Ce diaporama a bien été signalé.
Le téléchargement de votre SlideShare est en cours. ×

CV 160105 Paul Magee

Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Prochain SlideShare
Trevor Reece - CV 30.1.15
Trevor Reece - CV 30.1.15
Chargement dans…3
×

Consultez-les par la suite

1 sur 3 Publicité

Plus De Contenu Connexe

Similaire à CV 160105 Paul Magee (20)

Publicité

CV 160105 Paul Magee

  1. 1. CURRICULUM VITAE PAUL P. MAGEE B.Sc. CIVIL ENGINEERING 1 Name PAUL MAGEE Qualifications B.Sc. Civil Engineering IPMA Level D (International Project Management Association) CCNSG Safety Passport Holder BESC Temporary Works Coordinator HSG47(Avoidance of Danger from U’ground Services) Address 43 Beatty Avenue Tel 0191 2135908 Jesmond Mobile 07570775360 Newcastle-upon-Tyne NE2 3QN E-mail magee_paul@sky.com Profile: Highly experienced and qualified in many aspects of Civil Engineering in the UK and overseas in Electrical Transmission including HVDC, pharmaceutical, petrochemical, nuclear, water treatment, and demolition and building industries. Possessing a record of achieving quality whilst controlling costs with co- ordination of all main and subcontractor works. Key Skills include: Co-ordination and programming, quality control and supervision, quantity surveying and measurement, claims and contractual matters, meetings and liaisons, interim and final accounts, Health and Safety, CDM, Risk Assessments and Method Statements, compilation of contracts and specifications, structural surveys. Proficient in Autocad. Highly experienced in the construction of HVDC Convertors, substations, concrete structures (inc. water retaining), steel structures, concrete repairs & refurbishment, pharmaceuticals, piling, earthworks, roads, coastal protection, building and drainage. Proficient in M&E requirements. EMPLOYMENT HISTORY Dates January 2015- Present Client Bailey Gomm Ltd, MSD, Cramlington. Position Construction Manager Duties Construction Manager on the decommissioning of the Proscar pharmaceutical facility. Bailey Gomm are the principal contractor and there are three main subcontractors involved in the decommissioning works. Namely Tolent doing the Civil and Building Demolitions, Electron doing the electrical strip out and Abtek removing the Mechanical Equipment. All potentially contaminated demolition material has to be swabbed and certified clean before disposal. All persons entering the contaminated area must wear double Tyvek Suits, air hoods and and respirators Dates July 2014- January 2015 Client BT Bell Consulting Engineers Position Structural Engineer Duties Employed by BT Bell Consulting Engineers to carry out countrywide structural assessments of all the quarries and ready-mix plants belonging to Hope Construction Materials. Dates January 2012-July 2014 (at which time I was made redundant due to overcapacity on account of Siemens lack of orders) Employer Siemens Transmission and Distribution Position Civil Project Manager for Civil Works Phase 1 on Western Link Interconnector at Hunterston, North Ayrshire Duties I was responsible for the discharge of secondary planning conditions, through design development, tendering and delivery of the £35M Hunterston Civil work elements of the £1.1Billion HVDC Western Link between Hunterston in North Ayrshire and Flintshire Bridge in North Wales. This was the biggest contract that National Grid had ever let and was also the biggest contract that Siemens had ever undertaken.
  2. 2. CURRICULUM VITAE PAUL P. MAGEE B.Sc. CIVIL ENGINEERING 2 Briefly my job was to:- • Administer civil engineering sub-contracts to ensure delivery within time, cost and quality parameters. • Facilitate and oversee the production of accurate and concise civil documents for inclusion within Tender • To contribute to the overall design of projects such as to produce the best technical/economic solution • Manage the design process to ensure correctness and timely issue of construction drawings and documents. • Oversee preparation of tender documents for appointment of contractors. • Advise on appointment and manage the civil site supervisory personnel • Ensure the correct execution of the Project Health and Safety Plan • Monitor financial reporting in conjunction with commercial department. • Present a competent and professional front to clients, potential clients and contractors with regard to civil engineering matters. Dates July 2009-December 2011 Employer Siemens Transmission and Distribution Position Civil Project Manager Duties I was engaged three sister projects in Norwich. These are a 132KV GIS Building at Earlham 132KV Substation, a 132KV AIS at Norwich Main and the introduction of some 132KV HIS at Norwich Trowse. The total value of all three projects was £20M.The client was UK Power Networks (until recently EDF) and the contracts are being carried out under the NEC Contract. The quality was commended by the client and the projects were delivered on time and under budget. Dates September 2008-July 2009 Employer Siemens Transmission and Distribution Position Civil Project Manager Duties Civil Project Manager on the 33/132kV at Arecleoch (in South West Scotland) Wind Farm for Scottish Power Energy Networks. It was an AIS substation and comprised a Control Building and various equipment foundations. Dates April 2007 – August 2008 Client Nissan Motor Manufacturing UK Position Project Engineer Duties were to take projects from inception, through planning approval where necessary, formulation of client design, specification, and the health and safety plan, followed by the tendering process and finally construction. Principal projects included two warehouses of £4.75M and £1M value. In additional there were a multitude of minor projects. Responsible for liaising between the contractor and various operational departments within NM- UK in the ongoing design and drawing approval process. Duties included budgetary control, valuations and managing variations to the contract. Responsible for ensuring quality, safety and achievement of programme Dates June 2006 –March 2007 Client WSP Buildings Ltd Position Resident Engineer Duties Contracted by WSP to oversee the successful demolition of Westgate House in Newcastle upon Tyne. Westgate House was an eleven-story concrete framed building that bridged one of the principal thoroughfares in Newcastle. On account of its’ location the method of demolition had to be very closely controlled to avoid accidents, damage to adjacent listed buildings, and also traffic disruption.
  3. 3. CURRICULUM VITAE PAUL P. MAGEE B.Sc. CIVIL ENGINEERING 3 Dates Nov 2004 – May 2006 Client WA Fairhurst and Partners Position Supervisor Duties Contracted by WA Fairhurst to act as Supervisor, as defined under the ECC Contract, for Howdon Viaduct Refurbishment (£1.8M). Howdon Viaduct is a 200m long, 7 span wrought iron railway viaduct, built in the early 1800s. In 1981 it was strengthened and repainted immediately before the Metro opened, and this was its’ current functionat that time. The scope of works comprised metalwork repairs, the blasting and repainting of the entire structure, masonry repairs, and graffiti removal. All work was subject to Listed Building Consent. Method statements had to be submitted and approved by both WA Fairhurst and North Tyneside Council. Dates Nov 2001 - Oct 2005 Client WSP Ltd /LA Architects Position Resident Engineer / Architect’s Representative Duties Initially I was contracted by WSP as R.E overseeing the groundworks & superstructure of this £4.8M swimming pool. The pool was built as an extension to the Louisa Leisure Centre on the steeply sloping site of the former pit in Stanley, Co., Co. Durham. Works comprised concrete foundations & water retaining structures and steel frames on flight-augured piles. Latterly from Sept. 2002, I was hired by LA Architects fulfilling a follow-on role as Architect’s Site Representative for the remainder of the building & high quality finishing works including extensive tiled & non-hygroscopic wall finishes. May– Nov 2001 Alstom Transmission & Distribution Ltd Field Engineer Substation Dec – May 2001 WSP Ltd. Resident Engineer Land Reclamation March - Dec 2000 VA Tech Reyrolle Ltd. Site Manager Substation August 1997-March 2000 Bailey Gomm Project Management Project Manager Pharmaceuticals 1996-1997 Henry Boot Management Ltd. Civils Manager Durham Prison Conversion to Cat A 1995-1996 Mowlem Engineering Ltd. Civils Manager Chemical Plant 1994-1995 Henry Boot Management Ltd. Senior Engineer RVI Hospital, Newcastle 1989-1994 WSP (formerly RT James Ltd.) Resident Engineer Various 1989 Tilcon Ltd. Senior Engineer Lane rental 1988-1989 Miller Construction Senior Engineer Wolsington Bypass 1988 Balfour Beatty Ltd. Senior Engineer BMW Showroom 1987-1988 Shand Ltd. Senior Engineer Cargo Fleet Sewage Treatment Works 1986-1987 Norwest Holst Ltd. Senior Engineer Waste Vitrification Plant, Sellafield 1984-1986 Qatar General Petroleum Corp. Resident Engineer Halul Island Oil Terminal 1982-1984 Bechtel, Indonesia Field Engineer Pertamina Refinery, Balikpapan, Borneo 1981-1982 Technoconsult, Venezuela Field Engineer

×