sustainable Management of Living Natural Resources
6.4 Supply Chain
7 Indigenous Peoples
7.1 General: avoidance of adverse impacts; participation and consent
7.2 Circumstances Requiring Free, Prior, and Informed Consent (impacts on
lands and natural resources subject to traditional ownership or under
customary use; relocation from those; critical cultural heritage)
7.3 Mitigation and Development Benefits
7.4 Private Sector Responsibilities Where Government is Responsible for
Managing Indigenous Peoples Issues
8 Cultural Heritage
8.1 Protection of Cultural Heritage in Project Design and Execution (chance find
procedures; consultation; community access; removal of (non-) replicable
cultural heritage; critical cultural heritage)
8.2 Project’s Use of Cultural Heritage

Contenu connexe

Tendances

Environmental Impact Evaluation of Mining
Environmental Impact Evaluation of MiningEnvironmental Impact Evaluation of Mining
Environmental Impact Evaluation of Miningijtsrd
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)Angom Baleshwor
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentNigel Gardner
 
Environmental Impact Assesment EIA Presentation_20181025
Environmental Impact Assesment EIA Presentation_20181025Environmental Impact Assesment EIA Presentation_20181025
Environmental Impact Assesment EIA Presentation_20181025Rasika Weerasooriya
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsKushal Patel
 
Environmental inventory / baseline studies
Environmental inventory / baseline studiesEnvironmental inventory / baseline studies
Environmental inventory / baseline studiesSyed Javed
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIAJenson Samraj
 
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of FijiCloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of FijiWaqas Tariq
 
Environment Impact Assessment - EIA
Environment Impact Assessment - EIAEnvironment Impact Assessment - EIA
Environment Impact Assessment - EIAPradeepMittal22
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaMizanur R. Shohel
 
Environment Impact Assessment Using Remote Sensing
Environment Impact Assessment Using Remote SensingEnvironment Impact Assessment Using Remote Sensing
Environment Impact Assessment Using Remote Sensingshubham shama
 
EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009Jenson Samraj
 

Tendances (20)

Environmental Impact Evaluation of Mining
Environmental Impact Evaluation of MiningEnvironmental Impact Evaluation of Mining
Environmental Impact Evaluation of Mining
 
PEISS
PEISSPEISS
PEISS
 
EIA Process
EIA ProcessEIA Process
EIA Process
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Stages of EIA
Stages of EIAStages of EIA
Stages of EIA
 
Environmental Impact Assesment EIA Presentation_20181025
Environmental Impact Assesment EIA Presentation_20181025Environmental Impact Assesment EIA Presentation_20181025
Environmental Impact Assesment EIA Presentation_20181025
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
 
Eia
EiaEia
Eia
 
Eia requirements
Eia requirementsEia requirements
Eia requirements
 
Environmental inventory / baseline studies
Environmental inventory / baseline studiesEnvironmental inventory / baseline studies
Environmental inventory / baseline studies
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIA
 
Environmental management
Environmental managementEnvironmental management
Environmental management
 
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of FijiCloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
 
Environment Impact Assessment - EIA
Environment Impact Assessment - EIAEnvironment Impact Assessment - EIA
Environment Impact Assessment - EIA
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
 
EIA
EIAEIA
EIA
 
Eia procedures
Eia proceduresEia procedures
Eia procedures
 
Environment Impact Assessment Using Remote Sensing
Environment Impact Assessment Using Remote SensingEnvironment Impact Assessment Using Remote Sensing
Environment Impact Assessment Using Remote Sensing
 
EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009
 

En vedette

Stakeholder engagement resources for project managers webinar, 21 March 2017
Stakeholder engagement resources for project managers webinar, 21 March 2017Stakeholder engagement resources for project managers webinar, 21 March 2017
Stakeholder engagement resources for project managers webinar, 21 March 2017Association for Project Management
 
Space matrix ( Tugas 2)
Space matrix ( Tugas 2)Space matrix ( Tugas 2)
Space matrix ( Tugas 2)FarizDS
 
Ge matrix and its implications roll no 82
Ge matrix and its implications roll no 82Ge matrix and its implications roll no 82
Ge matrix and its implications roll no 82Mihir Makwana
 

En vedette (7)

Queen street station tunnel or throat development rodger querns
Queen street station tunnel or throat development  rodger quernsQueen street station tunnel or throat development  rodger querns
Queen street station tunnel or throat development rodger querns
 
Stakeholder engagement resources for project managers webinar, 21 March 2017
Stakeholder engagement resources for project managers webinar, 21 March 2017Stakeholder engagement resources for project managers webinar, 21 March 2017
Stakeholder engagement resources for project managers webinar, 21 March 2017
 
Space matrix ( Tugas 2)
Space matrix ( Tugas 2)Space matrix ( Tugas 2)
Space matrix ( Tugas 2)
 
Goal achivement matrix
Goal achivement matrixGoal achivement matrix
Goal achivement matrix
 
Ge matrix and its implications roll no 82
Ge matrix and its implications roll no 82Ge matrix and its implications roll no 82
Ge matrix and its implications roll no 82
 
Space matrix
Space matrixSpace matrix
Space matrix
 
Ge matrix
Ge matrixGe matrix
Ge matrix
 

Similaire à South africaprojectprojectproposal20151102

Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
 
Environmental Impact assessment
Environmental Impact assessmentEnvironmental Impact assessment
Environmental Impact assessmentDavis Ciprikis
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSamanth kumar
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020Chandrakant Singh
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentIntan Ayuna
 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Sciencetheijes
 
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...Abraham Ncunge
 
Monitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E ToolMonitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E ToolNAP Events
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.Royallity Vishwanath
 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfHajiraThabasum
 
Green Building and Technology Unit 3
Green Building and Technology Unit 3Green Building and Technology Unit 3
Green Building and Technology Unit 3Chaitanya Nagare
 
Environmental Audits
Environmental AuditsEnvironmental Audits
Environmental AuditsYajush Sonar
 
January 8th esp 179 lecture- class intro and eia basics
January 8th  esp 179 lecture- class intro and eia basicsJanuary 8th  esp 179 lecture- class intro and eia basics
January 8th esp 179 lecture- class intro and eia basicsCEQAplanner
 
UNIT – I ptpg final (2).ppt
UNIT – I ptpg final (2).pptUNIT – I ptpg final (2).ppt
UNIT – I ptpg final (2).pptkrpnath1
 

Similaire à South africaprojectprojectproposal20151102 (20)

Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
Environmental Impact assessment
Environmental Impact assessmentEnvironmental Impact assessment
Environmental Impact assessment
 
EIA
EIAEIA
EIA
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Guidance notoneia (1)
Guidance notoneia (1)Guidance notoneia (1)
Guidance notoneia (1)
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
 
Assessment Proposal NLWRA
Assessment Proposal NLWRAAssessment Proposal NLWRA
Assessment Proposal NLWRA
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Science
 
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 
Monitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E ToolMonitoring the process using the PEG M&E Tool
Monitoring the process using the PEG M&E Tool
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.
 
PEG M&E Tool
PEG M&E ToolPEG M&E Tool
PEG M&E Tool
 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
 
PEG M&E Tool
PEG M&E ToolPEG M&E Tool
PEG M&E Tool
 
Question
QuestionQuestion
Question
 
Green Building and Technology Unit 3
Green Building and Technology Unit 3Green Building and Technology Unit 3
Green Building and Technology Unit 3
 
Environmental Audits
Environmental AuditsEnvironmental Audits
Environmental Audits
 
January 8th esp 179 lecture- class intro and eia basics
January 8th  esp 179 lecture- class intro and eia basicsJanuary 8th  esp 179 lecture- class intro and eia basics
January 8th esp 179 lecture- class intro and eia basics
 
UNIT – I ptpg final (2).ppt
UNIT – I ptpg final (2).pptUNIT – I ptpg final (2).ppt
UNIT – I ptpg final (2).ppt
 

Dernier

Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENGeorgeDiamandis11
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...tanu pandey
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Servicesexy call girls service in goa
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 

Dernier (20)

Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 

South africaprojectprojectproposal20151102

  • 1. Environmental and Social YoungProfsNet Development Practitioners Project proposal: Review and evaluation of Environmental Impact Assessment reports on filling station projects in South Africa Project goal To review and evaluate critically the quality of Environmental Impact Assessment reports on filling station projects in South Africa. Objectives 1. To review recent Environmental Impact Assessment (EIA) reports that have been approved by the lead authority: Department of Environmental Affairs, for learning purposes. 2. To analyze the reports with reference to legal and regulatory compliance as well as best practice standards and existing guidelines, based on established criteria. 3. To determine if the EIA’s conducted on filling stations comply with legal and regulatory requirements, meet a number of generally accepted quality criteria and available best practice guidelines and standards. Background to Environmental Impact Assessment Environmental Impact Assessment (EIA) was first established as a response to increasing concerns regarding the environmental effects of major developments (IEMA, 2004). The United States (US) became the pioneer country to establish the first comprehensive environmental protection law, known as the National Environmental Policy Act (NEPA) in 1969. NEPA provided a baseline for EIA legislation throughout the world. Environmental impact assessment is a policy and management tool for both planning and decision-making (Glasson, Therivel & Chadwick, 2005; Modak & Biswas, 1999). EIA’s seek to assess the environmental and social and socio-economic impacts (both positive and negative) of proposed activities in order to promote sustainable development. EIA’s have been conducted since the 1970’s, however the first South African EIA regulations were promulgated in September 1997 as required in Sections 21, 22 and 26 of the Environment Conservation Act (Act 73 of 1989). The ECA EIA regulations were later later replaced by the National Environmental Management Act (NEMA) 107 of 1998 EIA. The newly promulgated NEMA EIA regulations recognize petrol stations as one of the activities for which a full EIA is mandatory (NEMA: EIA Regulations 2010 (GNR 543, 544, 545 and 546)). Regarding petrol stations, the current legislation states that only projects with tank capacities over 80 m3 are required to conduct an EIA. Lawrence (2003) defines EIA as a systematic process of: Determining and managing (identifying, describing, measuring, predicting, interpreting, integrating, communicating, involving and controlling) the potential (or real) impacts (positive and negative, direct and indirect, individual and cumulative, likelihood of occurrence) of proposed (or existing) human actions (projects, plans, programmes, legislation, activities) and
  • 2. 2 their alternatives on the environment (physical, chemical, biological, ecological, human health, cultural, social, economic, built, and interrelations). This definition shows that EIA is a process that blends many activities. The systematic exploration of interrelationships between the proposal and the environment and among alternatives and impacts is clearly crucial in EIA (Lawrence, 2003). In essence EIA is a systematic process that examines the environmental, social and socio-economic consequences of development actions and ensures that these effects are taken into account during project design (Glasson et al, 2005). Effectiveness of Environmental Impact Assessment EIA can be an effective environmental management tool if it achieves three purposes: 1. assist the developer of a project 2. inform decision-making and 3. promote sustainable development (Glasson et al, 2005). As argued by Glasson et al (2005) EIA should be a means to good environmental (, social and socio-economic) management over the life of a project. Generally, it is agreed that EIA has led to improvements in the environmental (, social and socio-economic) management of development activities (Bailey, 1997; Glasson et al, 2005). However, the development of EIA practice has also been accompanied by a significant amount of literature that identifies numerous weaknesses: lack of consideration of cumulative impacts, insufficient public participation, little monitoring and auditing, limited influence on the decision making process, inadequate consideration of alternatives and the poor quality of environmental impact assessment reports have been highlighted as weaknesses of current practice (Glasson et al, 2005; Mokhehle & Diab, 2001; Wood, 2003). Project approach To achieve the objectives of the project a team of members of YoungProfsNet will carry out the review and collectively produce a report. Each EIA report will be reviewed independently by three members of the project team and the EIA reports will be assigned for review to members in such a way that each report will be reviewed by a different trio of team members. The team shall set SMART (Specific, Measurable, Achievable, Realistic and Time-based) targets for the execution of the project. These targets will set a timeline for the project work to meet the project objectives. The resulting report will be peer-reviewed by other YoungProfsNet members. The project report may be the basis for a formal publication. Review and evaluation  Review checklists A simple and effective review technique is to use a checklist with pre-defined questions. Checklists are useful to review the completeness of an EIA. There are several review checklists available internationally that can be used and adapted to meet the requirements of the project. An example is the review checklist used by the Southern African Institute for Environmental Assessment (SAIEA) that is subdivided into the following eight sections: 1. Methodology used in compiling the EIA report 2. Description of the project 3. Assessment of alternatives to the project
  • 3. 3 4. Description of the environment 5. Description of impacts (a description of the affected environment (baseline conditions) and an estimation and prediction of the main impacts) 6. Consideration of measures to mitigate impacts (necessary measures or environmental management plan identified, including follow up and monitoring arrangements and a specification of contingency plans and non-standard operating responses) 7. Non-technical summary  Evaluation criteria Each report will be reviewed separately and evaluated according to a number of criteria: 1. Readability 2. Clarity 3. Comprehensiveness 4. Appropriate use of maps, tables, figures, graphs and other illustrations 5. Readability and clarity of the non-technical summary for the general public 6. Public availability of other information/communication material for specific (groups of) stakeholders 7. Compliance with the National Environmental Management Act (107/1998): Environmental Impact Assessment Regulations, 2014 Reports meeting these seven criteria (and the SAIEA criteria) satisfactorily are judged to conform to good impact assessment practice. EIA reports meeting the additional review criteria, the IFC Performance Standards and conforming to ISO14000 would be judged to represent good international impact assessment practice. NEMA Environmental Impact Assessment Regulations 2014 1.1 Details of the EAP who prepared the report 1.2 Details of the expertise of the EAP, including a curriculum vitae 2 The location of the activity, including 2.1 the 21 digit Surveyor General code of each cadastral land parcel 2.2 where available, the physical address and farm name 2.3 here the required information in items 2.1 and 2.2 is not available, the coordinates of the boundary of the property or properties 3 A plan which locates the proposed activity or activities applied for as well as the associated structures and infrastructure at an appropriate scale, or, if it is 3.1 a linear activity, a description and coordinates of the corridor in which the proposed activity or activities is to be undertaken 3.2 on land where the property has not been defined, the coordinates within which the activity is to be undertaken 4 A description of the scope of the proposed activity, including 4.1 all listed and specified activities triggered and being applied for 4.2 a description of the associated structures and infrastructure related to the development 5 A description of the policy and legislative context within which the development is located and an explanation of how the proposed development complies with and responds to the legislation and policy context
  • 4. 4 6 A motivation for the need and desirability for the proposed development, including the need and desirability of the activity in the context of the preferred location 7 A motivation for the preferred development footprint within the approved site 8 A full description of the process followed to reach the proposed development footprint within the approved site, including 8.1 details of the development footprint alternatives considered 8.2 details of the public participation process undertaken in terms of regulation 41 of the Regulations, including copies of the supporting documents and inputs 8.3 a summary of the issues raised by interested and affected parties, and an indication of the manner in which the issues were incorporated, or the reasons for not including them 8.4 the environmental attributes associated with the development footprint alternatives focusing on the geographical, physical, biological, social, economic, heritage and cultural aspects 8.5 the environmental attributes associated with the development footprint alternatives focusing on the geographical, physical, biological, social, economic, heritage and cultural aspects 8.5.1 can be reversed 8.5.2 may cause irreplaceable loss of resources 8.5.3 can be avoided, managed or mitigated 8.6 the methodology used in determining and ranking the nature, significance, consequences, extent, duration and probability of potential environmental impacts and risks 8.7 positive and negative impacts that the proposed activity and alternatives will have on the environment and on the community that may be affected focusing on the geographical, physical, biological, social, economic, heritage and cultural aspects 8.8 the possible mitigation measures that could be applied and level of residual risk 8.9 if no alternative development locations for the activity were investigated, the motivation for not considering such 8.10 a concluding statement indicating the preferred alternative development location within the approved site 9 A full description of the process undertaken to identify, assess and rank the impacts the activity and associated structures and infrastructure will impose on the preferred location through the life of the activity, including 9.1 a description of all environmental issues and risks that were identified during the environmental impact assessment process 9.2 an assessment of the significance of each issue and risk and an indication of the extent to which the issue and risk could be avoided or addressed by the adoption of mitigation measures 10 an assessment of each identified potentially significant impact and risk, including 10.1 cumulative impacts 10.2 the nature, significance and consequences of the impact and risk; 10.3 the extent and duration of the impact and risk
  • 5. 5 10.4 the probability of the impact and risk occurring 10.5 the degree to which the impact and risk can be reversed 10.6 the degree to which the impact and risk may cause irreplaceable loss of resources 10.7 the degree to which the impact and risk can be mitigated 11 Where applicable, a summary of the findings and recommendations of any specialist report complying with Appendix 6 to these Regulations and an indication as to how these findings and recommendations have been included in the final assessment report 12 An environmental impact statement which contains 12.1 a summary of the key findings of the environmental impact assessment 12.2 a map at an appropriate scale which superimposes the proposed activity and its associated structures and infrastructure on the environmental sensitivities of the preferred site indicating any areas that should be avoided, including buffers 12.3 a summary of the positive and negative impacts and risks of the proposed activity and identified alternatives 13 Based on the assessment, and where applicable, recommendations from specialist reports, the recording of proposed impact management objectives, and the impact management outcomes for the development for inclusion in the EMPr as well as for inclusion as conditions of authorisation 14 The final proposed alternatives which respond to the impact management measures, avoidance, and mitigation measures identified through the assessment 15 Any aspects which were conditional to the findings of the assessment either by the EAP or specialist which are to be included as conditions of authorisation 16 A description of any assumptions, uncertainties and gaps in knowledge which relate to the assessment and mitigation measures proposed 17 A reasoned opinion as to whether the proposed activity should or should not be authorised, and if the opinion is that it should be authorised, any conditions that should be made in respect of that authorisation 18 Where the proposed activity does not include operational aspects, the period for which the environmental authorisation is required and the date on which the activity will be concluded and the post construction monitoring requirements finalised 19 An undertaking under oath or affirmation by the EAP in relation to 19.1 the correctness of the information provided in the reports 19.2 the inclusion of comments and inputs from stakeholders and interested and affected parties 19.3 the inclusion of inputs and recommendations from the specialist reports where relevant 19.4 any information provided by the EAP to interested and affected parties and any responses by the EAP to comments or inputs made by interested or affected parties 20 Where applicable, details of any financial provisions for the rehabilitation, closure, and ongoing post decommissioning management of negative environmental impacts 21 An indication of any deviation from the approved scoping report, including the plan of study, including
  • 6. 6 21.1 any deviation from the methodology used in determining the significance of potential environmental impacts and risks 21.2 a motivation for the deviation 22 Any specific information that may be required by the competent authority 23 Any other matters required in terms of section 24(4)(a) and (b) of the Act  Additional review criteria Each report will also be assessed by the following additional criteria: 1. Are project construction and operation assessed separately (and are separate environmental management plans for construction and operation presented) 2. Are normal and abnormal (maintenance, emergency situations) operations assessed 3. Are emergency control and recovery covered 4. Are cumulative and possible future impacts of project extension covered 5. Are abandonment and restoration addressed 6. Is the ‘post development’ (‘boom-bust’) situation following construction and at abandonment assessed ?  IFC Performance Standards While this may not be so relevant for filling station projects, external finance for project development (by development banks or commercial lenders) may require compliance with the IFC Performance Standards on Environmental and Social Sustainability (http://www.ifc.org/wps/wcm/connect/115482804a0255db96fbffd1a5d13d27/PS_English_2 012_Full-Document.pdf?MOD=AJPERES  ISO14000 (Environmental Management Standard) conformity There would be considerable merit if impact assessment reports would be compatible with ISO14000 (by including a regulatory, an aspects and an impacts register) and the environmental, social and health management plans for construction and operation would meet ISO14000 requirements.  Review and evaluation summary The quality review of the EIA report involves evaluating how well the assessment tasks have been performed (Lee & George, 2000). The elements of EIA review and the aspects considered will differ with the requirements that are in place in a particular country. Reviews must establish a set of quality criteria to be met as well as a minimum standard for achieving these (Pretorius, 2006). A review of the EIA report should not just be a matter of checking that required information is presented. It should also consider the quality and success of the entire EIA process (Jalava et al, 2010). When evaluating EIA report quality, meeting legal and regulatory requirements is paramount.
  • 7. 7 Review and evaluation rating An integrated checklist is given in Appendix 1. Checklist items will be rated as follows: Rating Description 3 Satisfactory or good 2 Needs to be improved 1 Unsatisfactory 0 Not applicable; not available for review; not relevant References and further reading GDACEL. (2001). EIA Administrative Guideline: Guideline for the Construction and Upgrade of Filling Stations and Associated Tank Installations. Johannesburg. Glasson, J., Therivel, R. & Chadwick, A. (2005). Introduction to Environmental Impact Assessment. 3rd Edition. London: Routledge. pp. 222-223. Government Notices R. 982 (2014). National Environmental Management Act (107/1998): Environmental Impact Assessment Regulations. Government Gazette Vol. 594 (No. 38282): 3-74. IEMA (2004). Guidelines for Environmental Impact Assessment, Lincoln: IEMA. IEMA (2011). The State of Environmental Impact Assessment Practice in the UK (Special Report), Lincoln: IEMA Jalava K., Pasanen S., Saalasti M. & Kuitunen M. (2010). Quality of Environmental Impact Assessment: Finnish EISs and the opinions of EIA professionals. Impact Assessment and Project Appraisal 28(1):15-27. Kruger, R. (2012). A critical analysis of the quality of EIA reports for filling stations in South Africa. MSc thesis, North-West University, Potchefstroom. Lawrence, D.P. (2003). Environmental Impact Assessment: Practical Solutions to Recurrent Problems. John Wiley & Sons: New Jersey. Lee, N. & George, C. (2000). Environmental Assessment in Developing and Transitional Countries. John Wiley & Sons Ltd: Chichester. Lee, N., Colley, R., Bonde, J. & Simpson, J. (1999). Reviewing the quality of environmental statements and environmental appraisals. Occasional Paper number 55, EIA Centre, Department of Planning and Landscape, University of Manchester, Manchester. Modak, P. & Biswas, A.K. (1999). Conducting Environmental Impact Assessment in Developing Countries. Tokyo: UN University Press. Mokhehle, L. & Diab, R. (2001). Evolution of environmental impact assessment in a small developing country: A review of Lesotho case studies from 1980 to 1999. Impact Assessment and Project Appraisal 19(1):9-18. Pretorius, H.M. (2006). The quality of environmental impact reports in the North-West province, South Africa. MSc thesis, North-West University, Potchefstroom. Warburton, C.L. (2014). Evaluating South African Environmental Impact Assessment (EIA) processes in the context of the Gautrain Project. LLM thesis, University of the Witwatersrand., Johannesburg. Wood, C. (2003). Environmental Impact Assessment in Developing Countries: An Overview. Retrieved from http://www.environment-integration.org/Download /D123/Wood.pdf
  • 8. 8 2 November 2015 Contact: Miss Thembie Ndlovu (YoungProfsNet project lead) email: omuhle.omuhle@gmail.com Maarten Smies (YoungProfsNet project mentor) email: ms@frogsinternational.com
  • 9. 9 Appendix 1. Integrated checklist of criteria for the review and evaluation of Environmental Impact Assessment reports on filling station projects in South Africa General criteria 1 Readability 2 Clarity 3 Comprehensiveness 4 Appropriate use of maps, tables, figures, graphs and other illustrations 5 Readability and clarity of the non-technical summary for the general public 6 Public availability of other information/communication material for specific (groups of) stakeholders Criteria Southern African Institute for Environmental Assessment (SAIEA) 1 Methodology used in compiling the EIA report 2 Description of the project 3 Assessment of alternatives to the project 4 Description of the environment 5 Description of impacts (a description of the affected environment (baseline conditions) and an estimation and prediction of the main impacts) 6 Consideration of measures to mitigate impacts (necessary measures or environmental management plan identified, including follow up and monitoring arrangements and a specification of contingency plans and non- standard operating responses) 7 Non-technical summary NEMA EIA Regulations (2014) 1.1 Details of the EAP who prepared the report 1.2 Details of the expertise of the EAP, including a curriculum vitae 2 The location of the activity, including 2.1 the 21 digit Surveyor General code of each cadastral land parcel 2.2 where available, the physical address and farm name 2.3 here the required information in items 2.1 and 2.2 is not available, the coordinates of the boundary of the property or properties 3 A plan which locates the proposed activity or activities applied for as well as the associated structures and infrastructure at an appropriate scale, or, if it is 3.1 a linear activity, a description and coordinates of the corridor in which the proposed activity or activities is to be undertaken 3.2 on land where the property has not been defined, the coordinates within which the activity is to be undertaken 4 A description of the scope of the proposed activity, including 4.1 all listed and specified activities triggered and being applied for 4.2 a description of the associated structures and infrastructure related to the development 5 A description of the policy and legislative context within which the development is located and an explanation of how the proposed development complies with and responds to the legislation and policy context
  • 10. 10 6 A motivation for the need and desirability for the proposed development, including the need and desirability of the activity in the context of the preferred location 7 A motivation for the preferred development footprint within the approved site 8 A full description of the process followed to reach the proposed development footprint within the approved site, including 8.1 details of the development footprint alternatives considered 8.2 details of the public participation process undertaken in terms of regulation 41 of the Regulations, including copies of the supporting documents and inputs 8.3 a summary of the issues raised by interested and affected parties, and an indication of the manner in which the issues were incorporated, or the reasons for not including them 8.4 the environmental attributes associated with the development footprint alternatives focusing on the geographical, physical, biological, social, economic, heritage and cultural aspects 8.5 the environmental attributes associated with the development footprint alternatives focusing on the geographical, physical, biological, social, economic, heritage and cultural aspects 8.5.1 can be reversed 8.5.2 may cause irreplaceable loss of resources 8.5.3 can be avoided, managed or mitigated 8.6 the methodology used in determining and ranking the nature, significance, consequences, extent, duration and probability of potential environmental impacts and risks 8.7 positive and negative impacts that the proposed activity and alternatives will have on the environment and on the community that may be affected focusing on the geographical, physical, biological, social, economic, heritage and cultural aspects 8.8 the possible mitigation measures that could be applied and level of residual risk 8.9 if no alternative development locations for the activity were investigated, the motivation for not considering such 8.10 a concluding statement indicating the preferred alternative development location within the approved site 9 A full description of the process undertaken to identify, assess and rank the impacts the activity and associated structures and infrastructure will impose on the preferred location through the life of the activity, including 9.1 a description of all environmental issues and risks that were identified during the environmental impact assessment process 9.2 an assessment of the significance of each issue and risk and an indication of the extent to which the issue and risk could be avoided or addressed by the adoption of mitigation measures 10 an assessment of each identified potentially significant impact and risk, including 10.1 cumulative impacts 10.2 the nature, significance and consequences of the impact and risk; 10.3 the extent and duration of the impact and risk
  • 11. 11 10.4 the probability of the impact and risk occurring 10.5 the degree to which the impact and risk can be reversed 10.6 the degree to which the impact and risk may cause irreplaceable loss of resources 10.7 the degree to which the impact and risk can be mitigated 11 Where applicable, a summary of the findings and recommendations of any specialist report complying with Appendix 6 to these Regulations and an indication as to how these findings and recommendations have been included in the final assessment report 12 An environmental impact statement which contains 12.1 a summary of the key findings of the environmental impact assessment 12.2 a map at an appropriate scale which superimposes the proposed activity and its associated structures and infrastructure on the environmental sensitivities of the preferred site indicating any areas that should be avoided, including buffers 12.3 a summary of the positive and negative impacts and risks of the proposed activity and identified alternatives 13 Based on the assessment, and where applicable, recommendations from specialist reports, the recording of proposed impact management objectives, and the impact management outcomes for the development for inclusion in the EMPr as well as for inclusion as conditions of authorisation 14 The final proposed alternatives which respond to the impact management measures, avoidance, and mitigation measures identified through the assessment 15 Any aspects which were conditional to the findings of the assessment either by the EAP or specialist which are to be included as conditions of authorisation 16 A description of any assumptions, uncertainties and gaps in knowledge which relate to the assessment and mitigation measures proposed 17 A reasoned opinion as to whether the proposed activity should or should not be authorised, and if the opinion is that it should be authorised, any conditions that should be made in respect of that authorisation 18 Where the proposed activity does not include operational aspects, the period for which the environmental authorisation is required and the date on which the activity will be concluded and the post construction monitoring requirements finalised 19 An undertaking under oath or affirmation by the EAP in relation to 19.1 the correctness of the information provided in the reports 19.2 the inclusion of comments and inputs from stakeholders and interested and affected parties 19.3 the inclusion of inputs and recommendations from the specialist reports where relevant 19.4 any information provided by the EAP to interested and affected parties and any responses by the EAP to comments or inputs made by interested or affected parties 20 Where applicable, details of any financial provisions for the rehabilitation, closure, and ongoing post decommissioning management of negative environmental impacts 21 An indication of any deviation from the approved scoping report, including the plan of study, including
  • 12. 12 21.1 any deviation from the methodology used in determining the significance of potential environmental impacts and risks 21.2 a motivation for the deviation 22 Any specific information that may be required by the competent authority 23 Any other matters required in terms of section 24(4)(a) and (b) of the Act GDACEL Gauteng guidelines for petrol stations 1 A 1:50 000 map and street map 2 Detailed site development plans; and must indicate the following: location of the site in relation and the distance of the tank(s) from council boundaries; lay-out of adjacent properties; current land use and zoning of the area; major roads, railways, open spaces; environmentally sensitive/significant features; places of social and cultural importance; seep lines, channels, dams, rivers and other water bodies; existing filling station within a 5 or 25 km radius (that which is applicable) 3 Description of the geology of the site with a description of the soil types in terms of compatibility 4 Detailed motivation on the need and desirability of the proposed development 5 Depth of the water table should be provided with a baseline reference of groundwater quality of the site and surrounding areas 6 The location of wells and boreholes on the site and neighbouring properties with an indication of the level of reliance of the neighbouring properties on ground water resources 7 A description of other environmental issues (eg socio-economic aspects related to the sense of place, visual impact, etc.) as a result of the construction, upgrade or the operation of the filling station 8 A description of the public participation process prescribed by the EIA regulation 9 Method of waste disposal from the premises. Details (quantity, quality and method) 10 Specific site design and recommendations for installation of underground tanks in relation to the receiving environment 11 If the proposed filling station will include a car wash, the following must be taken into account: manual vs. automated systems; water recycling practices; quantity and quality of the effluent discharged into the sewer must be determined in consultation with the relevant local authority 12 A comparative assessment (benefits vs. disadvantages) of alternatives, specifically location, land-use and the no-go option 13 In the case where there are existing filling stations in proximity, an assessment of the cumulative impacts on the environment, as a result of combined impacts from all filling stations in the applicable radius (5 or 25 km), must be undertaken: 13.1 the ability of the natural and social environment to assimilate cumulative stresses placed on them 13.2 the likelihood of negative synergistic effects 13.3 whether the proposed development has a significant impact on, or is constrained by existing or future development rights 13.4 the feed flow and anticipated traffic volume
  • 13. 13 13.5 a feasibility study which includes the information in item 4, but not entirely based upon it 13.6 the demand (necessity) and desirability of the proposed development; with an indication of the potential of the proposed filling station in terms of fulfilling the need of the targeted consumer 13.7 impact on the feasibility of existing filling stations; the no-go option as an alternative Additional review criteria 1 Are project construction and operation assessed separately 1.1 are separate environmental management plans for construction and operation presented 2 Are normal and abnormal (maintenance, emergency situations) operations assessed 3 Are emergency control and recovery covered 4 Are cumulative and possible future impacts of project extension covered 5 Are abandonment and restoration addressed 6 Is the 'post development' ('boom-bust') situation following construction and at abandonment assessed ISO14000 conformity Does the report contain a Regulatory register Does the report contain an Aspects register Does the report contain an Impacts register Is the environmental management plan ISO14000 compatible IFC Performance Standards on Environmental and Social Sustainability 1 Assessment and Management of Environmental and Social Risks and Impacts 1.1 Environmental and Social Assessment and Management System 1.2 Policy: environmental and social objectives and principles 1.3 Identification of environmental and social risks and impacts 1.4 Management Programme 1.5 Organizational Capacity and Competency 1.6 Emergency Preparedness and Response 1.7 Monitoring and Review 1.8 Stakeholder Engagement 1.9 External Communications and Grievance Mechanisms 1.10 Ongoing Reporting to Affected Communities 2 Labour and Working Conditions 2.1 Working Conditions and Management of Worker Relationship 2.2 Protecting the Work Force (child labour; forced labour) 2.3 Occupational Health and Safety 2.4 Workers Engaged by Third Parties 2.5 Supply Chain 3 Resource Efficiency and Pollution Prevention 3.1 Resource Efficiency (greenhouse gases; water consumption) 3.2 Pollution Prevention (wastes; hazardous materials management; pesticides use and management)
  • 14. 14 4 Community Health, Safety, and Security 4.1 Community Health and Safety 4.2 Security Personnel 5 Land Acquisition and Involuntary Resettlement 5.1 General: project design; compensation and benefits for displaced persons; community engagement; grievance mechanism; resettlement and livelihood restoration planning and implementation 5.2 Displacement: physical displacement; economic displacement 5.3 Private Sector Responsibilities Under Government-Managed Resettlement 6 Biodiversity Conservation and Sustainable Management of Living Natural Resources 6.1 General: impact assessment; avoidance of impacts on biodiversity and ecosystem services 6.2 Protection and Conservation of Biodiversity (modified habitat; natural habitat; critical habitat; legally protected and internationally recognized areas; invasive alien species) 6.3 Sustainable Management of Living Natural Resources 6.4 Supply Chain 7 Indigenous Peoples 7.1 General: avoidance of adverse impacts; participation and consent 7.2 Circumstances Requiring Free, Prior, and Informed Consent (impacts on lands and natural resources subject to traditional ownership or under customary use; relocation from those; critical cultural heritage) 7.3 Mitigation and Development Benefits 7.4 Private Sector Responsibilities Where Government is Responsible for Managing Indigenous Peoples Issues 8 Cultural Heritage 8.1 Protection of Cultural Heritage in Project Design and Execution (chance find procedures; consultation; community access; removal of (non-) replicable cultural heritage; critical cultural heritage) 8.2 Project’s Use of Cultural Heritage